A RESOLUTION ACCEPTING THE PLANNING COMMISSION'S
RECOMMENDATION AND APPROVING A SPECIAL PERMIT FOR THE
LOCATION OF WIRELESS COMMUNICATION FACILITIES AT THE
SOUTHWEST CORNER OF COURT STREET AND ROAD 68.
WHEREAS, AT &T, submitted an application for the location of cellular
facilities at the southwest corner of W. Court Street and Road 68 (Tax Parcel 119 -701-
412); and,
WHEREAS, the Planning Commission held a public hearing on May 15, 2014 to
review the proposed cellular facilities; and,
WHEREAS, following deliberations on June 19, 2014 the Planning Commission
recommended approval of a Special Permit for the proposed cellular tower with certain
conditions; IOW, THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO:
1. That a Special Pen-nit is hereby granted to AT &T for the location of cellular
facilities in a C -1 (Retail Business) District under Master File # SP2014 -005 with the
following conditions:
a) The special permit shall apply to parcel # 119 -701 -412, Lot 2, Short Plat
93 -08, Franklin County WA;
b) The property shall be developed in substantial conformity with the
elevations and site plan submitted with the application except as
conditioned herein;
c) The cellular antennae tower shall not exceed 90 feet in height as
measured from existing grade;
d) The entire cellular antennae tower shall be treated with faux tree features
including branches, foliage and bark;
e) The ground -level equipment shall be screened from all adjacent rights -
of -way by a block wall;
f) The ground -level cellular equipment enclosure shall be surrounded by a
landscaping buffer which obscures view of the equipment enclosure.
Said landscaping buffer shall be served by an automatic irrigation
system and shall be maintained in a well -kept manner by the applicant;
g) The ground -level equipment enclosure shall be located no closer than
fifteen (15) feet from the property line adjacent to Road 68;
h) The driveway connecting Road 68 to the equipment enclosure shall be
paved with either concrete or asphalt to the design specifications of the
Pasco City Engineer;
i) The antennae tower shall not emit white light between the hours of 6pm
and Sam;
j) The proposed cellular facility must comply with all FCC regulations
regarding radio frequency emissions;
k) The special permit shall be null and void if a City of Pasco building
permit is not obtained by July 30, 2015.