HomeMy WebLinkAboutCH2M Hill - WSDOT Supplemental Agreement No. 2 CP5-ST-3A-12-57 Oregon AveJI N.,
Su lemental A reement
pp g
Organization and Address
CH2M HILL, INC.
Number 2
295 Bradley Boulevard, Suite 300
Richland, WA 99532
Original Agreement Number
STPUS-0397(008)
Phone: 509.375.3444
Project Number
Execution Date
Completion Date
STPUS-0397 008
11/26/2012
12/31/2015
Project Title
New Maximum Amount Payable
Oregon Avenue (SR 397) Corridor Traffic Study and
$ 412,492.00
Description of Work
Provide professional services to include additional signal warrant analysis, additional stormwater design and
coordination, additional signalization design, additional enviromnental documentation associated with historic
property inventories, and environmental documentation and engineering analysis associated with noise attenuation
options.
The Local Agency of City of Pasco, WA
desires to supplement the agreement entered into with CH2M HILL, INC.
and executed on 11/26/2012 and identified as Agreement No. STPUS-0397(008)
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
Section 1, SCOPE OF WORK, is hereby changed to read:
4.;ee Rxhihit A-1, Sons a of Wnrk,anhed.
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for
completion of the work to read: The Completion Date. is revised to 19/1111'2015
III
Section V, PAYMENT, shall be amended as follows:
The total Maximum Amromt Parvahle ander the. agreement is increased by 036 663 to $417„492
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces
below and return to this office for final action.
By:Roger W. Flint
Consultant Signature
DOT Form 140-063 EF
Revised 9/2005
CITY OF PASCO, WASHINGTON
OREGON AVENUE (SR -397) CORRIDOR TRAFFIC STUDY
& DESIGN
Supplement #2 — Supplemental Professional Services
EXHIBIT A-1: SCOPE OF WORK
INTRODUCTION
This Supplemental Agreement No. 2 scope of work modifies the scope of CH2M HILL, Inc.'s
(CONSULTANT) professional engineering services and compensation for the original agreement
(dated 11/26/2012) to include:
Task 1: Project management and administrative services associated with the extended project
duration. Original agreement assumed project duration thru June, 2014. Current
project anticipated to be complete in February, 2015.
Task 2: Additional traffic study services to include signal warrant analysis for Idaho Street
intersection with Oregon Avenue, associated with proposed Dura Plastics
development.
Task 3: Additional stormwater design and coordination services associated with unanticipated
and restrictive stormwater infiltration capacity of soils near the Oregon Ave / Ainsworth
St. intersection.
Task 3: Additional traffic design services to design a signalization system for Idaho Street
intersection with Oregon Avenue, associated with proposed Dura Plastics
development.
Task 5: Additional environmental documentation services associated with preparation and
submittal of 19 Historic Property Inventory (HPI) forms to DAHP. Original agreement
assumed four HPI forms would be needed.
Task 5: Additional design and environmental review services associated with development of a
noise barrier analysis. Supplement #1 scope for Noise Study services assumed that
no barriers would be warranted.
The CONSULTANT will provide the following services:
TASK 1. PROJECT MANAGEMENT AND COORDINATION
The CONSULTANT will provide project management and administration services for the work
elements described in this document.
Supplement #2, Exhibit A-1: Scope of Work
Revised. 9/10/2014 Page 1 of 4 CM2MHIL
1.1. Contract Management
The CONSULTANT will provide services to manage the contract, manage project scope,
schedule and budget, amend professional agreements with subconsultants, prepare and
process monthly invoicing, progress reporting, and other internal management duties.
The CONSULTANT will provide the CITY with a monthly Progress Report, in writing, reporting
on the CONSULTANT'S progress and any known issues or anticipated changes in performing
the Work.
Task 1.1 Assumptions:
+ Additional duration of 8 months (June, 2014 to February, 2015)
Task 1.1 Deliverables:
+ Monthly Progress Reports (1 hard copy and .pdf electronic format)
1.2. Project Coordination
1.2.1. Correspondence and Meetings
The CONSULTANT will partner with the CITY to accomplish the Oregon Avenue (SR 397)
Corridor Traffic Study & Design. Coordination of the project work elements will include an
additional 8 months (assumed) of:
• Coordination meetings with CITY to be conducted at appropriate intervals
throughout the project.
• Regular coordination meetings with internal CONSULTANT team, including
subconsultants to be conducted at appropriate intervals throughout the project.
Task 1.2 Assumptions:
+ Bi -Weekly Coordination Meetings with CITY via phone or in CONSULTANT offices.
+ CITY staff will conduct necessary meetings with Council and CONSULTANT will not
attend.
Task 1.2 Deliverables:
+ Meeting Agendas, and Meeting Notes (.pdf electronic format)
Supplement #2, Exhibit A-1: Scope of Work
Revised: 9/10/2014 Page 2 of 4 'r% CH2MHILL
TASK 2. CORRIDOR TRAFFIC STUDY AND PRELIMINARY DESIGN
2.1. Existing Conditions Review
2.1.1. Transportation Baseline Analyses
2.1.1.2. Baseline Traffic Model and LOS Analysis
The CONSULTANT will review CITY -provided information based on the proposed
Dura Plastics development on Idaho Street and provide a signal warrant analysis that
considers planned short and long-term development on the property.
Task 2.1
+ CITY to furnish Dura Plastics development data. CONSULTANT may reasonably
rely upon the accuracy, timeliness, and completeness of data provided.
Task 2.1 Deliverables:
+ CONSULTANT will update the Transportation Study Report to include the signal
warrant findings and recommendations
TASK 3. FINAL ROADWAY DESIGN
3.1. Final Roadway Design Plans
3.1.4. Drainage and Utility Plans
Unanticipated and the limited infiltration capacities have been encountered during
geotechnical field explorations on the project. The CONSULTANT will provide additional
design services, analysis, and coordination to ascertain a stormwater management best
practice for treatment and disposal of runoff for the southern -most sub -basin, near the
intersection of Oregon Avenue and Ainsworth Street.
3.1.7. Traffic Signal and Illumination Plans
The CONSULTANT will design a traffic signal system for the intersection of Oregon
Avenue and Idaho Street. The CONSULTANT will prepare signal plans (1 sheet) and
details (1 sheet) in accordance with current (as of execution of this supplement) WSDOT
guidelines, showing proposed locations for new or relocated signals, luminaires, electrical
hardware, and wiring diagrams. It is anticipated that the signal system will be installed at
a future time, and by others. The signal plans and specifications for this project will only
include underground facilities, such as conduit and junction boxes.
Task 3.1
+ Phase II plans will be updated to include the recommended treatment and disposal
BMP for this site.
Supplement #2, Exhibit A-1: Scope of Work
Revised. 9/10/2014 Page 3 of 4 r—H2MHILL
+ CITY will coordinate directly with the Port of Pasco regarding solutions that may
impact Port properties, utilities, and/or stormwater facilities.
Task 3.1 Deliverables:
+ The CONSULTANT will submit plans at the 60%, 95% and 100% design milestones
for review.
TASK 5: ENVIRONMENTAL DOCUMENTATION AND PERMITTING
5.1.1 Section 106/Cultural Resources Assessment
The CONSULTANT will record and document an additional 15 historic properties identified
within the project APE on Historic Property Inventory (HPI) Forms to be submitted to
DAHP, and evaluate for National Register of Historic Places eligibility [NRHP-eligible
historic properties become Section 4(f) properties].
Subtask 5.1.1
+ No meetings are planned or included.
+ Resources and analyses will be documented in the Cultural Resources Report.
Subtask 5.1.1 Deliverables:
+ Cultural Resources Report
5.1.5 Traffic Noise Study and Report
The CONSULTANT's Traffic Study Noise report will be revised to include an engineering
review and analysis of two noise barriers that have been identified as required on Oregon
Avenue, immediately north and south of Clark Street. The CONSULTANT will review
reasonableness and feasibility for the barriers in accordance with WSDOT's noise policy
and provide recommendations in the revised final Traffic Noise Study Report.
Subtask 5.1.5 Assumptions:
+ No meetings are planned or included.
Subtask 5.1.5 Deliverables:
+ Revised final Traffic Noise Study Report
Supplement #2, Exhibit A-1: Scope of Work
Revised: 9/10/2014 Page 4 of 4
City of Pasco, Washington
Exhibit E-1
Oregon Avenue (SR -397) Corridor Traffic Study & Design
CH2M HILL
Labor Hours (See Attached Labor Summary) 360 $15,015.98
Direct Salary Cost $15,015.98
Direct Salary Escalation Cost (estimated)
2013 to 2014 0% $0.00
Total Direct Salary Cost $15,015.98
Overhead Cost @ 114 16% of Total Direct Salary Cost $17,142.24
Fixed Fee @ 30 0% of Total Direct Salary Cost $4,504.79
Total Overhead & Fixed Fee Cost $21,647.04
Total Labor Cost $36,663.02
Direct Expenses
No.
Each
Cost
Reports
0
$0.05
$0.00
Misc. copies
0
$0.05
$0.00
Reprographics
0
$40
$0.00
Mail/Deliveries/etc.
0
$15
$0.00
Mileage
0
Mi. @
$0.560
/Mile
$0.00
Auto Rental/Gasoline
0
days @
$85
/day
$0.00
Lodging
0
days @
$110
/day
$0.00
Aerial Photographs
0
$3,000
$0.00
Travel Total (airfare, train, etc)
0
$500
$0.00
Equipment Rentals, EDM, GPS
0
$50
$0.00
Parking
0
$30
$0.00
Per Diem
0
days @
$75
/day
$0.00
Drilling
0
$4,500.00
$0.00
Excavating/Test Pit
0
$2,000.00
$0.00
Materials Lab
0
$600.00
$0.00
Total Expenses
$0
Subcontracts
Bernardo I Wills Architects $0.00
Total Subcontracts $0.00
Total Lump Sum Price (Labor, Expenses, Subcontracts) $36,663
M M (NO N tD
w M ON Cl)
� O Vi EfJ FH
0000 O
(A (A W M !H
QC c6
ao
X F
w
0 0 0 0 0
V
L
C
O
co O (O r- M
M M (O N (O
JIn 0 O (O
L V M M (D t0
�a
N J
U
J
J_
O N 0 O
G O N M
N =
U
m
Z o
O z ~
LU F
0
O<w
a
P:z a
Z z
LU
0W a
Oa O
00
C.)
Q Fa
Y Z } W
F zF0=1
2Nw0
Lu V 0 0
aLLQa
a W
U as z Z
O
o�a�
IrO?z
IL LL w
r N M In
Y Y Y Y
N N f/7 fq
a a a a
FF HF -