HomeMy WebLinkAbout0783 Resolution1
783
RESOLUTION NO-.
,A RESOLUTION CLASSIFYING -CITY STREETS OF,THE CITY
OF PASCO AND REPEALING RESOLUTION NO. 743.
WHEREAS, -R. C. W.'35:78.010 requires the cities of the State to
establish a system of arterial streets, and
WHEREAS, the City of Pasco desires to. use of Arterial Funds
for the improvement of certain streets, NOW, THEREFORE,
THE CITY COUNCIL OF THE CITY OF PASCO DO RESOLVE AS FOLLOWS:
The following,.cl:assification.of City streets in- the City of Pasco
is hereby adopted:
1. The following streets are hereby designated as Arterials for the use
of Urban Arterial Trust Funds -
Major:
Lewis Street from West City Limits to East City Limits;
North Fourth Avenue from Lewis Street to Empire Way;
Tenth Avenue from West Lewis Street to South City Limits;
Secondary
Chase Avenue from West "A Street to Airport Terminal;
North Fourth Avenue from Empi'..e Way to North City limits;
Maitland Avenue from "A" Street to Ainsworth Avenue;
Oregon Avenue from "A"'Street to Empire Way;
Court Street from Road Twenty. -four to North Fourth Avenue;
"A" Street from Chase -Avenue to East City Limits;
Ainsworth Avenue from Tenth Avenue to East City Limits;.
Collector
Lucas Avenue from West Lewi,s*Street to Court Street;
South Fourth Avenue from West Lewis Street to Ainsworth Avenue;
Sylvester Street from West City limits to Road,Twenty-eight;
Sylvester..Stre'e.t from Chase. Avenue to Fifth.Avenue;
Yakima Street from Fifth Avenue -to Third Avenue; -
2. The following streets are hereby designated as Arterials for the use'
of Gas Tax Funds: -
Major.
All streets listed in Section 1;
Tenth Avenue from West Lewis Street to Nixon Street;
Court Street from North fourth. Avenue to Oregon Avenue;
imb
page 2
2. Major (Cont'd)
Yakima Street.from Third Avenue to Oregon Avenue;
'Melrose (Oregon Avenue) from "A"'Street to Ainsworth Avenue;
Secondary and Collector
"A" Street from Road Twenty-eight to Chasse Avenue;
Road Twenty-eight from "A" Street to Sylvester Street;
Ainsworth Avenue from Tenth -Avenue to "A" Street
Adelia Street.from Oregon Avenue to Wehe-Avenue
Clark Street from Oregon Avenue to Illinois Avenue;
Columbia Street from Wehe Avenue to Tenth Avenue; -
Third Avenue from Columbia Street to North Fourth. -Avenue;
Fifth Avenue from.Columbia Street to Park Street;
Arthur Avenue'from Park Street to Jay Street;
First Avenue from "A Street to Court Street;
Aurelia Avenue from Court Street to Nixon -Street;
Wehe Avenue from "A: -Street to Adelia Street;
Elm Avenue from East Lewis Street to."A" Street'
Alton Street from Wehe Avenue to Elm Avenue;
Pearl Street from Road Twenty-four to Lucas Avenue;
LucasAvenue from Court Street to Lincoln Drive;
Illinois -Avenue from Sylvester Street to Pearl Street;
Hickory Avenue:from,Court Street to Jan Street;
Road Twenty-four from Court Street to,Pearl Street;
3'. All other streets of the City of Pasco are designated as Access Streets.
4. Resolution No.. 743 i.s hereby repealed.
PASSED by the City Council and 'APPROVED by the Mayor this ' 17
day of June ,1969.,
ATTEST: :.
is tgea.,,).,,D,a:jla.e,riDirecto.rr of
Admin ation acid ;ex -officio
City CYerk
.APPROVED AS TO FORM:
D .Wayne Campbell; Cita! Attorney
. E. Carter, Mayor
SA-- 1 •
SIX YEAR CONSTRUCTION PROGRAM
1970-1975
HEARING DATE June 17 ADOPTION DATE June 17 RESOLUTION NO.
URBAN ARTERIAL BOARD - MAJOR
(COUNTY)
(CITY) Pasco, Washington
ITEM
140.
LOCAL NAME
OF
ROAD OR STREET
RUAD
OR
STREET
NO.
F C
U L
N A
C S
U
R
B
A
R
U
R
A
TYPE OF WORK
(LENGTH
I IN
MILES
COST ESTIMATE
1970
1971
1972
1973-75
TOTAL
T S
N
L
_
East Lewis Street-Wehe
Avenue to Avery Avenue 3-2
M
X
Gr. Dr. Surf. Pave, -Curb
0.8
` 88,000
$88,000
2
Columbia River Bridge &
Approaches U.A.B.
M
X
Design Engineering, Right-of-way
2
1
Project No. 8-4-174(8)
Acquisition, Construction
0.8
$2,802,00
$2,676,00
5,478,000
..3
Pasco share 1/3 of prof.
934,00
892,00
1,826,000
3
Kennewick share 1/3 of p-oj.
934,DOC
892,00
1,826,000
Franklin Co. 1/-6 of prof-
467,00
446;00
913,000
-
•-
4
Benton. Co. 1/6 of prof.
467,00
.446;00
913,000
1. To -;,al cost of project
2 Includes $220,000 sch uled fo
3rd and 4th quarters f 1969
3 Includes $73,000 sche-led-in
969
4 Includes $37,000 sche haled in
969
3
North 4th Avenue from
Court Street to Empire
Way. 9-4
M
X
Gr>Dr.,Surf., Pave, Signs, Illum
0.6
70,00
70,000
SA-- 1
SIX YEAR CONSTRUCTION PROGRAM
1970-1975
(COUNTY)
HEARING DATEjune 17 ADOPTION DATE June 17 RESOLUTION NO. (CITY)
IiDQAf\l ADTf-DTAI DOADf) QL'r0h11)ADV
Pasco, Washington
ITEM
1.40.
LOCAL NAME
OF
ROAD OR' STREET
ROA D
OR
STREE
NO.
C
JU L
N A
C,S
U
R
B
A
R
U
R
A
TYPE OF WORK
(LENGTH
I IN
MILES,
. . . . . . . .
COST ESTIMATE
1-970
.1971
1972
1973-75
TOTAL
T.SqN
L
I
Chase Avenue'- Lewis St.
to Court Street-
6-1
S
x
Storm Sewer, Gr.Dr.' Surf. Pave,
Curb,-Swk..
0.8.
296,000
296.000
2
East "A: Street- Elm
Avenue too East City Limi
s 4-2
S
x
Gr. Dr..'Suf. Pave, Curb.
0.3
33,000
33,000
3
Oregdn Avenue "A" Stre!t
to Ainsworth Avenue
11-1
S
X
Gr. Dr. -Surf. 'Pave, includes 2
structures over railroads'
0.6
.$617,000
617,000
4
-AinsworthiAvenue from
10th Avenue to Port
Office- i
5-1
S
x
Gr. Dr. Surf. Pave, Slgntn"g, Illun-1.3
160,000
160,000
5
North 4th Avenue from
Empixe Way to North
Airport Entrance
9-5
S
X
Gr. Dr. Surf., Pave
1.7
$80"000
30,000
6
Oregon Avenue from
Superior Street to
Empire Way
11-3
S
x
Widen to 4 lanes
0.5
40,000
40,000
Z�
SA- - 1 :t
HEARING DATE June 17
ARRAN ARTFRIAI_ ROARO C01.1_FCTOR
SIX YEAR CONSTRUCTION PROGRAM
1970-1975
ADOPTION DATE June -17 RESOLUTION NO.
(COUNTY)
(CITY) Pasco, Washington
;ITEM
NO.
LOCAL -NAME OR
OF t;STREET
ROAD OR STREET �5 NO.
U LGR
N A B
C S A
U
R
A
TYPE OF WORK
LENGTH
I IN
MILES—,1970
COST ESTIMATE
1971
1972
1973-75
TOTAL
i.
T S N
L
1
South 4th Avenue from
"A'. -Street to Ainsworth
Avenue 9-1
C
X
Gr. Dr. Surf., Pave. Illum.
0.4
$30,000
$30,000
7
SIX YEAR CONSTRUCTION PROGRAM
1970-1975
HEARING DATEdune 17 ADOPTION DATE dune 17 RESOLUTION NO.
ARTERIAL STREET FUNDS
(COUNTY)
(CITY) Pasco*, Washington
TEM
140.
LOCAL NAME
OF
ROAD OR STREET.
OAD-
OR
STREET
NO.
U L
N A
C S
R
B
A
U
R
A
TYPE OF WORK
(LENGTH
I IN
MILES
COST ESTIMATE
1970
1971
1972
1973-75
TOTAL
T S
N
L
-
1
Central Business Dust,
Arterial Traffic Control
x
.Prelimi.nary 'Engi.neer-i.ng••
0.0
$ 9,500
9,500
2
Columbia Street, First
Avenue tb 10th Avenue
S
Ix
Gr. Dr. Surf. Pave, Curb, Swk.
0.8
70,000
70,000
3
South 10th Ave, from "A'.`
Street to W. Lewis St. -
M
IX
Real i.g<nment & 'Channel i.zati.on .
0.1
10,000
10,000
4
W. Lewis St. from 10th
Avenue to 1st Avenue
M
Ix
Widen & Resurface _'
0.8
20,000
20,000
5
North 4th Avenue from
Columbia St, to Nixon St
M
X
Resurface
0.5
14,000
14,000
6
Fifth Ave. & Arthur Ave
Columbia St, to Court St
S
X
Gr, Dr. Sur, Pave, CurbsSwk.
0.9
80,000
80,000
7
"A" St. from Oregon
Avenue to Elm'Avenue
4-1
M
X
Gr. Dr., Surf., Pave, Curb•
0.3
25,000
25,000
8'
Wehe Ave.- from Lewis St.
to "A" Street
S
X
Gr.. Dr. Surf, Pave, -Curb, Swk.
0.5
70,000
70,000
I11um.
9,
Alton Street from Wehe
IX
Avenue to Elm Avenue
S
Gr. Dr. Surf. Pave, Curb, Swk.
0.3
12,000
12,000
10
Elm Avenue from "A" St.
to Lewis Street
S
X
Gr. Dr. Surf. Pave, Curb, Swk.
Acquire R/W
0.5
45,000
�'
45,000
SIX YEAR CONSTRUCTION PROGRAM page 2
1970-1975
(COUNTY)
HEARING DATE ADOPTION DATE -- RESOLUTION NO. (CIT.Y) Pasco, Washington
rnrrr /n \ .� •
TEM
1-10.
LOCAL NA14E
OF
ROAD OR STREET
ROAD
OR
STREET
NO.
F C
U L
N A
C S
U
R
B
A
R
U
R
A
TYPE OF WORK
(LENGTH
IN.
I MILES
- -
� COST ESTIMATE
1970
1971
1972
1973-75
TOTAL
T S
N
L
-
11
East Lewis St. from
First Ave. to Wehe Ave.
3-1
M
X
Gr. Dr. Surf. Pave, Curb, Swk
0.6
54,000
54,000 .
12
First Ave. from Columbia
Street to Court Street
S
X
Gr, Dr.. Surf. Pave, Curb, SWk
0.8
60,000
60,000
13
Court St.'from 4th -Ave.
to Oregon Avenue
M
X
Gr. Dr..`.Surf. Pave, Curb, Swk.
L11um.~--
0.2
30,000
30,000
14
Grade Separation
Structure Court Street
M
X
'Structure over Railroad R/W
0.3 !
600,000
600,000
15
Columbia St. from Front
i
Avenue to Wehe Avenue
S
X
Gr. Dr. Surf. Pave
0.4
50,000•
50,000
16
Road 28 from Lewis St.
to Sylvester Street
S
X
Gr. Dr. Surf. Pave, S-igning,Illun
0.2
15,000
15,000
17
Lewis St. Intersection
with Road 24
M
X
Add Turning Lanes Traffic
Signals, Islands
0.0
7,000
7,000
1.8
Yakima St. from 3rd to
lst Avenue
M
X
Gr. Dr. Surf Pave
0.2
30,000
30,000
19
Grade Separation
Structure Columbia St.
S
X
Structure over Railroad Right of
Way
0.•1
400,000 -
400,000
201
Clark Street from Ore4o
Avenue to Second Ave
S�
X
Gr. Dr. Surf. Curb, Swk
0.1
15,000
15,000
�A = 1 s
pag6 3
SIX YEAR CONSTRUCTION PROGRAM
1.970-1975
HEARING DATE June 17 Ju
ADOPTION DATE ne 17 (COUNTY)
-RESOL??TION NO.
(CITY) Pasco, Washington
.ARTERIAL STREET FUNDS (Cont'd)
ITEM
170.
LOCAL NAME
OF
ROAD 'OR STREET
ROAD
OR
STREET
NO.
F C
U L
N A
C S:
R
B
A
U
R
A
TYPE OF WORK
LENGTH
I IN
MILES
COST ESTIMATE -
1970
1971
1972
1973-75
�
TOTAL
T S
N
L
- ---
--
21
Grade Separation Structu
e
Clark Street
S
X
Structure over Railroad Right of
Way
0.1
$400,000
$400,000
22
Various intersections on
Arterials; throughout
the City
X
Install and/or modernize traffic
=
& peaes,trian signals,
channelization, aad ill.uminatio r
0.0
75,000
SIX YEAR CONSTRUCTION -PROGRAM
1970-1975
iTE June 17 ADOPTION DATE June '17 RESOLUTION NO.
VEMENTS
(COUNTY)
(CITY)
Pasco, Washington
�ITEM
140.
LOCAL NAIAE
OF
ROAD OR STREET
ROAD
OR
STREET
NO.
E F C
U L
N A
C S
U
R
B
A
R
U
R
A
TYPE OF WORK
(LENGTH
IN
MILES,
COST ESTIMATE
1970
1971
1972
1973-75
TOTAL
S
N
L
1
Owens Avenue from "W'
Street to Alton Street
A
x
Gr.Dr. Surf.Pave. Curb. Swk.
0.3
15,000
'-15,000
2
Douglas Avenue from 'W'
to Alton Street
A
x
Gr. Dr. 5urf, Pave, Curb, Swk
0.3 I
13,000
13,000
3
Beech Avenue from Alton
Street to "A" Street
'A
X
Gutter,,"Pave
0.3
7,500
7,500
4
Butte Street from Wehe
Avenue to Elm Avenue*
A
X
C-urb, Swk. Gr, Dr. Surf, Pave
0.3
$10,000
10,000
5
Helena Street from Wehe
to Elm -Avenue
A
X
Curb, Swk. Gr., Dr., Surf. Pave
0.3
$10,000,
10,000
6
Marvin -Street - Front
Avenue to'Idaho Avenue
A
X
Gr. Dr., Surf. Pave
0.2
$6,000
6,000
7
Hayes Street from Front
Avenue to Oregon Ave.
A
X
Gr. Dr. Surf. Pave
0.1
5,000
5,000
8
Front Avenue from
Columbia
Street to "A" St.
A
X
Gr. Dr. Surf. Pave
0.5
20,0.00
20,000
It
-low