HomeMy WebLinkAbout1075 Resolution1075 RESOLUTION NO. A RESOLU'T'ION OF THE CITY OF PASCO PROVIDING FOR DEVELOPMENT OF A UTILITY BILLING SYSTEM WHEREAS, the Cities of Pasco and Richland have thoroughly considered independent utility billing systems and joint utility billing systems, and WHEREAS, the City of Pasco finds it in the City's best interests to enter into an agreement with the City of Richland for development of a joint utility billing system, now, therefore, IT IS HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO as follows: Section 1. The City Council hereby authorizes and directs the the City Manager to enter into an agreement with the City of Richland to develop a joint utility billing system. Section 2. The terms of said agreement shall be those contained in the letter attached to this resolution and by this reference incorporated herein, dated March 2, 1977, from the City of.Richland. Section 3. The total cost to the City of Pasco shall not exceed $7,157.00 unless additional authorization is obtained from this Council. Section 4. This resolution shall become effective upon its passage. r PASSED this 15 day of march, 1977. V � , Jan rick, Mayor Attest:. City Clerk Approved as to form: C;a2trEioctk T. Roach, City Attorney I sivaLah, �1L�J' CITY OF RICHLAND, WASHING -ION Community Services/Personnel March 2, 1977 Mr. __eo Olney Finance Director City of.Pasco 412 West Clark Pasco, Washington 99301 P RE: UTILITY BILLING SYSTEM DEVELOPMENT Dear Mr. Olney: This letter is to formalize our understanding of services to be provided to Pasco by Richland and our consultant, Compass Management Group, in developing a Joint Utility Billing System. All services and costs are in accordance with the (1) Joint Data Processing Agreement dated January 3, 1977 and (2) the Compass proposal dated February 23, 1977. 1. The system will be developed for use by both cities and considering the needs of both cities equally. Our consultant and Data Processing Supervisor will work directly with you during system design and during implementation to ensure that the system meets your needs. 2. Costs for developing the system will be split between the two cities on the basis of usage. Pasco will pay 25% of total development costs as specified on pages 12, 13 and 14 of the Compass proposal. Total cost to -Pasco Will not exceed $7,157 unless additional specific written authorization is obtained. 3. Development costs including consultant services staff time and equipment usage will be invoiced to Pasco by Richland on a monthly basis as cost is incurred. 505 SWIFT BOULEVARD BOX 190 RICHLAND, WASHINGTON 99352 509-943.9161 r. sivaLah, �1L�J' CITY OF RICHLAND, WASHING -ION Community Services/Personnel March 2, 1977 Mr. __eo Olney Finance Director City of.Pasco 412 West Clark Pasco, Washington 99301 P RE: UTILITY BILLING SYSTEM DEVELOPMENT Dear Mr. Olney: This letter is to formalize our understanding of services to be provided to Pasco by Richland and our consultant, Compass Management Group, in developing a Joint Utility Billing System. All services and costs are in accordance with the (1) Joint Data Processing Agreement dated January 3, 1977 and (2) the Compass proposal dated February 23, 1977. 1. The system will be developed for use by both cities and considering the needs of both cities equally. Our consultant and Data Processing Supervisor will work directly with you during system design and during implementation to ensure that the system meets your needs. 2. Costs for developing the system will be split between the two cities on the basis of usage. Pasco will pay 25% of total development costs as specified on pages 12, 13 and 14 of the Compass proposal. Total cost to -Pasco Will not exceed $7,157 unless additional specific written authorization is obtained. 3. Development costs including consultant services staff time and equipment usage will be invoiced to Pasco by Richland on a monthly basis as cost is incurred. 505 SWIFT BOULEVARD BOX 190 RICHLAND, WASHINGTON 99352 509-943.9161 Mr. neo Olney City of Pasco -2 March 2, 1977 4. Computer programs developed will be come the joint property of Richland and Pasco and shall be subject to paragraph 9 of the Joint Data Processing Agreement. We expect to begin work on the system in late March, pending approval of the consultant contract by our City Council. Very truly yours, DSS: gem CONCUR: BY: TITLE: CITY OF PASCO DANIEL S. SMOLEN, Director Community Services/Personnel z c t COMPASS MANAGEMENT GROUP, INC. MANAGEMENT CONSULTANTS February 23, 1977 Mr. Leo Olney Finance Director City of Pasco P. O. Box 293 Pasco, Washington 99301 Dear Mr. Olney: We are pleased to present a proposal to assist the City of Pasco and City of Richland with implementation of a joint Utility Billing System. The proposed approach and my involvement in the project will provide these significant advantages to the cities: • Knowledge and experience I have gained in working with other utility billing systems (in private and public utilities) will be extremely useful in design of the new system. • Applying proven project management methods, as I have done in the recently completed Utilities Inventory system, will mini- mize the risk of project failure. • My familiarity with both data processing resources and system user personnel should be extremely useful in designing a system which will best meet the needs of both cities. I am confident we can meet the target date for system completion of July 15 if we begin work in late March. Timely and successful completion of this project should help ensure continuation of a joint data processing operation which is of great benefit to both Pasco and Richland. Very/truly yours, - 4 Donald W. Cornell THE COMMONS BUILDING, SUITE 160 BELLEVUE, WASHINGTON 98004 (206) 454-8328 r CITY OF RICHLAND CITY OF PASCO PROPOSAL FOR SYSTEMS ANALYSIS AND PROJECT MANAGEMENT SERVICES FOR JOINT RICHLAND/PASCO UTILITY BILLING SYSTEM COMPASS MANAGEMENT GROUP, INC. February 1977 V V INTRODUCTION The City of Richland and City of Pasco have entered into a joint data processing services agreement. It commits the cities to sharing of a computer-based utility billing system using the Richland computer. A feasibility study of alternatives for implementing a joint utility billing system has been performed by Richland's Data Processing Supervisor. The most significant conclusions of that study are summarized as follows: • The current utility billing system used by Richland is technically obsolete, functionally inadequate, and not usable as the basis for joint billing. • Alternatives such as major revision of the current system or transfer of a system used elsewhere are not feasible. The most feasible means of implementing joint utility billing is by developing a new system, using an experienced analyst/project manager from outside the City to lead the project and in-house data processing staff for programming and testing. • Costs of system development should be shared by the cities on a basis consistent with the number of accounts served by each. The Data Processing Steering Committee has, reviewed and accepted the feasibility report. The Committee Chairman asked for a written proposal from Compass .Management Group to provide the necessary systems analysis and project management services. This proposal describes the proposed approach, the role of the consultant, and the qualifications of the consultant. 1 I 1 PROJECT OBJECTIVES The overall goal of the proposed project is to produce a functioning data. processing system for utility billing, receivables management, and pay- ment processing which will be used by both the City of Richland and City of Pasco. The new system will replace each city's present systems for utility billing, which are inadequate, inefficient, and obsolete. The more specific objectives of the project are as follows: • To develop a system which meets all needs for utility billing which are identified by system users in each city • To take full advantage of the technical capabilities of the com- puter, including high-speed disk storage and access capability and on-line inquiry to account status • To minimize and eliminate whenever possible manual data manipulation and calculation which can be more effi- ciently done by the computer • To provide a single consolidated master record for each account, reflecting all account activity and current status • To provide accounting for customer deposits • To maintain a file of meter information • To automatically prorate final bills and new customer bills To reduce processing time and cost by fifty percent • To develop a system which is flexible enough to be trans- ferred and sold to other cities The extent to which these objectives are actually achieved in the new system will depend on the skill and dedication of the project team. The systems analyst and system designer roles will be especially important, because shaping of the system to match the objectives will take place in the analysis and design phases. 2 SCOPE AND APPROACH In accordance with the implementation approach approved by the EDP Steering Committee, Compass Management Group proposes to provide the necessary systems analysis and project management services which cannot be readily provided by in-house staff. Richland staff members will, however, have important roles performing the functions they are most qualified to perform: detailed system design, program coding, testing, and documentation. Working together as a project team, consultant .skills and staff skills will be combined to provide the best assurance of successful and timely proj- ect completion. Project Phases and Deliverables As project manager, the consultant would utilize a structured, proven approach in developing the new system. The approach involves clearly defined responsibilities, specific deliverable products at critical points, user approval of all deliverable products, specific documentation require- ments, and proven project control methods. The project will be performed in four distinct phases: Phase I General Systems Design Phase II Technical Design Phase III Coding and Testing Phase IV Conversion and Implementation Specific deliverable products to be produced in each phase, consultant responsibilities, Richland data processing staff responsibilities, and tar- get dates are shown in a chart on the following page. Responsibility for quality control of the deliverable products will be assigned to the consultant in his role as project manager. Each phase of the project will be considered complete only after the designated user representative from .each city has approved the deliverable product of the phase. 3 PROJECT DELIVERABLES AND RESPONSIBILITIES PHASE AND CONSULTANT DP STAFF USER TARGET COXTPLETION DELIVERABLES RESPONSIBILITY RESPONSIBILITY RESPONSIBILITY_ I- General Design General systems design docu- Develop a conceptual design Participate in meetings with Provide information on ment including: based on discussion of require- users. Assist consultant with needs and desired fea- April 20, 1977 1. Overall system design ments with users. Refine layout of report formats. tures of new system. flowchart design and fully define the Identify most efficient input/ Review and approve 2. Output format descriptions inputs, outputs, and processes output modes, deliverable products. 3. Input descriptions necessary to satisfy objectives. 4. General description of sys- tem processing logic II - Technical Design Technical design specifications Assist the DP Supervisor in Expand on the general design to Review and approve the including: preparation of technical design provide enough detail so that deliverable products. May 15, 1977 1. Detailed processing flow- documentation. Review all pro- programming may be done. Pre - chart cessing logic, file designs, and pare all documentation needed as 2. File design record layouts to ensure com- deliverables. 3. Record layouts patibility with general design 4. Program specifications and project objectives. Pre- sent the technical design to users. III - Coding and Testing 1. A completely programmed Direct the performance of this Write programs to meet specifi- Review test output. system phase to ensure timely and sue- cations in technical design docu- Review and approve all June 30, 1977 2. System test plan and com- cessful completion.. Review ment. Test and debug programs deliverables. plete test data base each of the deliverables for to the satisfaction of the project 3. Technical and internal pro- acceptability. Prepare the manager. Prepare necessary gram logic documentation conversion plan. Prepare test documentation as specified in for system maintenance data and review test output to deliverables list. 4. Job stream and operations ensure program accuracy. documentation 5. I/O control instructions G. File conversion plan IV - Conversion and 1. Implementation plan Direct the performance of this Implement the system, following Review plan, documen- Implementation 2. Implemented system in phase to ensure timely and sue- the plan. Execute file creation tation, and training production status cessful implementation of the and conversion programs. Pre- materials. Indoctri- July 15, 1977 3. User -level systems system. Prepare an implemen- pare user documentation and nate staff. Install new documentation tation plan and assist in prep- training materials. manual interfaces. 4. User training materials aration of user training Review output of initial materials. Monitor outputs of runs. system execution following conversion. Project Organization For purposes of this project, the organization structure and reporting relationships will be as shown on the following page. The consultant will be directly. responsible to Richland's Community Services Director (the department head responsible for data processing). Richland's Accounting Supervisor, and Pasco's Finance Director will provide information and assistance in system design and will review all project products. The Data Processing Supervisor will provide day-to-day supervision of all work done by the data processing staff and will report progress to the consultant. 9 UTILITY BILLING SYSTEM PROJECT ORGANIZATION CHART User Representatives • Richland Account- ing Supervisor (H. Dellinger) • Pasco Finance Director (L. Olney) Richland Programmer T. Hyatt Community Services Director D. Smolen Consultant Project Manal D. Cornell Ric hland Data Processing Supervisor B. Quiver 6 Programmer M. Surplus L PROJECT SCHEDULE AND RESOURCES The project will be begun as soon as the Financial System installation is complete, approximately March 21. Assuming normal progress, the tar- get dates for completion of each phase are: Phase I April 20 Phase II I I May 15 Phase III. .June 30 Phase IV July 15 To meet this schedule, this project must have top priority for the data processing staff. The Data Processing Supervisor should spend nearly full time on the project from April 10 until completion. Two programmers will be needed nearly full time from May 15 to project completion. Involvement of the consultant will be most necessary in Phase I and Phase IV, when he will be spending full time on the project. In phases H and III, his time commitment will be reduced substantially. Estimated consultant man-hours are as follows: Phase Estimated Hours % of FTE I 160 100% H 64 50 III 60 25 IV 88 100 Total Consultant Hours 372 7 IMPLEMENTATION SCHEDULE RICHLAND/PASCO UTILITY BILLING SYSTEM_ Dore MONISM IT Technical Design tin■ 0 iv: conversion and Implementation mmilim FE Join in No 0 0 mi�lm III IN.-Mi000w iam so t tEmissions ■ mi N■■ t n � � i �u w■��i■�n ■ n� n� ��iii ■�ii�i�� ingloolim MEN �■� � ��i■=��� iiiii s■oismilloo p■nan�oil CONSULTANT QUALIFICATIONS The consultant who will serve as project manager and systems analyst is Don Cornell. He is uniquely qualified for this assignment for these reasons: He has been providing consulting. services to Richland since. July of 1976. He was responsible for the Data Processing Evaluation Report, served as Acting DP Supervisor for three months, served as project manager for the successful imple- mentation of a Utility Inventory Control system, and is currently project manager for the Financial System installation project. • He has been project manager for a successful city utility billing system project in Bremerton. • Before becoming a consultant he was a systems analyst and programmer for billing systems for two years with a private electric utility. • He has a total of more than ten years' experience in data processing systems development. A resume for Mr. Cornell is included on the two following pages. K K DONALD W. CORNELL SUMMARY: Mr. Cornell is a senior data processing consultant for Compass Management Group, providing technical and managerial consulting services to a variety of governmental. and private organiza.- tions. He has more than ten years' experience in large-scale data processing, as a consultant, a systems analyst, and a programmer. EDUCATION: University of Wisconsin, Bachelor of Business Administration, major in Finance; completed substantial graduate work in the MBA program Received formal training in statistical sampling and auditing techniques while employed by a major CPA firm EXPERIENCE: The following paragraphs list Mr. Cornell's professional experience and major relevant projects with large-scale computing systems. 1975 Present -- Senior Consultant, Compass Management Group Mr. Cornell has performed several major studies for computer users since joining Compass. For the Seattle School District, he reviewed the organization and manage- ment of the data processing department and system design of an on-line data base system for budgeting and accounting control. He has performed an audit of internal control and security in the State Treasurer's sys- tem for issuance and redemption of warrants. This included review of all processing and file controls and transmission procedures for remote batch processing. For the City of Bremerton, he has redesigned and supervised the programming,• testing, and implementation of a system for billing and accounting for all utility services. Also for the City of Bremerton, he directed the development of a financial management sys- tem. For the City of Richland, Mr. Cornell performed a detailed study of data processing activities and needs. For the Municipality of Metropolitan Seattle, he assessed future applications require- ments and performed a salary review. Most recently, he has managed the development, including systems analysis, design, and programming, of a sophisticated client tracking and financial system for the State of Washington Department of Social and Health Services. 10 1973 - 1975 -- Supervisor of Data Processing Consulting, Ernst & Ernst Mr. Cornell performed or supervised all data processing audit activities for Ernst & Ernst in Washington, Oregon, Alaska, and Northern California. All of these studies were done to determine data processing controls and procedures and management poli- cies were adequate to ensure control over financial transactions. Opinion of the inde- pendent auditors depended upon the audit work performed by Mr. Cornell. Additionally, he evaluated the on-line system of the Pacific National Bank of Washington to determine if the teleprocessing monitor software was adequate to provide. support for a network of over 100 terminal devices. For Paccar Inc. and Simpson Timber Company he evaluated the adequacy of telepro- cessing support software used for data transmission and CPU -to -CPU communication. For Santa Clara County, California, Mr. Cornell performed a complete review of all data processing functions performed by the County Data Center for the County Hospital. Included was an evaluation of cost/benefit of an on-line base system supporting 40 termi- nals at the hospital. This four-month study resulted in recommendations for improved efficiency in teleprocessing system usage and revised cost allocation methods for both on-line and batch processing. For the Pacific National Bank of Washington, he developed detail design specifications and reviewed implementation of a major cost accounting system on a large-scale com- puter. 1969 - 1973 Systems Analyst. Allis-Chalmers Corp. Designed, programmed and implemented major changes to on-line terminal monitor soft- ware to provide more efficient polling of terminals and report more accurate cost data for terminal users. Developed a called subroutine to unstring on-line terminal input screen characters into the proper receiving fields in the calling application programs. Provided technical support to application programmers for resolution of problems in on- line systems. Taught classes in use of JCL and DAL to new employees. Developed a large segment of the corporate cash management system, including on-line application programs and methods for processing the integrated data base. Designed and implemented changes to the financial system which processed all transactions for finan- cing of customer notes receivable. Analyzed and designed systems for administration of credit policy and installment. loan processing for a large credit organization. 1966 - 1969 -- Programmer and Methods Analyst, Wisconsin Electric Power Compan Developed changes to the customer information billing system, using a large number of on-line terminals for both inquiry and updating of customer records. Programmed all changes made to the primary file maintenance program for all electric utility customer billing transactions. Served as systems group liaison to users of the on-line system, answering all questions, resolving operational problems, and prioritizing needs for changes. Developed complete user documentation for the system. 11 PROJECT COST Consultant Services Cost The cost of consultant services for this project will be billed at the rate of $28 per hour for professional services, plus all reasonable and neces- sary out-of-pocket expenses incurred. The best estimate of total fees and expenses is computed as follows: 372 hours @ $28 Expenses estimate $10,416 2,500 Total Estimated Consultant Cost $12,916 Actual time spent on this project may, of course, vary from. the estimate, but is expected to be in the range of 280-400 hours. Compass Management Group would be willing to accept a contract with a maximum amount of fees and expenses (such as $12, 916 above) and limit our involvement to no more than 372 hours. Compass would prefer to bill all charges for professional services to Richland because we will be directly responsible to the Community Services Director. A portion of those costs would be shared with Pasco through the established process. Cost Sharing The Data Processing Steering Committee recommended spreading costs for this project to each city on the basis of system usage. In that case, Richland would bill Pasco for data processing staff time and computer time in accordance with the rates established in the Joint Data Processing Services Agreement and the relative number of service billings. The 12 The service billings (number of accounts) for each city are as follows: Pasco Accounts Richland Accounts Water 51500 12, 493 Sewer 41800 11.1733 Garbage 42 800 11,.733 Electricity 0 M733 Total 15, 100 Accounts 47, 692 Accounts Total Service Billings: Pasco 151100 25% Richland 47, 692 75 Total 62,792 100% Total Project Cost Including Allocation of. Budgeted Costs The total cost of this project consists of consultant fees (the only additional out-of-pocket expenditure) and an allocation of Richland's current staff and equipment costs (already budgeted). The total project cost is $28, 628, of which 25%would be paid by Pasco. Of Richland's 75% share, most costs represent staff and equipment already available. Richland's additional out- of-pocket cost is $5, 659 and Pasco's out-of-pocket cost is $7, 157. Details are as follows: Outside consultant services Cost of Richland staff and equipment (already in budget) - Programming staff time (1, 016 hours @ $12) Computer test time (50 hours @ $42) Data entry (80 hours @ $9) Total Staff and Equipment TOTAL PROJECT COST INCLUDING STAFF AND EQUIPMENT 13 $12,916 121192 23,100 720 157712 $28,628 Net Cost Calculation Total cost including staff and equipment Less: Richland billings to Pasco for this development project (257o of total) Richland share of total project cost including current staff and equipment Less: Staff and equipment already budgeted Net additional expenditure by Richland for this project 14 $28,628 7, 157 21, 471 15, 712 $ 5,659 • CONSULTANT SERVICE TERMS AND CONDITIONS Compass Management Group will manage this project and perform the necessary systems analysis and general design as described in the Scope and Approach section of this proposal. Total consultant service costs would be determined by the number of hours spent by the consultant multiplied by the hourly rate of $28. 00. Expenses for reasonable and necessary consultant travel and living costs will be itemized and billed to the client(s). The following terms and conditions apply to this agreement: 1. Fees and expenses for consultant services will not exceed $12, 916 without express written approval by the designated client representative. 2. Invoices for services and expenses will be presented semi- monthly in arrears. All invoices are due and payable within 15 days of receipt. 3. Any additional required work related to this project which is not now foreseen and stated in the proposal will be treated as a change of scope. No additional work would be done without written authorization. Additional compensation for any such work would be charged at the standard rate. 15