Loading...
HomeMy WebLinkAbout3568 ResolutionRESOLUTION NO. 3S& d A RESOLUTION ACCEPTING THE PLANNING COMMISSION'S RECOMMENDATION AND APPROVING A SPECIAL PERMIT FOR THE LOCATION OF WIRELESS COMMUNICATION FACILITIES AT THE SOUTHWEST CORNER OF COURT STREET AND ROAD 68. WHEREAS, AT &T, submitted an application for the location of cellular facilities at the southwest corner of W. Court Street and Road 68 (Tax Parcel 119 -701- 412); and, WHEREAS, the Planning Commission held a public hearing on May 15, 2014 to review the proposed cellular facilities; and, WHEREAS, following deliberations on June 19, 2014 the Planning Commission recommended approval of a Special Permit for the proposed cellular tower with certain conditions; IOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO: 1. That a Special Pen-nit is hereby granted to AT &T for the location of cellular facilities in a C -1 (Retail Business) District under Master File # SP2014 -005 with the following conditions: a) The special permit shall apply to parcel # 119 -701 -412, Lot 2, Short Plat 93 -08, Franklin County WA; b) The property shall be developed in substantial conformity with the elevations and site plan submitted with the application except as conditioned herein; c) The cellular antennae tower shall not exceed 90 feet in height as measured from existing grade; d) The entire cellular antennae tower shall be treated with faux tree features including branches, foliage and bark; e) The ground -level equipment shall be screened from all adjacent rights - of -way by a block wall; f) The ground -level cellular equipment enclosure shall be surrounded by a landscaping buffer which obscures view of the equipment enclosure. Said landscaping buffer shall be served by an automatic irrigation system and shall be maintained in a well -kept manner by the applicant; g) The ground -level equipment enclosure shall be located no closer than fifteen (15) feet from the property line adjacent to Road 68; h) The driveway connecting Road 68 to the equipment enclosure shall be paved with either concrete or asphalt to the design specifications of the Pasco City Engineer; i) The antennae tower shall not emit white light between the hours of 6pm and Sam; j) The proposed cellular facility must comply with all FCC regulations regarding radio frequency emissions; k) The special permit shall be null and void if a City of Pasco building permit is not obtained by July 30, 2015. Passed by e City /Council of the City of Pasco this 7t' day of July, 2014, Matt Watkins, Mayor ATTEST: City Clerk 2 APM- Leland AS TO FORM: � B. Kerr, City Attorney