HomeMy WebLinkAbout0847 Ordinancea
JRDI�,Iri4CE EiliE::DIi�;G Ph,' -CU CITY CODE 9-1.04 and SECTIJiN 1 JF
OY,1JI_ Ai,ICE Cao. 688, PEL111SCRIB vG STREET i-IIDT''_S; A!E,,1DI*NG PASCJ CITY CODE
n
9-1.44 ad SECTIO!! 9 OF ORDLi,,,.,XE iVO. 688, ?h3S6RIBL!G FEES; UD
RF,:�EALI:: G LLL lid DI.1 t _,,CF,S : _;D 1-k. kTu OF ORDIri tz�1 Iry C�..F'LI CT 1 jdITH .
i'LF CITY CJU..CIL MJF LrfE CITY OF =(k6CO DO ORDt_IX �S FULLO,vS:
Section 1, Pasco City Code 9-1.04 and Section 1 of Ordinance No. 688
are each amended to read as follows:
Nc street shall be dedicated for 3,ublic use nor improved, or other-
wise prepared for use by the ublic end. used by the -public as G street
or public way, unless the same shall have an unobstructed distance
between curbs of at least 36 feet; prcviding, further, t1 at such minimum
unobstructed distance between these curbs shall be a diStFnce of at
least 62 feet for all streets that may be designs ted as an arterial
street within the City of Pasco.
Section 2'. Pasco City Code 9-1.4-4 E.nd Section 9 of Ordinance No. 688
are each amended to read as follows:
T'r_e City Building Inspector is hereby authorized to charge for
inspection of concrete sidewalk in the amount and in the :Wanner following:
0-5C for the first 500 square feet, or less, and one-half cent for each
additional square foot.
The charge for running lines and grades shall be in accordance with
an estimEte by the.City Engineer and shall be sufficient tc cover the
cost of labor and materials required to run such line and grade.
All street construction work shall be in accordance ti:ith plans nd
specific&tions prepEred by the City Engineer and shall be constructed
under the supervision of the City Engineer, A 100% perforLuance bcnd
shell be filed with the City Engineer prior to start of ccnstruction.
There shall also be deposited with the City Treasurer a sum of money,
determined by the City Engineer, prior to the drawing up of the plans
and specifications, which sum shall be sufficient to cover the cost of
lehor and :materials required to drew up dans and specifications. At the
time of filing the 100% performance bond with the City, a sum shall be
deposited with the City Treasurer which shall be sufficient to cover the
cost of insp. ction and supervision of the work. The amount of this sum
shall be deter,nined b;' the City Engineer. At the comQletion of the con-
tract, written acceptance of the work shall be given by the City Engineer
and any of tre above sum which is over and Ebove the actual cost of
engineering and supervision and materials used s}ajl be refunded to the
person depositing such sum. If th.e sum deposited is insufficient to
cover the ccst of engineering, supervision and m terials, the city s'_e ll
bill for the balance prior to acceptance of the .acrk.
Section 3. This ordinance shall be in full force and ef_`'ect 5 days
after its passage and publics tion as required by law.
PhLlbED 'by the City Councci �_ l nd A ii. V.LD by the i4ayor of the City of
[�c r
Pasco this ." day of y , 1955 •
LTTi,,bT: a
CI'll /C LiRK
ArAol1 t eS Tyf,7
CITI �hTTjlr,.i Y
�iAYOR