Loading...
HomeMy WebLinkAboutRH2 East Side Booster Pump Amend 1ORIGINAL AMENDMENT NUMBER 1 TO PROFESSIONAL SERVICES AGREEMENT WHEREAS, the City and RH2 Engineering, Inc. entered into a Professional Services Agreement on September 2, 2014 to provide engineering services with respect to the East Side Booster Pump Station Upgrade project. NOW, THEREFORE, this agreement is amended to allow RH2 Engineering, Inc. to provide additional engineering services as described on Exhibits A, B and C. Scope of Work: Professional Services with respect to the preliminary design of a future Zone 2 reservoir and associated planning level cost estimate so it may be incorporated into the 2016-2021 Capital Improvement Project list. 2. Fee: The compensation for the work is based on a Time and Material Basis not to exceed the amount of $6,847. Time of performance: The services shall be complete for the project on or before December 31, 2015. Dated this 2 I� day of May, 2015. CITY OF PASCO: ATT ST: 0 Deb ie Clark, City Clerk CONSULTANT NAME: Paul A. Cross APPROVED AS TO FORM: Leland B. Kerr, City Attorney Amendment No. 1 to Professional Services Agreement — RH2 Engineering, Inc. Page I East Side Booster Pump Station Upgrade Project EXHIBIT A Scope of Work City of Pasco East Side Booster Pump Station Amendment No. 1 Storage Reservoir —10 -percent Design May 2015 Background In August 2014, the City of Pasco (City) selected RH2 Engineering, Inc., (RH2) to design improvements at the East Side Booster Pumping Station (ESBPS) to meet the current and projected demands in Zone 2 of the City's water system. As part of the 30- and 60 -percent design tasks in the original contract (Tasks 4 and 5), RH2 evaluated multiple projected demand scenarios for Zone 2 to determine the pumping capacity required at the ESBPS. During evaluation of these demand scenarios, RH2 identified a discrepancy between the supply capacity calculations in the City's 2010 Comprehensive Water System Plan (WSP) and the current Washington State Department of Health (DOH) Water System Design Manual. This discrepancy resulted in a required ESBPS capacity that is larger than identified in the WSP, and larger than assumed as part of the original ESBPS design contract. In March 2015, the City requested that RH2 evaluate scenarios to identify the required ESBPS capacities under multiple future demand scenarios with and without a new storage reservoir in Zone 2. Based on the results of RH2's future scenario evaluation, the City has requested that RH2 prepare a preliminary design and project cost estimate for two future Zone 2 storage reservoir locations. This Scope of Work is intended to include the work necessary to prepare a 10 -percent design and project cost estimate for a ground -level and elevated -storage reservoir in Zone 2 of the City's water system. Task 1— Storage Reservoir —10 -percent Design Objective: Determine the proposed reservoir capacity and prepare a preliminary site plan for the proposed reservoir locations. Approach: 1.1 Calculate the storage requirements of the future reservoir based on the minimum requirements presented in the DOH Water System Design Manual. 1.2 Prepare a technical memorandum to summarize the existing and future (20 -year) storage analyses calculations. 1.3 Prepare a preliminary (10 -percent design) site and utility plan that shows the proposed reservoir shell dimensions, minimum parcel dimensions, property setbacks, and major mechanical piping to connect the reservoir to the existing water system. 1.4 Prepare two (2) renderings, one (1) each of the ground -level and elevated -storage reservoirs, at a generic location within Zone 2 of the City's water system. 1 5/12/2015 2:05:05 PM \\�h2\dfs\Richland\Dara\PSC\714109\A-Pmj Man\A-1\PSA—S0R_Amnnd_N.. l_Ew Side Booue,Pump Sanon.d«. Exhibit A City of Pasco East Side Booster Pump Station Exhibit A — Scope of Work Storage Reservoir —10 -percent Design Amendment No. 1 1.5 Prepare a planning -level project cost estimate for each of the ground -level and elevated -storage reservoirs. Assumptions: • The preliminary site and utility plan wild be based on a generic parcel at an approximately appropriate elevation within Zone 2 of the City's water system. A parcebby parcel reservoir siting evaluation will not be performed • No hydraulic analyses will be performed to evaluate the ystem's conveyance capacity, potential areas of lydraulic limitations, turnover rater, or tank transmission main .ruing. • Structural, geological, stormwater, electrical, and control -related design elements will not be considered or shown in the preliminary site and utility plan for each reservoir. • Land acquisition costs will not be included in the planning -level cost estimate. RH2 Deliverables: One (1) 11 -inch by 17 -inch plan sheet for each of the ground -level and elevated -storage reservoirs showing the preliminary 10 -percent design site plan, utility plan, and rendering for each site. • Storage analyses technical memorandum, including reservoir storage calculations. 2 5/12/15 2:05 PM \\rh2\dit\Blchlv.d\Dau\PSC\714-109\A-Pmj Man\A-0\PSA SOW.Am .,_N.. 1_Ew Side B.w, N.p Snnon.docx 0 u n 0 r m c O w Y N Y w n n CL x E 7 0- W y aw N Z E o r m o m w 0 I_ a w E w m 0 rn cm w E Y W V w ¢ w i00 •iMlpl I00 00 ■YY Mt v�ytivm la.I la E E E .s E v N u ei ei'i ei e4 Exhibit B m - v- lwwa",nrsm�1 Is S� mm.,v.,os— Exhibit 0 EXHIBIT C RH2 ENGINEERING, INC. SCHEDULE OF RATES AND CHARGES 2015 HOURLY RATES CLASSIFICATION RATE CLASSIFICATION RATE Professional 1X$20_1.00 Technician IV $132.00 Professional _ Vlll $201.00 Technician III $124.00_ Professional VII $192.00 Technician II $93.00 Technician I $86.00 Professional VI $181.00 Professional V $171.00 Administrative V $125.0_0 Professional IV $163.00 Administrative IV $102.00 Administrative 111 $87.00_ Professional III $150.00 Administrative 11 $73.00 Professional 11 $142.00 Administrative I $63_00 Professional 1 $133.00 IN-HOUSE SERVICES In-house copies (each) 8.5" X 1 V __$0.09 _ CAD Plots Large_ $2540 In-house copies (each) 8.5" X 14" _$0_14 _ CAD Plots Full Size _ $10_00 In-house copies (each) 11" X 17" CAD Plots Half Size $2.50 In-house copies (color) (each) __$020 _ 8.5" X 1 V $0.90- CAD System Per How $27.50 in-house copies (color) (each) 8.5' X 14" _ $1.20 GIS System Per Hmrt $27.50 In-house copies (color) (each) I 1 X 17" - 52__00 Technology Charge _ _ 2.5% of Direct Labor Mileage Current IRS Rate OUTSIDE SERVICES Outside direct costs for perrait fees, reports, maps, data, reprographics, couriers, postage, and non -mileage related travel expenses that are necessary for the execution of the project and are not specifically identified elsewhere in the contract will be invoiced at cost. All Subconsultant services are billed M cost plus 15%. CHANGES IN RATES Rates listed here are adjusted annually. The current schedule of rates and charges is used for billing purposes. Payment for work accomplished shall be based on the hourly rates and expenses in effect at the time of billing as stated in this Exhibit. m - v- lwwa",nrsm�1 Is S� mm.,v.,os— Exhibit 0