HomeMy WebLinkAboutC & E Trenching - Change Order No 5M7-SM-2R-14-01 Rd 40 East Storm DrainageCITY OF PASCO PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO. 5 Project No: M7 -SM -2R-14-01 Proiect Title: Rd 40 East Strom Drainage Contractor: C&E Trenching LLC Description of Change: Detail as Appropriate: See Contract Bid Amount: S 56,367.57 SALES TAX @ 8.6%: $ 4,847.61 Total: $ 61,215.18 PREVIOUS CHANGE ORDER CURRENT CHANGE ORDER Subtotal $ 14,400.99 Subtotal $ 7,979.36 Sales tax @ 8.6% $ 1,238.49 Sales tax @ 8.6% $ 686.22 Total $ 15,639.48 Total $ 8,665.58 Total Change Orders To Date $ 24,305.06 New Contract Amount $ 85,520.24 IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER Contract Time Prior to this Change Order.. _. _. .. Modification to Contract time by this Change Order .................. revised Total Contract Time ........... ......... _........................ YES NO 20 0 20 It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously executed Contract Documents shall apply to this Change Order. AGREED TO D ACCEPTED: , H -y El - CONTRACTOR Date APPROVED: fv(` v/m7/7//� CITY ENGINEER Date APPROVED: PROJECT t ANAGER- Date Memo Public Works Department Engineering Division To: Mike Pawlak, P.E., City Engineer From: Kate Thompson, P.E., Civil Engineer CC: Teresa Reed -Jennings, P.E., Senior Civil Engineer Date: October 15, 2014 Re: Rd 40 East Storm Drainage — Necessary Repair Due to Damage to Completed Project On October 16, 2014 Teresa Reed Jennings and I conducted a visit to the completed project site for the Rd 40 East Storm Drainage project to look at an adjacent unpermitted project on private property. This site visit revealed that since the final walk through for the project on October 3, 2014 significant damage had been done to the north east portion of the project located on the north edge of a driveway entrance into the Lakeview Trailer Court. The residents of the Lakeview Trailer Court have been driving into the newly reshaped gravel ditch over the new catch basin when exiting the driveway. This has caused the ditch to lose its shape, and fill the catch basin with gravel and not function as designed. See photos below of the area during construction and on October 14, 2014. September 26, 2014 October 14, 2014 At the time of the final walk through the ditch was bowled at the catch basin to force water into the catch basin instead of draining across the roadway. On the day of our site visit, October 15, 2015, this shape to the ditch was no longer present due to the vehicles repeatedly driving over the ditch as shown in the above picture. In order to prevent the issues that existed prior to the construction of the project from re-emerging this area must be reconstructed. I recommend installing concrete curbing around the radius and lining the ditch with 0 Page 1 concrete immediately adjacent to the catch basin to prevent this issue from reoccurring once the contractor leaves the project site. Bollards may also be needed behind the curb to ensure vehicles do not drive around the curbing. Additionally, the residents of the Lakeview Trailer Court have been walking through the newly placed hydro - seed within the project limits. This will likely cause some areas of the hillside to erode sediment into the new ditches. The hydro -seeded areas will need to be monitored to see how the seed grows. If inadequate growth occurs, the vertical slopes may need additional erosion control measures to help reduce erosion due to wind and rain. 0 Page 2 Memo To: Mike Pawlak, P.E., City Engineer From: Kate Thompson, P.E., Civil Engineer Date: October 29, 2014 Re: Change Order #5, Rd 40 East Storm Drainage Public Works Department Engineering Division Change Order No. 5 reflects the revisions to the Rd 40 East Storm Drainage Project listed below. This change order was requested by the City to correct issues that developed after construction. 1) Residents at the Lakeview Trailer Court have been driving over the newly reshaped gravel ditch located on the north edge of the driveway entrance into the Lakeview Trailer Court. This has caused significant damage to the ditch, and is preventing the ditch from functioning properly. Please see the attached memo regarding the damage for additional information. In order to correct this issue we are installing additional concrete ditch in this location which will be approximately 6' wide by 11' long with 28' of curbing. The curbing will be 8" wide with 10" of reveal and will be painted yellow in order to keep vehicles from entering the new concrete ditch. This construction will require some asphalt to be patched back near the new concrete ditch. 2) The existing ditch upstream of the new concrete ditch described in item 1 above is eroding and depositing large amounts of sediment into the catch basin which will be located within the new concrete ditch. To protect the ditch from further erosion, we will be compacting and adding 4" of CSBC to the existing ditch line for a length of 200' north from the new concrete ditch. Within this new gravel ditch section rock check dams will be installed on 10' centers. These check dams will help slow the flow of the water and help sediment settle out before reaching the new catch basin. The table below lists all changes and costs associated for the Rd 40 East Storm Drainage project: NUMBER ITEM UNIT UNIT PRICE QUANTITY TOTAL 1 Additional Concrete Ditch LS $2,220.92 1 $2,220.92 2 Asphalt Patch LS $1,784.96 1 $1,784.96 3 Gravel V -Ditch SY $16.22 134 $2,173.48 4 Rock for Check Dams LS $300.00 1 $300.00 5 Additional Traffic Control LS $1,500.00 1 $1,500.00 SUBTOTAL $7,979.36 TAX 8.6% $686.22 TOTAL COST CHANGE ORDER #5 $8,665.58 The price for the Additional Concrete Ditch which includes painted curb was compared to the original unit price for Concrete Lined Ditch. The Additional Concrete Ditch costs approximately $304.24/SY vs the original unit price for Concrete Lined Ditch which was $75.72/SY. The Additional Concrete Ditch costs more due to the addition of the painted curb, This price was found t}o�be�acceptable. • Page 1 The price for the Asphalt Patch was found to be approximately $91.07/SY which is slightly higher than the original unit price for Pavement Repair which was $72.82/SY. This price difference is likely due to having to remobilize the paving crew for a small area of work. This price was found to be acceptable. The price for the Gravel V -Ditch was the same as the original unit price for Gravel V -Ditch. There was an additional charge for the rock needed to construct the check dams, since rock check dams were not part of the original section for Gravel V -Ditch. 0 Page 2 CAe TRENCHING, LLC Date: 10/20/2014 Attention: Katherine Thompson Company: City of Pasco Address: Phone/Fax/Email: Project Name: Road 40 east C&E Project Number: 14402C Scope of Work Bid: Per Bid items C & E Proiect Manager: Jake Wray J060 "F.e7 FcRt 666%. • P.O. Box 3788 • Pasco, WA 99302 • 509.545.6940 OFFICE • 509.545.8671 Fax Change Order Request #: 2 Change Order Request We hereby submit the following change order requestfor changes in the work required under this Contract with the listed changes in the Contract Sum listed below. Chante Order Request Swue of Work: Description Quantity Unit Unit Price Ext Price Additional concrete ditch measuring 6' by 11' 1.000 LS $2,220.92 $2,220.92 with 28 feet of concrete curb per WSDOT: CEMENT CONCRETE CURBS 7-. 2 Z C)- 4Z STANDARD PLAN F-10.12-03. (includes 4" Of 5/8" minus gravel under concrete and 4" of concrete.) 11' by 16' @ 3" deep Asphalt patch just south of 1.000 LS $1,784.96 $1,784.96 proposed concrete curb. (Includes saw cut, removal of existing asphalt, prep of subgrade Cj ( . 04 +P)y .4(0 including 8 inches of 1.25" minus gravel and 2" of 5/8" minus gravel and compaction.) 6' by 130' @ 3" deep Asphalt patch parallel to 1.000 LS $6,526.11 $6,526.11 concrete ditch. (Includes saw cut, removal of existing gravel and asphalt, prep of subgrade 8(G•-1 W's 2 -Co l) including 8 inches of 1.25" minus gravel and 2" of 5/8" minus gravel and compaction.) Grand Total: $10531.99 Conditions/ Exclusions: /CC5.8 the proposed scope of work in a timely manner. Pricing excludes all hard surfaces unless specifically included; Includin¢ boring. Wall penetrations, Concrete mow strips, walls. asphalt, Pricing excludes all soil and compaction testing Pricing excludes all excavation/trenching/installation solid rock and/or excessively rockv conditions. "For ALL Your Excavating Needs" www.candetrenching.com CA De TRENCHING, LLC - P.O. Box 3788 • Pasco, WA 99302 • 509.545.6940 OFFICE • 509.545.8671 FAX Pricine may be withdrawn if not accented within 30 days. Pricine excludes sales tax Pricine excludes sleeving, feneine, sienage, liehtine, and site furnishine. We look submit the following Change Order Request for your review if accepted please sign below and return authorization of work. Thank you for the opportunity to earn your work!! Acceptance of Change Request: The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined. Take W r� Jake Wray Accepted by Date 3�d iaE!�s C�u-ez-e b (Wd a rtcX� ^� OL w faC4cl curb ( Rd ccSi 31 . GD (L.F �i Rn{xl i 2. 8Z /St) "For ALL Your Excavating Needs" www.candetrenching.com Katherine Thompson From: Jake Wray <jake@candetrenching.com> Sent: Tuesday, October 28, 2014 3:37 PM To: Katherine Thompson Subject: Road 40 east Good afternoon, The cost for the traffic control is $1500.00 and the cost for the load of 4-6" rock for the check dams is $300.00. Let me know if you are good to go with this and I will schedule the work! Thanks. —Jake Jake Wray C & E Trenching LLC 509-528-2824 Phone 509-545-8671 Fax www.candetrenching.com