HomeMy WebLinkAbout1286 ResolutionRESOLUTION NO. 1286
A RESOLUTION conditionally approving the preliminary plat of Dani's
Subdivision and setting forth the specific conditions
underwhich a final plat of Dani's Subdivision may be
prepared.
WHEREAS, an application for preliminary plat was filed by E.A.
White, owner, on July 5, 1979, said application being assigned Planning
Division Master File No. 79 -24 -PP, Dani's Subdivision; and
WHEREAS, the city's Planning Commission conducted a public hearing
on August 16, 1979, due notice of which was properly given, and issued
its recommendation that the preliminary plat be conditionally approved;
and
WHEREAS, the City Council conducted a public hearing on September
17, 1979, due notice.of which was properly given, in of
the city's Planning Commission's recommendations; and
WHEREAS, the City Council deems the preliminary plat of Dani's
Subdivision to be in the public interest and, if properly conditioned,
makes adequate provision for the population to be generated thereby;
NOW, THEREFORE.,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO:
That the preliminary plat of Dani's Subdivision hereby is
conditionally approved and the applicant ray cause to be prepared a
final plat to conform, and in addition to all other applicable
regulations and requirements, with the following specific conditions:
1: That no construction commence until applicable engineering
design documents have been submitted and approved by the city engineer;
2. That all lots within the subdivision be served by the City of
Pasco sanitary sewer and water service;
3. That both Park Street (as a half roadway) and 25th Place ( a
cul-de-sac) be improved to city standards, which include a paved
roadway, installation of curb and gutter, storm drain system as required,
and street lights;
4. All improvements shall be designed and constructed in accordance
with the design criteria identified by the City Engineer, a copy of
which is attached hereto and incorporated as Exhibit "A";
5. The final plat shall reflect easements as required by the
servicing utilities.
6. All electric/communication services within the subdivision shall
be installed underground.
--2-
PASSED by the City Council of the City of Pasco this 17th day of
September 1 1979.
Chet Bailie, Mayor
ATTEST:
i
Evelyn s, teity Clerk
APP OVED AS TO FOS►:
Dennis J. De Fe ice, ity Attorney
REQUIRED Ib1PROVE1=S, DESIGN STANDARDS/CRITERIA AND PROCEDURES FOR SUBDIVISIONS
WITHIN THE R-2 ZONE
the City of Pasco is in the process of establishing and/or documenting and ccupiling
improvement standards, design, criteria, process, and procedure requirements
for subdivision and development improvements including water, sewer, street,
and storm drain systems, which must be met if upon completion of construction
the City of Pasco is to accept the facilities for maintenance and operation.
To this end, the following represents a partial completion of standards, criteria,
procedures, etc. Although not complete, this information will.be of value to
developers, engineers, and contractors.
The City of Pasco does, however, acknowledge and declare that no standard or
criteria.can properly address each and every situation. Accordingly, the city
does encourage and expect that in a untypical situation, engineering knowledge
and principles and good construction practice be applied to produce a proper
result given the situation be that.solution more or less demanding ($) that the
standard or criteria.
ENGINEERING DOCUMENTS - Plans and profiles shall be sutnd tted on mylar sheets
indicating all water, sewer., street and storm drain
systems and appurtenance. Sheets to be 34 to.36 inches
by 22 to 24 inches.
Plan Scale: 1 inch = 40 feet
Profile Scale: Horizontal 1 inch - 40 feet - vertical as necessary to depict
intent.
Calculations: Shall be made available if requested
PREMiSTURCTION CONFERENCE - After complete design approval and prior to construction
a Precdnstruction Conference must be scheduled with
the owner or his authorized representative, his
engineer/surveyor and contractor in attendance.
DESIGN STANDARDS/CRITERIA
Streets: Local Access
. Width 36 feet asphalt
. 1/2 width 20 feet asphalt
. Cul de sac 39.5 foot asphalt radius
2 inch A.C.P. Class B
. 4 inch 3/4 minus rock base
. Right-of-way 60 feet, 1/2 right-of-way 30 feet
. Right-of-way cul de sac bulb 50 radius
Cross scope .025 feet per foot
. Curb & gutter required - City of Pasco standard drawing
..Street lights - P.U.D. owned - See P.U.D. for construction
and acceptance information - underground wired, direct bury steel
pole Valmont No. (EM'50-8.OA319-6S) - to be installed at all
intersections - maximum spacing 330 feet
Street grades maximum 8.0% minimum 0.20%
Monuments - APWA type "B" standard plan No. 21
-at all intersections of centerline right-of-way and PI's
if in roadway otherwise P.C. & P.T.
Storm Drain System:
Closed pipe system to be installed as necessary to carry runoff
from 5 -year storm - ref WSDOT hydraulics manual for storm note
at tc=60 min i = aprox. .5 inch
In cases where storm drain system cannot outfall or connect
to other storm drains manholes shall be modified to serve tem-
porily as drywells.
Pipe - helically coiled aluminum - minimum size 10 inch
. Manholes APWA.plan no. 34 type 48 or no. 37 type 3-48
Catch basins see City of Pasco standard plan
Location - 7 feet N or W of centerline right-of-way except where temporary
drywells involved then 27 feet N or W
Water System:
. All lots must be served by city water and where available
suplemented'with separate irrigation system for lawn watering
. Pipe - Class 50 ductile iron cement lined - with valves 10 inch
and smaller, mechanical joint gate - 12 inch and larger mechanical
joint gate or. butterfly
. Fire Hydrants - 3 port waterous pacer or mueller centerion - 4 foot
bury = see City of Pasco standard detail for hydrant and valve
Number flow capability andilocation per Pasco Fire Department
2000 to 3000 gpm in R-2 zone (general)
. Trust blocking - See City of Pasco standard detail
. Minimum Line Size 6" - maximum velocity 5 feet per second without
fire flow -' 8 feet per second with fire flow, higher allowed where
probable future looping will reduce velocity to 8 -1 gal per 1000
sq. ft. without fire.
Valve Locations - on projection of property lines across right-
of-way at intersection - valve all but one leg of crosses and.tees.
on projections at intersections.- max valve spacing 660 feet on line
less than 12 inch in diameter.
. Line Locations - 15 feet north or west of centerline right-of-way
. Services - must be stubbed to at least property line.
-2-
Sanitary Sewer:
. All lots must be served by city sanitary sewer
Pipe - pvc, ASTMD3034 SDR35 or ABS composite ASPM D2680, type
SC joints 8 inch minimum
. Sizing criteria - R-2 zone - 100 gpcpd
- peaking factor -3.0
- 1 person per 1000 sq. ft. land
- manning n per manufactor but not less than .010
. Minimum slope - 8
inch
0.40
ft/foot
10
inch
0.28
ft/foot
12
inch
0.22
ft/foot
15
inch
0.15
ft/foot
. Manholes - APVa Standard plan No. 34 type 1-48 or
Standard . plan ' no. 37 type 3-48
- maxis= spacing 330 feet
-end with manhole
- standard depth 8 feet - city map required greater
depth at developer expense to facilitate extension
. Lines straight line and grade between manholes
Laterals stubbed at least to property lines - 10 feet uphill
from lower front lot corner
. Line location - 1 feet south or east of centerline right-of-way
CONSTRUCTION INSPECTION
. The City of Pasco shall be provided notice and opportunity to
make the following inspections, tests, and oks, they are
specifically listed because they for the most part are timely
and/or legally mandated. The city at its discretion may make
other observations inspections and tests as deemed appropriate.
. Adequate construction staking must be present to allow the
city inspector to easily determine that the contractor has or
has not constructed the item or placed a material in the intended
location which must correspond -to approve engineering documents.
• The City Inspector's approval shall not relieve the developer
from his obligation to construct improvements in accordance
with approved plans, profiles, and specifications.
Streets:
. Subgrade prior to placement of rock, prior authorization is required
Subsequent to placement of rock prior to placement of asphalt,
prior authorization is required to pave required.
. During paving operation
Storn Drain:
. After placement of pipe prior to backfill in trench
-3-
Water lines - After placement of pipe prior to backfill of trench
- all trust blocks
- pressure test
purity test
. Sanitary sewer- After placement of pipe prior to backfill
- lamping or equivalent
- pressure test
-4-