HomeMy WebLinkAboutRay Poland & Sons Change Order 4 C5-ST-3A-13-01 Lewis Street DemoCITY OF PASCO
PUBLIC WORKS DEPARTMENT
CONTRACT CHANGE ORDER NO. 4
Project No: C5- ST- 3A -13 -01 Project Title: Lewis Street Demolition
Contractor: Ray Poland & Sons
Description of Change: Cut & cap existing sewer service stubs.
Detail as Appropriate:
services na, $300 /ea ($3.600): and 4
Contract Bid Amount:
SALES TAX @ 8.6 %:
Total:
$ 409,777.00
$ 35,240.82
$ 445, 017.82
PREVIOUS CHANGE ORDER
CURRENT CHANGE ORDER
Subtotal $
150,387.68
Subtotal $ 6,720.00
Sales tax @ 8.6% $
12,933.34
Sales tax @ 8.6% $ 577.92
Total $
163,321.02
Total $ 7,297,92
Total Change Orders To Date $ 170,618.94
New Contract Amount $ 615,636.76
IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER YES NO
Contract Time Prior to this Change Order .. ............................... 130
Modification to Contract time by this Change Order .................... 0
revised Total Contract Time ..................... ............................... 130
It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being
made and that the compensation for this Change Order is full and complete and is the only compensation due
or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present
Contract Documents and that the provisions of the previously executed Contract Documents shall apply to this
Change Order.
D TO N CCEPTED:
lD
del CTOR Date
APPR9YEP:
CITY ENGINEER Date
APPRO
/6 y
C MANAGER Date
APPROVED:
/ PUBLIC WORKS
Date
DIRECTOR
ds 0 `)
Memo
Public Works Department
To: Mike Pawlak, City Engineer Engineering Division
From: David Tanner, Senior Engineer
Date: 09/23/2014
Re: Lewis Street Demolition Change Order #4
SUMMARY
We have received a Change Request for additional work necessary to cut and cap the
existing sewer services to the 16 buildings to be demolished.
Abandonment of the existing sewer stubs was not addressed in the original contract
documents, and this work should be considered as a change in conditions.
The original change request was for $550 per shallow sewer, and $1,225 per deep
sewer. After negotiation the final agreed upon price is $300 for shallow sewers, and
$780 for deep sewers. For purposes of this change order it is assumed that there are 12
shallow and four deep sewer connections to be cut and capped. Final quantities will be
adjusted as necessary.
Staff recommends approving Change Request #4 for the estimated amount of
$6,720.
• Page 1
David Tanner
From: Bryan <bryan @raypolandandsons.com>
Sent: Wednesday, August 20, 2014 10:24 AM
To: David Tanner
Subject: RE: Revised CO # 3
David,
Thanks. I will get a price together on the hydroseeding.
Bryan Knapik
Ray Poland & Sons Inc.
Project Manager
Ph # 509.586.2158
Fx # 509-585.0244
Cell # 509-947.7845
bryan @rysincue.com
From: David Tanner [mailto:tannerdCdpasco- wa.gov]
Sent: Wednesday, August 20, 2014 9:20 AM
To: Bryan
CC: Kent McCue; Ryan Mahaffey
Subject: RE: Revised CO # 3
Bryan,
The Revised Change Request is approved for the capping of existing sewer services only. The City has decided not to
utilize crushed concrete for dust control as proposed. Please prepare an estimate to hydro -seed all disturbed areas as
discussed.
Thank you,
David J. Tanner, PE
Senior Civil Engineer
City of Pasco, Public Works Dept.
(509) 545 -3444
From: Bryan rmailto :bryan(cbraypolandandsons.coml
Sent: Tuesday, August 19, 2014 9:15 AM
To: David Tanner
Subject: Revised CO # 3
David,
Here is a revised number on CO # 3 we talked about on the phone.
Thanks
P.O. BOX 6772
503 W COLUMBIA DRIVE
KENNEWICK, WA 99336
GENERAL CONTRACTOR
RAYPOS243JE
Change Order
WWW.RPSINCGC.COM
[5091 586 -2158
FAX: [5091 565-0244
PROPOSAL SUMO
PHONE I JDATE
City of Pasco
509 -545 -3444 811512014
STREET
JOB NAME
525 North Third Ave
Lewis Street Demo Project # CS-ST-3A-1 3-01
CITY, STATE AND ZIP CODE
JOB LOCATION
Pasco. WA 99301
Pasco, WA
We hereby submit the fdlowkg charge order for.
CHANGE ORDER # 3 Sewer service capping - Gravel for dust control
For the capping of the existing sewer service to the best of our knowledge that leaves the building we are taking down.
Will cap With a PVC cop if plastic pipe or concrete if it is clay, asbestos, concrete, etc. Will mark With a markerboard
for future reference and document the depth of existing sidewalk or curbing.
Shallow service 2ft - 4ft $ 300.00
14
Deep service 4ft 1 Oft S_-- ..-786.00_. - - .- � ...._...
k-L C, ) � H(���1 = � -r zv r
Haul and place 1 "to 2" o /crushed concrel`eTor ddst coritrol on areas where the buildings have beed removed.
Crushed concrete perAn $ 16.50
/'
�t pu- ..sysS r -z A*A11 Or7c
YT�4�p���c"S.
-if � hMi eve t}ti1�v Cfas r Ta^t
TOTAL THIS CHANGE ORDER $ -
We Propose hereby to furnish material and tabor- compete in accordance with above specificaHue. for the sum of
Dollars $
Payment to be made as follows:
All material is guaranteed to be as spttified. All work to be completed in a workmsnlike
manner according to standard practices. Any alteration or privation torm above specific-
1
Au horize i nature / Bryan Kna ik
lions Invblafng extra costs will tie executed only upon ""ten orders, and will become an
extra charge over and above me estimate. All agreements contingent upon strikes, accidents
or delays beyond our control. Owner to wnyfim, tornado and other necessary insurance.
Our workers are fully Covered by Workmen's Compensation Insurance
Acceptance of Change Order - The above prioes, specificetiors and
cordbiors are satisfactory and are hereby accepted. You are euarorized
Signa!ure
to do the work as specified. payment will be made as outlined above.
Date of Acceptance:
Sigremre
P.O. BOX 6772
503 W COLUMBIA DRIVE
KENNEWICK, WA 99336
GENERAL CONTRACTOR
RAYPOS243JE
Change Order
WWW.RPSINOGO.COM
15091 586 -2158
FAX: 15091 5B5 -O244
PROPOSAL SUBMITTED TO
PHONE I JDATE
City of Pasco
509 - 545 -3444 6/15/2014
STREET
JOB NAME
525 North Third Ave
Lewis Street Demo Pro ect # C5- ST- 3A -13 -01
CITY, STATE AND ZIP CODE
JOB LOCATION
Pasco, WA 99301
Pasco, WA
We hereby submit the fdbwing charge order for:
CHANGE ORDER # 3 Sewer service capping - Gravel for dust control
For the capping of the wresting sewer service to the best of our knowledge that leaves the building we are taking down.
Will cap With a PVC rap if plastic pipe or concrete if it is clay, asbestos, concrete, etc. Will mark with a markerboard
for future reference and document the depth of existing sidewalk or curbing. -se V16,0 5- zcZ z iloB�) A14"v
Shallow service 2ft - 4ft $ 550.x0
Deep service 4ft -1 Oft $ 1,225.00
Haul and place 1" to 2" of crushed concrete for dust control on areas where the buildings have beed removed.
Crushed concrete per /tn $ 16.50
:t 1, o� Ta+ s "y' � �rs�� C S*bAN � vec� Ukssl
TOTAL THIS CHANGE ORDER $ -
we Propose hereby to furnish material and labor- complete in accordance wnh above specifications, for the sum W:
Dollars $
Payment to be made as follows:
At material is guaranteed to be as specified. Ali work to be completed in a workmanlike
4
manner according to standard practices. Any alteration or deviation form above specife-
od Si nature /Bryan Kna ik
tons involving extra costs will be executed only upon written orders, and will become an
extra charge over and above Me estimate. All agreements contingent upon strikes, accidents
or delays beyond our control. Owner to carry fire. tornado and other necessary Insurance.
Our workers are fully covered by Workmen's Compensation Insurance.
Acceptance of Change Order - The above prices. specifications and
coMdiors are satisfactory and are hereby accepted. You are authorized
Signature
to do the work as specified. payment will be made as outlined above.
Date of Acceptance:
Signal.