Loading...
HomeMy WebLinkAboutFranklin Co Emergency Management (FCEM) Primary Evacuation RoutesORIGINAL PUBLIC WORKS/ENGINEERING DIVISION (509) 545-3444 / FAX (509) 543-5728 P.O. Box 293 (525 North 3` Avenue) Pasco, Washington 99301 / www.pasco-wa.gov April 15, 2015 Mr. Sean Davis, Director Franklin County Emergency Management 502 W. Boeing Street Pasco, WA 99301 RE: Memorandum of Understanding Dear Mr. Davis: THIS IS A MEMORANDUM OF UNDERSTANDING between the City of Pasco, hereinafter "City," and Franklin County Emergency Management, hereinafter "FCEM". The City is aware that FCEM is responsible for coordinating and establishing emergency response plans for emergencies and the designated Emergency Shelter/Assistance Shelter is Columbia Basin College. The City is aware that certain City streets will be used as designated Primary Evacuation Routes during emergency events. Both the City and FCEM collaborated closely to develop a traffic control master plan for the evacuation routes (see Attachment A). Concerns about motorist sign apathy and sign deterioration was discussed and it was agreed upon that the directional signs need to be non-visible and protected from the weather during non- events. The master plan identified using foldable directional signs and temporary traffic barricades for the routes. In consideration of FCEM's services to the City and the reimbursement of the initial costs of the foldable directional signs (see Attachment B), the City agrees to fabricate, install and maintain the foldable directional signs. City also agrees to provide temporary barricades and uncover the directional signs during emergency events. This memorandum shall constitute the entire understanding and agreement between the City of Pasco and Franklin County Emergency Management and shall not be modified except by written amendment of the memorandum and approved by both parties. Sincerely, Ahmad Qayouin PE Public Works Director Approved: City of Pasco tumiad Qayoumi, eE Public or 'rector, Date: Approved: Franklin Conty Emergency Management ha44,,,�7c)a_� Sean Davis Director Date: () 2 S as �E5 � ATTACHMENT A Quantity Unit Description 24 EA 30" x 24" Aluminium Blank 15 YD White Prizmatic Backing 15 YD Black Film 2 Rolls Band -it Banding Material 1 Box Ultra-loc Buckles for banding 36 EA Flared Leg Bracket 4 EA 2"x24' GI Pipe 16 EA Sign Brackets 48 EA Clips 9 EA Concrete 24 Signs Material to fabricate with hanging and folding hardware Sales Tax Total Cost Total $39.50 $948.00 $10.86 $162.90 $4.41 $66.15 $88.20 $176.40 $88.20 $88.20 $3.85 $138.60 $340.00 $1,360.00 $1.95 $31.20 $4.00 $192.00 $3.95 $35.55 $3,163.45 8.60% $272.06 $3,435.51 40 HR Labor $48.00 $1,920.00 Total $5,355.51