HomeMy WebLinkAboutMoreno & Nelson Memorial Park Upgrades C5-PK-8R-14-01CITY OF PASCO
PUBLIC WORKS DEPARTMENT
CONTRACT CHANGE ORDER NO. 1
Project No: C5 -PK -8R-14-01 Project Title: Memorial Park Upgrades
Contractor: Moreno & Nelson Construction Corp.
Description of Change: Installation of removable bollards
Detail as Appropriate: See Attached Memo
Contract Bid Amount: $ 98,071.69
SALES TAX @ 8.6%: $ 8,434.17
Total: $ 106,505.86
PREVIOUS CHANGE ORDER
CURRENT CHANGE ORDER
Subtotal
Subtotal $ 1,488.95
Sales tax @ 8.6% $
Sales tax @ 8.6% $ 128.05
Total $
Total $ 1,617.00
Total Change Orders To Date $ 1,617.00
New Contract Amount
IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER
Contract Time Prior to this Change Order (Working Days) ............................
Modification to Contract time by this Change Order ....................
Revised Total Contract Time ....................................................
$ 108,122.86
YES NO
20
It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being
made and that the compensation for this Change Order is full and complete and is the only compensation
due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the
present Contract Documents and that the provisions of the previously executed Contract Documents shall
apply to this Change Order.
AGREED TO D ACCEPTED:
tr " s
TRACTOR Date
APPROVED:
CONSTRUCTION MANAGER Date
Z7YPP
4'1 /�-
PR ECT MANAGER Date
0�
Memo
•
Engineering
TO: Kent McCue, Construction Manager
Rick Terway, Administrative & Community Services Director
FROM: David Tanner, Senior Civil Engineer
DATE: March 16, 2015
RE: Memorial Park Upgrades - Change Order 1
Removable Bollards
Please review and approve the attached change order, and supporting documentation
for installation of removable bollards at two ends of the proposed pedestrian path. The
estimate for this work was prepared at our request, and was not included in the original
contract documents.
The original submitted cost was $3,732.87. After Dan Dotta researched materials and
recommended some bollards that were available at a more reasonable price, total costs
incurred are $1,488.95 as shown on the attached documentation.
Staff recommends approving this change order for $1,488.95 plus tax, and the addition
of 1 contract day as requested.
0 Page 1
CITY OF PASCO
PUBLIC WORKS DEPARTMENT
CONTRACT CHANGE ORDER NO. 2
Project No: C5 -PK -8R-14-01 Project Title: Memorial Park Upgrades
Contractor: Moreno & Nelson Construction Corp.
Description of Change: Additional HMA Path
Detail as Appropriate: See Attached Memo
Contract Bid Amount:
SALES TAX @ 8.6%:
Total:
$
98,071.69
$
8,434.17
$
106,505.86
PREVIOUS CHANGE ORDER
CURRENT CHANGE ORDER
Subtotal $
1,488.95
Subtotal $ 400.00
Sales tax @ 8.6% $
128.05
Sales tax @ 8.6% $ 34.40
Total $
1,617.00
Total $ 434.40
Total Change Orders To Date $ 2,051.40
New Contract Amount $ 108,557.26
IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER YES NO
Contract Time Prior to this Change Order (Working Days) .............................. 21
Modification to Contract time by this Change Order .................... 1
Revised Total Contract Time .................................................... 22
It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being
made and that the compensation for this Change Order is full and complete and is the only compensation
due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the
present Contract Documents and that the provisions of the previously executed Contract Documents shall
apply to this Change Order.
AGREED TO AN CCEPTED:
C CTOR Date
APPROVED:
—bttA ►11dla
CONSTRUCTION MANAGER Date
AP
n irrT nnoninr Fo n.,«e
Memo
1. ' • _l
Engineering
TO: Kent McCue, Construction Manager
Rick Terway, Administrative & Community Services Director
FROM: David Tanner, Senior Civil Engineer
DATE: March 20, 2015
RE: Memorial Park Upgrades- Change Order 2
Additional HMA Path
Please review and approve the attached change order, and supporting documentation
for excavation of additional HMA path. The City requested a price from the contractor to
add a bypass pathway around an existing picnic shelter. Existing unit prices for asphalt,
sod, and rock will be used to pay the excess quantity for materials. This change order
will pay for the excavation only. The estimate for this work was prepared at our request,
and was not included in the original contract documents. The total cost for this work was
$400.
Staff recommends approving this change order for $400 plus tax, and the addition of 1
contract day as requested.
0 Page 1
CITY OF PASCO
PUBLIC WORKS DEPARTMENT
CONTRACT CHANGE ORDER NO. 3
Project No: C5 -PK -8R-14-01 Project Title: Memorial Park Upgrades
Contractor: Moreno & Nelson Construction Corp.
Description of Change: Additional HMA Path
Detail as Appropriate: See Attached Memo
Contract Bid Amount: $ 98,071.69
SALES TAX @ 8.6%: $ 8,434.17
Total: $ 106,505.86
PREVIOUS CHANGE ORDER
CURRENT CHANGE ORDER
Subtotal $ 1,888.95
Subtotal $ 1,979.24
Sales tax @ 8.6% $ 162.45
Sales tax @ 8.6% $ 170.21
Total $ 2,051.40
Total $ 2,149.45
Total Change Orders To Date $ 4,200.85
New Contract Amount $ 110,706.71
IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER
YES NO
Contract Time Prior to this Change Order (Working Days) .............................. 22
Modification to Contract time by this Change Order .................... 1
Revised Total Contract Time .................................................... 23
It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being
made and that the compensation for this Change Order is full and complete and is the only compensation
due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the
present Contract Documents and that the provisions of the previously executed Contract Documents shall
apply to this Change Order.
AGREED ACCEPTED:
Cql RACTOR Date
APPROVED:
����1 LA 0411
CONS'FRUCT�NAMR ^ Date
APP
M��:7
�1&-
PROJECT MANAGER Date
APPROVED:
PUBYC WORKS Date
DIRECTOR I
Memo
in • .1
Engineering
TO: Kent McCue, Construction Manager
Rick Terway, Administrative & Community Services Director
FROM: David Tanner, Senior Civil Engineer
DATE: March 20, 2015
RE: Memorial Park Upgrades- Change Order 3
Additional Electrical Work
Please review and approve the attached change order, and supporting documentation
for additional electrical work. The original electrical plans, prepared by Meier
Architecture and Engineering, assumed we could use the existing feed to the picnic
shelter. The existing feed was discovered to be a direct feed from Franklin County PUD
with no disconnect. Rather than add another meter and disconnect, the city elected to
trench power from an existing box located nearby. The estimate for this work was
prepared at our request, and was not included in the original contract documents. The
total cost for this work was $1,979.24.
Staff recommends approving this change order for $1,979.24 plus tax, and the addition
of 1 contract day as requested.
0 Page 1
CITY OF PASCO
PUBLIC WORKS DEPARTMENT
CONTRACT CHANGE ORDER NO. 4
Project No: C5 -PK -8R-14-01 Project Title: Memorial Park Upgrades
Contractor: Moreno & Nelson Construction Corp.
Description of Change: Column Repair and Retrofit
Detail as Appropriate: See Attached Memo
Contract Bid Amount: $ 98,071.69
SALES TAX @ 8.6%: $ 8,434.17
Total: $ 106,505.86
PREVIOUS CHANGE ORDER
CURRENT CHANGE ORDER
Subtotal $
3,868.19
Subtotal $
6,673.27
Sales tax @ 8.6% $
332.66
Sales tax @ 8.6% $
573.90
Total F
4,200.85
Total
7,247.17
Total Change Orders To Date $ 11,448.02
New Contract Amount $ 117,953.88
IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER
YES NO
Contract Time Prior to this Change Order (Working Days) .............................. 23
Modification to Contract time by this Change Order .................... 4
Revised Total Contract Time .................................................... 27
made and that the compensation for this Change Order is full and complete and is the only compensation
due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the
present Contract Documents and that the provisions of the previously executed Contract Documents shall
apply to this Change Order.
AGREED TO AND ACCEPTED: APP QVED:
CONTRACTOR Dale PI ANAGER ale
APPROVED:
/ts
C NSTRUCTION MANAGER Date
A PRO
P<( LIC O
DIRECTOR
Memo
IN
l.' •.1
Engineering
TO: Kent McCue, Construction Manager
Rick Tenvay, Administrative & Community Services Director
FROM: David Tanner, Civil Engineer
DATE: May 4, 2015
RE: Memorial Park Upgrades- Change Order 4
Column Repair and Retrofit
Please review and approve the attached change order, and supporting documentation
to repair and retrofit the existing columns of the picnic shelter at Memorial Park. Rot was
found in the existing columns once the walls were removed. The original structural
plans, prepared by Meier Architecture and Engineering, did not anticipate the rot, and a
modified design was obtained to address the proposed repair and retrofit. This
additional work was completed at our direction, and the costs submitted are reasonable
for the amount of additional work performed. The total cost submitted for this work was
$6,673.27.
Staff recommends approving this change order for $6,673.27 plus tax, and the addition
of 4 contract days as requested.
0 Page 1
CITY OF PASCO
PUBLIC WORKS DEPARTMENT
CONTRACT CHANGE ORDER NO. 5
Project No: C5 -PK -8R-14-01 Project Title: Memorial Park Upgrades
Contractor: Moreno & Nelson Construction Corp.
Description of Change: Replace Roof Sheathing
Detail as Appropriate: See Attached Memo
Contract Bid Amount: $ 98,071.69
SALES TAX @ 8.6%: $ 8,434.17
Total: $ 106,505.86
Total Change Orders To Date $ 11,991.03
New Contract Amount $ 118,496.89
IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER YES NO
Contract Time Prior to this Change Order (Working Days) .............................. 27
Modification to Contract time by this Change Order... ................. 1
Revised Total Contract Time .................................................... 28
It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being
made and that the compensation for this Change Order is full and complete and is the only compensation
due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the
present Contract Documents and that the provisions of the previously executed Contract Documents shall
apply to this Change Order.
AGREED TO AND ACCEPTED: APP OVED:
` S 6.2oiS \
83MAC=T01R Dale PROJECT MANAGER Dale
APPROVED:
C TRUC ION MANAGER Dater
APPR VED:
PUBLI S - Date b
DIRECTQ
PREVIOUS CHANGE ORDER
CURRENT CHANGE ORDER
Subtotal $ 10,541.46
Sales tax @ 8.6% $ 906.57
Total $ 11,448.03
Subtotal $ 500.00
Sales tax @ 8.6% $ 43.00
Total $ 543.00
Total Change Orders To Date $ 11,991.03
New Contract Amount $ 118,496.89
IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER YES NO
Contract Time Prior to this Change Order (Working Days) .............................. 27
Modification to Contract time by this Change Order... ................. 1
Revised Total Contract Time .................................................... 28
It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being
made and that the compensation for this Change Order is full and complete and is the only compensation
due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the
present Contract Documents and that the provisions of the previously executed Contract Documents shall
apply to this Change Order.
AGREED TO AND ACCEPTED: APP OVED:
` S 6.2oiS \
83MAC=T01R Dale PROJECT MANAGER Dale
APPROVED:
C TRUC ION MANAGER Dater
APPR VED:
PUBLI S - Date b
DIRECTQ
Memo
1. • • .l
Engineering
TO: Kent McCue, Construction Manager
Rick Terway, Administrative & Community Services Director
FROM: David Tanner, Civil Engineer
DATE: May 4, 2015
RE: Memorial Park Upgrades- Change Order 5
Replace Roof Sheathing
Please review and approve the attached change order, and supporting documentation
to replace 5 sheets of water damaged plywood sheathing on the roof of the picnic
shelter. This additional work was not anticipated in the original design, and was
completed at our direction. No mark-up was requested by the general contractor for this
work. The costs submitted are reasonable for the amount of additional work performed.
The total cost submitted for this work was $500.
Staff recommends approving this change order for $500 plus tax.
0 Page 1
CITY OF PASCO
PUBLIC WORKS DEPARTMENT
CONTRACT CHANGE ORDER NO. 6
Project No: C5 -PK -8R-14-01 Project Title: Memorial Park Upgrades
Contractor: Moreno & Nelson Construction Corp.
Description of Change: Final reconciliation for overages and deductions for final progress payment.
Detail as Appropriate: See Attached Memo
Contract Bid Amount: $ 98,071.69
SALES TAX @ 8.6%: $ 8,434.17
Total: $ 106,505.86
PREVIOUS CHANGE ORDER
CURRENT CHANGE ORDER
Subtotal $ 11,041.46
Subtotal $ 2,988.20
Sales tax @ 8.6% $ 949.57
Sales tax @ 8.6% $ 256.99
Total S 11,991.03
Total $ 3,245.19
Total Change Orders To Date $ 15,236.22
New Contract Amount $ 121,742.08
IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER YES NO
Contract Time Prior to this Change Order (Working Days) .............................. 27
Modification to Contract time by this Change Order .................... 1
Revised Total Contract Time .................................................... 28
It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being
made and that the compensation for this Change Order is full and complete and is the only compensation
due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the
present Contract Documents and that the provisions of the previously executed Contract Documents shall
apply to this Change Order.
AGREED TO AND ACCEPTED:
`_-q S•6•zot5'
CONTRACTOR Date
APPROVED:
CONSTRUCTION MANAGER Date
APPROVED:
PROJECT MANAGER Date
AP ROV
tl IS
PUB IC e O K. Da
DIR TOR
Memo
Public Works Department
To: File Engineering Division
From: David Tanner, Civil Engineer
Date: 05/06/2015
Re: Memorial Paris Upgrades— Final Engineer's Report
Bid Item Changes in Quantity
• Base Bid Picnic Shelter, Item 4 — The sidewalk was removed and replaced at the
southwest connection point of the trail to address ADA issues. Total quantities for this
overage were as measured in the field. After negotiation with the contractor, it was
agreed that this work would be paid out of the bid item for Cement Concrete Transition
Pad. Actual measured quantity for this bid item was 30 SY, while the estimated quantity
was 18 SY for a total overage of $752.28.
• Alternate #1 — Pathway 1, Item 4 — This overage is for crushed surfacing, installed under
additional pathway, as measured in the field. Actual measured quantity for this bid item
was 239.7 SY, while the estimated quantity was 230 SY for a total overage of $166.26.
• Alternate #1 — Pathway 1, Item 5 — This overage is for HMA for additional pathway, as
measured in the field. Actual measured quantity for this bid item was 239.7 SY, while the
estimated quantity was 230 SY for a total overage of $279.26.
• Alternate #2 — Pathway 2, Item 4 — This overage is for crushed surfacing, installed under
additional pathway, as measured in the field. Additional pathway for this bid item
includes a 5'x35' section requested by parks staff during the walk through following the
preconstruction meeting. Actual measured quantity for this bid item was 325 SY, while
the estimated quantity was 300 SY for a total overage of $364.75.
• Alternate #2 — Pathway 2, Item 5 — This overage is for HMA for additional pathway, as
measured in the field. Additional pathway for this bid item includes a 5'x35' section
requested by parks staff during the walk through following the preconstruction meeting.
Actual measured quantity for this bid item was 325 SY, while the estimated quantity was
300 SY for a total overage of $560.50.
• Alternate #3 — Pathway 3, Item 3 — Final quantity for this bid item was based on actual
quantities installed under the pedestrian pathway, as measured in the field. Actual
measured quantity for this bid item was 18.6 SY, while the estimated quantity was 20 SY
for a total savings of $26.87.
• Alternate #3 — Pathway 3, Item 4 — This overage is for HMA for asphalt patching, as
measured in the field, and includes necessary patching for the asphalt transition into the
newly installed sidewalk at the southwest connection point of the trail and patching
infront of the newly installed ADA ramp at the east connection point.. Actual measured
quantity for this bid item was 33.6 SY, while the estimated quantity was 20 SY for a total
overage of $892.02.
0 Page 1
Change Orders
Change Order 1, Bollards: This work is for the installation of 4 removable bollards (2 at
the east and 2 at the southwest connection points of the pathway) which were requested
by parks staff during the preconstruction meeting. The original bid price for this work was
for $3,732.87. However, the contractor agreed to install bollards researched and
recommended by the Facilities Manager for a final cost of $1,488.95 plus tax.
Change Order 2, Excavation for Additional Pathway: This work is for additional excavation
necessary to install the 5'x35' section of pathway requested by parks staff during the walk
through following the preconstruction meeting. The total added cost for this bid item is
$400 plus tax.
Change Order 3, Additional Electrical Work: The original electrical plans, prepared by
Meier Architecture and Engineering, assumed we could use the existing feed to the picnic
shelter. The existing feed was discovered to be a direct feed from Franklin County PUD
with no disconnect. Rather than add another meter and disconnect, the city elected to
trench power from an existing box located nearby. This work was completed at the City's
request, and was not included in the original contract documents. The total cost for this
work was $1,979.24 plus tax.
Change Order #4, Column Repair and Retrofit: Rot was found in the existing columns
once the walls were removed. The original structural plans, prepared by Meier
Architecture and Engineering, did not anticipate the rot, and a modified design was
obtained to address the proposed repair and retrofit. This additional work was completed
at the City's request. The total cost this work was $6,673.27 plus tax.
Change Order #5, Replace Roof Sheathing: This change order was to replace 5 sheets of
water damaged plywood sheathing on the roof of the picnic shelter. This additional work
was not anticipated in the original design, and was completed at our direction. No mark-
up was requested by the general contractor for this work. The total cost for this work was
$500 plus tax.
0 Page 2