STORMWATER MAINTENANCE AGREEMENT FOR:
THREE RIVERS WEST SUBDIVISION
THIS STORMWATER MAINTENANCE AGREEMENT (this "Agreement ") is
made and entered into this M06day of , 2014, by and between the City of
Pasco, Washington, a Municipal Corporation (hereinafter referred to as the "City "), and
HAYDEN HOMES, INC (hereinafter referred to as the "Developer "). The Developer is
seeking to develop a portion of parcel # 116020012 and in consideration thereof the
parties mutually agree and covenant the following:
1. Each storm water facility (catch basin) shall have a SiltsacO - Regular Flow
(ACF Environmental Catalog No. SILT02X02) installed per the manufacturer's
directions.
2. The Developer will provide all monitoring, maintenance practices and procedures,
as well as any financial obligations relating to the storm drain system. Failure to
provide adequate maintenance, which may result in the failure of any storm drain
system, is the complete responsibility of the Developer.
3. All storm drain systems (catch basins, abutting roadways, etc.) will be cleaned
and inspected by the Developer on a regular maintenance schedule, not to exceed
1 month between inspections and cleaning. A maintenance and cleaning schedule
is to be submitted to the City of Pasco Public Works Department affecting these
storm drain systems prior to construction of these facilities.
4. All storm drain systems are to be kept operational by the Developer at all times
until accepted by the City of Pasco.
5. Failure to maintain or keep operational at all times any storm drain system, which
would result in intervention by the City of Pasco, will result in all costs incurred,
including private property damage, to be levied against the owner /developer at a
rate not to exceed 125% percent of costs incurred.
6. Failure of any storm drain facility, as determined by the City of Pasco, will result
in the replacement of each facility as well as complete repairs to the Right -of-
Way by the owner /developer as directed by the City of Pasco. This may include
replacement of curb, gutter and sidewalk as well as repaving of adjoining street
side (centerline to curb) from intersection to intersection. This policy will start at
the beginning of construction of the storm drain facilities and remain in effect
until the expiration of the one year warranty period for said facilities.
7. All lots that contribute to or affect the performance of any given storm drain
facility, as determined by the City of Pasco, must be landscaped with approved
and accepted City of Pasco residential landscaping prior to that particular storm
drain facility receiving final inspection & acceptance. The City of Pasco reserves
the right to determine actual areas that may affect a stonn drain facility.
8. Prior to acceptance of any storm drain system, all facilities within the system must
be cleaned (including all foreign material removed) by the Developer. The City
of Pasco may require inspection each facility with the use of a camera by the
Developer. Flooding tests may also be conducted by the Developer. Once each
facility passes inspection and they are accepted by the City of Pasco the one year
warranty period for those accepted storm drain systems will begin.
9. In the event ownership of any property located within the confines of this
agreement is passed to another person(s) or entity this agreement shall remain
with the Developer.
10. This agreement will remain in full force and effect until such time as all
conditions have been met to the satisfaction of the City of Pasco or a new
agreement has been properly executed and recorded at the Franklin County
Courthouse, Washington.
Agreed to and acknowledged this l�day of nu 2014
CITY OF PASCO, WASHINGTON H DEN HOMES, INC
,1.+�.. t l ((
Michael A. P wlak, PE Hayden Watson, Owner
City Engineer