HomeMy WebLinkAbout0820 ResolutionRESOLUTION NO. 820
A RESOLUTIONr' ADOPTING A REVISED AND EXTENDED
COMPREHENSIVE, STREET PROGRAM FOR 'CHF CITY OF
PASCO, AND REPEALING RESOLUTION 'N'O. 784.
WHEREAS, R.C.W. 35.77.010 provides for annual provision and
extension of the comprehensive street program of each city and town, after
holding public hearings thereon, and
WHEREAS, the City of Pasco, adopted its comprehensive street
program on June 17, 1969, pursuant to R.C.W. 35,77.010, and it is now time to
revise and extend that comprehensive street program, and
WHEREAS, the City Council held a public hearing on the revision
and extension of the City of Pasco comprehensive street program on June 16, 1970.
NOW THEREFORE,
THE CITY COU\'CIL OF THE CT TY OF PASCO DO RESOLVE AS FOLLOWS:
Section 1.. The City Council of the City of Pasco hereby
adopts the revision and extensioc: of the comprehensive program for the ensuing
six years as attached hereto and labeled "Six -Year Construction Program -"1971-1-976"
incorporated herein and by this reference made a part thereof as though set forth
herein verbatim.
Section 2, The comprehensive street program shall be filed
with the Director of Highways within thirty (30) days.
PASSED by the City Council and APPROVED by the Mayor this
16th day of June, , 1970.
ATTEST:
i
Ruth Modesky, City Clerk .
APPROVED AS TO FORM:
D. Wayne Campbell, City Ateorney
�1-- '� �z-- ''`�
G -
t� Carter Mayor
`it T'; � J ,!..;1 §�% � i � l`�zc � til 4 -f j1- i'_j rri � Y-�.'-�� T•� 1�+1�' �i�j({`-1� -t'�^I �j },�
ij111 s� �i:d�s 1v `J `L�L�: S.) a`� a.Y-4.J Y � l�f i :�IJv tY-J:�WD -D
riEARING DATE June 16, 197ADOPTION DATE June 16, 1970k�SOLUl""ION E t�C NO.. (CITY)TY) Pasco .
Urban Arterial Rnnrrl — Mainr
ITE S
N0.
LOCAL NAME
OF
ROAD
OR
STREET
F C
U L
N A
U R
R U
8 R
TYPE OF WORK
LENGTH
IN
ESTIMATE
OF
COST
ROAD OR STREET
NO,
' C S
A A
!
MILES
1971
1972.
1973
1974.76
TOTAL
NL
,
1,
Columbia River Bridge
1m
U
Stage I
and Approaches
Design Engineering, Right -ow -way
0.8
2,471,132
1,500,000
2,028,868
--------
6,000,000*
Acquisition, construction of new
two-lane span
*Pasco 823,677
i
Kennewick 823,677
Benton Co. 411,889
I
!
Franklin Co. 411,889
!
Other Sources 32528,868
f
Stage II
Design and reconstruction existing
structure.
4,300,000
4,300,000**
**Pasco 215,000
Kennewick 215,000
UATF 3,870,000
TOTAL PROJECT
LO,300,000
SA -1 REV.
1/_10
1
15 71-1 VY S
(t/du/ 0/y)
NEARING DATE June 16, 197CADOPTION DATE June 16, 1970 RESOLUI"ION NO.. (CITY)
Urban Arterial Board - Major (Cont)
Pasco
2.
ITEr�
NO.
LOCAL NAME
OF
ROAD OR STREET
ROAD
D
STREET
I NO.
�'
U L
N A
C S
R U
B R
A A
i
TYPE OF WORK
LENGTH
IN
MILES
ESTIMATE OF COST
1971
1972.
1973
1974.76
TOTAL
T S
N L
2.
North 4th Avenue from
19-4
M
U
I Gr., Dr., Surf, Pave, Swk., Sig.,
0.6
70,000*
70,000
Court Street to Empire
ilium. widen to 62 feet.
Way
(Approved -UAB Project 8-4-174-(1
)-
*1970
3.
East Lewis Street from
M
U
Gr. Dr., Surf., Pave, Curb, Swk.,
142,000
142,000
Wehe Avenue to U.S. 12
13-2
Sig., illum.
(Joint Project with Franklin
County. costs reflect total
cost)
•
I
9
:►i � L'� �' h,:i/\ :ir `./ V'1\i :..� ��t<..j �./ � �:�✓iti :.L :�L'aAJ.:
NEARING DATEJune 16, 197OADOPTION DATE June 16, 1970RESOLUTION NO., Pasco 3.
URBAN ARTERIAL BOARD - SECONDARY
ITE:d
NO.
t
LOCAL NAME
OF
ROAD
OR
STREET
F C
U L
N A
U R
R U
B R
TYPE OF WORK
LENGTH
IN
ESTIMATE OF COST
ROAD OR STREET
N0.
C S
A A
MILES.
1971
1972.
1973
1974.76
TOTAL
;
TS
N L
1.
Chase Avenue from Lewis
Stora. Sewer, Gr., Dr., Surf , Pave,
Street to Court Street
6-1
S
U
illum, Curb, Swk, Sig., Undergrou
d 0.8
313,000*
313,000
(Approved UAB Project 8-4-174-(O1
t
*1970
i
2.
East 'A' Street from Elm
f
Avenue to East City Limitsl4-2
S
U
Gr., Dr, Surf, Pave, Curb, Swk.,
0.3
33,000*
33,000
i
Widen to 62 feet (approved UAB
Project 8-4-174-(03) *1970
3.
Ainsworth Avenue
5-1
S
U
Gr., Dr., Surf., Pave, Curb, Swk,
1.3
176,000
176,000
from 10th Avenue to
I
Sig., illum.
City Limits
4.
(North 4th Avenue from
;9-5
IS
U
Gr., Dr., Surf., Pave, Curb &
1.1
100,000
100,000
Empire.Way to North
Gutter, -Sig., illum.
Airport Entrance
5. JOregon
Avenue from
11-3
S
U
( Widen to 4 lanes Gr, Dr, Surf,
0.5
75,000
75,000
Superior Street to Empire
Pave, illum.
1
Way
I
I
11.
6.
Oregon Avenue from 'A'
11-i
S
U
New'Construction-Gr., Dr., Surf.,
Street to Ainsworth
�
t
Pave., illum, Structure
0.6
1,000,000
11000,000
IA -1
(,JiL
June 16' 1970 Tune 16 1970 (C �%i���) Pasco 4.
HARING DATE _ ADOPTION DATE RESOLU T ION NO. (CITY)
URBAN ARTERIAL BOARD - COLLECTOR
�,
ITE9
?:0.
` LOCAL NAME
I OF
ROAD
OR
STREET
F C;
U L
N A
U R
R U
B R
I
TYPE OF WORK
LENGTH
IN
ESTIMATE Or COST
ROAD OR STREET
N0.
C S
A A
MILES
1971
1972.
1973
1974.76
TOTAL
TS
N L
1.
South 4th Avenue from
i9-1
�C
U
Gr., Dr.,Surf., Pave, Swk., Curb,
0.2
3.0,000*
30,000
alley South, of.'B' Street
I
Gutter widen to 52 feet.
to Ainsworth Avenue
,
(Approved UAB Project 8-4-174 (9)
I
I
*1970
may' ei 77T i' /\
June i6 70 I June 16 1970 i (COUNTY) Pasco 5.
HEARING DATE � ADOPTION' DATE _ � RESOLU�i ION NO., (CITY)
ARTERIAL STREET FUND
ITEC I LOCAL NAME
OF
N
ROAD
OR
STREET
I F C)
U L
I N A
U R
R U
B R
TYPE OF WORK
LENGTH
IN
ESTIMATE OF COST
ROAD OR STREET
I NO.
I C S
A A
MILES
1971
1972.
1973
1974.76
TOTAL
1
T' S
N L
l.!
ColumbiaStreet from 4th
S
U
Gr. Dr. Surf. Pave, Curb, Swk.
0:5
80,000*
80,000
Avenue to 10th Avenue
illum., Storm Sewer * 1970
2.'
South 10th Ave. from
Columbia Street to W.
M
U
Realignment & Channelization
0.0
4,500*
J
4,500
I Lewis Street
'-1970
3.
W. Lewis St. from 8th
�
I M
U
Widen & Resurface *1970
0.1
14,000*
1
14,000
Avenue to 7th Avenue
I
`
f
4.1
"A" St, from Oregon
I
Avenue to Elm Avenue
4-1
I M
U
Gr. Dr., Surf., Pave, Curb, Swk.
0.3
40,000*
.
40,000
ilium. *1970
c
5.1
Alton Street .from Wehe
�
( S
U
Gr. Dr., Surf., Pave, Curb, Swk.
0.3
14,000*
14,000
Avenue to Elm Avenue
*1970
6.1
Elm Avenue from "A" St.
!
S
U
Gr., Dr., Sur., Pave, Curb, Swk.
0.5
45,000*
45,000
to Lewis Street
Acquire R/W
7.
Wehe Ave. from 'Lewis St.
S
i U
Gr. Dr., Surf, Pave, Curb, Swk.,
0.5
90,000
90,000
to "A" Street
Illum, Storm Sewer
8
East Lewis St. from
3-1
M
U
Gr. Dr., Surf, Pave, Curb, Swk.,
0.6
54,000
54,000
First Ave. to Wehe Ave.
9
Fifth Ave. & Arthur Ave.
S
U
Gr. Dr., Sur, Pave, Curb, Swk.,
0.9
100,000
100,000
Columbia St. to Court
I Storm Sewer, Sig.
St.
•
I
e
1
S::.l REV. 1%70
V �✓ �: Y., ' J:.11 � ALJ � � i :L til � Sri J► V � 1Vi
(COUNTY)
HEARIINIG DA T EJune 16, 1970ADOPTION DATE June 16. 197CRESOLU-CION NO.. (CITY) Pasco
ARTERIAL STREET FUNDS
IT";
N0,
LOCAL NAME
OF
ROAD
I OR
STREE7
F C
U L
'tv A
U R
R U
6 R
TYPE OF WORK
LENGTH
IN
ESTIMATE OF COST
ROAD OR STREET
N0.
C S
A A
MILES
1971
1972.
1973
1974.76
TOTAL
T S
N L
10
First Ave. from Columbia
i
S
` U
I Gr. Dr. Surf. Pave, Curb, Swk.,
0.8
90,000
190,000
Street to Court Street
I
( Ilium., Storm Sewer
11
Court St, from 4th Ave.
I
M
U
I Gr. Dr. Surf. Pave, Curb, Swk.,
0.1
30,000
30,000
to Avenue First
Ilium.
12
1
Columbia St. from Front
S
U
Gr. Dr. Surf. Pave
0.4
50,000
50,000
Avenue to Wehe Avenue
13
Road 28 from Lewis St.
S
U
Cr. Dr. Surf. Pave, Curb, Sig.,
0.2
30,000
30,000
to Sylvester Street
Ilium.
14
Lewis St. Intersection
M
U
Add Turning Lanes, Traffic
0.0
10,000
10,000
with Road 24
Signals, Islands
15
Yakima St. from 3rd to
I
M
U
Gr. Dr. Surf Pave
0.2
30,000
30,000
ist Avenue
16
Grade Separation
S
U
Structure over Railroad Right of
-0.1
500,000
500,000
Structure Columbia St,
Way
17
Clark Street from Oregon
S
U
Gr. Dr. Surf, Curb, Swk, Structu-e
0.5
600,000
600,000
Avenue to Second Avenue
18
Grade Separation
M
U
Structure over Railroad R/[J
0.3
600,000
600,000
Structure Court Street
19
Various intersections or
U
Install and/or modernize traffic
0.0
75,000
Arterials throughout
& pedestrian signals, channel -
j
Ij
the City
�
ization, and illumination
7 T ��'li -,`7 �7l f: n r (^.S T'� 77-) ` r;�'rye �l11_j
L: 1.2 _.. _ u n_ L �Ld D �I a li 3 4.d � d � ��� � u � illi Y v l� lY:e
C�
June 16 1970 June 16 1970 (COUNTY)
HEARING DATE ' ADOPTION DATE RESOLUTION NO.. (CITY)
SCHEDULED ACCESS STREET IMPROVEMENTS
pasco
IT`M
NO
LOCAL NAME
OF
i
ROAD
OR
STREET
F C
U L
N A
U R
R U
B R
TYPE OF WORK
LENGTH
IN
ESTIMATE OF COST
ROAD OR STREET
I N0.
C S
A A
MILES
1971
1972.
1.973
1974.76
TOTAL
T' S
N L
1�
Owens, Douglas, and
(
A
U
Gr. Dr. Surf, Pave, Curb, Gutte
, 0.3
44,000*
44,000+k
Beech Avenue from "A"
*1970
Street to Alton Street
21
Butte Street from Wehe
A
U
Curb, Gutter, Cr. Dr. Surf,
0.3
10,000
1.0,000
Avenue to Elm Avenue
Pave
!
31
HelF:na Street from Wehe
A
U
Curb, Gutter, Gr., Dr., Surf.
0.3
10,000
10,000
to Film Avenue
i
Pave
4
Marvin Street - Front
A
U
Gr. Dr.., Surf, Pave, Curb &
0.2
6,000
6,000
Avenue to Idaho Ave.
Gutter
5
Hayes Street from
A
U
Gr. Dr. Surf. Pave, Curb &
0.1
5,000
5,000
Front Ave, to Oregon Ave
Gutter
6
Front Avenue from
i A
U
Gr. Dr. Surf. Pave, Curb &
0.5
20,000
20,000
Columbia St. .to "A* St.
�
Gutter
7
Wern.ett & College Drive
A
U
Gr. Dr. Surf, Pave
0.5
30,000
30,000
;;A -I r:LY. I/lu
HEARING DATE -June 16, 193ADOP T ION DATE June 16, 1970( CITY)
RESOLU T ION N0. (CITY)
Urban Artarinl Rnarrl — NTnA v -
Pasco
1.
ITE:.i
NO.
LOCAL NAME
OF
ROAD OR STREET
ROAD
OR
STREET
NO.
F C
U L
N A
C S
U R
R U
E R
A A
TYPE OF WORK
LENGTH
IN
MILES
ESTIMATE OF COST
1971
1972.
1973
1974.76
TOTAL
T' S
I N L
1.
Columbia River Bridge
M
U
Stage I
and Approaches
Design Engineering, Right -ow -way
0.8
2,471,132
1,500,000
2,028,868
--------
6,000,000*
j
Acquisition, construction of new
two-lane span
*Pasco 823,677
Kennewick 823,677
Benton Co. 411,889
I
Franklin Co. 411,889
Other Sources 32528,868
IStage
II
Design and reconstruction existing
structure.
4,300,000
4,.300,000**
**Pasco 215,000
Kennewick 215,000
i
I UATF 3,870,000
TOTAL PROJECT
LO,300,000
I
Sb .l rrv_
I/7n
--
,'-`• IT Y • �±�' 7 I; `L%V 1 1i 1' i
(fidu�4//)
HARING DATE June 16. 1970ADOPTION DATE June 16, 1970 RESOLUTION NO.. (CITY) Pasco
Urban Arterial Board - Major (Cont)
2.•
IT_M%
NO.
� LOCAL NAME
OF
ROAD OR STREET
ROAD
R
STREET
NO.
F CIU
N A
C S
R
B R
A A
I TYPE OF WORK
I
LENGTH
IN
MILES
ESTIMATE OF COST
1971
1972.
1973
1974.76
TOTAL
T S
N L
2.
North 4th Avenue from
9-4
M
U
Gr., Dr., Surf, Pave, Swk., Sig.,
0.6
70,000*
70,000
Court Street to Empire
illum. widen to 62 feet.
Way
(Approved UAB Project 8-4-174-(lC).
*1970
3.i
East: Lewis Street from
3-2
M
U
Gr. Dr., Surf., Pave, Curb, Swk.,
142,000
142,000
Wehe Avenue to U.S. 12
Sig., illum.
(Joint Project with Franklin
County. costs reflect total
I
cost)
I
ti
.
S:._1 LSV_
1/7 f.
.