HomeMy WebLinkAbout2014.06.09 Council Workshot PacketAGENDA
PASCO CITY COUNCIL
Workshop Meeting 7:00 p.m. June 9, 2014
I. CALL TO ORDER
2. ROLL CALL:
(a) Pledge of Allegiance.
3. VERBAL REPORTS FROM COUNCILMEMBERS:
4. ITEMS FOR DISCUSSION:
(a) WCIA Insurance Summary Update. (NO WRITTEN MATERIAL ON AGENDA)
Presentation by: Stan Strebel, Deputy City Manager.
(b) Fire Safety Inspection Program:
1. Agenda Report from Rick White, Community & Economic Development Director dated
June 4, 2014.
2. Fire Safety Inspection Program - Proposed Resolution.
(c) Irrigation System Master Plan:
1. Agenda Report from Ahmad Qayoumi, Public Works Director dated June 5, 2014.
2. Irrigation System Master Plan - Proposed Resolution.
3. Irrigation System Master Plan - Proposed Capital Improvements List.
4. Irrigation System Master Plan - Plan.
(d) Six -Year Transportation Improvement Plan 2015 -2020:
I. Agenda Report from Ahmad Qayoumi, Public Works Director dated June 5, 2014.
2. Six -Year Transportation Improvement Plan 2015 -2020 - Proposed Plan.
3. Six -Year Transportation Improvement Plan 2015 -2020 -Resolution.
4. Six -Year Transportation Improvement Plan 2015 -2020 - Map.
(e) Billing & Collection Processes:
1. Agenda Report from Dunyele Mason, Finance Manager dated June 2, 2014.
2. Billing & Collection Processes - Proposed Ordinance.
(f) Local Government Investment Pool:
1. Agenda Report from Dunyele Mason, Finance Manager dated May 23, 2014.
2. Local Government Investment Pool - Proposed Resolution.
3. Local Government Investment Pool - Prospectus.
4. Local Government Investment Pool - Transaction Authorization Form,
5. OTHER ITEMS FOR DISCUSSION:
(a)
(b)
(c)
6. EXECUTIVE SESSION:
(a)
(b)
(c)
7. ADJOURNMENT
REMINDERS:
1. 11:45 a.m., Monday, June 9, Pasco Red Lion - Pasco Chamber of Commerce Membership Luncheon.
(Presenters: Tri-City Dust Devils General Manager, Derrel Ebert and Team Manager, Drew Saylor)
2. 6:00 -7:00 p.m., Wednesday, June 11, Pasco Red Lion "Silver Room" - City Manager Candidate
Executive Session with Councilmembers.
3. 7:00 -9:00 p.m., Wednesday, June 11, Pasco Red Lion "Silver Room" - City Manager Candidate
"Meet and Greet" Session. (ALL COUNCILMEMBERS INVITED TO ATTEND)
4. 7:00 a.m., Thursday, June 12 - BFCG Tri-Mats Policy Advisory Committee Meeting.
(COUNCILMEMBER BOB HOFFMANN, Rep.; REBECCA FRANCIK, Alt.)
5. 7:30 a.m. - 5:00 p.m., Thursday, June 12, Pasco City Hall - Council to interview and evaluate
candidates for the position of City Manager (Executive Session).
6. 7:00 p.m., Thursday, June 12 - Ben - Franklin Transit Board Meeting. (MAYOR MATT WATKINS,
Rep.; MIKE GARRISON, Alt.)
7. 9:00 a.m., Saturday, June 14, Boys & Girls Club - RSC- AmeriCorps "Summer Safety Fun Fair."
(COUNCILMEMBER REBECCA FRANCIK)
AGENDA REPORT
FOR: City Council
TO: Gary Crutchfie C' Manager
FROM: Rick White,
Community & Economic Development Director )Z [(J
SUBJECT: Fire Safety Inspection Program
I. REFERENCE(S):
1. Fire Safety Inspection Program — Proposed Resolution
June 4, 2014
Workshop Mtg.: 6/9/14
II. ACTION REQUESTED OF COUNCIL / STAFF RECOMMENDATIONS:
6/9: DISCUSSION
III. FISCAL IMPACT:
Estimated at $65,000.
IV. HISTORY AND FACTS BRIEF:
V
A. The City of Pasco has not had a formal fire safety inspection program since 1987. During this time
the City has experienced rapid commercial and industrial development. In the last rating by the
Washington Survey and Rating Bureau (Bureau) in 2007, the City received 595 deficiency points
out of a possible 650 in fire safety control.
B. Pasco will receive a revised rating from the Bureau in 2015 or 2016. With the continued growth
since the 2007 rating, the City could receive additional deficiency points and a re- classification. The
Bureau and local commercial insurance vendors estimate that changes up or down from our current
class 5 would result in an increase or decrease in the overall insurance premium between 5% and
10% depending on occupancy type, building construction, loss history and occupancy risk.
C. Efforts already undertaken to improve the City's rating include automatic aid for building fires,
training program improvements, ongoing regionalization of the communications system, smoke
detector services, public fire safety educator certification and fire safety education programs, fire
investigation certification program and juvenile fire setting intervention. The implementation of a
Fire Safety Inspection Program will result in the highest chance to improve the City's rating from
the Bureau.
D. The Uniform Fire Code (UFC) is adopted by the City in conjunction with the adoption of the State
Building Code, and through the UFC, the City has the authority to implement an Inspection
Program and establish appropriate fees.
E. City Council received a preliminary report on possible implementation of a Fire Safety Inspection
Program at the January 13, 2014 Council Workshop. There was concurrence to move forward with
establishing the program.
DISCUSSION:
A. To determine possibilities for a Fire Safety Inspection Program, the number of active City business
licenses was inventoried. This resulted in a determination of 1,500 various types of commercial
business licenses. These business licenses were broken down into the following categories:
• Low Hazard Licenses (559) such as retail stores, beauty salons, business offices or small
groceries without food preparation or fuel services...
• Moderate - Hazard Licenses (730) such as restaurants, contractors with construction
equipment and/or storage, used tire businesses, larger retail stores and dance halls or
nightclubs...
• High- Hazard Licenses (130) such as food processing and warehousing, automotive
repair or body shops, welding, painting, roofing companies, materials storage, auto
wrecking...
• Others (49) such as schools, day cares, motels...
4(b)
B. The Fire Safety Inspection Program is proposed to include a yearly inspection of all high hazard
occupancies and a biennial inspection for all moderate hazard occupancies. Low hazard occupancies
are not proposed for regular inspections.
C. Apartments and multi - family units will be inspected through the existing Rental Inspection Program
with revisions to the existing inspection checklist. The inspections will include adequacy and
placement of fire extinguishers, door closures, automatic lighting and other fire related safety
provisions.
D. The Inspection Program will use an existing City building inspector. The resulting service gap with
the construction inspection workload will be made up by the use of a contract building inspector.
This will enable the Fire Safety Program to be initiated in- house. Any downtime in the construction
inspection demand can be accommodated by deferring use of the contract inspector. Any downtime
in the Fire Safety Program can be accommodated by using the existing building inspector for
construction inspections.
E. The construction inspector will be needed for the estimated 1200 hours that the existing building
inspector will be devoting to the Fire Safety Program. In preliminary discussions with a private
inspection service, this will result in a yearly cost for a contract inspector of approximately $65,000.
This cost is proposed to be recovered through a fee for both initial fire inspections and re-
inspections. A fee of $75 per inspection would recover all of the expected cost. A fee of $60 per
inspection would recover $52,500 resulting in a City subsidy of $12,500 or about 20% of the
Program costs.
F. The Inspection Program for the High Hazard occupancies and a portion of Moderate Hazard
occupancies can be initiated at the beginning of 2015 in conjunction with business license renewals.
The remaining Moderate Hazard occupancies would be scheduled for inspections in 2016.
G. The proposed resolution (Reference #1) would establish the Inspection Program. Once direction
from Council oil the fee is received, staff will prepare an ordinance amending the existing Fee
Schedule for Council action.
RESOLUTION NO.
A RESOLUTION ESTABLISHING A FIRE SAFETY INSPECTION
PROGRAM FOR THE CITY OF PASCO.
WHEREAS, the City is preparing for a Washington Survey and Rating Bureau rating process in
2015 or early 2016; and
WHEREAS, adoption of the Uniform Fire Code provides the authority for the City to establish a
Fire Safety Inspection Program and related fees; and
WHEREAS, Implementation of a Fire Safety Inspection Program is likely to improve the City's
Fire Rating, thereby minimizing increases or potentially realizing decreases in insurance rates; and
WHEREAS, an effective Fire Safety Inspection Program is likely to reduce loss and injuries
from fires and evacuations; and
WHEREAS, a review of existing City business licenses indicates that there are approximately
130 High Hazard Occupancies and 730 Moderate Hazard Occupancies conducting business within Pasco;
and
WHEREAS, an effective Fire Safety Inspection Program will consist of yearly inspection of
High Hazard Occupancies and biennial inspections of Moderate Hazard Occupancies;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
PASCO:
Section 1. The City Manager is hereby authorized and directed to establish the following Fire
Safety Inspection Program effective July 1, 2015:
In conjunction with the annual business license renewal cycle, the City will provide advance
notice of the requirement for a fire safety inspection and a fire inspection checklist to High
Hazard and Moderate Hazard occupancies.
High Hazard occupancies will require an annual inspection and Moderate Hazard
occupancies will require a biennial inspection.
Apartments and multi - family units will have fire safety inspections conducted through the
existing biennial rental inspection program.
Section 2. The City Manager shall report annually to the City Council as to the cost and
effectiveness of the Fire Safety Inspection Program.
Passed by the City Council of the City of Pasco this _day of , 2014.
Matt Watkins, Mayor
ATTEST:
Debbie L. Clark, City Clerk
APPROVED AS TO FORM:
Leland B. Kerr, City Attorney
AGENDA REPORT NO. 18
FOR: City
June 5, 2014
TO: Gary Crutc -ty Manager
FROM: Ahmad Qayo i, Public Works Director Workshop Mtg.: 06/09/2014
Mtg.: 06/16/2014
SUBJECT: Irrigation System Master Plan Re gu lar
I. REFERENCE(S):
1. Irrigation System Master Plan — Proposed Resolution
2. Irrigation System Master Plan — Proposed Capital Improvements List
3. Irrigation System Master Plan — Plan
II. ACTION REQUESTED OF COUNCIL / STAFF RECOMMENDATIONS:
06/09: Discussion:
06/16: MOTION: I move to approve Resolution No. adopting the
Irrigation System Master Plan.
III. FISCAL IMPACT:
IV. HISTORY AND FACTS BRIEF:
A) On May 20, 2013, City Council approved a professional services agreement with
MSA to complete a study of the City's water rights and a way to manage the available
rights. The City owns and operates two water systems; one for domestic use and one
for irrigation use. These systems are supplied by surface and ground water and
include a surface water intake from the Columbia River, a system of 10 wells, with
associated pumping and treatment equipment.
B) The irrigation system has grown to include ten well sites, one river pump station, and
a three million gallon standpipe, and now serves over 6,000 residential customers. In
addition to the residential water users, the system also supplies irrigation for a soccer
complex, five residential parks, two schools, and numerous landscaping areas
maintained by the City. Service is provided from April through October.
V. DISCUSSION:
A) MSA has completed the Irrigation System Master Plan, including capital
improvements for the irrigation system for the near and long term.
B) Staff recommends Council's approval of the Irrigation System Master Plan by
Resolution.
4(c)
RESOLUTION NO.
A RESOLUTION accepting the Irrigation System Master Plan prepared
by MSA Associates.
WHEREAS, the city presently provides irrigation water to more than 6,000 citizens and
the city's population is expected to continue to grow; and
WHEREAS, the city relies on approximately 932 acre feet of water from the Columbia
River and 11 well sites for its irrigation water supply; and
WHEREAS, withdrawals from the Columbia River are strictly regulated by the state in
its effort to balance the needs of various user interests and it is, therefore, expected that
additional withdrawals from the Columbia River will become increasingly difficult; and
WHEREAS, the city acquired and has greatly expanded an irrigation system serving
much of the Pasco plateau, thus partially mitigating the consumption of domestic raw water
supply associated with urban growth on the plateau; and
WHEREAS, the city recognizes the increasing need to preserve and conserve its
irrigation supply as well as optimize the use and benefit of the wells it owns and operates; and
WHEREAS, the city's consultant, MSA Associates, has studied the city's domestic and
irrigation system supplies and has developed a management plan designed to optimize long -term
use of the city's limited water supplies; NOW, THEREFORE,
THE CITY COUNCIL OF THE CITY OF PASCO, WASHINGTON, DO
RESOLVE AS FOLLOWS:
Section 1. That the City Council hereby accepts the Irrigation System Master Plan
prepared by MSA Associates, attached hereto as Exhibit A, to be used as a guide by staff and
Council in making various decisions about the city's irrigation system.
PASSED by the City Council of the City of Pasco at its regular meeting this _ day of
, 2014.
Matt Watkins, Mayor
ATTEST:
APPROVED AS TO FORM:
Debra Clark, City Clerk Leland B. Kerr, City Attorney
�
x
�
x
a
"a
a
s
s
a
q
s
a
a
3
a
s
$
q
�
$
dx
p
a
a
s
Y
_
s
$
a
s
a
a
r
$x
x
i
a
�
$
$
a
q
F
s
-
s
a
x
Y
;gy if
�s
�
a£§
yn
SSF p 3
gggy
�
8°
S
pppptl E
q� P
Z�
pRg
�
a YY
g�g
e
k
55
g
gg gg
ggg
R e
P
S9
QQ
ry
b
6
gQUn
y
F
a
y
g§
{)
$
Y
yy33 C
b
g
a ggggg
@
�
B
a
S
g
3
$
9
�
.rvrv,..,ew ry +ues mu..uwa
gy
l 6
�l $ 3
Will al'
°8885
cm w. n,..s
rvmas u•a aww.w
r
x
�
a
a
s
a
q
a
$
q
�
a
s
s
$
a
a
r
$x
x
i
a
�
q
F
s
s
a
x
�
h
k
P
S9
b
6
gQUn
y
F
a
y
{)
$
Y
yy33 C
b
�
B
S
g
3
$
9
�y
a �
gy
l 6
�l $ 3
Will al'
°8885
i
5
�y�
°
�' °
�
xew�rv+wtls..u.swxa
��.�
warvb.y
wms
Ytlrvl
w..s
s+IVrv9
a.. s.rv+.w
ry 0
r z
CITY OF PASCO, WASHINGTON
IRRIGATION SYSTEM MASTER PLAN
December 2013
MSA V,-
31wrn'.SmshBPvotltics,luc. Water Solutions, Inc.
IRRIGATION SYSTEM MASTER PLAN
1"
THE CITY OF PASCO, WASHINGTON
DECEMBER 2013
44.
13
MURRAY, SMITH & ASSOCIATES, INC.
1145 Broadway Plaza, Suite 1010
Tacoma, Washington 98402 -3542
253.627.1520
In association with
GSI WATER SOLUTIONS, INC.
55 Southwest Yamhill Street, Suite 300
Portland, Oregon 97205
971.239.8799
13- 1444.407
ACKNOWLEDGEMENTS
The following City of Pasco staff contributed to the development of this Irrigation System
Master Plan:
Ahmad Qayoumi, Public Works Director
Teresa Reed - Jennings, Senior Utilities Engineer
Cameron Magelsen, Irrigation System Manager
Curtis Glines, Irrigation System Operations
Reuel Klempel, Wastewater Treatment Plant Manager
Doyle Heath, Engineering Technician
The following GSI Water Solutions, Inc. staff contributed to the development of this
Irrigation System Master Plan:
Phillip A. Brown, RG LHg
Kenny Janssen, RG
13- 1444.407 i Irrigation System Master Plan
December 2013 Acknowledgements
k: \tac�ojMa \13 \1494 -P— .resat Y0 0] mn g City of Pasco
P prryan[bn \irtigatlon syatan maakr planWkmwlMgemenu page fi�ul.EOCx
TABLE OF CONTENTS
EXECUTIVE SUMMARY
Authorization................................................................................
...........................ES -1
Background...................................................................................
...........................ES -1
Purpose..........................................................................................
...........................ES -1
Irrigation System Plan Overview ..................................................
...........................ES -1
ExistingSystem .............................................................................
...........................ES -2
Supply................................................................................
...........................ES -2
Groundwater Supplies ............................................
...........................ES -2
Surface Water Supplies ..........................................
...........................ES -4
Water Rights Summary ..........................................
...........................ES -5
Storage...............................................................................
...........................ES -6
PressureZones ...................................................................
...........................ES -6
BoosterPump Stations .......................................................
...........................ES -6
DrySystems .......................................................................
...........................ES -6
Irrigation Water Demands .............................................................
...........................ES -7
Irrigation System Analysis and Findings ......................................
...........................ES -7
HydraulicModel ................................................................
...........................ES -7
AnalysisCriteria ................................................................
...........................ES -8
Flow Velocities ......................................................
...........................ES -8
Irrigation System Pressures ....................................
...........................ES -8
Model Analysis and Findings ............................................
...........................ES -8
Existing Conditions ................................................
...........................ES -8
FutureConditions ...................................................
...........................ES -9
StorageAnalysis ...............................................................
..........................ES -12
Well Condition Assessment .........................................................
..........................ES -12
Recommendations ........................................................................
..........................ES -12
1. INTRODUCTION
Authorization..............................................................................
............................... 1 -1
Background....................................................................................
............................1 -1
Purposeand Scope ......................................................................
............................... 1 -1
Irrigation System Plan Overview ................................................
............................... 1-1
2. EXISTING SYSTEM
Introduction.................................................................................
............................... 2 -1
ExistingIrrigation System ...........................................................
............................... 2 -1
Supply..............................................................................
............................... 2 -4
GroundwaterSupplies .............................................
............................2 -4
13- 1444.407 n Irrigation System Master Plan
December 2013 Table of Contents City of Pasco
k:Macy \*UV -p wets rem "y 7p\ W =lion\ i6ationrytemm tw pjmvV le ofcot .&m
SurfaceWater Supplies ........................................... -4
............................2
Water Rights Summary ........................................ ...............................
2 -4
Storage.............................................................................
ModelLayout ................................................................... ...............................
...............................
2-4
Distribution...................................................................... ...............................
2 -7
PressureZones ..................................................... ...............................
2 -7
BoosterPump Stations .........................................
2
...............................
DrySystems
-7
......................................................... ...............................
Interties
2-8
to Other Systems ...... ............................... ..............................
IrrigationSystem Demands
2 -8
......................................................... ...............................
ProductionRecords
2 -8
.......................................................... ...............................
2 -8
OverallSystem
ExistingConditions .............................................. ...............................
Usage ...................................................... ...............................
ResidentialDemands
2-8
.................................................:... ...............................
2 -10
CommercialDemands
Operations and Maintenance Problems ........................... ...............................
................................................... ...............................
2 -10
AgriculturalDemands
Freshwater Mussels .............................................. ...............................
.................................................... ...............................
2 -11
General Operating Procedures
Interstate Highway 182 Crossing ......................... ...............................
.................................................. ...............................
WaterQuality ................................................................................
2 -11
...........................2
Agreements with Kidwell Farms, Inc ....................................... ...............................
-12
2 -12
RateSchedule
............................................................................ ...............................
2 -12
Summary...................................................................................
...............................
2 -12
3. CRITERIA, ANALYSIS, AND FINDINGS
Introduction................................................................................. ...............................
3 -1
IrrigationSystem Analysis .......................................................... ...............................
3 -1
ModelLayout ................................................................... ...............................
3-1
Pipe Characteristics ......................................................... ...............................
3 -1
Water Demand Distribution ............................................. ...............................
3 -2
Wells................................................................................ ...............................
3 -2
ModelCalibration ............................................................ ...............................
3 -2
AnalysisCriteria .............................................................. ...............................
3 -3
FlowVelocities .................................................... ...............................
3 -3
Irrigation System Pressures .................................. ...............................
3 -3
SystemStorage ..................................................... ...............................
3 -4
Model and Analysis Findings .......................................... ...............................
3 -4
ExistingConditions .............................................. ...............................
3 -4
FutureConditions ................................................. ...............................
3 -5
Storage.................................................................. ...............................
3-5
Operations and Maintenance Problems ........................... ...............................
3 -8
Northwest Commons Well Use ............................ ...............................
3 -8
Freshwater Mussels .............................................. ...............................
3 -8
Access to Pipes in Island Estates and Sunny Meadows ......................
3 -8
Interstate Highway 182 Crossing ......................... ...............................
3 -8
Telemetry System and Communications ............................ ............................3
-9
Well Condition Assessment ........................................................ ...............................
3 -9
13- 1444.407 iii Irrigation System Master Plan
December 2013 Table of Contents
k: \tacyrejaYS \I] \I&W -pucp water resource studYA07 plan prepmarion\irriSazion system muter City of Pasco
planUahle of COnfmlz docx
Data Review and Gap Analysis ....................................... ............................... 3 -9
Observations and Analysis ............................................ ............................... 3 -10
Summary................................................................................... ............................... 3 -10
4. RECOMMENDATIONS
Introduction................................................................................. ............................... 4 -1
Improvements Completed Since 2005 ........................................ ............................... 4 -1
Distribution System Improvements ............................................. ............................... 4 -2
Irrigation Main Improvements ......................................... ............................... 4 -2
Interstate Highway 182 Crossing Isolation Valve Improvements .................. 4 -2
Island Estates and Sunny Meadows Distribution Isolation Valve
Improvements.................................................................. ............................... 4 -3
Northwest Commons Well and Pivot .............................. ...............................
4 -3
Telemetry Improvements ............................................................ ...............................
4 -3
Source and Storage Improvements .............................................. ...............................
4 -3
Storage............................................................................. ...............................
4 -4
Irrigation Well Improvements ......................................... ...............................
4 -4
Well Assessment and Rehabilitation Pl an ............ ...............................
4 -4
Well Data Acquisition .......................................... ...............................
4 -5
Village of Pasco Heights Well Replacement ....... ...............................
4 -6
Construction of New Irrigation Wells .................. ...............................
4 -7
WellHouses ......................................................... ...............................
4 -7
Well Performance Monitoring Program ............... ...............................
4 -7
DrySystems .............................................................................. ...............................
4 -8
Recommendations for Further Study and Planning .................... ...............................
4 -8
WellField Study .............................................................. ...............................
4 -8
FreshwaterMussels ......................................................... ...............................
4 -8
RateStructure Study ........................................................ ...............................
4 -8
Irrigation System Master Plan Update ............................. ...............................
4 -9
ProjectCost Estimates ................................................................. ...............................
4 -9
Summary..................................................................................... ...............................
4 -9
APPENDICES
Appendix A:
Water Quality Data
Appendix B:
2007 Residential Water Use Study Memorandum
Appendix C:
Operating Agreements
Appendix D:
Project Cost Estimates
13- 1444.407 iv Irrigation System Master Plan
December 2013 Table of Contents City of Pasco
kltwo wjc \13\1444 -p wm rum "y407 Plan prepentm \mgwion system mete plwtable ofwnt W.doa
LIST OF FIGURES
Figure ES -1:
Existing Irrigation System ...................................... ...........................ES -3
Figure ES -2:
Total System Production ........................................ ...........................ES
-7
Figure ES -3:
Hydraulic Modeling Results for Existing Conditions
..................... ES -10
Figure ES -4:
Hydraulic Modeling Results for Future Conditions ........................
ES -11
Figure 2 -1:
Existing Irrigation System ....................................
2
Figure 2 -2:
...............................
Existing Irrigation System Hydraulic Profil e ....... ...............................
-2
2 -3
Figure 2 -3:
Total System Production ......................................
2 -9
Figure 3 -1:
...............................
Hydraulic Modeling Results for Existing Conditions
......................... 3 -6
Figure 3 -2:
Hydraulic Modeling Results for Future Conditions ............................
3 -7
Figure 4 -1:
Proposed Irrigation System Improvements ........ ...............................
4 -14
LIST OF TABLES
Table ES -1:
Irrigation Main Inventory by Size .......................... ...........................ES -2
Table ES -2:
Irrigation Well Summary ....................................... ...........................ES
-4
Table ES -3:
Irrigation Water Rights Summary .......................... ...........................ES
-5
Table ES -4:
Dry System Summary ............................................ ...........................ES
-6
Table ES -5:
Recommended Capital Improvement Budget Summary ................ES
-13
Table ES -6:
Near -Term Capital Improvement Program Summary ....................ES
-14
Table ES -7:
Long -Term Capital Improvement Program Summary ....................
ES -16
Table 2 -1:
Irrigation Main Inventory by Size ........................ ...............................
2 -1
Table 2 -2:
Irrigation Well Summary ..................................... ...............................
2 -5
Table 2 -3:
Irrigation Water Rights Summary ........................ ...............................
2 -6
Table 2 -4:
Pressure Zone Summary ......................................
2 -7
Table 2 -5:
...............................
Dry System Summary .......... :..............................................................
2 -8
Table 2 -6:
Peaking Factor Summary ..................................... ...............................
2 -9
Table 2 -7:
Irrigation System Connections Summary .......... ...............................
2 -10
Table 2 -8:
Summary of Agricultural Demands ................... ...............................
2 -11
Table 2 -9:
Irrigation Utility Fees and Rates Summary ........ ...............................
2 -13
Table 3 -1:
Hydraulic Modeling Calibration Summary .......... ...............................
3 -3
Table 3 -2:
Irrigation Well Data Summary and Gap Analysis ............................
3 -11
Table 3 -3:
Irrigation Well Ranking Summary ..................... ...............................
3 -12
Table 3 -4:
Well Condition Assessment Summary ............... ...............................
3 -12
Table 4 -1:
Irrigation System Improvements Completed Since 2005 ...................
4 -1
Table 4 -2:
Recommended Well Rehabilitation and Performance
Testing Activity Summary ................................... ...............................
4 -6
Table 4 -3:
Irrigation Well Data Acquisition Recommendations Summary
......... 4 -6
Table 4 -4:
Near -Term Capital Improvement Program Summary ......................
4 -10
Table 4 -5:
Long -Term Capital Improvement Program Summary ......................
4 -12
Table D -1:
Irrigation Main Project Cost Summary ............... ...............................
D -1
Table D -2:
Well Rehabilitation and Assessment Project Cost Summary ............
D -2
Table D -3:
Village of Pasco Heights Well Replacement
13- 1444.407 v Irrigation System Master Plan
December 2013 Table of Contents City f Pasco
LVUc wi ]3 \1444 -p water ran aWyWd7 plan pmp"M \irrigations =masts plmn le ofwm M.doc y
Project Cost Summary ......................................... ............................... D -4
Table D -4: New Irrigation Well Project Cost Summary ....... ............................... D -5
13- 1444.407 vi Irrigation System Master Plan
December 2013 Table of Contents City of Pasco
kltwjwje 13 \1444 -p We Msow x y4w Plan Pfepa ,ion\bripfion mtm m tefplmvl le ofcomeetadoa
EXECUTIVE SUMMARY
EXECUTIVE SUMMARY
Authorization
On June 4, 2013, Murray, Smith & Associates, Inc. (MSA) was authorized by the City of
Pasco (City) to prepare this plan.
Background
The City of Pasco owns and operates an irrigation water utility that provides water to
residential customers and a limited number of commercial customers. Providing a system for
irrigation water separate from the potable water utility allows the City's customers to avoid
using treated drinking water to irrigate. The City's existing irrigation system is supplied by
water from 11 groundwater wells and water pumped from the Columbia River. The City
acquired the first portions of the system in 2002 from a private irrigation utility. The system
has grown considerably since that time. The City uses the irrigation system annually from
April 1' to October 31'. The City has established the goal of developing a capital
improvements plan for the irrigation system to ensure the continued delivery of economical
irrigation water to City residents.
Purpose
The purpose of this plan is to provide a basis for identifying, analyzing, and planning capital
improvements to the irrigation system. The study includes a hydraulic analysis of the
existing system which compares the existing system's performance to analysis criteria in
order to identify deficiencies and develop system improvements. A capital improvements
plan is developed to assist in planning future projects. Included with this plan are conceptual
level project cost estimates.
The system's existing groundwater wells will also be evaluated through a tabletop review of
existing data. The results of this review will be used to develop preliminary
recommendations for improvements, further assessment, and rehabilitation work.
Irrigation System Plan Overview
This plan is organized by sections. Section 2 presents an inventory of the irrigation system
and its components as they currently exist and operate. The City's irrigation water rights are
also discussed in Section 2. Section 3 presents analysis criteria that form the basis for
identifying deficiencies in system performance and planning improvements to the irrigation
system. Section 3 also includes a description of the hydraulic model and the results of the
modeling analysis work. Groundwater well condition assessments are also documented in
this section. Section 4 presents recommendations for improvements to the system and to the
groundwater wells, as well as recommended further study and planning work.
13- 1444.407 Page ES -1 Irrigation System Master Plan
December 2013 Executive Summary City of Pasco
r-\TA(_P,.s \13 \1444 -Pasco Water RS.. Swdy \407 Plan Prepaz W.\hliptWo System Ma Plan\Se W0- Executive Summa ft.
Existing System
The City's irrigation system piping is polyvinyl chloride (PVC), ductile iron (DI), and steel
distribution pipes ranging from 3 inches to 24 inches in diameter. Table ES -1 shows a
summary of irrigation main sizes in the distribution system. Figure ES -1 shows an overview
of the irrigation system.
Table ES -1
Irrigation Main Inventory by Size
Diameter inches
Len ft
Length miles
< 6
356,347
67.49
6
125,506
23.77
8
80,678
15.28
10
5,122
0.97
12
96,254
18.23
15
8,078
1.53
16
27,878
5.28
18
4,488
0.85
24 1
483 1
0.09
Total 1
711,797 1
134.81
The oldest parts of the system are approximately 15 to 20 years old, with most of the system
constructed less than 10 years ago. Parts of the irrigation system were first acquired by the
City in 2002 from Kidwell Farms, Inc., a private irrigation utility owner. This utility was
part of subdivisions built by private developers.
Supply
The City's irrigation system is supplied by groundwater produced from 11 wells located
throughout the system and surface water pumped from the Columbia River. All sources of
supply pump to the system's main service zone, referred to as the 639 pressure zone. Supply
to lower zones is accomplished through the use of pressure - reducing stations.
Groundwater Supplies
The City's irrigation wells range between 135 and 245 feet deep and are completed in an
unconfined alluvial aquifer consisting mainly of sand and gravel. The wells range between
and 39 years old. Roughly half of the wells are constructed with perforated casing and the
others with stainless steel, wire wrap well screen. The reported production capacities range
between 450 and 2,500 gpm. Table ES -2 summarizes the City's irrigation wells.
13- 1444.407 Page ES -2 Irrigation System Master Plan
December 2013 Executive Summary City of Pasco
K \TAC_Projea W \1444'Pum WuerEw -u Sn Y\407PWPrepao -Urt9 - S,t.M=.Pl.\SmU.0 -E..6w Suaunery.daa
MAINE
c.%,=,-. Master Plan
XISTING CITY IRRIGATION
SYSTEM
-SA
P.
- ----------- -
AFLL
ware
CITY OF PASCO C
A
I 4j A
PE.EA
r —
, ri
F- pw
TTT t
�m p
Table ES -2
Irrigation Well Summary
Well Name
Year
Constructed
Depth
Pump Type
Fixed/
Variable
Average
Production
M (tBo�S)IZe
(BGS')
Speed
Rate m )
Desert
Estates
1951
152
Submersible
Fixed
650
75
Desert
Sunset
1929
202
Vertical
Turbine
Variable
1,450
150
First Place
2007
123
Vertical
Variable
2,500
350
Turbine
Island
Estates
1976
190
Submersible
Fixed
450
50
I -182
Unknown
134
Vertical
Variable
1,850
200
Turbine
Linda
Lovi sa
2012
205
Turbine
Fixed
1,100
150
Northwest
Commons
Unknown
203
Vertical
Turbine
Variable
1,300
150
Powerline
Vertical
Road
1980
171
Turbine
Fixed
1,900
200
Road 52
2006
185
Vertical
Variable
2,350
250
Turbine
Sirroco
1976
222
Vertical
Variable
1,400
150
Turbine
Village of
Pasco
1975
184
Submersible
Fixed
1,000
125
Hei is
Notes
1. Below ground surface
2. Gallons per minute
3. Horsepower
Surface Water Supplies
In addition to groundwater wells, the City uses water pumped from the Columbia River for
irrigation supply. The river intake pump station conveys water directly to the Road 108
Booster Pump Station located on the west side of the system. The Road 108 Booster Pump
Station pumps the irrigation water to the irrigation distribution system. Irrigation water
pumped from the river is metered through a master meter at the Road 108 Booster Pump
Station.
13- 1444.407 Page ES -4 Irrigation System Master Plan
December 2013 Executive Summary City of Pasco
K: \TACP ja \13 \1444 -Pww WuerBao So YWW Pl PCp ionU oMian SystemM Plan\Segion0 -EU.&i Suwry c
Water Rights Summary
The City's current irrigation water rights are a combination of water rights issued by the
Washington State Department of Ecology (DOE) and water rights which were given to the
City by private parties. The City's annual irrigation water rights total 7,592.9 acre -ft. Table
ES -3 shows a summary of the City's existing irrigation water rights.
Table ES -3
Irrigation Water Rights Summary
Well Name
Water Right3
Q;
(gpm)
Q,
acre -ft
Approximate Pumping
Capacity m
First Place
G3- 01243C
1,400
558.0
2,500
Desert Sunset
G3-20243P(B)l
214
107.9
1,450
G3-20243P(C)
1,174
441.6
Island Estates
G3- 20242C
1,134
504.0
450
Sirocco
G3-20243P(B)l
214
107.9
1,450
G3- 28452C
450
172.0
Road 52
G3- 20242P(A )
1,430
636.0
2,350
Village of Pasco
Heights
G3- 23525C
1,300
660.0
1,000
Northwest Commons
G3- 20243P(A
1,612
483.6
1,300
G3-20243P (B)'
214
107.9
Desert Estates
G3- 24981C A
80
41.9
750
G3- 24981C(B)
400
155.9
Linda Loviisa
G3- 20244C
1,880
759.8
1,000
G3- 24978C
1,600
660.0
G3- 26368C
400
164.0
I -182
G3- 24978C
1,600
660.0
1,850
G3- 26368C
400
164.0
Powerline Road
G3-27413P(B)
270
108.1
1,900
G3- 27413P(C )I,z
573.75
203.4
G3- 27413P
281.25
112.6
G3- 27413P(F)
270
108.0
Road 108 Booster
Pump Station
G3- 27413P (C)
573.75
203.4
3,000
53- 28615C
1,643
732.0
53- 28788C
139
56.0
53- 28789C
121
48.0
53- 28790C
195
200.0
53- 28932C
597
240.0
Total Rights 17,164 7152.8 19,000
Notes
1. Indicates that water right is shared
2. This water right has two points of withdrawal
3. G indicates a groundwater right; S indicates a surface water right.
4. Q; is the instantaneous allowable flow; Q. is the average annual allowable volume
13- 1444.407 Page ES -5 Irrigation System Master Plan
December 2013 Executive Summary City of Pasco
K1TACProjects \13 \1494 - Paves Wazeraesomces SWyW07 Pl Prryata,ion\Erigatian Sptm MutpPW\=m 0 -Ex ive Sum ..doa
Storage
The irrigation system has one storage tank located near the intersection of Sandifur Parkway
and Road 76. The storage tank sets the hydraulic grade for most of the City's system. The
storage tank serves the 639 pressure zone by gravity, so the water is able to serve the other
pressure zones at lower elevations through pressure - reducing stations. The City currently
operates the tank below full at a volume of 2.28 million gallons (MG).
Pressure Zones
The irrigation system has six pressure zones. The zones are separated by pressure - reducing
stations which allow zones with a higher hydraulic grade to supply zones having a lower
hydraulic grade with water.
Booster Pump Stations
The City currently has one booster pump station in its irrigation system. This is the Road
108 Booster Pump Station located at the intersection of Road 108 and Crescent Road in the
western portion of the irrigation service area. The design capacity of this station is 3,000
gpm. This station is used to boost water pumped from the Columbia River Intake Station to
the 639 Pressure Zone.
Another pump station is planned for construction in 2013. This station will be called the
Harris Road Booster Pump Station and will be located on Harris Road near Interstate 182.
This booster pump station has a design capacity of 3,125 gpm. The station will also pump
water supplied by the Columbia River Intake Station to the distribution system.
Dry Systems
The City's irrigation system includes portions that are installed and ready for use, but not
currently used. These systems are referred to as dry systems. The existing dry systems are
shown in Figure ES -1. Table ES -4 shows a summary of the current dry systems.
Table ES -4
Dry System Summary
Subdivision Name
Number of New Connections
Estimated Acreage ac
Broadmoor Estates
304
90.67
Broadmoor Place
233
62.33
Desert Oasis
170
54.17
Desert Plateau
304
108.48
Total
1011
315.65
13- 1444.407 Page ES -6 Irrigation System Master Plan
December 2013 Executive Summary City of Pasco
K1TACPwjeas\13\14N- Pasco Wne Resource Swdy \407 Pbn Pr =twnUmigatfon System Mane Plea\4 ion 0- fiative&u .doc
Irrigation Water Demands
The City typically uses its irrigation system from April to October every year. Production is
monitored and recorded by meters on each of the system's wells. Some large users are
metered, but most connections to the system are not currently metered.
Total system production is the sum of water produced by the irrigation system wells and
water pumped from the Columbia River. Figure ES -2 shows total system production from
2006 to 2012. As seen from the figure, system production has increased steadily from 2006
to 2012.
7,000
r: 6,000
d
u
5,000
a
0
4,000
'C
0
L
3,000
0
y
H
r 2,000
W
F 1,000
Figure ES -2
Total System Production
2006 2007 2008 2009 2010 2011 2012
Year
Irrigation System Analysis and Findings
The analysis of the irrigation system uses a hydraulic model to simulate pressure and flow
conditions in the system under several demand conditions. The results are compared to .
analysis criteria and form the basis for identifying deficiencies.
Hydraulic Model
The initial layout of the hydraulic model was completed by tracing pipes and junctions over
the City's GIS data. Graphical and tabular data provided by the City were used to locate
critical hydraulic elements such as the Road 68 Irrigation Tank, wells, pumps, and pressure -
reducing stations. The demands presented in Section 2 were distributed throughout the
13- 1444.407 Page ES -7 Irrigation System Master Plan
December 2013 Executive Summary City of Pasco
KATAC_Pmia WU1 -Pa Water Reso urce SmdyN07 Plan PrepuetiontLxigation SVt --M-s PJ.\SWion0- Executive SumnmryAO.
model using a nearest node method. The nearest node method assigns known demands with
a known spatial distribution to the nearest node in the system. Model calibration was
completed using data collected by the City's SCADA system. The system collects and logs
information from the system every 30 to 60 minutes. Monitoring points on the system
include well discharges, booster pump station discharges, and the storage tank.
Analysis Criteria
The analysis criteria used to evaluate the hydraulic performance of the irrigation system
include minimum system pressures and maximum flow velocities. Any result not meeting
these criteria is subject to further investigation and potential corrective action.
Flow Velocities
Pipes whose flow velocities exceed 5 feet per second (fps) under average day demand
conditions are considered to have inadequate capacity. Pipe flow velocities are allowed to
increase up to 8 fps during peak hour demand (PHD) conditions. Any pipes with flow
velocities above 8 fps under PHD conditions are considered to have inadequate capacity.
Irrigation System Pressures
The City's pressure criteria at service connections are summarized below. These pressure
criteria are based on industry standards, Uniform Plumbing Code requirements, and a review
of landscape irrigation equipment water pressure requirements.
1. Each service connection should maintain a minimum water pressure of 30 pounds per
square inch (psi) during all demand conditions.
2. No service connection should exceed a water pressure of 120 psi. Individual
customers are responsible for reducing water pressures over 80 psi if they desire to do
so.
3. During a failure of any part of the system, the maximum water pressure at customer
meters will not exceed 150 psi.
Model and Analysis Findings
The calibrated model was used to simulate two scenarios: year 2012 conditions and an
anticipated future demand condition. Modeling for the future condition included the City's
existing dry systems, but did not include any new pipes or new developments. The results of
each analysis are described below.
Existing Conditions
Existing conditions were modeled using 2012 PHD conditions. Two pipes in the system
exceed the flow velocity criteria of 8 fps under PHD conditions. These pipes are 4 inches in
diameter and located adjacent to the Sirocco Well discharge. All analysis criteria were
13- 1444.407 Page ES -8 Irrigation System Master Plan
December 2013 Executive Summary City of Pasco
K: \TAC_Proje 13 \1494 -Pasco WaaaaOw SnyA07 Pl FrapuationWngat SAtm Maeta FWa SWmO- Executive SlmamyAo=
satisfied with regard to system pressures. The results are summarized below. A graphical
summary of modeling results for the existing conditions scenario is shown in Figure ES -3.
• The system does not experience pressures over 120 psi under any demand condition.
In order to verify that maximum allowable pressures were not exceeded, a low -
demand condition was used to approximate static conditions.
• The system experiences pressures over 80 psi near discharges for wells and the Road
108 Booster Pump Station during high production. None of the locations which
experience pressures between 80 and 120 psi serve customers. They are typically
located on dedicated transmission mains and are caused by topography.
• Low system pressures were not predicted by the model under this scenario during
normal tank levels. If the storage tank water surface elevation reaches 600 feet above
mean sea level (AMSL), the system begins to experience isolated low pressures.
• No part of the system experiences pressures over 150 psi during a failure of pressure -
reducing valves. It is possible that pumps could fail in such a manner as to cause high
system pressures downstream of their discharges.
Future Conditions
The calibrated model was used to predict the hydraulic performance of the City's irrigation
system under anticipated future conditions. The future condition assumptions are:
• All of the City's current dry systems are connected and in use
• All of the City's existing subdivisions are fully developed
• All of the City's sources are producing the maximum allowed flows simultaneously
These assumptions represent near -term conditions that could occur within the next two to
five years. The actual timing of these conditions is dependent on a number of variables.
Any changes in the following conditions would alter the analysis results:
Expansion of the irrigation system service area beyond assumed service limits
Additional sources of supply
Changes in water rights
High system pressures were found near the discharges of wells and pump stations as in the
2012 PHD scenario. No pipes that serve customers directly experienced high pressures. No
low system pressures were found by the model. High flow velocities were found by the
model at two locations:
Near the discharge of the Sirocco Well as observed in the 2012 PHD scenario
North of the intersection of Road 52 and Sandifur Parkway
A graphical summary of modeling results for the future conditions scenario is shown in
Figure ES -4.
13- 1444.407 Page ES -9 Irrigation System Master Plan
December 2013 Executive Summary City of Pasco
K\TAC Projects \13 \1444.Pasm Wazer omos SNdy \407Plan Prp tlon\h7ipdon Sya Maslen PlarMW!on0 -Ex ve Sun ..&m
Q v. EE-E--s
city Of Pasco
.at., Pin
SURE RESULTS FOR
it CONDITIONS
ll�� 4"
kplil
Y4+N'ry II
LL
Iiiiassis.
pooss, M
SUL
.a. s. �I,r
4
A
CITY OF PASCO 1p
a—
as,
4- ZM
iTi
\ k,
x,
�11� K �l
F
CITYOF PASCID
7,
Tj
1. 1,
If
T
'—T
T1
r
E1,V7, i j 14
FS— ES4
Clty
lrig=y.l.. Master Plan
HYDRAULIC MODELING RESULTS FOR
FUTURE CONDITIONS
MSA
wr
7
CITYOF PASCID
7,
Tj
1. 1,
If
T
'—T
T1
r
E1,V7, i j 14
Storage Analysis
The system storage was evaluated at projected peak hour demand conditions to determine
whether or not enough storage is available in the system. The analysis concluded that the
existing irrigation system reservoir has adequate capacity to meet projected storage needs as
long as the water level in the tank is raised. Modeling confirmed that raising the water level
does not have any adverse impacts on the distribution system.
Well Condition Assessment
A tabletop condition assessment of the City's groundwater supply wells was completed as
part of this plan. The assessment consisted of gathering and analyzing available information.
The objective of this analysis is to identify wells having apparent construction, performance,
or water quality issues that may be limiting production with the purpose of developing a
targeted approach at candidate wells to regain performance and optimize individual and
combined system production. The results of the well condition assessments are summarized
as follows:
• Review of available information for the Desert Sunset, Sirocco, NW Commons,
Island Estates, I -182, and Powerline Road wells indicated the presence of biofouling
and incrustation which are possibly plugging screens and perforations. Significant
accumulations of sediment or debris in the wells are also noted.
• Observations indicated minor mineral and biological deposits within the First Place
and Desert Estates wells.
• Based on the information provided and relatively newer construction, the apparent
conditions of the Road 52 and Linda Loviisa Wells are considered good.
Recommendations
Recommendations for improvements to wells, improvements to the irrigation system, and
opportunities for further planning and study were developed as part of this report. The
recommendations are separated into near -term improvements and long -term improvements.
Near -term improvements are those which should be completed within the next one to five
years. Long -term improvements should be completed in six to twenty years.
The recommended capital improvement program totals approximately $800,000 for near-
term improvements. The sum of recommended budget for long -term improvements is $6.87
million and does not include the $800,000 of near -term recommended investment. Table ES-
5 shows a summary of the recommended capital improvement budgets. Tables ES -6 and ES-
7 include tabulated summaries of all recommended improvements and their associated
estimated project costs.
13- 1444.407 Page ES -12 Irrigation System Master Plan
December 2013 Executive Summary City of Pasco
K: \TAC PMjwls \l3 \1444 - Paso Wanrkaaurar SmdyWW Plan Prep 60n\htllnlion SW= Massa Plan\Smlion0 -Ex Live Sum .&m
Table ES -5
Recommended Capital Improvement Budget Summary
Near -Term
$800,000
Long-Tenn
$6,867,000
Total
$7,667.000
13- 1444A07 Page ES -13 Irrigation System Master Plan
December 2013 Executive Summary City of Pasco
K: \TAC Pmjxh \Il \1444 - Pssco WazerKaourcrs $Wtl)' \40'1 Plan PrepmationVrtigation Syuem Maata PW\Sxtion 0 - iucutive Snmmucy.tloa
Table ES-6
Near -Term Capital Improvement Program Summary
Group
ID
Project Location
or Name
Project Limits
Project
Estimated
Pro'ect Cost
Road 56 to Road
Extend existing 16 -inch diameter main east to Road 52. The new
IR.2
Powerline Road
52
main may be built in right of way that is being platted as part of
$186,000
the construction of a new elementary school at the intersection.
West along Sahara
Extend two 4 -inch diameter distribution mains on Sahara Drive
IRA
Drive from end of
west to the existing 12 -inch diameter main on Road 44. This
Sahara Drive
existing mains to
improvement provides a redundant connection to the rest of the
$46,000
�Road
44
system if the connection at Burden Boulevard is out of service for
y
an rmwn.
Install approximately 1,200 linear feet of new 6 -inch diameter
a
Sahara Drive to
distribution piping near the discharge of the Sirocco Well, The
IR.5
Sirocco Drive
Saguaro Drive
new pipes should be installed in public right of way. The existing
$90,000
E
pipes should be abandoned to eliminate pipe crossings in the rear
of 'vate lots.
r"
e
Isolation Valve
Island Estates and
Installation of up to 52 isolation valves in public right of way will
p
D.2
Improvements
Sunny Meadows
reduce the need for City staff to access back yards during
$156,000
a
Phase 1
Subdivisions
maintenance and repairs and allow more customers to stay online
during emergencies.
Isolation Valve
Interstate
Installation of two isolation valves in the vicinity of the crossing
D.3
Improvements
Highway 182
may help to prevent complete shutdown of the crossing during
$10,000
Phase 2
Crossin
maintename and repair activities.
This improvement would tie the Northwest Commons irrigation
Northwest
Northwest
pivot directly to the irrigation system and meter the pivot at the
DA
Commons Pivot
Commons
point of withdrawal. This will allow the City to operate the
$30,000'
Improvements
Subdivision
Northwest Commons Well independently of the pivot. Proposed
i e is 8 inches in diameter.
e
Activate Dry
This improvement is an operational improvement that consists of
fa ..
DS
Systems
-
activating the portions of the City's irrigation system which are
-
currently not in me. t
13- 1444.409 Page ES- 14
December 2013 Executive Summ Irrigation System Master Plan
xu�e�ornvnmiaaa. esswwnaa��e, sw�wrewe�mowyiaosYn ®wn :em�smwa. �r s.�y: � City of Pasco
Table ES -6
Near -Term Capital Improvement Program Summary (continued)
Group
ID
Project Location
or Name
Project Limits
Project Description
Estimated
Project Cost
This improvement proposes to change the maximum water level
5
Road 68 Irrigation
in the Road 68 Irrigation Tank from 639 to 641.5. It is an
e w
S.l
Tank
-
operational change and requires no capital investment. This
$10,000
d
Improvements
project also includes inspection and repair or replace level
e $
sensing equipment inside the Road 68 litigation Tank
a
S.2
Irrigation Well
Rehabilitation
_
Rehabilitation and data acquisition on all wells except Village at
$220,000
Program
Pasco Heights Well'
E
Freshwater Mussel
Conduct a study to determine the most effective way to address
is
P' l
Study
freshwater mussel colonization of distribution piping exposed to
$25,000
$
Columbia River Water.
h
e
m
Linda Lovdsa
Conduct a well field study in order to determine the optimal
o
P.2
Well Field Study
-
locations and sizes of new irrigation wells in the Linda Loviisa
$24,000
area.
a
p'
Data Acquisition
This recommendation consists of gathering data consistent with
P.3
on Existing Wells
-
Table 4 -3 as presented is Section The City has resources to
-
accomplish this project so there is no project cost.
n
Total Budget
Recommended for all Near -Term Capital Im roveroems
$797 000
Notes
I. For cost estimating purposes, 200 linear fat of 6 -inch diameter PVC was assumed and $15,000 was added for installation of anew meter and
valves.
2. See Figure 2 -1 for the location of the City's existing dry systems.
3. See text for detailed description of rehabilitation activities and wells involved.
13- 1444.407 Page ES -15 Irrigation System Master Plan
December 2013 Executive Summary City of Pasco
K:T mob Al3UW.V. wnva.owas swyam Px nR.nvouwroarnSp=i&mnemvsmma -m ,w s�.do
Table ES -7
Long -Term Capital Improvement Program Summary
Group
P
D
Project Location
or Name
Project Limits
Project Description
Estimated
Project Cost
Ill. 1
Powerline Road
Road 90 to
Extend existing 16 -inch diameter main west to Road 90 to
B
Convention Drive
improve flow and eliminate dead ends.
$1,000,000
>
Extend existing dead -end 8 -inch diameter main on Sandifur
i
M
IR.3
Sandifur Parkway
Porto Lane to
Parkway near Porto Lane along east side of Road 44 south to
E
.,
and Road 44
Burden Boulevard
Bunten Boulevard. Correct all dead -end distribution mains
$325,000
E
along Road 44 to the new main.
Road 68 east to
elation of a 12 -inch diameter main between existing
m
[R.6
Wrigley Drive
Convention Drive
distribution mains on Road 68 and Convention Drive. This
$212,500
rovement requires additional right -of -way.
cThis
improvement proposes installation of a redundant 12 -inch
600 Zone PRV
diameter some of supply to the 600 Zone. The ultimate size and
D.1
Supply
600 Zone
muting of the pipe and source zone would be chosen by the City
$915,000,
O
at a later time once right of way, easements, or land can be
ac uired between the two zones.
� v
.� E
This improvement proposes installation of a signal converting
a,
>
T.1
Road 52 Telemetry
Road 52
station to improve communications from the central telemetry
d �
Improvements
P
system to the Powerline Road Well, Road 52 Well, and
$35,000
1"' B
Northwest Commons Well.
d
S.3
Village at Pasco
Heights Well
Village at Pasco
Construction of a new well at Village of Pasco Heights. This
m
eReplacement
Heights
project assumes that the existing pump and motor will be reused.
$ 173,000
y �
a
E
Construction of well houses to enclose existing wells and
S.4
Well Houses
-
associated equipment. It is assumed that a total of seven well
$455,000
houses will be built at a project cost of $65,000 per well house.
13- 1444.407 Page ES -16 Irrigation System Master Plan
December 2013 - Executive Summary
r12Kx ]M . Wasm Sm O?vs�,wan ®m M0.r_q,S,_ Cil y
ofPasco
Table ES -7
Long -Term Capital Improvement Program Summary (continued)
Group
ID
Project Location
Project Limits
Project Description
Estimated
or Name
Project Cost
F
$ E
Construction of
Up to six new irrigation wells could be necessary to improve the
e o
S.5
New Irrigation
-
irrigation system capacity. For budgeting purposes, a project cost
$3,696,000'
h $
Wells
of $616,000 per well has been assumed.'
E
V
Conduct a rate study to see if irrigation system rates are adequate.
0
P.4
Rate Study
-
The rate study will be informed by the selection of a capital
$25,000
aimprovements
Program.
.G y
Irrigation System
Update of this irrigation system master plan following major
n
P.5
Master Plan
-
changes to the irrigation system or after five years, whichever
$30,000
Update
occurs first.
Total. Budget Recommended for all Lone-Term Capital Improvements
$067.000
Notes
1. For cost estimating purposes, 6,5001incor feet of 12 -inch diameter PVC was assumed and $100,000 was added for a pressure - reducing station.
2. The location of new wells will depend on data acquisition and the Linda Loviisa well field study.
3. The project cost is $616,000 per new irrigation well. With a total of six wells, the total project cost is $3.70 million. It is possible that fewer than
six new wells will be necessary.
13- 1444.407 Page ES -17 Irrigation System Master Plan
December 2013 Executive Summary City of Pasco
LITACjry{a. UAJ. -P W.. au. S�0] Sy Meuv PYOVSm'vm 0 -6ywiw Sumouey.Wu
SECTI ®N 1
SECTION 1
INTRODUCTION
Authorization
On June 4, 2013, Murray, Smith & Associates, Inc. (MSA) was authorized by the City of
Pasco (City) to prepare this plan.
Background
The City of Pasco owns and operates domestic and irrigation water utilities that provides
water to residential customers and a limited number of commercial customers. Providing a
system for irrigation water separate from the potable water utility allows the City's customers
to avoid using treated drinking water to irrigate. The City's existing irrigation system is
supplied by water from 11 groundwater wells and water pumped from the Columbia River.
The City acquired the first portions of the system in 2002 from a private irrigation utility.
The system has grown considerably since that time. The City uses the irrigation system
annually from April Is` to October 31'. The City has established the goal of developing a
capital improvements plan for the irrigation system to ensure the continued delivery of
economical irrigation water to City residents.
Purpose and Scope
The purpose of this plan is to provide a basis for identifying, analyzing, and planning capital
improvements to the irrigation system. The study includes a hydraulic analysis of the
existing system which compares the existing system's performance to analysis criteria in
order to identify deficiencies and develop system improvements. A capital improvements
plan is developed to assist in planning future projects. Included with this plan are conceptual
level project cost estimates.
The system's existing groundwater wells will also be evaluated through a tabletop review of
existing data. The results of this review will be used to develop preliminary
recommendations for improvements, further assessment, and rehabilitation work.
Irrigation System Plan Overview
This plan is organized by sections. Section 2 presents an inventory of the irrigation system
and its components as they currently exist and operate. The City's irrigation water rights are
also discussed in Section 2. Section 3 presents analysis criteria that form the basis for
identifying deficiencies in system performance and planning improvements to the irrigation
system. Section 3 also includes a description of the hydraulic model and the results of the
modeling analysis work. Groundwater well condition assessments are also documented in
this section. Section 4 presents recommendations for improvements to the system and to the
groundwater wells, as well as recommended further study and planning work.
13- 1444.407 Page 1 -1 Irrigation System Master Plan
December 2013 Introduction City of Pasco
K \TACPmjeas \13 \1444 -Pasco Waa Resolute Smdy\407Plan PrpaionWtiptbn Syuem MenaP \Smion1- Wmduaimfta
:TION 2
SECTION 2
EXISTING SYSTEM
Introduction
This section describes the City's existing irrigation system's supply, storage, and distribution
facilities. Water rights and historical production and demand data are presented. General
operations are also discussed in this section. The information in this section forms the basis
for building the hydraulic model and for developing the recommendations which result from
analysis of the irrigation system.
Existing Irrigation System
The City's irrigation system piping is polyvinyl chloride (PVC), ductile iron (DI), and steel
distribution pipes ranging from 3 inches to 24 inches in diameter. Table 2 -1 shows a
summary of irrigation main sizes in the distribution system.
Table 2 -1
Irrigation Main Inventory by Size
Diameter inches
Length (ft)
Length (miles)
< 6
356,347
67.49
6
125,506
23.77
8
80,678
15.28
10
5,122
0.97
12
96,254
18.23
15
8,078
1.53
16
27,878
5.28
18
4,488
0.85
24
483
0.09
Total
711,797
134.81
The oldest parts of the system are approximately 15 to 20 years old, with most of the system
constructed less than 10 years ago. Parts of the irrigation system were first acquired by the
City in 2002 from Kidwell Farms, Inc., a private irrigation utility owner. This utility was
part of subdivisions built by private developers.
The system has six pressure zones. The largest is the 639 pressure zone. All of the system's
sources of supply and storage are located in this zone. The other five zones have a lower
hydraulic grade line (HGL) and are supplied from the 639 pressure zone through pressure -
reducing valves. Figure 2 -1 shows an overview of the existing system. Figure 2 -2 shows a
hydraulic profile of the system.
13- 1444.407 Page 2 -1 Irrigation System Master Plan
December 2013 Existing System City of Pasco
KATAC_P j= \13 \1444 -POao WaWRaourca SWdyAVPlop Preps Whyipa nSy Maria PlanSww2- Existing Sys doc
t
m>a
i I
a,n�..a.�d..• 1
p. �..._.
TI
mo
r/ 41
n
1 E
CITY OF MSCO
"ya
\ \i v J
FIG.. 2.1
Cv
I,m Master Plan
EXISTING CITY IRRIGATION
SYSTEM n n.uarm
I I�ir,
I
� I
si
700 -
ABMLV1ATON8
WEST
e<. •13�
xak
EAST
-
639
700
rc wnno. nn.riw
xevcm w s.r I-
V .xw��«c ..K
® w wr
ZONE
600 —
-®+v 600
— 600
ZONE
560
ZONE
547
ZONE
P
P
P P
500 —
C.
-
p _
9
P
— 500
@
d
a x
400 — P
P
400
RIVER
4 @
F
MTAKE
a
41
ZONE
300 —
— 300
LEGEND
ABMLV1ATON8
— zwzu ac sv'�
xak
sw ac m.�
— a• pc s.n
rc wnno. nn.riw
xevcm w s.r I-
V .xw��«c ..K
® w wr
Supply
The City's irrigation system is supplied by groundwater produced from 11 wells located
throughout the system and surface water pumped from the Columbia River. All sources of
supply pump to the system's main service zone, referred to as the 639 pressure zone. Supply
to lower zones is accomplished through the use of pressure - reducing stations.
Groundwater Supplies
The City's irrigation wells range between 135 and 245 feet deep and are completed in an
unconfined alluvial aquifer consisting mainly of sand and gravel. The wells range between 1
and 39 years old. Roughly half of the wells are constructed with perforated casing and the
others with stainless steel, wire wrap well screen. The reported production capacities range
between 450 and 2,500 gpm. Table 2 -2 summarizes the City's irrigation wells.
Most of the City's irrigation wells are located on concrete pads and are open to the
atmosphere with nearby electrical equipment in weatherproof enclosures. The Desert Sunset
and Sirocco Wells are enclosed within buildings. The City has current capital improvement
projects planned to construct new well houses around the First Place Well and the Linda
Loviisa Well. The construction of these well houses is intended to prevent damage to
equipment from exposure and reduce noise levels to nearby properties when the pumps are
operating. None of the wells have backup power supply.
Surface Water Supplies
In addition to groundwater wells, the City uses water pumped from the Columbia River for
irrigation supply. The river intake pump station conveys water directly to the Road 108
Booster Pump Station located on the west side of the system. The Road 108 Booster Pump
Station pumps the irrigation water to the irrigation distribution system. Irrigation water
pumped from the river is metered through a master meter at the Road 108 Booster Pump
Station. Since there are no services between these two stations, all of the water pumped is
metered prior to distribution and use.
Water Rights Summary
The City's current irrigation water rights are a combination of water rights issued by the
Washington State Department of Ecology (DOE) and water rights which were given to the
City by private parties. The City's annual irrigation water rights total 7,592.9 acre -ft. Table
2 -3 shows a summary of the City's existing irrigation water rights.
Storage
The irrigation system has one storage tank located near the intersection of Sandifur Parkway
and Road 76. The storage tank sets the hydraulic grade for most of the City's system. The
13- 1444.407 Page 2 -4 Irrigation System Master Plan
December 2013 Existing System City of Pasco
K\TAC_Projega \13 \1444- Pax. Watnr Reawrces StaAyW7 Plan PnVanitionWrigation System Master PlansStxtion 2 - Existing System.&&
storage tank serves the 639 pressure zone by gravity, so the water is able to serve the other
pressure zones at lower elevations through pressure - reducing stations.
Table 2 -2
Irrigation Well Summary
Notes
1. Below ground surface
2. Gallons per minute
3. Horsepower
The storage tank is referred to as the Road 68 Irrigation Tank. Construction of the tank was
completed in 1992 and it was originally used as a potable water storage tank. The tank was
repurposed for use in the irrigation system in 2006. The tank is a welded steel standpipe with
an approximate volume of 2.62 million gallons (MG) when full. The City currently operates
the tank below full at a volume of 2.28 MG. The tank has a diameter of about 55 feet and the
current water storage height is 126.5 feet which corresponds to an elevation of 639 feet
above mean sea level (AMSL). The maximum water storage height is 147.5 feet or 660 feet
AMSL. The tank has approximately 18,000 gallons of storage per vertical foot of storage
13- 1444.407 Page 2 -5 Irrigation System Master Plan
December 2013 Existing System City of Pasco
K \TACPjwu \13 \1444 - Pasco Waza Racmca Smdy \407 Pbn RcpmmionVrdprion Sym=Mana Plnn\9ation 2 -a Wwg Syste .
Fixed/
Average
Well Name
Year
Constructed
Depth
(BGS)
Pump Type
Variable
Production
Motor Size
(HP)
Seed
Rate m2
Desert
1951
152
Submersible
Fixed
650
75
Estates
Desert
1929
202
Vertical
Variable
1,450
150
Sunset
Turbine
First Place
2007
123
Vertical
Variable
2,500
350
Turbine
Island
1976
190
Submersible
Fixed
450
50
Estates
I -182
Unknown
134
Vertical
Variable
1,850
200
Turbine
Linda
2012
205
Vertical
Fixed
1,100
150
Loviisa
Turbine
Northwest
Unknown
203
Vertical
Variable
1,300
150
Commons
Turbine
Powerline
1980
171
Vertical
Fixed
1,900
200
Road
Turbine
Vertical
Road 52
2006
185
Turbine
Variable
2,350
250
Siroco
1976
222
Vertical
Variable
1,400
150
Turbine
Village of
Pasco
1975
184
Submersible
Fixed
1,000
125
Heights
Notes
1. Below ground surface
2. Gallons per minute
3. Horsepower
The storage tank is referred to as the Road 68 Irrigation Tank. Construction of the tank was
completed in 1992 and it was originally used as a potable water storage tank. The tank was
repurposed for use in the irrigation system in 2006. The tank is a welded steel standpipe with
an approximate volume of 2.62 million gallons (MG) when full. The City currently operates
the tank below full at a volume of 2.28 MG. The tank has a diameter of about 55 feet and the
current water storage height is 126.5 feet which corresponds to an elevation of 639 feet
above mean sea level (AMSL). The maximum water storage height is 147.5 feet or 660 feet
AMSL. The tank has approximately 18,000 gallons of storage per vertical foot of storage
13- 1444.407 Page 2 -5 Irrigation System Master Plan
December 2013 Existing System City of Pasco
K \TACPjwu \13 \1444 - Pasco Waza Racmca Smdy \407 Pbn RcpmmionVrdprion Sym=Mana Plnn\9ation 2 -a Wwg Syste .
height. The tank is equipped with an impressed current cathodic protection system. It was
fully recoated in 2008.
Table 2 -3
Irrigation Water Rights Summary
Well Name
Water Right3
Q;
m)
Q„ 4
acre-ft)
Approximate Pumping
Ca aci m)
First Place
G3- 01243C
1,400
558.0
2,500
Desert Sunset
G3- 20243P(B )'
107.9
1,450
G3-20243P(C)
1,174
441.6
Island Estates
G3-20242C(B)
1,134
504.0
450
Sirocco
G3- 20243P
214
107.9
1,450
G3- 28452C
450
172.0
Road 52
G3-20242P(A)
1,430
636.0
2,350
Village of Pasco
Heights
G3- 23525C
1,300
660.0
1,000
Northwest Commons
G3-20243P(A)
1,612
483.6
1,300
G3-20243P(B)l
214
107.9
Desert Estates
G3- 24981C(A)
80
41.9
750
G3-24981C(B)
400
155.9
Linda Loviisa
G3-20244C2
1,880
759.8
1,000
G3- 24978C
1,600
660.0
G3- 26368C
400
164.0
I -182
G3- 24978C
1,600
660.0
1,850
G3- 26368C
400
164.0
Powerline Road
G3-27413P(B)
270
108.1
1,900
G3-27413P(C)1,2
573.75
203.4
G3-27413P(D)
281.25
112.6
G3-27413P(F)
270
108.0
Road 108 Booster
Pump Station
G3- 27413P(C)
573.75
203.4
3,000
S3- 28615C
1,643
732.0
S3- 28788C
139
56.0
S3- 28789C
121
48.0
S3- 28790C
195
200.0
S3- 28932C
597
240.0
LTotal Rights 17,164 7152.8 19 000
Notes
1. Indicates that water right is shared
2. This water right has two points of withdrawal
3. G indicates a groundwater right; S indicates a surface water right.
4. Q; is the instantaneous allowable flow; Qn is the average annual allowable volume
13- 1444.407 Page 2 -6 Irrigation System Master Plan
December 2013 Existing System City of Pasco
K\TAC_Prge X1RAM -P. Water aee..St.dyW07 Plan PrepmmionVtrigaLion System MWa P1m\SWion I- Existing Systemdoa
Distribution
The distribution system consists of pipe ranging from 3 inches in diameter to 24 inches in
diameter. The majority of the system piping is PVC with parts of the system in ductile iron
(DI) or steel.
Pressure Zones
The irrigation system has six pressure zones. The zones are separated by pressure- reducing
stations which allow zones with a higher hydraulic grade to supply zones having a lower
hydraulic grade with water. Table 2 -4 summarizes the pressure zones.
Table 2 -4
Pressure Zone Summary
Zone
Maximum Hydraulic
Storage
Supply Facilities
General Location or
Name
Grade (ft AMSL
Facilities
Service Area
Road 68
All groundwater
Main portion of
639
639
Irrigation
wells
irrigation system
Tank
600
600
No storage
No supply
Chapel Hill
facilities
facilities
subdivision
594
594
No storage
No supply
Desert Estates
facilities
facilities
subdivision
560
560
No storage
No supply
Loviisa Farms
facilities
facilities
547
547
No storage
No supply
First Place
facilities
facilities
subdivision
River
No storage
Columbia River
Intake near I -182
Intake
549
facilities
Intake Station
bridge over Columbia
Booster Pump Stations
The City currently has one booster pump station in its irrigation system. This is the Road
108 Booster Pump Station located at the intersection of Road 108 and Crescent Road in the
western portion of the irrigation service area. The design capacity of this station is 3,000
gpm. This station is used to boost water pumped from the Columbia River Intake Station to
the 639 Pressure Zone.
Another pump station is planned for construction in 2013. This station will be called the
Harris Road Booster Pump Station and will be located on Harris Road near Interstate 182.
This booster pump station has a design capacity of 3,125 gpm. The station will also pump
water supplied by the Columbia River Intake Station to the distribution system.
13- 1444.407 Page 2 -7 Irrigation System Master Plan
December 2013 Existing System City of Pasco
KATAC_Pwj�\13\1494 - Pmw Water Reno Sn yW Plea PCeCVatwn*igetm Syt=Mazda Plan =Wn3 -P mft Sy mdoa
Dry Systems
The City's irrigation system includes portions that are installed and ready for use, but not
currently used. These systems are referred to as dry systems. The existing dry systems are
shown in Figure 2 -1. Table 2 -5 shows a summary of the current dry systems.
Table 2 -5
Dry System Summary
Subdivision Name
Number of New Connections
Estimated Acreage (ac
Broadmoor Estates
304
90.67
Broadmoor Place
233
62.33
Desert Oasis
170
54.17
Desert Plateau
304
108.48
Total
1,011
315.65
Interties to Other Systems
The irrigation system is not connected to any other irrigation or water distribution systems.
The irrigation system was formerly connected to the City's potable water distribution system
through a backflow prevention device. The City completely removed the connection in
2006.
Irrigation System Demands
This section presents information on irrigation water production and demands. The City
typically uses its irrigation system from April to October every year. Production is
monitored and recorded by meters on each of the system's wells. Some large users are
metered, but most connections to the system are not currently metered.
Production Records
Total system production is the sum of water produced by the irrigation system wells and
water pumped from the Columbia River. Figure 2 -3 shows total system production from
2006 to 2012. As seen from the figure, system production has increased steadily from 2006
to 2012. The City performed two studies related to water use: one in 2001 and one in 2007.
The study from 2001 includes information cited in this report on irrigation water use for
public facilities and agriculture. The 2007 study contains more recent data on residential
irrigation water usage which are also used in this report.
Overall System Usage
Historical production data was used to calculate overall system usage and peaking factors.
The City has collected hourly data on all of its source meters and its storage tank for the past
13- 1444.407 Page 2 -8 Irrigation System Master Plan
December 2013 Existing System City of Pasco
K\TAC_Projec W \1444 -Paco We Resom Smdy\407 Plan Prepazatmo gam System Malta Plan\Seaion3- Existing Syamm.dom
three years. This data was used to analyze variations in demand and to develop the average
day demand (ADD), maximum day demand (MDD), and peak hour demand (PHD). The
results of this analysis are shown in Table 2 -6.
7,000
w 6,000
w
L
v
5,000
A
O
l�
a 4,000
'fl
O
3,000
d
m
r �, 2,000
F 1,000
M
Figure 2 -3
Total System Production
2006 2007 2008 2009 2010
Year
Table 2 -6
Pealing Factor Summary
2011 2012
Year
2012
2011
2010
5,786
1,885.28
5,439
155261
Average Day Demand
m
6,118
5,572
4,765
m d
8.810
8.282
4,527
Maximum Day Demand
3,513
4,062
8,487
9,704
m d
13.968
12.221
13.973
3,000
8/8/2012
1 8/2/2011
8/8/2010
Peak Hour Demand
m
17,529
15,116
16,077
m d
25.241
21.767
23.151
Hour
6:00 AM
10:00 AM
6:00 AM
MDD /ADD rage: 1.662
1.586
1.476
1.926
2006 2007 2008 2009 2010
Year
Table 2 -6
Pealing Factor Summary
2011 2012
Year
2012
2011
2010
Total System Production G
1,885.28
1,722.40
155261
Average Day Demand
m
6,118
5,572
5,038
m d
8.810
8.282
7.255
Maximum Day Demand
m
9,700
8,487
9,704
m d
13.968
12.221
13.973
Date
8/8/2012
1 8/2/2011
8/8/2010
Peak Hour Demand
m
17,529
15,116
16,077
m d
25.241
21.767
23.151
Hour
6:00 AM
10:00 AM
6:00 AM
MDD /ADD rage: 1.662
1.586
1.476
1.926
PHD/MDD (Average: 1.748
1.807
1381
1.657
PHD /ADD (Average: 2.895
2.865
2.628
1 3.191
13- 1444.407 Page 2 -9 Irrigation System Master Plan
December 2013 Existing System City of Pasco
KATAC_Pmjens \13 \1444 -Pasco Waal Keso. Study \407 PlanriePWMW,igwm System Mesta MMSection 2- Exiaeng Sy=m cx
The irrigation system has grown since the City began acquiring the system in 2002. The City
classifies connections to the system as either residential, billed on a flat fee basis, or
connections for customers billed by the acre. These larger accounts are typically commercial
irrigation customers and include public schools, parks, apartment complexes, and sports
facilities. Table 2 -7 shows the number of connections to the system each year.
Table 2 -7
Irrigation System Connections Summary
Year
Residential Connections
Customers Billed by Acre
2006
2,964
2007
3,351
2008
4,053
2009
4,403
2010
4,812
-
2011 1
5,159 1
22
2
5,379
23
M
5,434
25
Production has kept uniform pace with the number of connections to the system on an annual
basis. Since 2006, the production per residential connection to the system has remained
relatively constant at 1,575 gallons per day per connection per year.
Residential Demands
The City does not meter water use on residential connections to the irrigation system.
Residential irrigation use vanes widely across the City's service area and is dependent on
economic factors, maturity of the landscaping, and whether or not the property is irrigated
using domestic or irrigation water.
The City studied residential water use patterns in a 2007 memorandum and determined that
residential irrigation usage averages 3.18 acre -ft per gross acre per year or 5.31 acre -ft per
irrigated acre per year. The memorandum is attached as Appendix B.
Commercial Demands
Commercial users of the City's irrigation system include public schools and the City of Pasco
Department of Parks and Recreation. Irrigated facilities include a soccer complex, a track
facility, a softball complex, and five residential City parks. The soccer complex is metered.
Commercial irrigation usage varies according to the facility. City park use vaned from 19
gallons per square foot to 34 gallons per square foot. Water use at the athletic facilities
averaged 40 gallons per square foot which is higher than the rest of the system.
13- 1444.407 Page 2 -10 Irrigation System Master Plan
December 2013 Existing System City of Pasco
KATAC_Projeras\13 \1444 -F. Wa.a..Swdy \407Plan Prepar nUnigMinSy&enl Mauer PIM�wion2 -Ex6ft Sy�&ac
Agricultural Demands
The City of Pasco supplies irrigation water to three pivots from its system. Crops which are
commonly grown at the three sites vary annually and include wheat, alfalfa, and potatoes.
The pivots and land are not owned by the City. They include:
• A single pivot located at Linda Loviisa Farms
• A single pivot near the Northwest Commons Well
• A single pivot north of Powerline Road near the Powerline Well
All of the pivots are served directly by the system except for the pivot at the Northwest
Commons Well. The Northwest Commons pivot may only run when the Northwest
Commons Well is operating. Each pivot connection is metered.
Pivot acreages were calculated by scaling aerial photo maps. An annual demand of 3.30
acre -ft per acre was used to estimate the annual water usage of each of these pivots. This
estimated demand was calculated as part of a water usage study prepared by the City in 2001.
Table 2 -8 shows a summary of the agricultural demands.
Table 2 -8
Summary of Agricultural Demands
General Operating Procedures
City staff use a process referred to as staging to operate the irrigation system. In each stage,
various wells or combinations of wells are selected for production. Each stage includes more
pumps than the previous stage. When an additional pump is called to operate, it is referred to
as a step up. When a pump is called to stop, it is called a step down. The system uses a
delay between stepping up or stepping down to minimize pump cycling and prevent
dramatic increases or decreases in pressure and flow. The order of pumps is chosen by the
operator and varies on a regular schedule. The maximum number of stages is set by the
operator and varies up to 11, which is the number of well pumps in the system. The system
has the ability to operate manually or automatically via a master telemetry unit.
Under automatic control, pumps are called to operate based on signals from pressure sensors
within the system. The Island Estates Well, Sirocco Well, 1-182 Well, and Desert Sunset
13- 1444.407 Page 2 -11 Irrigation System Master Plan
December 2013 Existing System City of Pasco
KATAC_PjeaW \1444 -PUm Waw Rao St y1407 Plan Pr p a on\hnpon Syn MU Ptan\=m2 -Euft Sotem8o
Instantaneous
Estimated Irrigated
Estimated Annual
Pivot
Demand m
Acreage acres
Usage acre -ft
Powerline Road
380
125.7
414.8
Linda Loviisa
580
72.1
237.9
Northwest
560
73.5
242.6
Commons
Total
1,520
271.3
895.3
General Operating Procedures
City staff use a process referred to as staging to operate the irrigation system. In each stage,
various wells or combinations of wells are selected for production. Each stage includes more
pumps than the previous stage. When an additional pump is called to operate, it is referred to
as a step up. When a pump is called to stop, it is called a step down. The system uses a
delay between stepping up or stepping down to minimize pump cycling and prevent
dramatic increases or decreases in pressure and flow. The order of pumps is chosen by the
operator and varies on a regular schedule. The maximum number of stages is set by the
operator and varies up to 11, which is the number of well pumps in the system. The system
has the ability to operate manually or automatically via a master telemetry unit.
Under automatic control, pumps are called to operate based on signals from pressure sensors
within the system. The Island Estates Well, Sirocco Well, 1-182 Well, and Desert Sunset
13- 1444.407 Page 2 -11 Irrigation System Master Plan
December 2013 Existing System City of Pasco
KATAC_PjeaW \1444 -PUm Waw Rao St y1407 Plan Pr p a on\hnpon Syn MU Ptan\=m2 -Euft Sotem8o
Well are equipped with pressure sensors that communicate with the telemetry system. If a
low pressure is registered at any of these sites and lasts for 30 seconds, a new pump is called
to operate. This is called a low pressure step -up. When a pressure sensor sends a high
pressure alarm that lasts for 10 seconds, the stage will step down. This is called a high
pressure step -down.
When the tank level is low, the stage is stepped up. This is referred to as a low tank level
step -up. As long as the level remains low, additional pumps will be called to operate until
the level rises above the low tank set point or the maximum stage is reached. If there is a
high tank level signal, the stage is stepped down until the tank level falls below the high tank
set point.
Water Quality
Water for the irrigation system is not treated. Available water quality data is attached in
Appendix A.
Agreements with Kidwell Farms, Inc.
The City supplies irrigation water to three sites owned by Kidwell Farms, Inc. The three
sites are the Northwest Commons subdivision, the Linda Loviisa Subdivision, and land
leased from the Washington State Department of Natural Resources in Section 16, T -9 -N, R-
29-E. The City leases use of the Northwest Commons Well for an annual flat fee. The other
pivots are connected to the system and a flat fee is paid to the City by Kidwell Farms for the
connection. The fee varies by site and Kidwell Farms agrees to pay all maintenance and
electrical costs associated with its use of the City facilities.
Rate Schedule
The City bills most of its customers based on a flat fee for connection to the irrigation
system. Some large users are billed by the number of irrigated acres. Some users are billed
by an irrigation unit which is defined as 5,000 square feet of irrigated area. The City's rate
schedule and fees associated with the irrigation utility are summarized in Table 2 -9.
Summary
This section presented information on the existing irrigation system including sources of
supply, storage facilities, and the distribution system. Current demand data and trends were
documented. General operation of the system was explained and the irrigation rates charged
to customers are shown. The next section will present the hydraulic analysis of the irrigation
system and the well condition assessments. Findings from each of these analyses will be
discussed.
13- 1444.407 Page 2 -12 Irrigation System Master Plan
December 2013 Existing System City of Pasco
KATACPmje \13 \1444 - Pawn Winer Resources SwdY\407 Plan Preparation \Wption Sy9=Mww P1WSwtion 2 -E i t gSynm &d
Table 2 -9
Irrigation Utility Fees and Rates Summary
Irrigation Service Type
Fee/Charge
Reference
Irrigation water service; monthly rate during irrigation season:
Base rate per unit for single-family residential properties
$26.00
13.61.190(A
Base rate per unit for non-single-family residential property
$26.00
13.61.190(B)
Per irrigation unit
$8.12
13.61.190(C)
Per irrigated acre (public parks, playgrounds, and open
aces)
$75.81
13.61.190(D)
Unauthorized turn -on (any repair cost additional)
$50.00
13.61.090
Disconnect/connect service due to violation
$50.00
13.61.100
Annual system availabili fee
$88.00
16.61.060
13- 1444.407 Page 2 -13 Irrigation System Master Plan
December 2013 Existing System City of Pasco
KATAC_P je \13 \14 -Pa We Raom SWIM07 Plan P,.tbo Vm,tion System Ma Fiar wion2- aisthv Syat &m
MSA SECTI ®N 3
SECTION 3
CRITERIA, ANALYSIS, AND FINDINGS
Introduction
Section 3 presents a hydraulic analysis of the City's irrigation system and an assessment of
the City's irrigation wells. The irrigation system analysis criteria include pressure, flow
velocity, and storage criteria. A description of the analyses and associated findings are also
presented.
Irrigation System Analysis
This section describes analysis of the irrigation system which uses a hydraulic model to
simulate pressure and flow conditions in the system under several demand conditions.
Model Layout
The initial layout of the hydraulic model was completed by tracing pipes and junctions over
the City's GIS data. Graphical and tabular data provided by the City were used to locate
critical hydraulic elements such as the Road 68 Irrigation Tank, wells, pumps, and pressure
reducing stations.
Once initial layout was completed, the irrigation piping system was then skeletonized to
simplify the layout and increase modeling efficiency. Skeletonization is a process that
consolidates multiple real pipes into hydraulically equivalent single pipes. For this model,
the majority of skeletonization converted dead ends to demands at a single node where the
real pipe branches away from the system. Skeletonization was not performed on pipes larger
than 8 inches in diameter.
The modeling software's terrain extraction (TREX) program was used to apply elevations to
the model nodes. The TREX program has the ability to apply elevations to hydraulic model
nodes using a representation of a three - dimensional surface. The representation, usually
contours, can be constructed using United States Geological Survey (USGS) data. The
contours are superimposed on the model layout and the distance to the nearest two contours
is used to interpolate the elevation of every node in the model. The final node elevations in
the model are indicative of the surface elevation. The accuracy of the data and the final
product is within 5 feet, which gives calculated pressures accurate to approximately 2 pounds
per square inch (psi).
Pipe Characteristics
The hydraulic modeling software uses default modeling properties for common pipe
materials. The City's irrigation system was modeled using the Hazen - Williams theory of
13- 1444.407 Page 3 -1 Irrigation System Master Plan
December 2013 Criteria, Analysis, and Findings City of Pasco
& %TAC ProjeclsUMIM -Pasw Waar Resources StudyW09 Plan Preen ni.Mfi igmioa System Mute PlanSendon 3 - Analysis and Fmdiayadnca
pressurized flow. For PVC pipe, an initial C value of 150 was used. An initial value of 140
was used for steel pipe and 120 for ductile iron pipe.
Water Demand Distribution
The demands presented in Section 2 were distributed throughout the model using a nearest
node method. The nearest node method assigns known demands with a known spatial
distribution to the nearest node in the system.
ArcGIS, a GIS software program, was used to identify irrigated parcels. The area and the
geographic center of each parcel was calculated by the GIS program. This information was
used to assign the geographic area of each parcel, in acres, to the nearest node in the model.
To convert each node's area assignment to a water demand, the demands from Section 2 were
used. The total irrigated area in 2012 was approximately 1,492 acres. The PHD from 2012
was approximately 17,529 gpm. The known point demands were subtracted from this total
and assigned to the appropriate location in the model. Based on information received from
prior water demand studies performed by the City, it was determined that the remaining total
irrigation system demand could be distributed evenly across the irrigated area. This method
gives an average demand of 11.75 gpm/acre which was then applied universally to all of the
nodes in the hydraulic model. The modeled demand is within 1 percent of the demand
measured by the City's SCADA system.
Wells
Wells were modeled using flow control valves attached to virtual reservoirs with a HGL
higher than the rest of the City's system. The flow control valves were set to reflect the
documented production rates of each well.
Model Calibration
Model calibration was completed using data collected by the City's SCADA system. The
system collects and logs information from the system every 30 to 60 minutes. Monitoring
points on the system include well discharges, booster pump station discharges, and the
storage tank. Pressure and flow data were known at each pump discharge point within the
system during the peak hour. The tank level was not known, so it was estimated using data
from nearby points within the system.
Flows from each of the wells were modeled using flow control valves. The initial simulation
of the model produced hydraulic grade calculations at each well. These calculated hydraulic
grades were then compared to the known hydraulic grades collected by the SCADA system
and served as the primary calibration criteria. After several iterations, pipe roughness
coefficients were universally lowered to a value of 130. All of the hydraulic grades were
then within 4 percent of the target grades. Well calibrated models typically have
discrepancies of 10 percent or less. Table 3 -1 shows the results of the calibration.
13- 1444.407 Page 3 -2 Irrigation System Master Plan
December 2013 Criteria, Analysis, and Findings City of Pasco
K \TAC PI.I m%13 \1444 -Paco WmerR..Smy\407Plan Prepaat.Urligelion System Mash Plan \genlion3 -Alu isand FiM,,doa
Table 3 -1
Hydraulic Modeling Calibration Summary
well
Flow Target
(gpm)
Flow from
Model m
HGL
Target
HGL from
Model
Discrepancy
Island Estates
590
590
610.5
612.47
0.3
Linda Loviisa
443
443
628.6
611.92
-2.7
I -182
1238
1,238
651.6
638.94
-1.9
First Place
1663
1,663
649.9
642.72
-1.1
Sirroco
1415
1,415
640.0
653.29
2.1
Desert Estates
491
491
634.4
617.16
-2.7
Desert Sunset
1418
1,418
628.2
618.46
-1.6
Northwest
Commons
0
0
629.1
627.01
-0.3
Road 52
2125
2,125
644.4
634.34
-1.6
Powerline
1758
1,758
657.8
637.53
-3.1
Village Pasco
Heights
936
936
622.6
614.52
-1.3
Analysis Criteria
Once the physical layout and calibration of the model were completed, the model could be
used to analyze flow velocities and pressures within the system. The analysis criteria used to
evaluate the hydraulic performance of the irrigation system include minimum system
pressures and maximum flow velocities. Any result not meeting these criteria is subject to
further investigation and potential corrective action.
Flow Velocities
For this analysis, pipes whose flow velocities exceed 5 feet per second (fps) under average
day demand conditions are considered to have inadequate capacity. Pipe flow velocities are
allowed to increase up to 8 fps during PHD conditions. Any pipes with flow velocities above
8 fps under PHD conditions are considered to have inadequate capacity. These velocity
limits reflect standard industry practices for acceptable flow velocities in pressurized piping
systems. They are chosen to limit excessive head loss in the system.
Irrigation System Pressures
The City's pressure criteria at service connections are summarized below. These pressure
criteria are based on industry standards, Uniform Plumbing Code requirements, and a review
of landscape irrigation equipment water pressure requirements.
Each service connection should maintain a minimum water pressure of 30 psi during
all demand conditions.
13- 1444.407 Page 3 -3 Irrigation System Master Plan
December 2013 Criteria, Analysis, and Findings City of Pasco
KATAC_P ja \13 \1444 -Pasco Waeraaom SwdyW07 Plan Prepm&m*ftwion S,a Marta PW\Se wn3- Aiulyeis and Fwdinga.doa
2. No service connection should exceed a water pressure of 120 psi. Individual
customers are responsible for reducing water pressures over 80 psi if they desire to do
SO.
3. During a failure of any part of the system, the maximum water pressure at customer
meters will not exceed 150 psi.
System Storage
This analysis uses standby storage recommendations provided by the Washington State
Department of Health (DOH) for drinking water systems as water storage criteria because the
City does not have established water storage criteria for its irrigation system. The DOH
typically recommends that drinking water systems provide 150 minutes of water storage
during peak demand conditions and that this storage be available to all customers at a
minimum pressure of 30 psi. The City does not use the irrigation system to provide fire
suppression, so no fire suppression storage is provided.
Model and Analysis Findings
The calibrated model was used to simulate two scenarios: 2012 conditions and an
anticipated future demand condition. Modeling included the City's existing dry systems, but
did not include any new pipes or new developments. The results of each analysis are
described below.
Existing Conditions
Existing conditions were modeled using 2012 PHD conditions. These conditions are the
same as those used for the calibration of the hydraulic model. Two pipes in the system
exceed the flow velocity criteria of 8 fps under PHD conditions. These pipes are 4 inches in
diameter and located adjacent to the Sirocco Well discharge. All analysis criteria were
satisfied with regard to system pressures. The results are summarized below:
• The system does not experience pressures over 120 psi under any demand condition.
In order to verify that maximum allowable pressures were not exceeded, a low -
demand condition was used to approximate static conditions.
• The system experiences pressures over 80 psi near discharges for wells and the Road
108 Booster Pump Station during high production. None of the locations which
experience pressures between 80 and 120 psi serve customers. They are typically
located on dedicated transmission mains and are caused by topography.
• Low system pressures were not predicted by the model under this scenario during
normal tank levels. If the storage tank water surface elevation reaches 600 feet
AMSL, the system begins to experience isolated low pressures.
• No part of the system experiences pressures over 150 psi during a failure of pressure -
reducing valves. It is possible that pumps could fail in such a manner as to cause high
system pressures downstream of their discharges.
13- 1444.407 Page 3-4 Irrigation System Master Plan
December 2013 Criteria, Analysis, and Findings City of Pasco
K\TAC Projeala \13 \1444 - Pesco Water Resource Smdy`409 Plan PrepvatbnVrtigation System MasICPWVSection 3 - Awyrsis aM Fwdings.d«x
A graphical summary of modeling results for the existing conditions scenario is shown in
Figure 3 -1.
Future Conditions
The calibrated model was used to predict the hydraulic performance of the City's irrigation
system under anticipated future conditions. The future condition assumptions are:
• All of the City's current dry systems are connected and in use
• All of the City's existing subdivisions are fully developed
• All of the City's sources are producing the maximum allowed flows simultaneously
These assumptions represent near -term conditions that could occur within the next two to
five years. The actual timing of these conditions is dependent on a number of variables.
Any changes in the following conditions would alter the analysis results:
• Expansion of the irrigation system service area beyond assumed service limits
• Additional sources of supply
• Changes in water rights
High system pressures were found near the discharges of wells and pump stations as in the
2012 PHD scenario. No pipes that serve customers directly experienced high pressures. No
low system pressures were found by the model. High flow velocities were found by the
model at two locations:
Near the discharge of the Sirocco Well as observed in the 2012 PHD scenario
North of the intersection of Road 52 and Sandifur Parkway
A graphical summary of modeling results for the future conditions scenario is shown in
Figure 3 -2.
Storage
The system storage was evaluated at projected peak hour demand conditions to determine
whether or not enough storage is available in the system. The City currently operates the
tank at a water level of 126.5 feet which corresponds to an elevation of 639 feet. At this
level, the tank provides a total storage of 2.28 MG. The overflow of the tank is at elevation
660 feet. Water stored below elevation 597.5 feet is considered dead storage according to
the storage criteria described above. The volume of dead storage in the tank is
approximately 1.51 MG and the volume of active storage in the tank, as currently operated, is
approximately 0.77 MG.
The maximum possible average day demand was calculated by dividing the sum of the City's
annual irrigation water rights by the days in service. This demand, 7,744 gpm, was used to
13- 1444.407 Page 3 -5 Irrigation System Master Plan
December 2013 Criteria, Analysis, and Findings City of Pasco
K1TAc_jws \13 \1444 -Pam Water Rao=w SNdy\407 Plan PrepantionWrisation SyI=Mata PUMSMion 3- Analyse ud Fmdin doa
� B.1
„ it nig :kF 4�f.M-j 11 IN MEN
oqw.; I
cm
BMW,
Mo t
na
I :z
®R
ID
it
T-
0—
AV
F
1 71
yes, bN.I
A ..P;
rP f 77t
, , i- I
.1 1] -T
14
1 j - A
PT:
.7,
Wieser
samess,
Figum 3-2
CITY Of Flats,
mistation System Master Plan
HYDRAULIC MODELING RESULTS FOR
FUTURE CONDITIONS
A
I
, tatt�
PT:
.7,
Wieser
samess,
calculate a projected peak hour demand of 22,419 gpm. A peak hour demand peaking factor
of 2.895 was used.
This demand would be met by a combination of the City's wells and storage. It was assumed
that all of the City's sources would be pumping at the current instantaneous water right of
17,164 gpm. The tank would need to provide approximately 5,255 gpm for 150 minutes at a
minimum pressure of 30 psi. Based on this analysis, the system requires approximately
788,250 gallons of storage for the projected peak demand, not including dead storage. Based
on this analysis, the existing irrigation system reservoir has adequate capacity to meet these
storage needs.
Operations and Maintenance Problems
The City experiences some operations and maintenance problems with the irrigation system
which are described below.
Northwest Commons Well Use
The Northwest Commons well is plumbed so that it supplies the City's irrigation system and
a nearby agricultural pivot simultaneously. Whenever the well is being operated, the pivot
must also operate. Any water produced in excess of the pivot's requirements flows to the
irrigation system. The City currently allows a private third party to use the well to operate
the pivot, limiting the City's ability to use the well. The agreement under which this well is
operated is attached as Appendix C.
Freshwater Mussels
Some parts of the irrigation system which convey water drawn from the Columbia River
experience annual buildup of freshwater mussels in the piping. The most problematic area of
the mussel infestation is in the piping between the Road 108 Booster Pump Station and the
crossing under Interstate I -182. During the summer, high flows dislodge some mussels from
the pipe walls which can cause operational problems such as plugging.
Access to Pipes in Island Estates and Sunny Meadows
The original irrigation system piping that was constructed by private developer Water, Inc. is
located in the Island Estates and Sunny Meadows subdivisions. These pipes were installed in
easements located in the less accessible alignments on private property. City operations staff
may have difficulty accessing these areas for routine or emergency maintenance.
Interstate Highway 182 Crossing
Irrigation water supplied by pumps from the river intake station and the Road 108 Booster
Pump Station is conveyed underneath Interstate Highway 182 to serve the majority of the
City's irrigation system. The crossing ties into a pipe near Quadra Drive adjacent to the
13- 1444.407 Page 3 -8 Irrigation System Master Plan
December 2013 Criteria, Analysis, and Findings City of Pasco
K: \TACPrrxu \13 \1444 -Pa Wwer P.ao Shad 07Plan Prey nUmption System Mann Plan\S=Hon 3 -Awl is Fin Ws.doa
interstate highway. Discussions with City staff indicate that a complete shutdown of the
highway crossing is usually necessary to perform system maintenance and repairs in this area
because of inadequate local isolation valving.
Telemetry System and Communications
According to discussions with City staff, the Powerline Well, Road 52 Well, and the
Northwest Commons Well all rely on the same radio for communication with the system. If
this single radio were to fail or be compromised, communication and control at all three sites
would fail. City staff have indicated that the radio has experienced some irregular
communication problems in the past.
Data collected by the City's supervisory control and data acquisition (SCADA) system
indicate that there is a problem with the remote level sensor in the Road 68 Irrigation Tank.
Data received for the last several years does not include accurate or consistent readings on
the tank water level.
Well Condition Assessment
A tabletop condition assessment of the City's groundwater supply wells was completed as
part of this plan. The assessment consisted of gathering and analyzing available information.
The objective of this analysis is to identify wells having apparent construction, performance,
or water quality issues that may be limiting production with the purpose of developing a
targeted approach at candidate wells to regain performance and optimize individual and
combined system production. The results of this assessment are discussed below.
Data Review and Gap Analysis
The following information was provided by the City and was used in assessing the irrigation
supply system:
• Water Rights
• Driller's well logs
• Well construction records
• Aquifer test results
• Specific capacity
• Well inspection reports
• Well video surveys
• Water quality data
• Well usage information
• General notes and observations gathered by City operations staff
13- 1444.407 Page 3 -9 Irrigation System Master Plan
December 2013 Criteria, Analysis, and Findings City of Pasco
KATAC_Proje \13 \1494 - Pasco Water Kesomces SsadyW PWPW=p n\lrrapon Sy=Mara Plao\$Mion 3 -AWl is Fwdings.doc
All of the wells have some information available, but there are some data gaps that result in
recommendations for further assessment. A tabular summary identifying the data available
and the data gaps is presented in Table 3 -2.
Observations and Analysis
The results of the well condition assessments are summarized as follows:
• Review of available information for the Desert Sunset, Sirocco, NW Commons,
Island Estates, I -182, and Powerline Road wells indicated the presence ofbiofouling
and incrustation which are possibly plugging screens and perforations. Significant
accumulations of sediment or debris in the wells are also noted.
• Observations indicated minor mineral and biological deposits within the First Place
and Desert Estates wells.
• Based on the information provided and relatively newer construction, the apparent
conditions of the Road 52 and Linda Loviisa Wells are considered good.
Table 3 -3 ranks the wells in terms of priority, potential for improvement, and overall
condition assessment. The Desert Sunset Well received the highest priority ranking which
means that it should be the first well to receive maintenance and rehabilitation. The Sirocco
well has the highest potential for improvement which means that its capacity could be
improved the most. The Desert Sunset Well received the highest condition assessment
ranking indicating that it is in the worst overall condition. The overall assessment found that
there are opportunities for well performance and yield improvements. The three highest -
ranking wells in need of improvements are the Desert Sunset Well, the Sirocco Well, and the
Northwest Commons Well. Table 3 -4 presents a summary of the well condition assessments.
Summary
This section presented an analysis of the City's irrigation system. The distribution system
was analyzed using a hydraulic model. Current conditions and an anticipated future
condition were modeled. Low pressures and high velocities, as defined by the analysis
criteria, were noted. The irrigation system storage was analyzed for deficiencies. The
condition of the City's groundwater supply wells was also assessed. The results of these
analyses will be used in Section 4 to develop recommendations for improvements to the
irrigation system.
13- 1444.407 Page 3 -10 Irrigation System Master Plan
December 2013 Criteria, Analysis, and Findings City of Pasco
K \TAC P jro UM1444 -Pas. WUa X. mcs Swdy40Pon Repazazion\Gngalion Sygm Ma WPlan\Smion3- Amlysisand Find p.doa
' bk Y2
krigedov WM Mm Summary aced Cep "Wyaial
N.be
1. Anrk Jf9iwiralabeYqualirydWew AMA OfO WM WroaeU avukble
2. SpxifiammdV
13.I.Al Peg<3 -II 4ngaWnSyaw Plan
Dsembn Lll3 Crilerie. AOdylu, eM F tinl L1ry.fP
W.,
Unlbe
D,,n...
W.II
A wfn TM
q
S,mift
Wal IA".oUe.ec
W..
W.I.
We11 NV&
Ncln w/
Weg
R.O.
Mep
WYIUg
G.Yrvelbe
Den wtl
Ceped'
R,beW114HOV
VIMV
QuJlty
I.Parwlbv
Ob.—..
Comme.n wtl Dne Cepa
Ap ab
Meteuremwu
R erl
s—
D..
•40)gpmYt (romw:9 -W pwµ Wlby myw)
•CovWmti.v. tl.<aua m+l<LtliillMa
D6CIFNttt
4
6
1
1
1
9
4
1
0
2
q
..IlPrwvvih.lve
bg.rtilye �c,ti.n aheN
• Fxnmive bufwLry abwved NsmH well viMO awrxy
luaea evmtaf<uew� mMiavv
-3,59L nmu mMUCWby
SeY^<.3 nep<, w�h fins lwn vNy bstin1 nPpex. lOntineech
.1SC(mmce:3i Wl61
Fim Plete
2
6
I
9
3
2
q
q
0
2
q
uIP)
•• m:MSA
$36 C(w -hw p euro.
is
q
q
9
2
x
q
q
0
2
q
weblc n byGntA VAIk y Wm Sc—,, quJIiV oft n etMu
Pq. Hd hV
g
mvaWertE
<W.HFVNM9CxA
• MSA)
SmeMi.m pwrq n,laovgrlfle {bulnn &nM
DeA. S—el
4
4
]
3
0
z
4
a
1
2
q
cli—
a24 <na
•34v Ni.N.N ea ledm]/NfW3
•N Lu
pleN 9,nlet
3
I
4
1
0
0
a
9
1
x
4
AAAAAbleaquJerluu.g
•CO.emmi.vwud onyiller'v lvgnvi <onsiuew wilt vidml.g
•I Nio YL"
Iwn Ml. ),,
• I I,]3] p MSA); Wbiktl xell tlen
9-N .
I -IH2
3
4
4
4
0
1
R
q
1
2
3
.SH 1 IW an ] /brzWS
NLM cw
• 1.331 gpmM SC w<g W by myw]; 2100 etw'D
WII SC
SC WA)
• W01 wpeeem �ns tlO rn
gJe ebg
RaaE tx
z
4
a
q
0
x
z
i
o
z
]
- WWI «p.m ti0
Mwoff,epenivu
Mwrvn,. <ppewnm<Wh MmAl5N IL —Mews
A
1 i—; I.&mmlrm
•NvAxi lug Provitledf.<miew;existingurdiWIA
rol6eemrcp.eaibk unwoN<rv<uauvde tlunng
—111
wli
Pewnlioe
sw
x
4
q
q
0
0
o
q
o
z
a
•Lick NY.v,mble
•PVr imwnag,P•a.w< v<rea<a sal
Sb.�
2
q
q
q
o
0
0
4
1
x
x
muabw -CtiwroM N7MN5slvH:
dnl� LI J.';
NLA.
•29 NSC(mw I
A)]/N1003
• 111 HFmR 9C Imwm: MSA)
•mi.)nrw Drc<mM 100] (movie bb,0y. pYUg b remove
xdimmp
Nwlhwa
z
a
1
1
0
z
a
z
0
z
a
•w<hm nc'ore�aww weti.m
r mmm<
awu 1,
•W<Ilmrewnivn uJpvYU.n Wkv fiam well irwpecU- d
wNle,li.n
LiwalmiW
z
a
a
s
0
0
0
o
a
1
0
•N<wweuw� :I.�iw Deanabn 301:
N.be
1. Anrk Jf9iwiralabeYqualirydWew AMA OfO WM WroaeU avukble
2. SpxifiammdV
13.I.Al Peg<3 -II 4ngaWnSyaw Plan
Dsembn Lll3 Crilerie. AOdylu, eM F tinl L1ry.fP
Table 3 -3
Irrigation Well Ranking Summary
Well
Improvement Priority
Rank
Improvement
Potential Rank
Condition
Assessment Rank
Desert Sunset
1
4
1
Sirocco
2
1
4
Northwest
Commons
3
3
3
Island Estates
4
2
5
I -182
5
7
6
Powerline Road
6
7
7
First Place
7
6
10
Desert Estates
8
6
8
Village at Pasco
Heights
9
5
2
Road 52 1
9
7
9
Linda Loviisa 1
9 1
6
11
Table 3-4
Well Condition Assessment Summary
Well
Observations and Findin s
• Well is 39 years old and is approaching the typical life expectancy for groundwater supply
infrastructure (commonly assumed to be between 30 and 50 years in normal groundwater
environments).
• Flow to well is through perforated casing rather than a more efficient, engineered well screen.
Desert Sunset
' Static and pumping water levels are within perforated interval.
• Approximately 45 ft of accumulated sediment/debris possible (video depth < reported depth)
• Bottom depth of open - interval span not ]mown.
• Accumulated sediment/debris in well approaching intake depth setting.
• Heavy biofouling; precluded adequate assessment of existing conditions from video survey.
• Moderate incrustation of perforations previously reported.
• Well is 37 years old and is approaching the typical life expectancy for groundwater supply
infrastructure (commonly assumed to be between 30 and 50 years in normal groundwater
Sirocco
environments).
• Flow to well is through perforated casing rather than a more efficient, engineered well screen.
• Major biofouling present, mostly encompassing and possibly plugging perforations.
• 17 ft of sediment/debris buildup in bottom of well? video depth < reported depth)
• Well age is unknown.
• Previously rehabilitated (Dec -07).
Northwest
• Flow to well is through perforated casing rather than a more efficient, engineered well screen.
Commons
• Major biofouling present, mostly encompassing and possibly plugging perforations.
• Approximately 3 ft of accumulated sediment /debris in bottom of well.
• Accumulated sediment/debris near intake.
13- 1444.407 Page 3 -12 Irrigation System Master Plan
December 2013 Criteria, Analysis, and Findings City of Pasco
K \TACPmj.A13V"4- P.. W.R.. SNdy\407 Pl Prgiv nVniguion SAIM MWWPW\=ion 3 -A u J is uA Finding&=
Table 3 -4
Well Condition Assessment Summary (continued)
Well
Observations and Findings
• Well is 38 years old and is approaching the typical life expectancy for groundwater supply
infrastructure (commonly assumed to be between 30 and 50 years in normal groundwater
environments).
Island Estates
• Approximately 9 feet of sediment/debris buildup blocking three feet of perforated interval?
(video depth < reported depth)
• Flow to well is through perforated casing rather than a more efficient, engineered well screen.
• Major biofouting present, mostly encompassing and possibly plugging perforations.
• Well is 34 years old.
I -182
• Approximately 2 feet of sediment/debris accumulation in well? (video depth < reported depth)
• Some biofouling and incrustation of well screen present, blocking roughly 25% of open area.
Powerline Road
' Well is 33 years old.
• Varying degree of biofoulin resent minor to major).
First Place
' Well is 6 years old.
• Minor biofouling present at top and bottom of well screen.
• Well is 31 years old.
Desert Estates
• Minor scale/mineral deposits on well screen.
• Some minor corrosion observed near bottom of screen.
• Well is 38 years old and is approaching the typical life expectancy for groundwater supply
infrastructure (commonly assumed to be between 30 and 50 years in normal groundwater
environments).
• Approximately 1 ft of sediment/debris accumulation in well/screen bottom?
• Heavy incrustation/mineral deposits; approximately 50 to 80% of screen open area estimated to
be blocked .
Village at Pasco
• The well is equipped with a sand filter.
Heights
• Casing noted to have been pulled back to 159 ft bgs during screen exposure, roughly 3 ft above
top of screen assembly.
• Gap from casing pullback could be allowing formation material to enter well.
• Small gap noted during review of video survey, though may be from separated casing
joint/weld
• Blasting cap debris previously observed in well; possibly from previous rehabilitation. May
have caused the separation noted above.
• Well is 7 years old.
• Inspection report notes damage to top of well screen; no video log available for review to
Road 52
confirm or assess.
• Besides noted damage, the well screen (based on inspection report photos) appears in relatively
good condition.
• Inspection report notes stainless steel banding material in well.
Linda Loviisa
' New well constructed December 2012
• No inspection reports or well video survey available for review
13- 1444.407 Page 3 -13 Irrigation System Master Plan
December 2013 Criteria, Analysis, and Findings City of Pasco
K \TAC Pmjwm\]3 \1444 -Pow WU9ra wwa SwdyA07 PUn Pm "iongffiption Syamm Marla PlanlSw m3 -Atu is aM Hnding &a
-
- SECTI ®N 4
SECTION 4
RECOMMENDATIONS
Introduction
Section 4 presents recommendations based on the analysis and findings of Section 3.
Recommendations for improvements to wells, improvements to the irrigation system, and
opportunities for further planning and study are provided.
Improvements Completed Since 2005
The City of Pasco has completed irrigation system improvements that were recommended as
part of its 2005 I -182 Corridor Irrigation System Plan (2005 Plan). Table 4 -1 shows a
summary of the improvements recommended in the 2005 Plan that have since been
completed.
Table 4 -1
Irrigation System Improvements Completed Since 2005
Improvement Number
from 2005 Plan
Project Description
IW -1
Construction of the First Place Well
IW -2
Existing Well Rehabilitation
IW -3
Existing Well Rehabilitation
IW -4
Future Well Rehabilitation
IW -5
Future Well Rehabilitation
IW -6
Future Well Rehabilitation
IS -1
Conversion of Road 68 Standpipe from domestic system to
irrigation system
113-1
Construction of the Harris Road Booster Pump Station (currently
under construction
IR 1.1
16 -inch diameter irrigation main from Court Street to Harris Road
Booster Pump Station (currently under construction
16 -inch diameter main along Harris Road from Harris Road Booster
IR 1.2
Pump Station to Broadmoor Boulevard (currently under
construction
IR 1.3
16 -inch diameter main from Broadmoor Boulevard to Sandifer
Parkway
IR 1.5
Construction of 10 -inch diameter PVC main from I -182 Well to
s stem
IR 1.7
16 -inch diameter irrigation main along Road 52 from Leopard Drive
(Powerline Road) to Sandifur Parkway
In addition to these improvements as described by the 2005 Plan, the City has completed the
construction of two additional new irrigation wells. Construction of improvement IR 1.4 is
13- 1444.407 Page 4 -1 Irrigation System Master Plan
December 2013 Recommendations City of Pasco
K\rnc Pbjw\1A144 -Paco W%"K=ve4 sowrw07 Pwn PrapvawnWngazwn sn�rz aPw voo4- R«o�ww.do<
no longer necessary because the City constructed an irrigation main along Sandifur Parkway
to the tie -in point proposed by improvement IR 1.4. The main along Sandifur Parkway
accomplishes the same hydraulic task as the main which had been proposed by IR 1.4.
The City is currently completing design for a project proposing construction of a new river
intake near the City's existing river intake station. The new intake would be used exclusively
for drinking water and the old intake would be converted to irrigation use.
Distribution System Improvements
Recommended improvements to the distribution system include irrigation main extensions,
replacement of undersized mains, looping improvements, isolation valve installation, and
other minor improvements. Each is discussed below.
Irrigation Main Improvements
Irrigation main improvements include replacing undersized pipes to reduce head loss,
extending existing mains, and looping mains to improve connectivity and reliability of the
system. Recommended irrigation main projects are:
• Extend arterial main on Powerline Road west to Road 90
• Extend arterial main on Powerline Road east to Road 52
• Extend arterial main on Sandifur Parkway east and south along Road 44 to tie in at
Burden Boulevard
• Extend distribution mains on Sahara Drive west to Road 44
• Replace small- diameter pipes on Sirocco Drive near Sirocco Well discharge with
larger pipes
• Extend existing main on Wrigley Drive from North Road 68 to Convention Drive.
Completing this improvement requires right of way or easement acquisitions.
Approximately 22,000 linear feet of new irrigation main are recommended for construction.
The total estimated project cost for these improvement is approximately $2.77 million. An
itemized tabulation of irrigation main projects and their associated costs is included later in
this section.
Interstate Highway 182 Crossing Isolation Valve Improvements
It is possible to make complete shutdown of the Interstate Highway 182 crossing less
frequent by installing isolation valves in the system nearby. This would allow operations
staff to shut off portions of the line along Quadra Drive instead of the main crossing in order
to make repairs. Repairs on the main crossing would still require the crossing to be shut
down.
13- 1444.407 Page 4 -2 Irrigation System Master Plan
December 2013 Recommendations City of Pasco
K:\TAC_Proj.M\13U1 - P- -W-tra ourcee SIdIA07 4- A�om.doc
Based on a review of available information, it is recommended that the City install two 12-
inch diameter isolation valves near the highway crossing. For budgeting purposes, a project
cost of $5,000 per valve has been allowed for a total project cost of $10,000. It is
recommended that the installation of the valves be done between October 31 and April 1
when the irrigation system is not in use.
Island Estates and Sunny Meadows Distribution Isolation Valve Improvements
The Island Estates and Sunny Meadows subdivisions have irrigation systems that were
installed in easements that run through the rear of residential lots. When one of these older
mains breaks, City operations staff have difficulty getting access to residents' back yards to
make repairs. Where possible, it is recommended that isolation valves be installed so that
mains can be turned off from public right -of -way while repairs are made. It is recommended
that the installation of the valves be done between October 31 and April 1 when the irrigation
system is not in use.
It is recommended that an estimated preliminary budget of $156,000 be provided to complete
these improvements. This estimated budget is based on the installation of up to 52 valves at
$3,000 per installation. The number of proposed isolation valves recommended is based on a
review of the City's GIS data. It is further recommended that City staff identify final
locations of the isolation valve improvements and confirm the final budget for this work.
Northwest Commons Welland Pivot
The Northwest Commons Well is currently plumbed to serve the nearby irrigation pivot and
the City's irrigation system. It is recommended that the City install piping and valves near
the well that allow the irrigation pivot to be supplied from the system instead of just the well.
This new connection should be metered. The direct connection from the well to the pivot
should be abandoned. This will allow the City to use the Northwest Commons well on its
own schedule and allow the pivot owner to operate the pivot without operating the well. The
estimated project cost for this recommendation is approximately $68,000.
Telemetry Improvements
Based on discussions with City staff, it is recommended that the City upgrade
communication capacity along Powerline Road with the installation of a fiber optic line. The
fiber optic line would serve as a more reliable means of communication from the central
telemetry unit to the Powerline Well, Road 52 Well, and Northwest Commons Well. Having
two ways to communicate to the wells makes the system more reliable as well. The
estimated project cost for this recommendation is approximately $35,000.
Source and Storage Improvements
Recommendations for storage and irrigation well improvements are discussed below
13- 1444.407 Page 4 -3 Irrigation System Master Plan
December 2013 Recommendations City of Pasco
K:\TAC Pmjea l3 \1444.Pam WaWRoo Stodywal Plan PteP nWngation SpWmMasts Plan\Smion4- Reconn=Utbm.dom
Storage
The storage analysis presented in Section 3 found that the existing irrigation system reservoir
has adequate storage capacity for the future conditions described if the reservoir is operated
at a higher water level. It is also recommended that existing new water level sensing
equipment be repaired or replaced to obtain more accurate water level readings. The
estimated project cost for this recommendation is $10,000.
Irrigation Well Improvements
The results of the analysis presented in Section 3 were used to develop recommendations on
irrigation well assessment, rehabilitation, replacement, and monitoring. A discussion of
these recommendations is presented below.
Well Assessment and Rehabilitation Plan
The analysis presented in Section 3 was used to develop a well assessment and rehabilitation
plan. The plan prioritizes candidate wells for further assessment and potential rehabilitation
for the purposes of optimizing individual well performance and maintaining the value of the
City's irrigation assets. This plan is developed to ensure that this asset remains in service for
the long term at minimal operating costs.
The main objective for rehabilitating a well is to restore or prevent losses in both production
capacity and well efficiency. Conditions routinely found to contribute to declining well
performance include incrustation, biofouling, physical plugging of formation or screen or
both, and corrosion. These conditions could be caused by inherent characteristics of the
aquifer, well design and construction, water quality, well operations, or combinations
thereof. Rehabilitation techniques used to address these conditions in attempts to restore or
recondition wells include:
Mechanical methods such as brushing, surging, and airlift pumping to loosen and
remove incrustation, organic material, and accumulated sediment
Chemical treatments designed to dissolve and weaken encrusting minerals and
biological slimes
Impulse generation methods (e.g., Hydropuls®) that generate high- pressure pulses
that loosen mineral and biological deposits in the well and adjacent formation. This
technology is typically used in combination with other mechanical and /or chemical
methods to increase its effectiveness
A combination of mechanical, chemical, and impulse generation well rehabilitation methods
are recommended for the following wells:
• Desert Sunset
• Sirocco
13- 1444.407 Page 44 Irrigation System Master Plan
December 2013 Recommendations City of Pasco
&ATAC_PT,l"U3n444 -P.. W.W Resources SWdy\4M Plan Prepavt .Vr lgazim System Mutes PUMSenion4 - Reconvnendazbnsdecx
• Northwest Commons
• Island Estates
• I -182
• Powerline Road
The recommended order of activities is as follows:
1. Conduct a one -hour specific capacity test to establish baseline conditions pre -
rehabilitation and collect a groundwater quality sample for inorganic chemistry and
bacterial assessment.
2. Remove pumping equipment and install rehabilitation equipment.
3. Brush and surge well to loosen buildup and airlift pump to remove debris.
4. Tremie dissolved chemical solution into the water column and agitate by surging to
penetrate the formation and enhance the effectiveness of the treatment.
5. Apply impulse generation technology.
6. Remove the loosened debris by airlift pumping.
7. Conduct a video survey of the well, disinfect the well, and reinstall pumping
equipment.
8. Conduct a one -hour specific capacity test to evaluate the effectiveness of the
rehabilitation and assess the post - rehabilitation well performance.
A combination of mechanical and chemical methods is recommended for the First Place and
Desert Estate Wells to address the minor mineral and biological deposits observed.
Activities to be performed would be those identified above, excluding the impulse generation
efforts.
Based on the information provided and relatively newer construction, the apparent conditions
of the Road 52 and Linda Loviisa Wells are considered good and no rehabilitation efforts are
recommended at this time. It is recommended that well video surveys be completed at these
wells to verify existing conditions and monitoring each well's yield and drawdown. This
work will establish baseline performance conditions and monitor for potential performance
declines over time.
It is recommended that no rehabilitation work be completed for the Village at Pasco Heights
Well due to its age and poor condition. Based on an evaluation of the well rehabilitation is
not likely to adequately address the significant incrustation, poor casing condition, and
sanding conditions at this well. The recommended rehabilitation activities for each well are
summarized in Table 4 -2.
Well Data Acquisition
Section 3 identified gaps in the available information concerning the City s existing irrigation
water supply wells. A list of recommendations to fill those data gaps was developed and is
presented in this section. Table 4 -3 shows a summary of the proposed data acquisition
13- 1444.407 Page 4 -5 Irrigation System Master Plan
December 2013 Recommendations City of Pasco
K \TAC_P ja W \1444 -Palm Waffa on SW YA0'1 Plan Pnyaarionllrtigatpn Slag Manta Plan \Smion4 - amommaMatiow.doa
activities. It is assumed that the City has the resources necessary to complete the
recommended activities, so a project cost was not developed for this work.
Table 4 -2
Recommended Well Rehabilitation and Performance Testing Activity Summary
Table 4 -3
Irrigation Well Data Acquisition Recommendations Summary
Well
Rehabilitation and Performance Testing Activities
Well
Mechanical
Chemical
Impulse
Generation
Pre- and Post-
Performance Testing
Video
Survey
Desert Sunset
X
X
X
X
X
Sirocco
X
X
X
X
X
NW Commons
X
X
X
X
X
Island Estates
X
X
X
X
X
I -182
X
X
X
X
X
Powerline Rd.
X
X
X
X
X
First Place
X
X
X
X
Desert Estates
X
X
X
X
Road 52
X
X
Linda Loviisa
X
X
Village at
Pasco Heights
Table 4 -3
Irrigation Well Data Acquisition Recommendations Summary
Well
Recommended Data Ac uisition Activities
Northwest
Conduct a specific capacity test to confirm yield and reassess whether the
Commons
yield can be increased at this well.
Establish the pump intake depth setting. This can be done in conjunction
I -182
with rehabilitation activities. Assess available drawdown and evaluate the
abili to increase yield at this well.
Conduct a specific capacity test. This test can be done in conjunction with
Island Estates
rehabilitation activities. Assess whether the yield can be increased at this
well.
A well field study should be performed to determine the optimal sizes and
Linda Loviisa
locations of new wells in the Linda Loviisa area. More information is
resented below.
Village of Pasco Heights Well Replacement
It is recommended that a new well be drilled to replace the existing Village of Pasco Heights
Well. To confirm the timing and need for this improvement, it is recommended that the
well's yield and drawdown be monitored to assess changes in its performance over time and
13- 1444.407 Page 4 -6 Irrigation System Master Plan
December 2013 Recommendations City of Pasco
K:\TACPrejtaN13 \1444 -Pe Wawr om SmdyM7 Plan Prepmmiov\4tigation System Master Plan \S=iov4- Aecommevdazbrsdocx
plan for replacement. The estimated project cost for a replacement well is approximately
$173,000. A detailed cost summary is provided in Appendix D.
Construction of New Irrigation Wells
Based on the assessment presented in Section 3, up to six new wells could be necessary.
These new irrigation wells would be a mixture of wells meant to replace some of the City's
existing irrigation wells and wells improve the City's irrigation system capacity. For
budgeting purposes, a project cost of approximately $616,000 per well has been developed.
A detailed cost summary is available in Appendix D.
The number of new irrigation wells that will be necessary will not be known until a well field
study and data acquisition have been completed. The capital improvements program
presented in this section assumes that all six wells will be necessary.
Well Houses
It is recommended that the City continue to improve its wells by enclosing them within well
houses. Enclosures minimize potential damage to equipment from exposure and reduce
noise levels. Well houses also improve the security of the well and add aesthetic value to the
vicinity. The estimated project cost for this improvement is approximately $65,000 per well
house.
Well Performance Monitoring Program
It is recommended that the City implement a monitoring program at all existing wells to
track well performance and plan for periodic well maintenance, rehabilitation, and potential
replacement. The recommended monitoring plan consists of bi- annual measurements of
specific capacity from each well. The specific capacity measurements should be made prior
to system start-up in the spring and following system shut -down in the fall. The process is
described below:
• Measure the static water level from a common measuring point during a period when
the well has been idle.
• Measure the pumping water level from the same measuring point after 30 and 60
minutes of pumping.
• Maintain a constant pumping rate and record the flow rate at 30 and 60 minutes of
pumping.
• Calculate the specific capacity for each well. The specific capacity is the pumping
rate divided by the amount of drawdown. Drawdown is calculated by subtracting the
static water level from the pumping water level.
The specific capacity measurements for each well should then be monitored over time to
evaluate the need for maintenance and rehabilitation. Water levels should also be recorded
13- 1444,407 Page 4 -7 Irrigation System Master Plan
December 2013 Recommendations City of Pasco
KATAC_Projav \13 \1444 -Pasta Wau Resources SMdYAM Plan PM WnUrription System MasKr Ph"Wion4 -Rew= dawm.dom
during periods when the well has been idle to assess whether apparent changes in specific
capacity are actually related to well performance or groundwater level declines in the aquifer.
Dry Systems
It is recommended that the City begin using its existing dry systems. According to
predictions based on hydraulic modeling, the City's existing irrigation system has the
hydraulic capacity to support the new systems. This operational change does not have any
associated capital cost as long as no new pipe is required to connect the dry systems to the
existing system.
Recommendations for Further Study and Planning
During the course of this study, opportunities for further study that could improve planning
efforts for the City's irrigation system were identified. This section presents those findings.
Well Field Study
It is recommended that a well field study be completed in order to determine the optimal
locations and sizes of new irrigation wells in the Linda Loviisa area. These wells will
increase the irrigation system capacity. A budget of $24,000 is recommended for this work.
Freshwater Mussels
It is recommended that the City conduct further investigation on the nature of the freshwater
mussel infestation in the western portion of the system near the Road 108 Pump Station.
Depending on the type of mussel, there may be federal or state regulations regarding
acceptable ways to clear the pipes. The mussels should be identified and the extent of the
infestation determined via television inspection or some other means. In the meantime, it is
recommended that the City decrease pressure at the Road 108 Pump Station or limit its use.
This may limit or halt the spread of the freshwater mussel colonization. A budget of $25,000
is recommended for this work.
Rate Structure Study
The City currently charges a flat rate to residential customers. Large customers are billed by
irrigated acre. Some of its larger customers are served and billed according to undocumented
verbal agreements. Industry experience has shown that the use of water under this rate
structure is relatively uncontrolled. It is recommended that the City undertake a rate study
and a financial review. The results of this work will assist the City in developing rates that
ensure that the current level of service is maintained and that funds are available for capital
projects and system growth. A budget of $25,000 is recommended for this work.
13- 1444.407 Page 4 -8 Irrigation System Master Plan
December 2013 Recommendations City of Pasco
K1TAC Pmjaa \13 \14J4 Puw Weer Resource SrudyWO] PW Preperaz "wnVrtiSetwn Syrian Mssta Plan\Senion4 - RewimnenEetunxdocx
Irrigation System Master Plan Update
As the City's irrigation system grows and additional water rights are acquired, the City
should re- evaluate its capital improvements plan and check on the performance of the
hydraulic system. This plan should be updated every five years or sooner to reflect major
system expansions or changes as well as any significant changes in water rights. As part of
this study it is recommended that the skeletonized hydraulic model be further developed to
include all system piping. A budget of $30,000 is recommended for this work.
Project Cost Estimates
Project cost estimates were developed for all recommended irrigation system improvements.
The project cost estimates include construction cost with a 10 percent contingency, sales tax,
and a 35 percent allowance for administration, engineering, and legal services. The cost
estimates developed are commensurate with a Class 4 cost estimate as defined by the
American Association of Cost Engineers. The actual cost can vary from 30 percent under to
50 percent over the estimated cost. Appendix D includes data and detailed breakdowns of
the project costs for the recommended system improvements.
Since construction costs change periodically, an indexing method to adjust present estimates
in the future is useful. The Engineering News Record (ENR) Construction Cost Index (CCI)
is a commonly used index for this purpose. For purposes of future cost estimate updating,
the September 2013 ENR CCI for Seattle, Washington is 10147.96.
Summary
This section presented recommendations for capital improvements to the irrigation system
and maintenance programs. These recommendations were based on analysis of the system as
presented in Section 3. Tables 4 -4 and 4 -5 include tabulated summaries of all recommended
improvements and their associated estimated project costs. The recommendations are
separated into near-term improvements and long -term improvements. Near -term
improvements are those which should be completed within the next one to five years. Long-
term improvements should be completed in six to twenty years. Figure 4 -1 shows the City's
irrigation system with recommended improvements highlighted and the dry systems
operational.
13- 1444.407 Page 4 -9 Irrigation System Master Plan
December 2013 Recommendations City of Pasco
K\TAC_P je \13\1444 -Pssm WazecRp --Sm YW07 Plan PrepazationWngal 'wn Syuem Maeio PpnVSa9ion4 -Rxommw w..d..
Table 44
Near -Term Capital Improvement Program Summary
Group
ID
Project Location
Name
Project Limits
pr oject Description
Estimated
or
Project Cost
Road 56 to Road
Extend existing 16 -inch diameter [Hain east to Road 52. The new
IR.2
Powerline Road
52
main may be built in right of way that is being platted as part of
$186,000
the construction of a new elementary school at the intersection.
West along Sahara
Extend two 4 -inch diameter distribution mains on Sahara Drive
Drive from end of
west to the existing 12 -inch diameter main on Road 44. This
IRA
SaharaDrive
existing mains to
improvement provides a redundant connection to the rest of the
$46,000
ROB
system if the connection at Burden Boulevard is out of service for
E
any reason.
Install approximately 1,200 linear feet of new 6 -inch diameter
a
IR.S
Sirocco Drive
Sahara Drive to
distribution piping near the discharge of the Sirocco Well. The
Saguaro Drive
new pipes should be installed in public right of way. The existing
$90,000
pipes should be abandoned to eliminate pipe crossings in the rear
of private lots.
Isolation Valve
Island Estates and
Installation of up to 52 isolation valves in public right of way will
°
D.2
Improvements
wnwY
S Meadows
reduce the need for City staff to access backyards during
$156,000
Phase I
Subdivisions
maintenance and repairs and allow more customers to stay online
during emergencies.
Isolation Valve
Interstate
Installation of two isolation valves in the vicinity of the crossing
O
D.3
Improvements
Highway 182
may help to prevent complete shutdown of the crossing during
$10,000
Phase 2
Crossing
maintenance and repair activities.
This improvement would tie the Northwest Commons irrigation
Northwest
Northwest
pivot directly to the irrigation system and meter the pivot at the
DA
Commons Pivot
Continues
point of withdrawal. This will allow the City to operate the
$30,000'
Improvements
Subdivision
Northwest Commons Well independently of the pivot. Proposed
pipe is 8 inches in diameter.
E
Activate Dry
This improvement is an operational improvement that consists of
GDS
Systems
_
activating the portions of the City's irrigation system which are
currently not in uses
13- 1444.407 Page 410 Irrigation System Master Pin
December 2013 Recommendations
s: rrnc_ r�oimn�niau. recow. wrt. w�swywmr�e. ��wwy.,:. osm ®�w„Qe,.otsmma.aoo.�me.m ®.m.. City Of Pasco
Table 4 -4
Near -Term Capital Improvement Program Summary (continued)
Group
ID
Project Location
Project Limits
Project Description
Estimated
or Name
Project Cost
This improvement proposes to change the maximum water level
Road 68 Irrigation
in the Road 68 Irrigation Tank from 639 to 641.5. It is an
q w
S.l
Tank
-
operational change and requires no capital investment. This
$10,000
Improvements
project also includes inspection and repair or replace level
sensing equipment inside the Road 68 Irrigation Tank
rp E
S.2
Irrigation Well
Rehabilitation
Rehabilitation and date acquisition on all wells except Village m
�
-
Pasco Heights Well.'
$220,000
m
Freshwater Mussel
Conduct a study to determine the most effective way to address
P.1
Study
y
freshwater mussel colonization of distribution piping exposed to
$25,000
E
Columbia River Water.
9
C
°i
Linda
Conduct a well field study in order to determine the optimal
'2d
P 2
Well Field Study
tua dy
-
locations and sizes of new irrigation wells in the Linda Lovnsa
$24,000
area.
a
a"
Data Acquisition
This recommendation consists of gathering data consistent with
P.3
on Existing Wells
-
Table 4 -3 above. The City has resources to accomplish this
-
project so there is no project cost.
Total Budget
Recommended for all Near -Term Capital Improve
$797,000
Notes
1. For cost estimating purposes, 200 linear feet of 6 -inch diameter PVC was assumed and $15,000 was added for installation of a new meter and
valves.
2. See Figure 2 -1 for the location of the City's existing dry systems.
3. See text for detailed description of rehabilitation activities and wells involved.
13-1444.407 Page 4 -11 Irrigation System Master Plan
December 2013 Recommendations City of Pasco
x>TAC-P.gmniruw4. P. W. � S� 4 . P ®memetno
Table 4 -5
Long -Term Capital Improvement Program Summary
Group
ID
Project Location
Name
Project Limits
Project Description
Estimated
or
Project Cost
Ml
Powerline Road
Road 90 to
Extend existing 16 -inch diameter main west to Road 90 to
$1,000,000
d
Convention Drive
improve flow and eliminate dead ends.
E
�
Extend existing dead -end 8 -inch diameter main on Sandifer
r°.
111.3
Sandifur Parkway
Porto Lane to
Parkway near Porto Lane along east side of Road 44 south to
and Road 44
Burden Boulevard
Burden Boulevard. Connect all dead-end distribution mains
$325,000
along Road 44 to the new main.
Road 68 east to
Installation of a 12 -inch diameter main between existing
m
IR.6
Wrigley Drive
Convention Drive
distribution mains on Road 68 and Convention Drive. This
$212,500
0
improvement requires additional right-of-way.
This improvement proposes installation of a redundant 12 -inch
5
600 Zone PRV
diameter source of supply to the 600 Zone. The ultimate size and
D.1
Supply
600 Zone
routing of the pipe and source zone would be chosen by the City
$915,000'
at a Inter time once right of way, easements, or land can be
acquired between the two zones.
O
This improvement proposes installation of a signal converting
Fd >
T.1
Road 52 Telemetry
Road 52
station to improve communications from the central telemetry
$35,000
Improvements
system to the Powerline Road Well, Road 52 Well, and
F fi
Northwest Commons Well.
e
U
S.3
Village at Pasco
Heights Well
Village at Pasco
Construction of a new well at Village of Pasco Heights. This
Replacement
Heights
project assumes that the existing pump and motor will be reused.
$173,000
h �
Construction of well houses to enclose existing wells and
5.4
Well Houses
-
associated equipment. It is assumed that a total of seven well
$455,000
houses will be built at a project cost of $65,000 per well house.
13- 1444.407 Page 4 -12 brigation System Master Plan
December 2013 Recommendations
z�rnc_rw�Winua. e.�m wnaxew� swswat ewxeGanrmwgrm syu ®wnayso�seawa. e«m�mm�a�a City of Pasco
Table 4 -5
Long -Term Capital Improvement Program Summary (continued)
Group
ID
Project Location
Name
Project Limits
Project Description
Estimated
or
Project Cost
e
E
Construction of
Up to six new irrigation wells could be necessary to improve the
0 o
S.5
New Irrigation
-
irrigation system capacity. For budgeting purposes, a project cost
$3,696,000'
m `a
Wells
of $616,000 per well has been assumed.'
E
e
Conduct a rate study to see if irrigation system rates me adequate.
m
P.4
Rate Study
-
The rate study will be informed by the selection of a capital
$25,000
:D
improvements program.
°
m m
hrigation System
Update of this irrigation system master plan following major
P.5
Master Plan
-
changes to the irrigation system or after five years, whichever
$30,000
°i
Update
occurs first.
Total Budget Recommended for all Long-Term Capital Improvements
$6,867,000
1. For cost estimating purposes, 6,500 linem feet of 12 -inch diameter PVC was assumed and $100,000 was added for a pressure - reducing station.
2. The location of new wells will depend on data acquisition and the Linda Loviisa well Held study.
3. The project cost is $616,000 per new irrigation well. With a total of six wells, the total project cost is $3.70 million. It is possible that fewer than
six new wells will be necessary.
13- 1444.407 Page 4-13 Irrigation System Master Plan
December 2013 Recommendations
xv eAmr.ur,�uo -v.,m wnae.,., somas+wreme. Hwy .,msmms+.. =emwmmna- a�ww®aw City ofPasco
]lei
Cily of Pasco
lrr
1 IMPROVEMENTS
�NENNIENNN,
------- ------
417 iii
L ,2
------ POPE tZEE
aaa�
-ZONE
r
........... lu'll 11 J
—1.1 . - . f-'r*
E
N.
FAR
_jn'
aaaaw
E" —ATES VIL
W
T.
4
as
ZZWOFIV1,00
MSA APPENDIX A
APPENDIX A
WATER QUALITY DATA
Appendix A includes water quality information for the water supplied by the Cityts irrigation
system wells. Available water quality data is attached on the following pages.
13- 1444.407 A -1 Irrigation System Master Plan
December 2013 Appendix A: Water Quality Data City of Pasco
k:\m0jtgecUU3 \1444. PascowNerresomca9WY\ 407 In prepmati0n \iai8ati0n system toasterplan\app imeappaAix a- wta9wiky&t&d x
System Review
ID M 664003 Type: A -COMM Services
System Name: Pasco Water Department ._ t
Residentia_. 6606 _ _. Res_ Popufalion: 24746
County: Franklin Permit Color: Yellow iouc Bs08 Approved:
Coliform Summary
First 12 Months
Second 17 Mnnthc
Year _ _
Month
02
Mar
_ 02_
Fea
_02 _ 01
1 Dan Dec
01 __Ot •
NOV Oct
O7_
SeP
in __ 01_
Aug Jul
01
Jun
01
May
01
Apr
Measurement
01__01
Mar
_ 01
Feb Jan
. 00
' Cec
_ 00
Nov
00
pct
;_ 00 _
Sep
.00___.00
Aug
Jul�,un
00
W _ -+
Ma rr:
Required Samples ._._?0._. 30 _: 30 `30_,_30._30._.30 30...x_. x._30._ -30
Routines Taken 32 40 39 39 38 ' 37 38 40 1 37 39 39 30
30 _30__30 � 30 � 30 30 30 3C 30 30
29 31 31 34 32 31 31 32 37 3;
30 3C
Present Routines 1
THM 92
3 2 1
Present FecallE Coll
DON
Parameter
Required Repeats
2941
27
Repeats Taken
27.5000
2943
Water Quality Violations
Violation Parameter M Violation
Date Group # Name S Type
04/30192 COLT 1 Total Coliform M Minor Repeat
10/31/91 COLI 1 Total Coliform S Non -Acute
Lead and Copper Monitoring Summary
Monitoring Period Lead Copper Samples
Start to End 90th High 90th High Act Req
0711992 1211992 0.0070 0.0550 0.2300 0.7020 70 60
0111993 0611993 0.0040 0.0140 0.4500 0.8280 60 60
0711993 1211993 O.DD40 0.0080 0.4000 0.6700 36 30
0111994 0611994 0.0090 0.0190 0.3420 0.4100 32 30
0711994 1211994 0.0030 0.0050 0.2370 01700 32 30
0111995 1211995 0.0070 0.0140 0.5570 0.7750 44 30
0111996 1211998 0.0020 0.0020 0.1810 0.2440 30 30
Volatile Organic Chemical Samples
Sample #
Collected
Type SOP Detects No 0 Not A
046.11531
12/12/01
THM 92
3 2 1
EPA
DOH
Parameter
Measurement
2941
27
Chloroform
20.1000
2943
28
Bromo- Didiloromethane
3.1000
2950
31
Total Tri-Halomethane
23.2000
046-08765
09124/01
THM 92
3 2 1
EPA
DON
Parameter
Measurement
2941
27
Chloroform
27.5000
2943
28
ammo- Dichloromemane
3.3000
2950
31
Total Tn- Nalomemane
31.0000
046 -05160
06/13/01
THM 92
4 1 1
EPA
DON
Parameter
Measurement
294'
27
Chloroform
38.7000
2943
28
Bromo- Dichloromethane
5.3000
2944
29
Dibromo- Cholomlethane
0.5000
2950
31
Total Td- Halomelhane
44.5000
046-02032
03/14101
THM 92
3 2 1
EPA
DON
Parameter
Measurement
2941
27
Chloroform
20.7000
2943
28
Bromo-Dichlommetnane
1.9000
2950
31
Total Td- Halomethane
22.6000
046 -11010
12112/00
THM 92
3 2 1
046-08242
09/20/00
THM 92
3 2 1
04644569
06/07/00
THM 92
3 2 1
Inactive Sources
S02
Name_
_ p _Use _
� Type _
W
Use
E
--
Well #1A &8
___gpm__
200
Depth
180
_,N
9
R: E Section _
'S•`: _
- _NE -NW
Treated:
Disinfection. Chlorination. Hypochlome
Raoium 226
LT 1.000
Inorganic Chemical Samples
Sample# Collected Type
SO# Detects No
Not
062 -00466
EPA
08/20/93 Ichem
DON Parameter
02 1
Measurement
1040
20 Nitrate -N
3SCO
SOS
-- _...._. Name _
_ p _Use _
101 -04030
Dradie ST Weli #4
W E
_gpm
N R: E
Section
350 130
1 9 29
22 NE - NE
Inorganic Chemical Samples
Sample# Collected Type SO# Detects No Not
062- 00571 08/30/94 NIT 05 1
EPA DON Parameter Measurement
1040 20 Nhrate-N 16.43
062-00343 05/25/94 NIT 05 1
EPA DON Parameter Measurement
1040 20 Nitrate -N 1740
062-00123 02/16194 NIT 05 1
EPA DON Parameter Measurement
1040 20 Nitrate -N 17.30
062 -00858 11/30/93 Ichem 05 1
051.14434 04106/93 Ichem 05 22
Synthetic Organic Chemical Samples
Sample # Collected Type SO# Detects No D Not A
095.12212 12/18/95 547 05 1
095.12212 12/18195 549 05 1 1
Radionuclide Samples
Sample #
Collected
Type SO# Detects No D Not A
101 -04030
04105193
RAO 05
3
EPA
DOH
Parameter
Measurement
4020
39
Raoium 226
LT 1.000
4000
41
Gross Alpha (Minus Uranium)
5.900
4100
42
Gross Beta
LT 10.00
System Review
Permanent Sources
801
-
�Coluitia
Name
Tyke Use
`S
Volatile Organic Chemical Samples
River
p
Sample #
Collected
Type SO# Detects
No D Not A
om
Depth
I T: N i R: E Senion i 'G•' /.
046.09521
10/15101
524.2 01
3
56 4
18000
0
9 I 30
1 3 M -NE
EPA
DOH
Parameter
Measurement
Suscaptlbilily
Vulnerability
Renewed
2941
27
Chloroform
10.80
"
--
2943
28
Bmmo -0ichlommelhane
2.400
Treated:
Taste l Odor Control B DeChlormation
Permanganate
2950
31
Total Td- Halomethane
13.20
Particulate:
Filtration. Rapid Sand
046.06214
07/12101
524.2 01
3
56 4
Rapid
Rapid Mix /In -Line Blender
EPA
DOH
Parameter
(Turbidity):
Measurement
Coagulation
2941
27
Chloroform
16.00
Removal
Flomlation
2943
28
Bromo-Dichloromethane
3.100
Disinfection:
Chlorination. Gaseous
2950
31
Total Trf- Halomethane
19.40
Chlorination Hvpochlodte
046 -03230
04118101
524.2 01
3
56 4
Corrosion Control:
Ph Adjustment
Inorganic Chemical Samples
EPA
DOH
Parameter
Measurement
2941
27
chloroform
6.900
Sample If
Collected
Type SO#
Detects No Not
2943
28
Bronno-0ichloromethane
2.700
046-05158
06/13/01
IOC 01
9 19 15
2950
31
Total Tri- Halomethane
12.00
EPA
DOH
Parameter
Measurement
1025
19
Fluoride
0.770
046 -00623
01123/01
524.2 01
3
56 4
1041
114
Nitrite -N
NO
EPA
DOH
Parameter
Measurement
1040
20
Nitrate -N
0.590
2941
27
Chloroform
8.900
1038
161
Total (N031 NO3.)
0.590
2943
28
Bromo-Dichloromethane
2.700
1028
8
Iron
NO
2944
29
Dibromo- Cholormethane
NO
1032
10
Manganese
NO
2950
31
Total Td4lalomethane
12.00
1915
15
Hardness
68.90
1064
16
Conductivity
177.0
046 -09306
10116100
524.2 01
3
56 3
0100
17
Turbidity
0.200
046.06003
07/ 19100
524.2 01
3
56 3
1905
18
Color
6.000
046 -03260
04/25/00
5242 01
3
56 3
1057
26
TDS- Total Dissolved Solids
NA
046 -01549
02/29100
524.2 Oi
3
56 3
04644567
06107/00
ICC 01
5 23 15
046-03459
05/04/99
524.2 01
3
56 3
EPA
DOH
Parameter
Measurement
046-04812
07108198
THM 01
3
2 1
1915
15
Hardness
58.40
046 -01064
02123/98
524.2 Ot
3
56 2
1064
16
Conductivity
155.0
D46 -00432
01126/98
THM 01
3
2 1
0100
17
Turbidity
0.200
1905
18
Color
ND
Synthetic Organic Chemical Samples
1025
1040
19
20
Fluoride
NNrate•N
NO
No
Sample#
Collected
Type SO# Detects
No Not
1055
22
Sulfate
18.60
D46 -05161
08!13/01
515.1 01
14 3
1057
26
TDS -Total Dissolved Solids NA
046 -04570
06/07100
531.1 01
10
1041
114
Niuite -N
NO
046-04570
06/ 07100
525.2 01
60 3
046-04570
06107/00
515.1 01
14 3
119. 95462
06/14199
ASB 01
1
04643458
05/04/99
515.1 01
14 3
EPA
DOH
Parameter
Measurement
046 -03458
05/04/99
525.2 01
60 3
1094
115
Asbestos
LT 0.098
046 -03458
05/04199
531.1 Ot
10
046 -03457
05104/99
10C 01
5 23 15
046-01046
02123198
525.2 01
59 3
EPA
DOH
Parameter
Measurement
046 -01D46
02123/98
515.1 01
14 3
1915
15
Hardness
73.90
046-01046
02123198
531.1 01
10
1064
16
Conductivity
182.0
046 -03308
08118197
515.1 01
13 4
0100
17
Turbidity
0.200
046-MB
07101197
525.2 01
21 41
1905
18
Color
NO
1025
19
Fluoride
NO
Radionuclide Samples
1040
20
N9nte -N
No
1055
22
SuBate
19.60
Sample #
Collected
Type SO# Detects
No D Not A
1057
26
TDS -Total Dissolved Solids NA
023.68311
04/18101
RAO 01
3 7
EPA
DOH
Parameter
Measurement
046 -01045
02/23/98
IOC 01
8 21 14
4000
41
Gross Alpha (Minus Uranium) NO
4100
42
Gross Beta
NO
046-03304
07101/97
IOC 01
7 21 15
4102
43
Tritium
NO
02367752
10/16100
RAD Ot
3 7
062-00338
10/13196
NIT 01
1 2
EPA
DOH
Parameter
Measurement
046-04111
10101196
IOC 01
7 21 15
4000
41
Gross Alpha (Minus Uranium) NO
4100
42
Gross Beta
NO
111.99186
11103195
10C 01
28 15
4102
43
Tritium
NO
IIII
System Review
Emergency Sources
S06 __. Name_ __ Type_
Use
WP WFI S07S07,S08, S09, Si0 WF
E
Repo
N R E Section 'G • 1:
500 160.
_
__9 ._- .. z9.- _- _.._18-- ' -NE•_NW
Treated: Disinfection, Chlorination. H pochlonte
S03
---- - --- -- Name .__. - -- - - -
- _IYP.E --
15
Hardness
WP- Well #2
1 WW
I E
,_.9pm Depth T: N R: E Section %116
1400 160 -NW
Inorganic Chemical Samples
Sample # Collected Type SON Detects No D Not A
062 -00160 04/15193 Ichem 03 1
EPA DOH Parameter Measurement
1040 20 Nkote•N 15.70
17
SO4
_.____ ._..__ Name -- - ___TYpe
_Use
0.300
WP•Wall#3 WW
E
- ...- 9Pm. -- --_. Rep th.__
__L,N R: E.__._. Section Y.• %.
300 200
_
9 29 18 NE • NW
S07
-- Name
_ Type __
^Use
ND
WP• Well 1A
WW
.
E
_. _9Pm__. 0th.. T_N_ R: E Section '/. • Y.
_ _
100 160 9 ., 29_.... ____ .__.1x_..__. - -tit -.NW ..
I—
SOB
—__ _ Name _ _
Ty e1�
Usa
SuNate
WP•WellIS
WW
E
__.9Pm.._. -.. -Depth
T_N R:E `Section ' /.•' /.
108 179
__
9 29 18 NE -NW]
Inorganic Chemical Samples
Sample # Collected Type SO# Detects No 0 Not A
062-00434 10115/99 NIT 06 1 2
EPA DOH Parameter Measurement
1040 20 Nitrate -N 3.300
046-06753 08112199 NIT 06 1 2
EPA DOH Parameter Measurement
1040 20 Nitrate•N 4.200
062-00241 06114199 NIT 06 1 2
EPA DOH Parameter Measurement
1040 20 Nitrete•N 6.100
062-00087 03117199 NIT 06 1 2
EPA OOH Parameter Measurement
1040 20 Nitrate•N 5.900
046 -03305
07101/97
IOC
06
8
20 15
EPA
DOH
Parameter
3
Measurement
1915
15
Hardness
13 4
046 -03309
217.1
1064
16
Conductivity
046-03309
07/01197
542.0
0100
17
Turbidity
07/01/97
525.2E
0.300
1905
16
Color
41
LT
5.000
1025
19
Fluoride
5.00
ND
1040
20
Nkrete•N
4.800
1055
22
SuNate
56.30
1057
26
TDS -Total Dissolved Solids
ND
046 -04088
09/30/96
NIT
06
1
2
062 -00569
08130/94
NIT
06
2
062-00345
05/25/94
NIT
06
1
062 -00122
02/16194
NIT
06
1
Volatile Organic Chemical Samples
Sample # Collected Type SON Detects NOD Not A
046.03307 07/01/97 524.2 06 3 55 3
EPA DOH Parameter Measurement
2943 28 Bmmo- Dichlommethane 140
2944 29 Dibromo- Choiormethane 760
2942 32 Bromolorm 200
111 -96210 06/20196 THM 06
111 -99909 02/07/95 THM 06 2 3 1
EPA DOH Parameter Measurement
2941 27 Chloroform 1.10
2950 31 Total Td- Halometnane 1.10
Synthetic Organic Chemical Samples
Sample #
Collected
Type
SO# Detects
No D Not A
046 -07733
10128/98
504
06
3
046 -03309
07/01197
515.1
06
13 4
046 -03309
07/01/97
531.1
06
10
046-03309
07/01197
525.2
06
52
046 -03309
07/01/97
525.2E
06
2
Radionuclide Samples
Sample #
Collected
Type S0# Detects
NOD Not A
101-04032
04/06/93
RAO 06 3
EPA
DOH
Parameter Measurement
4020
39
Radium 226 LT
100
4000
41
Gross Alpha (Manus Uranium)
5.30
4100
42
Gross Beta
8.60
101 -04031
04/06/93
RAD 06 2
EPA
DOH
Parameter Measurement
4000
41
Gross Alpha 1Minus Uraniuml LT
5.00
4100
42
Gross Beta LT
5.00
III
/� /S iOR/!fj t j%1HYLl�M [MfM Cw
C ^iTY l'wNb7) C„ +c71.S U.;i7J /•�=
Center Fw LAberatwy Sciences
RJ Lee Group, Inc.
2715 SL Andrews LP Sale c
Pasco, WA 90301
l608LFe6-0999
Moat. -N
LABORATORY REPORT
any of Pasco
P.O. Box 293
RJ Lea Group Job W.: WA0607200MM2
Pasw WA 99391
Samptea Raceivae: ]/fln2005
Ann: Dean Cenimlli
RbPre ft e: ]/2112005
Phone.' (W9) 545-3469
Anal Olml Pr Data
Cilanl P,No, WA
Fax:(509)545-395
Purchaea Od0r NP.:
Aneiaelr
EPA 300.0 -WA
Non -Poteble Weler
sirocco
WAOBW200.W W21104
]Ay2005
Moat. -N
EPA 300.0 -Wq
t4onPOlebte Weiar
shelf-
20 0.03
4112
WA060T20050002-002
T/ &2005
Nnlale -N
EPA 3W.0 -WA
Nen- POlabla Walar
m L
2e o.03
Blhan
WAWO]ZIW50002 -003
]!52005
Date -N
EPA 300.0 -WA
Non -Poteble Weler
.91L
25 0.03
Ibnd Eel
T /&2006
NNmte -N
EPA 3000 WA
L
i! 0.03
WA1190]2095W02L04
Nmn fc table Water
thasonam
T/ &2005
Nim. -N
EPA 300.0 -WA
m
24 O03
WA08W20050002-005
Nm POteble Water
All sad meidclas reached on a tiny Weight basis unless Whenvise rated.
These resWts tie sutala fe 1pursued fa RJ Lee Group! cane, (arms and carldaavu Masha eel d g,, canyrenys afW dad wenany an, fl nceWr WhaWUyproVlawis.
No Groaal 6aaY waedb'fYl®aewmetl N-Uro mamerNVdayr bafmiasaausetl alnfemmfanc holeaamliae tin weep to for a, ours of my 0y Mb repaf. RJ
l.ea Gmup wia shoe the aempba /w a peaotl MHdnfy (3p) days bolare discaNing. A shipphg erd hentlam lea will DB esdeuotl (a fhP mean Many samples.
Aulhwised
Request for Services
Locslad Al RJ Lee Group, Inc. in pactneraphip with Columbia Basin College.
/ 1
4+
Drinking Water
Sample bnl-
FbY D9e Only
V
Sample PUryoae n In(orme8on n Regulatory
Sampleanni9,
(509)
System IDs
i "thlppstlm nanda ;Vmaa.n
Com an _G'34 i7RlO
Fax: (5 ,601089
Fax: (509 544.6010
Comaq: G
DON Sources
>�•i¢mpOggn Nemipt°U
atpwaplaWecv- utw:er
4)'pN aigeea aY:
Pro'eq Name: Project#: POe Guolaa
Address: Q v'f
Group Type o nB nOther
4 9ebe%cnadfed
Git
State: ZI _-
_
PreservatloNMetrix/COnbiner rypa Key
Phpne:S._.1 Fax:(
1 -meN:
Pmervnbn Wy:
Ceptaw NeY:
Sam brjs)Signalure
_E
BnPes H2SO4
u'C HCl
HNO3 NeOH
Olhn Na50
eslevpter
S- SaWSludae
E =UW
SWSwtaanvaler P =Gl"m
OW=Onnkiipwaxr G =Glass
0-OX
x =OBer
—_ --
Re DNivery Imtrugloro: Email Resuaa7 YES / NO Fax Reauln7 YES / NO
Tum Aroun_d Requeak
__..
StanderN PdorM (ousnips tlan)'
n
nelyela
Rapusetstl
COmmenViNaetrYCNOna:
O
K
~
C
y
R
0
j
Client Sample leentfioation
CLS Sample ID
Sample
Semple
tl
U
x
of
Date
Tim
e
a
.2
-C , S T
--
6
-
-
-
-
Tima:
�'�
'
Relinquished Sy (`1LI
-- sempb0
»..
Qd1e `
_
Received 8y:
Dale
La
linquished By
Date:
Time:
_
Recalved BY:_
Relinquishe0 By:
Data:
Tile,
_
.
,
/ 1
4+
APPENDIX D
APPENDIX B
2007 RESIDENTIAL WATER USE MEMORANDUM
Appendix B contains a memorandum completed in 2007 to study residential water use
patterns and trends. The memorandum is attached on the following pages.
13- 1444.407 B -1 Irrigation System Master Plan
December 2013 Appendix B: 2007 Residential Water Use Memorandum City of Pasco
k: \=c .ja \13 \1444 -p w— resources am YW07 plan p gmwion\hrigeti -y'—m 1e plan\appe im\appe mb- 200]miden w .,. nwn.dumdo.
MEMORANDUM CH2MHILL
Residential Water Use Study
TO: Bob Alberts, Public Works Director
FROM: Tony Krutsch, Project Manager
CH2MHILL
DATE: August 3, 2007
INTRODUCTION
This Residential Water Use Study looks at residential water consumption at various locations
throughout the City of Pasco. Approximately 360 residential housing units were included
in the study representing 16 neighborhoods. Neighborhoods were selected to represent a
cross section of older and newer construction, with both separate irrigation systems, and
those lots dependent on the City domestic water system as the source of supply for
irrigation.
This study represents an update of a Water Usage Study prepared by the City of Pasco in
September 2001. In various locations throughout this technical memorandum, information
from September 2001 Water Usage Study is quoted.
Water records for each residential lot selected for this study were obtained from the City of
Pasco Finance Department for the period of January 2005 through June 2007. After the water
records were obtained and entered into a spreadsheet, the records were purged to remove
inconsistent data that could have affected the analysis and evaluation.
Unlike the September 2001 Water Usage Study, this evaluation is primarily based on the
residential lot rather than population.
CITY WATER USAGE
Chart 1 identifies the average daily residential lot water usage for the 2 -year evaluation
period for all neighborhoods included in this evaluation.
PASCO WATER USE STUOYIKEN
COPYRIGHT 2013 BY CH2M HILL, INC. • COMPANY CONFIDENTIAL
RESIDENTIAL WATER USE STUDY
Chart 1. Residential Lot Water Usage - gallons per day
•rr
Water Usage - Entire City
A��
T
wrr -
-�
rr
As
c
Ir1
rr
T
A
9
a
Seriesi
0
A
6
0)
Jan Feb Mar Apr May Jun Ad Aug Sep Oct
Nov Dec
months
•rr
:rr A
A��
wrr -
-�
rr
crr
Ir1
rr
The winter average daily residential lot water usage varies between older and newer
neighborhoods. In older neighborhoods, winter usage averaged 237 gpd while in newer
neighborhoods, winter usage averaged 155 gpd (average of 206 gpd for both older and
newer neighborhoods).
For those neighborhoods using the City domestic water system for residential lot irrigation,
average daily domestic water usage was calculated at 883 gpd per unit, and the summer
average daily water usage was calculated at 1,473 gpd per unit. The older Desert Plateau
neighborhood had the highest summer average daily water usage at 2,939 gpd per unit.
Older neighborhoods in central and east Pasco averaged 1,107 gpd per unit for the summer
monthly period.
Chart 2 identifies each of the 16 neighborhoods included in this evaluation and the average
usage of City domestic water by neighborhood in ac -ft /month during the winter (Dec -Feb)
and summer (June -Sept) periods.
Chart 2. Seasonal Lot Water Usage - Acre -feet
_v �
O C
o.0000
Unl<
KENl7 -10.08 DEMAND STUDY TECH MEMO.DOC 2
COPYRIGHT 2013
BY CH2M HILL, INC. •COMPANY CONFIDENTIAL
RESIDENTIAL WATER USE STUDY
Chart 3 identifies each of the 16 neighborhoods and the total annual average usage of City
domestic water by neighborhood in ac -ft /year.
Chart 3. Annual Lot Water Usage - Acre -feet
The average monthly domestic water consumption for all lots in the City was calculated at
0.0412 acre -ft per month and 0.4880 acre -ft per year. For those neighborhoods utilizing a
separate irrigation system for irrigation, the average monthly domestic water consumption
was calculated at 0.0191 acre -ft per month and 0.2249 acre -ft per year. In neighborhoods
relying on the City domestic water supply system for irrigation, the average monthly
domestic water consumption was calculated at 0.0729 acre -feet per month and 0.8264 acre -
feet per year. The older Desert Plateau neighborhood has the highest monthly average and
annual average usage of domestic water at 0.1540 acre -feet per month, and 1.7836 acre -feet
per year respectfully. The central and east Pasco neighborhoods, which rely on the City
domestic water supply system for irrigation had a monthly average domestic water
consumption of 0.0644 acre -feet per month, and an annual water consumption of 0.7229
acre -feet per year.
KEN17 -1608 DEMAND STUDY TECH MEMO.DOC 3
COPYRIGHT 2013 BY C142M HILL, INC. • COMPANY CONFIDENTIAL
WATER USE STUDY
Chart 4 provides a comparison of the 16 neighborhoods in terms of winter versus summer
usage shown in gallons per day per unit.
Chart 4. Seasonal Lot Water Usage - gallons per day
Chart 5 identifies the average daily water usage in terms of gallons per day per unit of the
16 neighborhoods for the entire City (1), those neighborhoods served by a separate
irrigation system (2), and those neighborhoods relying on the City domestic water supply
system for irrigation (3).
Chart 5. Annual Lot Water Usage for Entire City - gallons per day
1600
1400
1200
gallons per 1000
day /unit 800
600
400
200
0
Water Usage - Annual
2 3
1- Entire City, 2 -W separate irrig,
3 -W City irrig
S2 S2- summer,
31 S1- winter
KEN/7 -10.08 DEMAND STUDY TECH MEMO. DOG y
COPYRIGHT 2013 BY CH2M HILL, INC. • COMPANY CONFIDENTIAL
RESIDENTIAL WATER USE STUDY
Chart 6 looks at the average daily water usage in terms of gallons per day per unit of all the
older neighborhoods evaluated in this report (1), those older neighborhoods served by a
separate irrigation system (2), and those older neighborhoods relying on the City domestic
water supply system for irrigation (3).
Chart 6. Annual Lot Water Usage for Older Neighborhoods - gallons per day
Water Usage -Old Neighborhoods - Annual
1600 - - - - -�
1400
1200
gallons per 1000 800
day /unit 600
400
200 S2
01 S1 S2- summer,
1 2 S1- winter
3
1 -Entire City, 2 -W separate
irrig, 3 -W City irrig
Chart 7 looks at the average daily water usage in terms of gallons per day per unit of all the
new neighborhoods evaluated in this report (1), those new neighborhoods served by a
separate irrigation system (2), and those new neighborhoods relying on the City domestic
water supply system for irrigation (3).
Chart 7. Annual Lot Water Usage for New Neighborhoods - gallons per day
Water Usage -New Neighborhoods - Annual
1000
l JSl I
800
gallons per 600
day /unit
400 200
0 S2 S2- summer1 2 S1- winter
3
t- Entire City, 2 -W separate
irrig, 3 -W City irrig
KENA -10-08 DEMAND STUDY TECH MEMOAOC
COPYRIGHT 2013 BY CH2M HILL, INC. • COMPANY CONFIDENTIAL
RESIDENTIAL WATER USE STUDY
The September 2001 Water Usage Study evaluated 10 houses in 8 neighborhoods (total of 80
homes) throughout the City of Pasco. Chart 8 lists the 8 neighborhoods from the September
2001 report, and also identifies the results from this Residential Water Use Study separated
into the same 8 neighborhoods.
Chart 8. Average Daily Water Usage - gallons per day
Neighborhood
September 2001 Study
Residential Use Study
Sun Willows
601 gpd
771 gpd
Ivy Glades
157 gpd
182 gpd
Wilson
246 gpd
241 gpd
Core City
570 gpd
669 gpd
West Pasco
236 gpd
221 gpd
I. Estate /S. Meadow
143 gpd
157 gpd
Desert Plateau -1
934 gpd
1,651 gpd
Desert Plateau - 2
- --
285 gpd
East Pasco
823 gpd
712 gpd
As Chart a pomts out, ttiere are some differences between the two studies. These
differences are likely the results of selecting more residential units in each neighborhood in
this Residential Water Use Study, and the use of different residents within each neighborhood
in each evaluation. Desert Plateau is shown with 2 listings in Chart 8. Desert Plateau -1 is
an older neighborhood which utilizes the City domestic water supply system for irrigation
water, while Desert Plateau - 2 is a newer neighborhood with smaller lot size and fewer
records available for analysis. One of the calculations presented in the September 2001
report was the estimated percentage of City water used indoors vs. outdoors for those
neighborhoods where no separate irrigation supply system was available. Chart 9 compares
the results of this Residential Water Use Study with the September 2001 report.
Chart 9. City Water Use - Indoor and Outdoor (gallon/year)
Neighborhood
Avg Mo
Use-.
Winter
Total Avg
based on
Winter
Total Actual
Use
% Indoors
This Study
(Sept 2001)
%Outdoors
This Study
(Sept 2001)
Desert Plateau -1
6,525
78,295
581,146
13.5%(27%)
86.5%(73%)
Sun Willows
3,482
41,786
257,657
16.2% (23 %)
83.8% (77 %)
Core City
9,073
108,878
232,943
46.7 °k (39 %)
53.3%(61%)
East Pasco
8,320
99,839
238,160
42.0%(45%)
58.0% (55 %)
Average
10,038
82,200
327,477
29.6% (33%)
70.4% (67%)
KEN17 -16-08 DEMAND STUDY TECH MEMO.DOC
COPYRIGHT 2013 BY CH2M HILL. INC. • COMPANY CONFIDENTIAL
RESIDENTIAL WATER USE STUDY
Chart 10 provides a comparison of the outdoor water usage from the September 2001 report
and this Residential Water Use Study for those neighborhoods relying on the City domestic
water supply system for irrigation supply. The average square feet of each lot irrigated is
from the September 2001 report.
Chart 10. Average Annual Gallons per square foot and acre -feet
Neighborhood
Gross
Avg
Total
Gallons
Density
Gross Acre-
Acre -ft per
Lot Size'
Lawn
Outdoor
per sq -ft
of
ft per year2
year per
(sq ft)
Size'
Water
This
Homes
This Study
lawn area
(sq ft)
(gallons)
Study
per
(Sept 01)
(Sept 01)
gross
acre'
Desert Plateau -1
10,390
8,100
502,851
62 (29)
3.5
5.39 (2.52)
8.30
Sun Willows
6,420
4,900
215,872
44 (31)
4.8
3.18 (2.24)
5.89
Core City
6,820
5,200
124,064
24 (20)
4.9
1.88(l.55)
3.63
East Pasco
6,970
5,400
138,321
26 (27)
4.8
2.07 (2.17)
3.42
Average
7,650
5,900
245,276
39 (26)
4.5
1 3.18 (2.12)
1 5.31
'From September 2001 Water Usage Study
2 Average sq -ft of lawn times number of homes per acre divided by 43,560 sq -ft, then multiplied by gallons per
sq -ft, divided by 7.48
3 Total Outdoor Water usage divided by Avg Lawn Size, divided by 7.48
The September 2001 Water Usage Study noted that the Franklin Conservation District
estimated that home lawns accounted for 37.7 inches (3.08 ac -ft or 23 gallons per sq -ft) of
water annually. With an anticipated loss of up to 20 %, the application rate per lawn area
would increase to 3.7 ac -ft or 27.7 gallons per sq -ft.
In both the Desert Plateau -1 and Sun Willows neighborhoods, irrigation application rates
are much higher than those anticipated by the Franklin Conservation District. The average
application rate for irrigated lot area for the entire City of 5.31 ac -ft exceeds the anticipated
application rate of 3.7 ac -ft (including losses) by approximately 44 %.
WATER USE STUDY FINDINGS
The following represents findings of this Residential Water Use Study and the evaluation of
water consumption throughout the City of Pasco.
1. Residential Indoor Water Usage.
In the older residential neighborhoods, daily domestic indoor water usage averaged 237
gallons per day (annual usage of 0.2655 acre -feet per year). For the new residential
neighborhoods, daily domestic indoor water usage averaged 155 gallons per day
(annual usage of 0.1736 acre -feet per year), or 53% less than older neighborhoods. For
KENITID 08 DEMAND STUDY TECH MEMO.DOC
COPYRIGHT 2013 BY CH2M HILL, INC. • COMPANY CONFIDENTIAL
RESIDENTIAL WATER USE STUDY
the new residential neighborhoods, it is highly likely that the plumbing fixtures and
devices used have an improved efficiency over those in older neighborhoods.
2. Residential Outdoor Water Usage.
For the 16 neighborhoods evaluated in this Residential Water Use Study, the volume of
water consumed for domestic purposes was calculated at less than 50% of the total
volume consumed for domestic plus irrigation. At the seven neighborhoods, utilizing
the domestic water supply system for irrigation, the volume of water consumed for
domestic purposes was calculated at about 30% of the total volume consumed for
domestic plus irrigation (Over twice as much water was consumed by irrigation of a lot
than was used for domestic purposes by each residential unit).
In older residential areas (central and east Pasco), irrigation of the landscaped area of
each lot was similar to that anticipated by the Franklin Conservation District (3.7 acre -ft
per year) at 3.63 acre -ft per year (central) and 3.42 acre -ft per year (east) respectively.
The central and east Pasco area residential units are of older construction, landscaping is
considered to be mature and well established, and residents are generally considered to
have moderate incomes.
In newer residential areas (Sun Willows and Desert Plateau), irrigation of the
landscaped area of each lot far exceeded the Franklin Conservation District anticipated
average of 3.7 acre -ft per year. The Sun Willows neighborhood consists of relatively
small landscaped areas (Average of 4,900 square feet) in a newly developed area.
Residents are generally considered to have higher incomes. Irrigation application rates
in the Sun Willows neighborhood were calculated at 5.89 acre -feet per year or nearly
60% greater than the Franklin Conservation District anticipated average.
The Desert Plateau neighborhood evaluated for this study consists of residents with
above average lot size, where income levels are generally considered to be high.
Landscaping is generally 3 to 5 years old and irrigation application rates were calculated
at 8.30 acre -feet per year. This application rate is 124% greater than the Franklin
Conservation District anticipated average (3.7 acre -feet per year). Even if the actual
irrigated area of lots within this Desert Plateau neighborhood were larger (by 25% to
10,000 square feet) than the average (8,100 square feet) calculated in the September 2001
Water Usage Study for Desert Plateau, the irrigation application rate to landscaped areas
would be 6.72 acre -feet per acre or over 80% greater than the Franklin Conservation
District anticipated average.
APPLICATION TO WATER SYSTEM PLAN
Based on this evaluation, the update of the City of Pasco Water System Plan will utilize
the residential water consumption figures shown in Chart 11 for the projection of future
domestic and irrigation supply demands for the existing and future residential
neighborhoods throughout the Pasco Urban Growth Boundary.
KEN17-1008 DEMAND STUDY TECH MEMO.DOC
COPYRIGHT 2D13 BY C112M HILL, INC. • COMPANY CONFIDENTIAL
RESIDENTIAL WATER USE STUDY
Chart 11. Water Usage in Residential Areas - acre -feet per year per unit
Residential Area With Separate
With Domestic
Separate Irrigation
Irrigation System
Water Irrigation
Demand
(acre- ft/year/unit)
(acre- ft/year /unit)
(acre- ft/year/unit)
Old Neighborhood 0.2655
0.7229
0.5031
New Neighborhood 0.1736
0.9644
0.8699
Chart 12 identifies the average day domestic and average day irrigation demand per
unit, and per gross acre of residential neighborhoods in terms of gallons per day.
Chart 12. Per Unit Water Usage
Residential
Area
With Separate
Irrigation System
(gpd)
With Domestic Water
Irrigation (gpd)
Separate Irrigation
Demand (gpd)
unit
gross acre
unit
gross acre
unit
gross acre
Old
Neighborhood
240
660
750
3.5 units/ acre
840
2,540
3,160
4.0 units /acre
960
2,900
3,300
4.5 units /acre
1,080
2,970
3,380
5.0 units/ acre
1,200
3,130
3,560
New
Neighborhood
160
1,500
2,250
3.5 units /acre
560
6,300
9,450
4.0 units /acre
640
6,000
9,000
4.5 units /acre
720
6,410
9,610
5.0 units/ acre
800
6,750
10,120
KEN17 -1008 DEMAND STUDY TECH MEMO.DOC
COPYRIGHT 2013 BY CH2M HILL, INC. • COMPANY CONFIDENTIAL
MSA APPENDIX C
APPENDIX C
OPERATING AGREEMENTS
Appendix C contains operating agreements that the City has with Kidwell Farms, Inc. These
agreements include the use of the Northwest Commons well and annual contracts for
irrigation water use at pivot sites. The agreements are attached on the following pages.
13- 1444.407 C -1 Irrigation System Master Plan
December 2013 Appendix C: Operating Agreements City of Pasco
k: \t ,.je \13\1444 -p.,. w... Au yW07 playp ..flo.\i igni. syg. non. pleo\aP i.a.pP duc - .p thg egce w.dou
RECEIVED
JUL 3 0 2008
PUBLIC WORKS 01111N.
FILED FOR RECORD AT REQUEST OF: Zona G. L MeR Auditor, Frankkn County. WA.
City of Pasco, Washington AFN s 1722639 Recorded 0713012008 at 02:31 P
13"Type: ASGN 4 Page(s) F11" Instrument 146.
WHEN RECORDED RETURN TO: Recorded at the request ol: PASCO CITY OF
City of Pasco, Washington
525 North 3rd
Pasco WA 99301
ASSIGNMENT OF WELL EASEMENT
(Including Well System)
BY THIS ASSIGNMENT effective this day of l c 2008,
Farm 2005, LLC, a Washington Limited Liability Company, hereinafter referred
to as "Assignor ", does by these presents, assign to the City of Pasco, Washington,
a Municipal Corporation, hereinafter referred to as "Assignee ", all of its right,
title and interest as co- owner, to that certain easement and water well system
described below according to the following terms and conditions.
WHEREAS, that easement document which is the subject matter of this
assignment, was entered into with Glacier Park Company, a Delaware
Corporation, as Grantor therein, and Alford Farms, Inc., a Washington
Corporation as Grantee therein, on December 20, 1989, designated as Easement
Deed No. G -89 -3566, and recorded as Franklin County Auditor's No. 548122
( "Easement "); and
WHEREAS, such easement was assigned by the original Grantee to
Kenneth G. Smith by Assignment of Easement dated November 25, 1997, and
recorded December 23, 1997, in Franklin County, Washington, as Auditor's File
No. 548122. Such easement was further assigned by Assignment of Easement
dated November 30, 2007, between Kenneth G. Smith as Assignor to Pasco
School District No, 1, a Washington Municipal Corporation, and Farm 2005,
LLC, a Washington Limited Liability Company, as Franklin County Auditor's
No. 1711948, as co- owners each having an undivided one -half interest therein;
and
WHEREAS, Farm 2005, LLC, and Pasco School District No. I have
entered into a Water Well System Shared Use Agreement dated October 22, 2007,
thereby establishing their respective interest and responsibilities regarding the
water well related water pumping and piping infrastructure located upon and
Assignment of Well Easement - I
within the easement, this Agreement is assignable by their respective parties with
their successors in interest being bound by the terms thereof; and
WHEREAS, Farm 2005, LLC, desires to convey all of its right, title and
interest in the easement and water well and related water pumping and piping
infrastructure located thereon, and including all of its rights and responsibilities
under the Water Well System Shared Use Agreement; NOW, THERFORE,
IN CONSIDERATION OF MUTUAL COVENANTS CONTAINED
HEREIN, and as a donation for public purposes, receipt of which is hereby
acknowledged, the Parties agree as follows:
1. Assignment of Easement. Assignor does hereby assign to Assignee
all its right, title and interest in that easement designated as Easement Deed No.
G -89 -3566 dated December 20, 1989, for underground water line, overhead
power line, and water well use, upon and over the surface of real property located
in the:
Southeast Quarter or the Southeast Quarter of the Southeast
Quarter of Section 3, Township 9 North, Range 29 East,
Willamette Meridian, Franklin County, Washington, more
particularly described designated by diagram on the
attached Exhibit A.
Included in such Assignment are all fixtures located upon such premises
consisting of the existing well system including pumps, panels, casings and piping
infrastructure constituting the existing well system, including but not limited to:
1- GE 150 hp, Serial # OVJ210003
1- Layne Pump, # W2004033
1 - Service Disconnect Allen- Bradley 4 99454 with
PUD Meter # 25879
Assignor warrants that it has the right to transfer its interest in the above -
described equipment and further agrees to warrant and defend the transfer,
assignment, conveyance, grant, and delivery of the well system and above -
described equipment made hereby against all persons whomsoever, to take all
steps reasonably necessary to establish the record of Assignor's title and at the
request of the Assignee, to execute and deliver further instruments of transfer and
assignment and take any other action Assignee may reasonably request to more
effectively transfer and assign to and vest in Assignee each and every component
of the well system, at the sole cost and expense of the Assignor.
Assignment of Well Easement - 2
2. Assumption of Water Well System Shared Use Agreement.
Assignee hereby accepts the assignment of well easement including the fixtures
and components of the water well system described above, and Assignor's interest
in the Water Well System Shared Use Agreement dated October 22, 2007, and
agrees to be bound by and abide by each and every term and condition of said
easement and Water Well System Shared Use Agreement, and hereby expressly
assumes all obligations of the original Grantee thereunder except those liabilities
arising out of acts or omissions occurring prior to the execution of this
Agreement.
3. Reservation. This easement is subject to reservation reserved in
the Grantor, Glacier Park Company, in the event that such premises shall cease to
be used for underground waterlines, overhead power lines, and water well
purposes for a period of twelve (12) months.
4. General Provisions. For the purpose of this Agreement, time is of
the essence. In the event a dispute arises concerning the breach, enforcement or
interpretation of this Agreement, the parties shall meet in a good faith attempt to
resolve the dispute. In the event the dispute is not resolved either by agreement of
the parties, or by voluntary mediation, the dispute shall be resolved by arbitration
pursuant to RCW 7.04A, the Mandatory Arbitration Rules (MAR). Venue shall
be placed in Franklin County, Washington, and the prevailing party shall be
awarded its attorney fees and costs against the other.
DATED this �C j day of, r► � ` 2008.
ASSIGNOR
Farm 2005, LLC
CL
Ch L. Berg, LLC Met er
Assignment of Well Easement - 3
STATE OF WASHINGTON )
�y
County of Franklin
On this day personally appeared before me CHERYL L. BERG, Member of
Farm 2005, LLC, described in and who executed the within and foregoing instrument,
and acknowledged that she signed the same as her free and voluntary act and deed for the
uses and purposes therein mentioned.
�r ?uµut I I IV bb hall
ss19 F� xe
3
�pZARY a
pUB4�� a
County of Franklin
fiend ffic ?i aphis '2�dayof �(P ,2008
Notary Public in and f6rthf State of Washington
Residing at Va S C. o
My Commission Expires --j - ;k t. ^ 60 _._
ss
On this day personally appeared before me GARY CRUTCHFIELD, City
Manager of the City of Pasco, Washington, described in and who executed the within and
foregoing instrument, and acknowledged that he signed the same as his free and
voluntary act and deed for the uses and purposes therein mentioned.
GIVEN under my hand and
' PUBOZ
Assignment of Well Easement - 4
My
at
. . .lW"47A1NJJM
and for
PUBLIC WORKS /ENGINEERING DIVISION 509-545-344-4/ FAA 509 -543
293, 525 NORTH THIRD AVENUE, PASCO,
Tom Kidwell
Water, Inc.
2420 W. Court
Pasco, WA 99301
RE: Pump Station Agreement
Dear Mr. Kidwell:
February 14, 2012
Ff6 ��VFD
,040 �� 2 zple
u tors
The city purchased from Water, Inc., all its facilities including the pump station situated on the FCID can:
within Section 16. The purchase agreement provided that the parties would provide, by separate agreemen
for your potential use of the pump station for irrigation of certain agricultural lands owned by you at th;
time. Since that agreement, however, you have sold those certain properties; consequently, the city is n,
obligated by the purchase agreement to provide for your use of the pump station for other lands.
The city understands, however, your desire to use the pump station to irrigate the agricultural lands yt
presently lease from the Washington State Department of Natural Resources (DNR). Based on our rece
discussions, the city will permit your use of the pump station in strict accord with the following stipulatior
In exchange for the city's permission to use the pump station for the 2012 growing season, you shall:
I . be responsible for all electrical costs associated with pump station;
2. be responsible (to the city's satisfaction) for all maintenance and repair costs associated with the t
of the pump station during the growing season;
3. pay $2,500 for the seasonal use with payment due not later than April 30, 2012;
4. provide evidence of liability insurance of at least $100,000 and naming the city as an additioi
insured;
5, indemnify and hold the city harmless from any claims whatsoever associated with use of the pu
station;
6. be responsible for all costs whatsoever to acquire water from the FCID canal;
7. assure that use of water transferred through the pump station shall be restricted to those lands wit
Section 16 which you have legal authority to use,
8. no chemicals shall be sprayed in any form on the pump and control systems;
9. no chemicals are to be used in or with the irrigation system.
10. pay City $I001year lease for pump equipment. The applicant is responsible for relocation, electr
costs and maintenance of equipment pump.
Your signature hereunder will reflect your agreement with the foregoing provisions.
Agreed to:
Tom Kidwell
Sincerely,
Ahmad Qayoumi
Public Works Director
Date
PUBLIC WORKS /ENGINEERING DIVISION 509.545 -3444 /FAX 509 -543
P.O. BOX 293, 525 NORTH
Tom Kidwell
Water, Inc.
2420 W. Court
Pasco, WA 99301
RE: Well Agreement
Dear Mr. Kidwell:
WASHINGTON 99.301
Fury 14, 2012
n
p&84tC 2 < 41917
S`2
C17" CaA�
The City of Pasco acquired from the Northwest Commons subdivision, as part of the preliminary ph
requirements, the water rights and well in 2006. The preliminary plat requirements provided that th
owner /developer could negotiate a separate agreement with the City if they wish to continue to utiW
water from the well for irrigation of agricultural lands.
The City understands your desire to use the well to irrigate the agricultural lands you presently lease
the subdivision site. The City will permit your use of the well in strict accord with the followh
stipulations. In exchange for the city's permission to use the well for the 2012 growing season, yt
shall:
1. adhere to the City's operation instructions;
2. be responsible for all electrical costs associated with farm irrigation;
3. be responsible (to the city's satisfaction) for all damage, maintenance and repair costs associat,
with the use of the well during the growing season;
4. pay $1,500 for the seasonal use with payment due no later than April 30, 2012;
5. provide evidence of liability insurance of at least $100,000 and naming the City as an addition
insured;
6. indemnify and hold the City harmless from any claims whatsoever associated with use of the
well;
7. assure that use of water shall be restricted to those lands within the subdivision of Northwest
Commons;
8. no chemicals shall be sprayed in any form on the pump and control systems;
9. no chemicals are to be used in or with the irrigation system.
Your signature hereunder will reflect your agreement with the foregoing provisions.
Sincerely,
Ahmad Qayoumi
Public Works Director
AQfjv
Agreed to:
Tom Kidwell Date
Tom Kidwell
Water, Inc.
2420 W. Court
Pasco, WA 99301
PUBLIC WORKS/ ENGINEERING DIVISION 509 -545 -3444 /FAX 509 -54:
P.O. BOX 293,525 NORTH THIRD AVENUE, PASCO, WASHINGTON 99301
FO&q 14, 2012
f^�IV��
�fB T 4
Td IT
PVeC1C wV�Kb #2
RE: Well Agreement at Linda Loviisa Subdivision
Dear Mr. Kidwell:
Gy
The City understands your desire to use the well to irrigate the agricultural lands you presently lease;
the Linda Loviisa subdivision site. The City will permit your use of the well in strict accord with ti
following stipulations. In exchange for the city's permission to use the well for the 2012 growir
season, you shall:
L Connect your system at a location approved by the City and provide a meter and valving as
deemed necessary by the City.
2. adhere to the City's operation instructions;
3. be responsible for all electrical costs associated with farm irrigation;
4. be responsible (to the city's satisfaction) for all damage, maintenance and repair costs associau
with the use of the well during the growing season;
S. pay $2,500 for the seasonal use with payment due no later than April 30, 2012;
6. provide evidence of liability insurance of at least $100,000 and naming the City as an addition
insured;
7. indemnify and hold the City harmless from any claims whatsoever associated with use of the
well;
8. assure that use of water shall be restricted to those lands within the subdivision of,
9, no chemicals shall be sprayed in any form on the pump and control systems;
10. no chemicals are to be used in or with the irrigation system.
Your signature hereunder will reflect your agreement with the foregoing provisions.
Sincerely,
Abroad Qayoumi ` ~'
Public Works Director
AQ /jv
Agreed to:
L
Tom Kidwell Date
PUBLIC WORKS / ENGINEERING DATISION 509.545 -3444 / FAX 509 -54
P.O. BOX 293,525 NORTH THIRD AVENUE. PASCO, WASIUNGTON 99301
April 2, 2010
Tom Kidwell
Water, Inc.
2420 W. Court
Pasco, WA 99301
RE: Well Agreement at Linda Loviisa Subdivision
Dear ?&. Kidwell:
The City understands your desire to use the well to irrigate the agricultural lands you presently leas
the Linda Loviisa subdivision site. The City will permit your use of the well in strict accord with
following stipulations. In exchange for the city's permission to use the well for the 2010 grov
season, you shall:
I . Connect your system at a location approved by the City and provide a meter and valving as
deemed necessary by the City.
2. adhere to the City's operation instructiorrs;
3. be responsible for all ell etrical costs associated with farm irrigation;
4. be responsible (to the city's satisfaction) for all damage, maintenance and repair costs associ
with the use of the well during the growing season;
5. pay $2,500 for the seasonal use with payment due no later than April 30, 2010;
6. provide evidence of liability insurance of at least 5100,000 and naming the City as an additi,
insured;
7. indemnify and hold the City harmless from any claims whatsoever associated with use of th
well;
8. assure that use of water shall be restricted to those lands within the subdivision of;
9. no chemicals shall be sprayed in any form an the pump and control systems.
Your signature hereunder will reflect your agreement with the foregoing provisions.
sincerely,''/
Bob Alberts
Public Works Director
BAlV
Agreed to:
Tom Kidwell Date
PUBLIC WORKS / ENGINEERING DIVISION 509 -545 -3444 / FAX 509 -542
P.O. BOX 293, 525 NORTH THIRD AVENUE, PASCO, WASHINGTON 99301
March 31, 2010
Tom Kidwell
Water, Inc.
2420 W. Court
Pasco, WA 99301
RE: Well Agreement
Dew Mr. Kidwell:
The City of Pasco acquired from the Northwest Commons subdivision, as part of the preliminary pl
requirements, the water rights and well in 2006. The preliminary plat requirements provided that d
owner /developer could negotiate a separate agreement with the City if they wish to continue to utili
water from the well for irrigation of agricultural lands.
The City understands your desire to use the well to irrigate the agricultural lands you presently least
the subdivision site. The City will permit your use of the well in strict accord with the followi
stipulations. In exchange for the city's permission to use the well for the 2010 growing season, y
shall;
1. adhere to the City's operation instructions;
2. be responsible for all electrical costs associated with farm irrigafion;
3. be responsible (to the city's satisfaction) for all damage, maintenance and repair costs associai
with the use of the well during the growing season;
4. pay $1,500 for the seasonal use with payment due no later than April 30, 2010;
5. provide evidence of liability insurance of at least $100,000 and naming the City as an additioi
insured;
6. indemnify and hold the City harmless from any claims whatsoever associated with use of the
well;
7. assure that use of water shall be restricted to those lands within the subdivision of Northwest
Commons;
8. no chemicals shall be sprayed in any form on the pump and control systems.
Your signature hereunder will reflect your agreement with the foregoing provisions.
Sincerely,
Bob Alberts
Public Works Director
BA jv
Agreed to:
Tom Kidwell Date
PUBLIC: WORKS DEPARTMENT 1509► 543 -573
"),15 -!`77 7°: 4t rnurl Pawn. 1l ashin�
kt ,n wlof
March 19, 2013
Tom Kidwell
Water, Inc.
2420 W. Court
Pasco, WA 99301
RE: Well Agreement
Dear Mr. Kidwell:
37
The City of Pasco acquired from the Northwest Commons subdivision, as part of the preliminary plat
requirements, the water rights and well in 2006. The preliminary plat requirements provided that the
owner /developer could negotiate a separate agreement with the City if they wish to continue to utilize
water from the well for irrigation of agricultural lands.
The City understands your desire to use the well to irrigate the agricultural lands you presently lease at
the subdivision site. The City will permit your use of the well in strict accord with the following
stipulations. In exchange for the city's permission to use the well for the 2013 growing season, you
shall:
I. pay for seasonal use $1,330 (which includes $151.34 applicable state leasehold taxes) by April
30, 2013;
2. be responsible for all electrical costs associated with farm irrigation;
3. be responsible (to the city's satisfaction) for all damage, maintenance and repair costs associated
with the use of the well during the growing season;
4. adhere to the City's operation instructions:
5. provide evidence of liability insurance of at least $100,000 and naming the City as an additional
insured;
6. indemnify and hold the City harmless from any claims whatsoever associated with use of the
well;
/. assure that use of water shall be restricted to those lands within the subdivision of Northwest
Commons;
8. no chemicals shall be sprayed in any form on the pump and control systems;
9. no chemicals are to be used in or with the irrigation system;
10. maintain and test RP;
11. if chemical is used it must he preapproved by the City.
Your signature hereunder will reflect your agreement with the foregoing provisions.
Sincerely,
Ahmad Qayoumi
Public Works Director
AQ /jv J
Agreed to:
Tom Kidwell 31N4
Date
PUBLIC WORKS DEPARTMENT (5091543-57381 VAN (509) 543 -5737
jt'f) . HM j 1?_'r` NUnh t" %\CIIUCl Pqi poY ntt pl :nytH : "y
March 19, 2013
Tom Kidwell
Water, Inc.
2420 W. Court
Pasco, WA 99301
RE: Well Agreement at Linda Loviisa Subdivision
Dear Mr. Kidwell:
The City understands your desire to use the well to irrigate the agricultural lands you presently lease at
the Linda Loviisa subdivision site. The City will permit your use of the well in strict accord with the
following stipulations. In exchange for the city's permission to use the well for the 2013 growing
season, you shall:
I. pay $2,215 for seasonal use (which includes $252.04 of applicable state leasehold taxes) by
April 30, 2013;
2. be responsible for all electrical costs associated with farm irrigation:
3. be responsible (to the city's satisfaction) for all damage, maintenance and repair costs associated
with the use of the well during the growing season;
4. connect your system at a location approved by the City and provide a meter and valving as
deemed necessary by the City.
5. adhere to the City's operation instructions;
6, provide evidence of liability insurance of at least $100,000 and naming the City as an additional
insured:
T indemnify and hold the City harmless from any claims whatsoever associated with use of the
we] I;
8. assure that use of water shall be restricted to those lands within the subdivision of;
9. no chemicals shall be sprayed in any form on the pump and control systems;
Your signature hereunder will reflect your agreement with the foregoing provisions.
Sincerely,{
Abroad Qayoumi
Public Works Director
Agreed for
fom Kidwell
Date
PUBLIC WORKS DEPAR,rMENT (509) 543 -5738 / FAX (509) 543 -5737
P.U. Boa' 9715 ?: Vnnh �'d :'�ri nuri P,,o 1 aAm ton 99301 tcm m pa.0 a;r coy
March 19, 2613
Ton) Kidwell
Water, Inc.
2420 W. Court
Pasco. WA 99301
RE: Pump Station Agreement
Dear Mr. Kidwell:
The city purchased from Water, Inc., all its facilities including the pump station situated on the FCID canal
within Section 16, The purchase agreement provided that the parties would provide, by separate agreement,
for your potential use of the pump station for irrigation of certain agricultural lands owned by you at that
time. Since that agreement, however, you have sold those certain properties; consequently, the city is not
obligated by the purchase agreement to provide for your use of the pump station for other lands.
The city understands, however, your desire to use the pump station to irrigate the agricultural lands you
presently lease from the Washington State Department of Natural Resources (DNR). Based on our recent
discussions, the city will permit your use of the pump station in strict accord with the following stipulations.
In exchange for the city's permission to use the pump station for the 2013 growing season, you shall:
1. pay $2,215 for the seasonal use of the pump station and $90 1year lease for pump equipment (which
includes $262.28 of applicable state leasehold tax) by April 30, 2013.
2. be responsible for all electrical costs associated with pump station;
3. be responsible for relocation, electrical costs and maintenance of equipment pump.
4. be responsible (to the city's satisfaction) for all maintenance and repair costs associated with the use
of the pump station during the growing season;
5. provide evidence of liability insurance of at least $100,000 and naming the city as an additional
insured;
6. indemnify and hold the city harmless from any claims whatsoever associated with use of the pump
station;
7. be responsible for all costs whatsoever to acquire water from the FCID canal;
8. assure that use of water transferred through the pump station shall be restricted to those lands within
Section 16 which you have legal authority to use.
Your signature hereunder will reflect your agreement with the foregoing provisions.
Sincerely,
-- AhmadQayoumi
Agreed to: !
O
Public Works Director
Tom Kidwell — _ l r
Date
1 NLBLIC WORKS DEPARTAtEV7 (509) 543 -5738 / FAX (509) 543 -5737
• P I1 BoN 293 1525 Nunh , "' 4ienurl Pa+cn N a,hmNwo 09101
March 19, 2013
Tom Kidwell
Water, Inc.
2420 W. Court
Pasco, WA 99301
RE: Well Agreement at Rd 52
Dear Mr. Kidwell:
The City understands your desire to use the well to irrigate the agricultural lands you presently lease at
the Rd 52 site. The City will permit your use of the well in strict accord with the following stipulations.
In exchange for the city's permission to use the well for the 2013 growing season, you shall:
I . pay $2,215 for seasonal use (which includes $252.04 of applicable state leasehold taxes) by
April 30, 2013;
2. be responsible for all electrical costs associated with farm irrigation;
3. be responsible (to the city's satisfaction) for all damage, maintenance and repair costs associated
with the use of the well during the growing season;
4. connect your system at a location approved by the City and provide a meter and valving as
deemed necessary by the City.
5. adhere to the City's operation instructions;
6. provide evidence of liability insurance of at least $100.000 and naming the City as an additional
insured;
7, indemnify and hold the City harmless from any claims whatsoever associated with use of the
well;
8. assure that use of water shall be restricted to those lands within the subdivision of:
9. no chemicals shall be sprayed in any form on the pump and control systems;
Your signature hereunder will reflect your agreement with the foregoing provisions.
Sincerely,
Ahmad Qayoumi
AQ /Jv
Public Works Director
�� l i
Agreed to: t
Tom Kidwell Date
MASS b
APPENDIX D
PROJECT COST ESTIMATES
Appendix D contains detailed cost estimating data used to determine project costs as
presented in Section 4.
Irrigation Mains
Irrigation main project cost estimating data was prepared using bid tabulations from nearby
irrigation districts. Some of the City of Pasco's recent bid tabulations were also used. The
costs assume PVC irrigation pipe. Construction costs represented total estimated
construction cost per linear foot (LF) of pipe and included sales tax. A 10 percent
contingency was added to bid costs to calculate a construction subtotal. To calculate project
costs, a 35 percent contingency was added to account for administrative, legal, and
engineering costs. Table D -I summarizes irrigation main project costs.
Table D -1
Irrigation Main Project Cost Summary
Pipe Diameter (inches
Project Cost per Linear Foot $/LF
4
65
6
75
8
105
10
115
12
125
16
135
18
145
20
150
24
170
Well Rehabilitation and Assessment
The total project cost for well rehabilitation work is estimated at $225,500. Well
rehabilitation costs are summarized in Table D -2 and are based on the following
assumptions:
• New pump and motor costs are not included
• The City will conduct the specific capacity testing recommended at each well
• The City will conduct well video surveys
• Administrative, legal, and engineering costs for this project are estimated at 50
percent of the construction cost instead of 35 percent to account for additional on -site
engineering representation associated with rehabilitation activities. Rehabilitation
activities typically require more on -site representation than construction of new
facilities.
13- 1444.407 D -1 Irrigation System Master Plan
December 2013 Appendix D: Project Cost Estimates City f Pasco
LMWc jectaVAIW - pascowuaresoun UWYMI Pi P mtiun\mguionryuanm =p4QWp dic %app MU d -Mjm cost aNnu &s ty
Table D -2
Well Rehabilitation and Assessment Project Cost Summary
Description
Quantity
Unit
Unit
Price
Total
Desert Sunset, Sirocco, Northwest Commons, Island Estates, 1-182, and Powerline Road
Wells
Mobilization and Demobilization
6
LS
$1,500.00
$9,000.00
Disconnect, Remove, and Reinstall Existing
Equipment
72
HR
$350.00
$25,200.00
Specific capacity testing
12
HR
$0.00
$0.00
Onsite Hourly Work to Perform Rehabilitation
96
HR
$350.00
$33,600.00
Miscellaneous E ui ment and Chemicals
6
LS
$1,500.00
$9,000.00
Video Survey
121
EA
1 $0.00
$0.00
Disinfection
61
EA
1 $1,000.00
$6,000.00
Wastewater Containment and Disposal
6
1 EA
$2,500A0
$15,000.00
Subtotal
$97,800.00
First Place and Desert Estates Wells
Mobilization and Demobilization
2
LS
$1,500.00
$3,000.00
Disconnect, Remove, and Reinstall Existing
Equipment
24
HR
$350.00
$8,400.00
Specific Capacity Testing
4
HR
$0.00
$0.00
Onsite Hourly Work to Perform Rehabilitation
16
HR
$350.00
$5,600.00
Miscellaneous Equipment and Chemicals
2
LS
$1,000.00
$2,000.00
Video Survey'
4
EA
$0.00
$0.00
Disinfection
2
EA
$1,000.00
$2,000.00
Wastewater Containment and Disposal
2
EA
$2,500.00
$5,000.00
Subtotal
$26,000.00
Road 52 and Linda Loviisa Wells
Specific Capacity Testing'
4
HR
$0.00
$0.00
Video Survey'
2
EA
$0.00
$0.00
Disinfection
21
EA 1
$1,000.00
$2,000.00
Subtotal
$2,000.00
Subtotal $125,800
Construction Contingency (10 percent) $12,580
Sales Tax (8.6 percent) $11,900
Construction Subtotal $150,280
Administrative, Legal, and Engineering Costs (50 percene) $75,140
Rounded Estimated Project Cost $225,500
Notes
1. Assumes City will conduct specific capacity testing and well video surveys.
2. Administrative, legal, and engineering costs are higher due to increased
on -site engineering representation for rehabilitation activities.
13- 1444.407 D -2 Irrigation System Master Plan
December 2013 Appendix D: Project Cost Estimates City of Pasco
k:lucymi.\13W4- Pas. Y dyWo pUP praparetionVangarion rys�av mass. planVPPeMiceaVPR du a - M jw wa stun .&cx
Village of Pasco Heights Well Replacement
The total project cost to replace the Village of Pasco Heights Well is estimated at $172,400.
Itemized costs are summarized in Table D -3 and are based on the following assumptions:
• The well pump and motor in use at the existing Village of Pasco Heights Well are in
good condition and can be reused in the new well.
• Costs for infrastructure expansion for connection to existing water system are not
included
• No permitting costs are included
• No cost for a well video survey is included since the City can perform the survey
The total cost includes:
• Aquifer and well performance testing (e.g., step -rate and constant -rate pumping tests)
• Plumbness and alignment testing
• Water quality analysis
• 100 feet of 10 -inch diameter PVC discharge piping to connect to the existing
irrigation system
General New Irrigation Well Construction
A general -use project cost was developed for use in budgeting construction of a new
irrigation water supply well. The total estimated project cost is $616,000. Itemized costs are
summarized in Table D -4. This estimated project cost can be used on a per -well basis and is
based on the following generalized assumptions:
• The total depth of the new well is 200 feet
• The diameter of the well is 16 inches
• The length of the stainless steel screen is 20 feet
• The pump is a vertical turbine type pump with a 150 -HP motor equipped with a
variable -speed drive
• 500 feet of 10 -inch diameter PVC discharge piping will be needed to connect the well
to the existing irrigation system
• The City will perform well video surveys
The total cost includes:
• Aquifer and well performance testing (e.g., step -rate and constant -rate pumping tests)
• Plumbness and alignment testing
• Water quality analysis
It is possible that individual well construction costs may vary from those presented here due
to fluctuations factors such as depth, diameter, production rates, aquifer characteristics, and
13- 1444.407 D -3 Irrigation System Master Plan
December 2013 Appendix D: Project Cost Estimates City of Pasco
kAtwc ja \I3 \1444 -P WXa MOm "YW07 Pl Ptepa IMVmigmion SeWm m WPIMnAP icestap Wka - Mj=cos wtvmles.EOCx
hydraulic conditions. To take these variations into account, a contingency of 20 percent was
used to estimate the construction cost of the well. The project cost included in Table D-4 is a
representative cost used for budgeting purposes only.
Table D -3
Village of Pasco Heights Well Replacement Project Cost Summary
Description
Quantity
Unit
I Unit Price
Total
Mobilization and Demobilization
1
LS
$10,000.00
$10,000.00
Site Preparation
1
LS
$5,000.00
$5,000.00
Drilling 20 -inch Diameter Surface Seal
20
LF
$240.00
$4,800.00
Furnish and Install 20 -inch Diameter Casing
20
LF
$100.00
$2,000.00
16 -inch Diameter Drill Shoe
1
0
$1,000.00
16 -inch Diameter Drilling
180
$21,600.00
Furnish and Install 16 -inch Diameter Casing
200
$14,000.00
Install Surface Seal
20
0
VHR$525.00
$800.00
16 -inch Diameter Shoe Cut
1
$4,000.00
Hourly Operations
8
$4,200.00
Well Casing Alignment
1
EA
$500.00
$500.00
16 -inch Diameter Telescoping Stainless Steel
Screen
10
LF
$200.00
$2,000.00
16 -inch Diameter Riser Pipe and Tail Pie
15
LF
$70.00
$1,050.00
Silica Sand
40
BG
$16.00
$640.00
Installation of Screen Assembly
16
HR
$525.00
$8,400.00
Well Development
16
HR
$325.00
$5,200.00
Remove existing pump and motor and Reinstall in
New Well
-Piping
180
LF
$20.00
$3,600.00
Furnish and Install Discharge
100
LF
$85.00
$8,500.00
Operate Test Pump
30 1
HR
$240.00
$7,200.00
Well Disinfection
1
LS
$500.00
$500.00
Well Head Completion
1
LS
$350.00
$350.00
Water Quality Analysis
1
LS
$1,500.001
$1,500.00
Subtotal
Construction Contingency (10 percent)
Sales Tax (8.6 percent)
Construction Subtotal
Administrative, Legal, and Engineering Costs (35 percent)
Rounded Estimated Project Cost
$106,840
$10,685
$10,110
$127,630
$44,670
$172,400
13- 1444.407 D-4 Irrigation System Master Plan
December 2013 Appendix D: Project Cost Estimates City of Pasco
kMacymj" \13\I4W- pesco water resoumu 9WY`A?1�N <Pereli- -Wdlmm ry.meta Plen*�di.\appeo d- pj..st alvwu.&.
Table D -4
New Irrigation Well Project Cost Summary
Description
Quantity
Unit
I Unit Price
Total
Mobilization and Demobilization
1
LS
$15,140.00
$15,140.00
Site Preparation
1
LS
$5,000.00
$5,000.00
Drilling 20 -inch Diameter Surface Seal
20
LF
$240.00
$4,800.00
Furnish and Install 20 -inch Diameter Casing
20
LF
$100.00
$2,000.00
16 -inch Diameter Drill Shoe
1
EA
$1,000.00
$1,000.00
16 -inch Diameter Drilling
180
LF
$120.00
$21,600.00
Furnish and Install 16 -inch Diameter Casing
200
LF
$70.00
$14,000.00
Install Surface Seal
20
LF
$40.00
$800.00
16 -inch Diameter Shoe Cut
1
EA
$4,000.00
$4,000.00
Hourly Operations
8
HR
$525.00
$4,200.00
Well Casing Ali ent
1
EA
$500.00
$500.00
16 -inch Diameter Telescoping Stainless Steel
Screen
20
LF
$200.00
$4,000.00
16 -inch Diameter Riser Pipe and Tail Pie
15
LF
$70.00
$1,050.00
Silica Sand
40
BG
$16.00
$640.00
Installation of Screen Assembly
Well Development
New Well Pump and 150 -HP Motor with
Variable-Speed Drive
16
16
1
HR
HR
LS
$525.00
$325.00
$125,000
$8,400.00
$5,200.00
$125,000.00
Furnish and Install Discharge Piping
Operate Test Pump
500
30
LF
HR
$85.00
$240.00
$42,500.00
$7,200.00
Well Disinfection
1
LS
$500.00
$500.00
Well Head Com letion
1
LS
$350.00
$350.00
Well House
1
LS
$37,000.00
$37,000.00
Electrical, Instrumentation, and Controls
1
LS
38,450.00
38,450.00
Water Quality Analysis
1 I
LS 1
$1,500.001
$1,500.00
Subtotal $350,030
Construction Contingency (20 percent[) $70,000
Sales Tax (8.6 percent) $36,125
Construction Subtotal $456,160
Administrative, Legal, and Engineering Costs (35 percent) $159,660
Notes Rounded Estimated Project Cost $616,000
1. Construction contingency is higher to account for uncertainty in well construction,
aquifer characteristics, and hydraulic conditions.
13- 1444.407 D -5 Irrigation System Master Plan
December 2013 Appendix D: Project Cost Estimates City of Pasco
01.. o*e 13 \1444 - Paz- wuerresomar mdyW07 PIa,Prepm nUm9B m system master PYntnPPe CWt PP ad -Mim wet annwms a
Murray, Smith &Associates, W.
Engineers /Planners
Tacoma, Washington
AGENDA REPORT NO. 15
FOR: City Council Date: 06/05/2014
TO: Gary Crutchfi anager
FROM: Ahmad Qayo i, Public Works Director Workshop Mtg.: 06/09/2014
Regular Mtg.: 06/16/2014
SUBJECT: Six -Year Transportation Improvement Plan 2015 - 2020
I. REFERENCE(S):
1. Six -Year Transportation Improvement Plan 2015 — 2020 - Proposed Plan
2. Six -Year Transportation Improvement Plan 2015 — 2020 - Resolution
3. Six -Year Transportation Improvement Plan 2015 — 2020 - Map
H. ACTION REQUESTED OF COUNCIL /STAFF RECOMMENDATIONS:
06/09: Discussion
06/16: Conduct Public Hearing
06/16: MOTION: I move to approve Resolution No. thereby adopting
the City's Six -Year Transportation Improvement Plan for 2015
-2020.
III. FISCAL IMPACT:
None
IV. HISTORY AND BRIEF FACTS:
A) Each year, all Cities and Counties in the State are required to adopt an updated
Six -Year Transportation Improvement Plan specifically for federal and state
funded projects. For the City of Pasco, this plan has consisted of all projects
including the annual overlays, street widening, and signal projects which are
within the City limits. Larger projects such as the Lewis Street Overpass also
have been shown.
B) The proposed six -year program represents those projects that are anticipated to be
needed within six years. Several projects will need to be coordinated with utility
projects which could change the actual timing of the projects. Although this
process of adopting a six -year plan is a state requirement, the Council will again
review the projects in the annual Six -Year C.I.P. process and the budgeting
process.
While the worksheets presented by staff include a potential funding source, many
of the projects listed will be dependent upon available funding. In addition, staff
will be pursuing available grants from the various funding programs.
Staff recommends the plan be presented at a public hearing on June 16, 2014, and
that Council adopt the plan by resolution.
4(d)
W
Lei
O �
o �
N �
1 �
� p
O p
N �
W
C!3
C� p
rte.
QI i
� O
� U
r U
�O
0
� o
� N
0 kr)
� O
I�1 �
O
•TT� ^^y
Vl
a
z
1
O
V
a
4•+
O y
U z
b
ro
a a b y a ro Q a 0 ro 9 r a a
a a o v o C o v
OOOa�Uv a nvC7�i wUv� 000 o7Q�i�
�I�I�INI�
66I6e I�sI�nI�sI &S IU9I66IGe IESI'.SIEn IEoqIGosIGO I�i�s ■ I�I�sIGl)I�I�I I's I-,�I�I�
w
0
v
o Grob Z i .*O bA 5%u ro b O
q U o c o v r Z ro U ° w u z
Ln
3
CJ
w Uro U �O b 'd b m V5
U W ro ro > a C7 ro w ro q G o
UTCA�Q����aoZQo�. °� U`�QOaOu
CdobQ.� roW a��wc4CaA �y��Q°
> ° Afw o v > N o q
��HQxav3o�oW
a a
00od¢�H ¢�g000cnga0.lN �:000al.��N.°i nl
°w
�b0
n
W
itl
0
.0
.Q
Q
•�
N
00
>
N
�
0 0
0
0
0
�+
O
ti
U
U
U
U
U
O a
_�
dd
O
q
O
O
O
0
p
:
a
Qp�j
;
O
ol
O
O
7
Vl
.
>
24;�
CO
CO
O
N
'drD
Q
O
N
R
O
O
> '
>
>
3
>
0 4
p
V-O
w
0
v
o Grob Z i .*O bA 5%u ro b O
q U o c o v r Z ro U ° w u z
Ln
3
CJ
w Uro U �O b 'd b m V5
U W ro ro > a C7 ro w ro q G o
UTCA�Q����aoZQo�. °� U`�QOaOu
CdobQ.� roW a��wc4CaA �y��Q°
> ° Afw o v > N o q
��HQxav3o�oW
a a
00od¢�H ¢�g000cnga0.lN �:000al.��N.°i nl
b �
N
w
Q
a Q
w w w ro
c r°
ro
Cn
> > Y
77.: -,Z
U �
l
O�maww'��
0
O.aUv
Q
pe) O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
n
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
OO
.r
O
O
ct
1p
O
O
O
N
nj
O
O
N
M
O
N
.-.
69
69
69
69
69
69
fH
69
69
69
69
69
69
69
69
69
69
69
>
N
y
W
o
C
G
C
G
Y
'O
O
H
rn
y
y
v,
M
YO
O
O
O
O
77
C
O
O
O
O
O
�"
Y
v
v
o
U
a
W
s>
VI
4V
Y
'yam
Vi
N
a
s
a
0
Q
0'
o
.0
a
a
a
.a
a
�0
>
m
=3°�
as
=
>x
O
_O
O
O
.�
N
Q�
O
O
O_
y
ti
Q
O
J,
e�
Cd
ro
w
O
p
_O
_O
c�
V]
'b
>
i
Q
CYi-.
H
(V
7
>>
i%
J
W
rte%
N
U
z
z
w
o
H
U
Q
�
z
W
F
v
�
O
oZ
H
o
^
Qn
O
�3
zQ
C
c
°
Cl)
w
j
q
tf
w
j
Q
0.
C
x
Q
.Q
N
cn
U
x
ro
O
C
coE
�LpCLn tl,,
W
U
N
.D
,
,
O
Q
a
>
n
a
C6
U
O
(A
O
[
U
¢
�d
Q
°�
C,
x
R
0.x
CA
3
O
r3
O
��C
7
❑a C
�°N
a°ca
'�O
N
N
b
3
O
O
N
O
N
:
N
N
Q I
Q C2
0.i
>"
N
N
G cn
r7
N
Q
Q
RESOLUTION NO.
A RESOLUTION adopting the revised and extended Comprehensive Street, Storm Drain
and Bridge Programs for the City of Pasco.
WHEREAS, RCW 35.77.010 provides for annual revision and extension of the
Comprehensive Street Program of each city and town, after public hearing thereon; and
WHEREAS, it is now time to revise and extend the Comprehensive Street, Storm Drain
and Bridge Programs; and NOW, THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO, That the
City Council of the City of Pasco hereby adopts the revision and extension of the Comprehensive
Street, Storm Drain and Bridge Programs for the ensuing six years as attached hereto and labeled
"Six -Year Transportation Improvement Plan 2015 - 2020" incorporated by this reference as
though fully set forth herein; and
Be It Further Resolved, that the Comprehensive Street, Storm Drain and Bridge Programs
shall be filed with the Benton - Franklin Regional Council and the State of Washington.
PASSED by the City Council of the City of Pasco this 16th Day of June, 2014.
Matt Watkins
Mayor
ATTEST:
Debra L. Clark
City Clerk
APPROVED AS TO FORM:
Leland B. Ken
City Attorney
r
T+n
�a
law
.r ' IL.— Illluul.r -� • L
w m
.gym 1111 a ■ ■ ■■r�
- .-- X111111.. ■um
•••••• i -.a.'il E l•
MMAJI 11111111
��� \ ,\` 11 ■Pill ■��i�_� � ; ,�
_ = II PAM
ll��il % /ANi11i � ��11:i 11
:l F� ♦Til1�1Y111un1.-
;illl IE "1111YIIfli.;�
��t'��'i I!��Il�lr \�i■ �`
_
SHE ��■■ .■� �,.
� - nom, � ff� ,' 11 ■ Ilse
�V1 �1�111�
IYII��E
p 111 Ills
Liles
qL un
eeeeeeeeeea
AGENDA REPORT
FOR: City Council
TO: Gary Crutchfie anager
Rick Terway, Admin & Community Services
FROM: Dunyele Mason, Financial Services Manager
SUBJECT: Billing & Collection Processes
I. REFERENCE(S):
H.
Il.
100
V
1. Billing & Collection Processes - Proposed Ordinance
June 2, 2014
Workshop Mtg.: 6/9/14
Regular Mtg.: 6/16/14
ACTION REQUESTED OF COUNCLUSTAFF RECOMMENDATIONS:
6/9: Discussion
6/16: MOTION: I move to adopt Ordinance No. , amending Pasco
Municipal Code Title 3 establishing various fees, defining
acceptance of credit cards and establishing procedures for
miscellaneous billing and, further, authorize publication by
summary only.
FISCAL IMPACT:
HISTORY AND FACTS BRIEF:
A) The city bills for various types of services. The utility billing and collection rules are
listed in Title 3 Chapter 200. Rent billing and collections processes are covered by
individual contract. LID and cemetery billings and collections are covered by
ordinance. Other types of services' (e.g. ambulance, abatements, inspections, false
alarm response, etc.) billing and collection processes are not currently specified in the
Pasco Municipal Code. Licenses, permits and impact fees are prepaid rather than a
billed service and are therefore specifically excluded from this discussion.
B) The city currently accepts credit cards for utility bills, cemetery bills, golf course
activities and recreation activities. The attached ordinance would expand this
acceptance to other billed services such as ambulance, fence replacement, back flow
devices, engineering inspection, etc. It would continue to prohibit the use of credit
cards to pay for non - billed charges such as permits, taxes, licenses, etc.
DISCUSSION:
A) Establish consistent due dates and collections fees for all billed services. Except
as specified by contract or specific ordinance (e.g. rents, LIDS, etc.) billing and
collection processes will be consistent with the utility billing and collection
processes: Due when billed, $10 penalty at 28 days, $10 collection fee at 38 days, a
$10 Pre - Collect collection agency notice at 45 days and turned over to outside
collection agency at 75 days (5% collection agency fee).
B) Expand credit card acceptance to include the remaining billed services. The use
of credit cards for billed services is a way keep customer loan activities in the private
sector. Examples of billed services are services for ambulance, cemetery, backflow
devices, code enforcement, fence replacement, engineering inspections, false alarms,
etc. Payment by credit card allows the customer to pay debts to the city in full, and
immediately, when billed. The customer can then pay their debt to the credit card
company (private lender) by setting the monthly payments at whatever they can
afford. This is a cost effective alternative to the city establishing installment payment
plans.
I
C) Formalize current policy of accepting credit cards for Recreational programs.
Keeping the city out of the lending business is one reason to accept credit cards; the
other is to promote certain activities or programs. The attached ordinance puts into
code the current practice of promoting recreational (including golf course) activities
by accepting credit cards and by waiving associated debit/credit card processing fees.
D) Formalize current policy to disallow credit card (but allow debit card) use for
prepaid (non - billed) charges. The processing fees for credit cards are higher than
they are for debit cards because credit cards are paid over time and are a form of
lending. Debit cards generally carry a lower processing cost because they transfer
payment immediately and therefore are just to cover the one time transaction
processing cost. Permitting, licensing and B &O tax processing activities are carried
out primarily by the business sector and are normal business activities. The city does
accept debit cards to provide business customers payment convenience. Unlike
individuals that incur sudden, large bills (such as for Cemetery and Ambulance
services), businesses typically have access to other types of credit (e.g. bank line of
credit) that do not require the city to incur any financing costs. The code change
maintains current practice for taxes, licenses and permit payments.
E) Establish guidelines for installment billings: Installment plans should only be used
for individuals and be short-term; an installment plan should not be authorized merely
as a mechanism for customer convenience. All installment payment plans should be
in writing in a form prescribed by the city and signed by both the customer and the
Finance Manager. Installment payment plans would be available as follows:
1. For debts owed by individuals only. Installment plans are not available for
debts owed by corporations, partnerships, businesses or other entity or
associations; and
2. For debts as defined in 3.300.010 (which include such services as ambulance,
cemetery, backfiow devices, fencing replacement, etc.); and
3. All installment payment plans must provide for payment in full within twelve
months of the original bill date. Monthly payments are to be a minimum of
$100. In cases of financial hardship, the applicant may request and the
Finance Manager is authorized to set a reduced monthly payment of not less
than $50 per month.
Any installment plan should include a loan origination fee equal to the greater of 3%
the amount owed or $10 and a per installment billing fee of $5.
F) Existing agreements. Agreements entered into prior to the effective date would
remain in place until paid in full or default (missed payment) occurs. If default occurs
then the entire remaining amount becomes immediately due and payable.
ORDINANCE NO.
AN ORDINANCE of the City of Pasco, Washington, amending Title 3
"Revenue and Finance" establishing various fees, defining acceptance of
credit cards and establishing procedures for miscellaneous billing.
WHEREAS, the City provides a variety of services whereby the customer is billed for
services rendered; and
WHEREAS, some of those billing and collection processes are not currently included in
municipal code; and
WHEREAS, unifying billing and collection processes will provide a more efficient
means of administering those systems and provide a more convenient and equitable system for
the City's customers; NOW, THEREFORE,
THE CITY COUNCIL OF THE CITY OF PASCO, WASHINGTON, DO ORDAIN
AS FOLLOWS:
Section 1. That the following subsections of the Pasco Municipal Code 3.200.140
pertaining to utility payments shall be repealed:
Section 2. That Section 3.200.140 entitled "MISCELLANEOUS UTILITY
CHARGES" of the Pasco Municipal Code, shall be and hereby is amended to read as follows:
J) There shall be a charge as set forth in Chanter 3.07 of this code to be known as the
"Utility Lien Search Fee" for providing a legally binding utility pay-off estimate pursuant to
RCW 60.80.020.
Section 3. That Chapter 3.112 RETURNED CHECKS the Pasco Municipal Code,
shall be and hereby is amended to read as follows:
CHAPTER 3.112 MWRNED CHECKS AND ELECTRONIC PAYMENTS
Sections:
3.112.010 PENALTY E-E RETURNED PAYMENT PENALTY — IMPOSITION
3.112.020 nvr.re r� T� CASH ONLY— AUTHORITY
3.112.030 RETURNED PAYMENT PENALTY NOTICE
3.112.040 MISCELLANEOUS PAYMENT PROCESSING CHARGES
3.112.050 DEBIT /CREDIT CARD ACCEPTANCE
3.112.010 PE- � RETURNED PAYMENT PENALTY — IMPOSITION. Any
person, corporation, business or partnership or other entity or association, issuing a bank check,
of draft or electronic form of payment including, but not limited to debit cards and credit cards
to the City of Pasco, or any of its departments, shall be assessed by the City Finance Department
a penalty fee known as the "Returned Payment Fee" as set forth in the fee provisions of this
code, if the pa}nnent bank eheek or d,44--is returned to the City unpaid or otherwise not
processed when presented
the aeeaunt e f 1 payer-i,.
3.112.020 PENALTY Y FEE CASH ONLY — AUTHORITY. The City Finance
Department and any other City Department is authorized not to accept the bank check or draft of
a person, corporation, business, partnership, or other entity or association assessed the penalty
fee set out in Section 3.1120.010 until the penalty fee has been paid along with the amount of the
underlying bank check or draft by cash, cashier's check or money order.
3.112.030 NOTICE. Notice of the penalty fee imposed by Section 3.112.010 and the
authority imposed by Section 3.112.020 shall be posted in a
place or places that is open to the view of the general public at-- 1 where payments are
accepted from members of the public Additionally, notice of the penalty shall be included on all
billing invoices.
3.112.040 MISCELLANEOUS PAYMENT PROCESSING CHARGES. There shall be a
charge as set forth in Chapter 3.07 of this code the following charges:
A) "Debit Card Convenience Fee (Counter)" for payments made by debit card and
processed at the utility payment counter and the "Debit /Credit Card Convenience Fee (Web)" for
payments made by debit /credit card and processed via the on -line web payment system
B) "On -line Processing Assistance Fee" for payments made over the phone that utiliz
p e
office .personnel to process the transaction via the on -line or phone Payment system
3.112.050 DEBIT /CREDIT CARD ACCEPTANCE. Credit cards will be accg ted as
payment for all billed charges related Payment processing charges and all charges incurred at the
Sun Willows Golf Course City View Cemetery and through the Recreation Division Credit
cards will not be accepted for permits licenses taxes and other fees where payment is required
before service, license or Permit is provided Debit cards are accepted for all fees Permits and
licenses whether billed or not
Section 4. That Section 3.07.150 entitled "Utilities - Billing" of the Pasco Municipal
Code, shall be and hereby is amended to read as follows:
3.07.150 UTILITIES — BILLING
3
Fee /Charge
Reference
A)
Application Fee
1)
Service to new connection
$15.00
13.16.010
2)
Service to existing connection
$15.00
3.200.140 (A)
B)
Utility Deposit Water Consumption Factor
$75.00
3.200.040
C)
Disconnect Collection Weeess Fee
$50.00
3.200.140(0)
D)
Field Service
1)
Field Service Fee
$15.00
3.200.140(D)
2)
After Hours Fee
$75.00
3.200.140(E)
3)
After Hours Fee /Collection
$25.00
3.200.140(F)
E)
Unauthorized Reconnect Penalty
$50.00
3.200.110
F)
Late Pay penalty
$10.00
3.200.140(B)
G)
Phei =e Celleetig = Fr-apeqg Collection
$10.00
3.200.140(B)
Notification Fee
H4
Debit Card Geavenietiee
V4-50
3.200.14O(�
Fee, -eulitef)
&1 -.-50
Phone Opefator-Asstat-�[4e
S3.0 (�
14}
Phone Ne n ssist n 7*n -r
&2-.W
Utility Lien Search Fe
$30.0 0
3.200.140 (J)
1?}i)
Meter test (accuracy test of meter)
$60.00
13.24.030
Fire Line - per month
$8.00
13.28.060
#)K)
Meter repair
$100.00 plus
13.24.100
time /material
9}L)
Sewer tap and inspection (In/ Out City)
$75.00
13.52.140
P4M)
Water tap application fee (each)
$150.00
3
Section 5. That Section 3.07.090 entitled "MISCELLANEOUS" of the Pasco
Municipal Code, shall be and hereby is amended to read as follows:
A) Photocopy Fees — per copy
B) Returned Cheeps Payment Fee
Fj Utilitp/ -Lien Seareh Fee
Fee /Charge
$ 0.15
$25.00
C)
Debit Card Convenience Fee (Counter(
$38,00
0.50
D)
Debit/Credit Card Convenience Fee (Web)
$ 1.50
E)
Phone Operator Assist Payment Fee
3.00
F)
Phone No Assist Payment Fee
$ 2.00
G)
Late Pay Penalty
$10.00
H)
Phone & Collection Fee
$10.00
I)
Pre - Collection Fee
$10.00
J)
Collection Turnover Fee (charges penalties & fees)
5%
K)
Installment Plan Origination Fee ($10 min)
3%
L)
Installment Plan Monthly Bill Fee
$ 5.00
Reference
Admin Order 42
3.112.010
Cftl
3.112.040 A)
3.112.040 A)
3.112.040 B)
3.112.040 B)
3.300.050 A)
3.300.050 B)
3.300.050 C)
3.300.050 D)
3.300.070 D)
3.300.070 D)
Section 6. That Section 3.200.080 entitled "DELINQUENCY" of the Pasco
Municipal Code, shall be and hereby is amended to read as follows:
3.200.080 DELINQUENCY.
A) All utility charges shall be due immediately upon billing and become delinquent if
not paid in full twenty days after the date of billing. Late fees, penalty fees and collections fees
are considered delinquent when assessed.
B) Notice of delinquency shall be sent on the subsequent monthly bill informing the
customer that a late pay penalty fee has been added and if payment for all delinquent charges is
not received by the date, time and location listed on the notice, additional fees will be incurred
and water service may be stopped without further notice. A copy of the delinquent bill will also
be sent to the owner for all delinquent tenant accounts. Delinquent charges €eFw4ieh- paynww
has not be reeei a that are not paid by ten days past the subsequent monthly bill date shall be
sent a phone notification to the customer's designated local phone number on file stating the date
and time by which payment must be received in order to be excluded from the disconnect
collection process. Delinquent charges s - ° hieh r°', +e ' ' that are not paid
by twelve days past the subsequent monthly bill date shall be subject to disconnection of water
service until payrrient has been a f all delinquent charges are paid unless the manager
and the customer establish a written and signed payment arrangement to provide for payment of
all charges billed and expected to be billed by the last payment date of the arrangement. Payment
arrangements are not automatic and are to be based on a written policy established by the City
Manager and administered by the manager. Failure to adhere to the written arrangement will
result in additional fees as specified in Chapter 3.07 and disconnection of water service without
further notice. If an account is processed through the disconnect collection process for two
consecutive months or any three times within the last twelve months, the manager may require
payment for all current as well as delinquent charges be received prior to reconnecting water
service.
4
C) A separate delinquent notice, in addition to the notice pursuant to paragraph (B)
shall be delivered to the service location of multi - family and commercial properties at least seven
days prior to scheduled disconnection of service to provide tenants the opportunity to contact the
landlord or to arrange payment prior to the disconnection of service.
Section 7. That a new Chapter 3.300 entitled "Miscellaneous Billing Management"
of the Pasco Municipal Code, shall be and hereby is created and shall read as follows:
Chanter 3.300 MISCELLANEOUS BILLING MANAGEMENT
Sections:
3.300.010
DEFINITIONS
3.200.020
FAILURE TO RECEIVE MAIL - CHANGE IN ADDRESS OR
OWNERSHIP
3.300.030
ORDER OF PAYMENT
3.300.040
BILLING
3.300.050
DELINQUENCY
3.300.060
AMBULANCE INSURANCE COVERAGE
3.300.070
CEMETERY SERVICES
3.300.080
INSTALLMENT PAYMENTS
3.300.090
BACKBILLS- PREPAYMENT REQUIRED
3.300.100
HEARING AND APPEAL.
3.300.010 DEFINITIONS. For the purpose of this Chapter, certain terms or words shall
be interpreted or defined as follows. Except as defined in this section all words in this title shall
carry the customary meanings. Words used in the present tense include the future and the future
includes the present and the plural includes the singular and the singular includes the plural. This
chapter specifically excludes debts and services covered by Chapter 3.200 Utility Billing
Management, or is set out by specific contract (e.g. rents), or is set out by specific ordinance or
resolution (e.g. Local Improvement District debt). If contracts are silent as to payment terms or
conditions, then this chapter shall apply.
A) "Manager" means the Finance Manager, and his or her designee.
B) "Office business hours" means Monday through Friday from 8:00 a.m. to 5:00
p.m. excluding holidays where city offices are closed.
C) "Office nonbusiness hours" means any days and hours not included in office
business hours.
D) "Paid" means payment that has been received, processed and posted to the
customer's account.
E) "Billing office" means the Finance Division office inside City Hall, which is
located at 525 N P Ave Pasco, WA. It specifically excludes the drop box located at City Hall or
any other location.
3.300.020 FAILURE TO RECEIVE MAIL - CHANGE IN ADDRESS OR OWNERSHIP.
Failure to receive mail shall not be recognized as a valid excuse for failure to pay bills when due.
Change in ownership of property and change in mailing address must be made in writing to the
Finance Department. All bills and notices, including delinquency and collection notices shall be
sent to the customer's billing address provided the City.
3.300.030 ORDER OF PAYMENT. Payments received shall be applied against
outstanding charges in the following order: Interest and finance charges, late and penalty fees,
collection charges, then charges in the order listed on the invoice. Overpayments may be applied
to other invoices for the same customer. If no other outstanding invoices exist then the
overpayment shall be refunded. Refunds will be issued within two weeks of the receipt of the
overpayment
3.300.040 BILLING. All charges shall be due immediately upon billing and become
delinquent if not paid in full to the billing office during office hours within twenty -eight days of
the original bill date. Late fees, penalty fees and collections fees are considered delinquent when
assessed. Bills shall include notice of availability of an installment payment plan when
applicable and the process for the customer to request such a payment plan.
3.300.050 DELINQUENCY. Delinquent bills shall be processed as follows:
A) Invoices that are not paid in full within twenty -eight days will incur a penalty
known as a "Late Payment Penalty" in an amount as set forth in Chapter 3.07. A delinquent
notice indicating the amount of the invoice and penalty will be mailed. The notice shall also
include the timeline for the additional of future collection fees as outlined below (at thirty -eight
days and forty -five days) as well as the process for the customer to dispute charges or request a
payment plan (if applicable).
B) Bills not paid in full within thirty -eight days from the original bill date will incur
a collection fee known as "Phone & Collection Fee" in an amount as set forth in Chapter 3.07.
The customer will be called at the phone number provided by the customer to the city Finance
Department. If no phone number is provided the city, at a minimum, will check the local phone
book to try and locate a phone number. The collection fee applies irrespective of the phone call
outcome.
C) Bills not paid in full within forty -five days of the original bill date will be flagged
to turn over to an outside collection agency for follow up. A "Pre- Collect" notice will be sent
informing the customer they have 30 days to either pay in full (including penalties and collection
charges) or dispute the charges or their account will be turned over to an outside collection
agency and that an additional collection fee has been added. Customers will also be notified that
once the bill (including penalties and collections charges) has been turned over collection then
their right to dispute charges becomes forfeit and the account will not be withdrawn from the
outside collection process once it is turned over. A collection fee known as "Pre - Collection Fee"
in an amount as set forth in Chapter 3.07 will be added.
D) Bills (including penalties and collections charges) not paid in full within seventy -
five days of the original bill date and which are not in dispute and which are not covered by an
installment payment plan will be turned over to an outside collection agency. Accounts turned
over to an outside collection agency incur an additional collection fee by the city known as the
"Collection Turnover Fee" at the time of transfer as set forth in Chapter 3.07 and will incur
interest charges at the maximum rate allowed by state law starting with the date of transfer.
3.300.060 AMBULANCE INSURANCE COVERAGE. The responsibility for payment
of ambulance and medical service charges remains with the patient (or patient's family if a
minor). In the case of ambulance charges, if the customer assigns the right to collect payment
from an insurance company and provides all information and approvals when requested, the city
will bill the insurance company directly. Once the insurance company has paid, then the
rol
remaining amount will be billed to the customer per 3.300.040. If the insurance company has not
paid within sixty days, then the full amount will be billed to the customer per 3.300.040. The
customer may request an installment payment plan per 3.300.060. If insurance proceeds are later
received by the city then the overpayment will be refunded to the customer.
3.300.070 CEMETERY SERVICES. All cemetery goods and services must be paid for
either at the time of sale, or before burial, provided, however upon acceptance of application for
time payment, the account may be paid over time as follows. Fifty percent of the invoice must be
paid prior to burial; the remaining amount exceeding $1,500 must be paid within sixty days. The
last $1,500 must be paid in no longer than twelve months from the original invoice date.
3.300.080 INSTALLMENT PAYMENT PLANS. Per 3.112.040 credit cards are
accepted for all billed debts. The city is considered the lender of last resort when there are no
savings or other credit avenues available. An installment plan is not authorized merely as a
mechanism for customer convenience. All installment payment plans must be in writing in a
form prescribed by the city and signed by both the customer and the manager. Installment
payment plans are available as follows:
A) For debts owed by individuals only. Installment plans are not available for debts
owed by corporations, partnerships, businesses or other entity or associations.
B) For debts as defined in 3.300.010.
C) All installment payment plans must provide for payment in full within no later
than twelve months of the original bill date with $100 per month as the recommended minimum
payment. An applicant may request a financial hardship waiver from the manager who is
authorized to set a lower monthly payment. Such lower payment shall be no less than $50 per
month.
D) There shall be a charge known as the "Installment Plan Origination Fee" as well
as a flat rate, per installment, processing fee known as the "Installment Processing Fee ". Both
amounts are set forth in Chapter 3.07.
3.300.090 BACK BILLS - PREPAYMENT REQUIRED. An applicant who is liable
to the City for unpaid, past due charges may be required to pre -pay for future services. Service
may be denied to any person or persons who use any deceptive, unlawful, or misleading means
or device whatsoever to avoid or minimize the payment for services or other charges owed.
3.300.100 HEARING AND APPEAL. Any person aggrieved by the assessment of
any charge, fee, or penalty, may, within ten (10) days of receipt of the City's billing to which
they are objecting, in writing, upon a form provided by the City, request an informal
administrative hearing before the manager. The manager hearing this dispute shall be authorized
to correct any errors to the customer's billing. The appeal hearing shall be scheduled by the
manager at City Hall and conducted during regular business hours within seven (7) business days
of receipt of the appeal. A written decision shall be delivered to the customer at the address
designated on the appeal within ten (10) days of the hearing.
Section 8. This Ordinance shall take effect September 1, 2014.
7
PASSED by the City Council of the City of Pasco at a regular meeting the 16th day of
June 2014.
Matt Watkins, Mayor
ATTEST:
Debra L. Clark, City Clerk
APPROVED AS TO FORM:
Leland B. Kerr, City Attorney
FOR: City Council
TO: Gary Crutchf
Rick Terway,
AGENDA REPORT
& Community Services
FROM: Dunyele Mason, Financial Services Manager
SUBJECT: Local Government Investment Pool
I. REFERENCE(S):
H.
H.
IV
VA
May 23, 2014
Workshop Mtg.: 6/9/14
Regular Mtg.: 6/16/14
1. Local Government Investment Pool — Proposed Resolution
2. Local Government Investment Pool — Prospectus
3. Local Government Investment Pool — Transaction Authorization Form
ACTION REQUESTED OF COUNCIL /STAFF RECOMMENDATIONS:
6/9: Discussion
6/16: MOTION: I move to adopt Resolution No. , naming Dunyele Mason
as the "authorized individual" to authorize all amendments,
changes or alterations to the Local Government Investment Pool
Transaction Authorization Form and to acknowledge the terms and
conditions of participation as outlined in the prospectus.
FISCAL IMPACT:
HISTORY AND FACTS BRIEF:
A) The city utilizes the investment expertise of the State Treasurer's office and invests
its excess cash into the Local Government Investment Pool (LGIP). In an effort to
provide more clarity regarding how the LGIP operates and as a result of recently
amended state WACs the LGIP has created and distributed a prospectus.
B) As a condition of continued participation in the LGIP, the State Treasurer is requiring
each investor to provide a copy of a Resolution that acknowledges the governing
body has read, received and understands the prospectus as well as specifically
designates, by name, the "authorized individual" that is authorized to create all
amendments, changes and alterations to the Transaction Authorization Form (which
controls who is allowed to move money and to designate which bank accounts money
comes in and out of). Changes to the "authorized individual" must be made by a new
resolution.
DISCUSSION:
C) The state is requesting a person's name rather than title to be specifically named by
Resolution as the "authorized individual." As the Financial Services Manager is
already bonded, staff recommends that Dunyele Mason be so named.
4(f)
RESOLUTION NO.
A RESOLUTION AUTHORIZING INVESTMENT OF MONIES IN
THE LOCAL GOVERNMENT INVESTMENT POOL.
WHEREAS, pursuant to Chapter 294, Laws of 1986, the Legislature created a trust fund
to be known as the Public Funds Investment Account [commonly referred to as the Local
Government Investment Pool (LGIP)] for the contribution and withdrawal of money by an
authorized governmental entity for purposes of investment by the Office of the State Treasurer;
and
WHEREAS, from time to time it may be advantageous to the authorized governmental
entity, the City of Pasco, the "governmental entity," to contribute funds available for investment
in the LGIP; and
WHEREAS, the investment strategy for the LGIP is set forth in its policies and
procedures; and
WHEREAS, any contributions or withdrawals to or from the LGIP made on behalf of
the governmental entity shall be first duly authorized by the Pasco City Council, the "governing
body" or any designee of the governing body pursuant to this resolution or a subsequent
resolution; and
WHEREAS the governmental entity will cause to be filed a certified copy of said
resolution with the Office of the State Treasurer; and
WHEREAS the governing body and any designee appointed by the governing body with
authority to contribute or withdraw funds of the governmental entity has received and read a
copy of the prospectus and understands the risks and limitations of investing in the LGIP; and
WHEREAS, the governing body attests by the signature of its members that it is duly
authorized and empowered to enter into this agreement, to direct the contribution or withdrawal
of governmental entity monies, and to delegate certain authority to make adjustments to the
incorporated transactional forms, to the individuals designated herein.
NOW THEREFORE, BE IT RESOLVED that the governing body does hereby
authorize the contribution and withdrawal of governmental entity monies in the LGIP in the
manner prescribed by law, rule, and prospectus.
BE IT FURTHER RESOLVED that the governing body has approved the Local
Government Investment Pool Transaction Authorization Form (Form) as completed by Dunyele
Mason and incorporates said form into this resolution by reference and does hereby attest to its
accuracy.
BE IT FURTHER RESOLVED that the governmental entity designates Dunyele
Mason, Finance Manager, as the "authorized individual" to authorize all amendments, changes,
or alterations to the Form or any other documentation including the designation of other
individuals to make contributions and withdrawals on behalf of the governmental entity.
BE IT FURTHER RESOLVED that this delegation ends upon the written notice, by
any method set forth in the prospectus, of the governing body that the authorized individual has
been terminated or that his or her delegation has been revoked. The Office of the State Treasurer
will rely solely on the governing body to provide notice of such revocation and is entitled to rely
on the authorized individual's instructions until such time as said notice has been provided.
BE IT FURTHER RESOLVED that the Form as incorporated into this resolution or
hereafter amended by delegated authority, or any other documentation signed or otherwise
approved by the authorized individual shall remain in effect after revocation of the authorized
individual's delegated authority, except to the extent that the authorized individual whose
delegation has been terminated shall not be permitted to make further withdrawals or
contributions to the LGIP on behalf of the governmental entity. No amendments, changes, or
alterations shall be made to the Form or any other documentation until the entity passes a new
resolution naming a new authorized individual; and
BE IT FURTHER RESOLVED that the governing body acknowledges that it has
received, read, and understood the prospectus as provided by the Office of the State Treasurer.
In addition, the governing body agrees that a copy of the prospectus will be provided to any
person delegated or otherwise authorized to make contributions or withdrawals into or out of the
LGIP and that said individuals will be required to read the prospectus prior to making any
withdrawals or contributions or any further withdrawals or contributions if authorizations are
already in place.
2014. PASSED by the City Council of the City of Pasco, Washington, this 16th day of June,
SIGNED in authentication of its passage this _ day of , 2014.
Matt Watkins, Mayor
ATTEST:
Debra Clark, City Clerk Leland B. Kerr, City Attorney
LOCAL GOVERNMENT
INVESTMENT POOL
Prospectus
January 2014
James L. McIntire
Washington State Treasurer
Contents
The LGIP
3 -4
wLei oovernment investment Pool —Money Market Fund 4 -9
Ill. Mdridgement
9 -10
I. The LGIP
The Local Government Investment Pool (the "LGIP ") is an investment pool of public funds placed in the custody of
the Office of the Washington State Treasurer (the "State Treasurer ") for investment and reinvestment as defined
by RCW 43.250.020. The purpose of the LGIP is to allow eligible governmental entities to participate with the state
in the investment of surplus public funds, in a manner that optimizes liquidity and return on such funds. In
establishing the LGIP, the legislature recognized that not all eligible governmental entities are able to maximize the
return on their temporary surplus funds, and therefore it provided a mechanism whereby they may, at their
option, utilize the resources of the State Treasurer to maximize the potential of their surplus funds while ensuring
the liquidity of those funds.
The State Treasurer has established a sub -pool within the LGIP whose shares are offered by means of this
Prospectus: The LGIP -Money Market Fund (the "LGIP -MMF" or the "Fund "). The State Treasurer has the authority
to establish additional sub -pools in the future.
The Fund offered in this Prospectus seeks to provide current income by investing in high - quality, short term money
market instruments. These standards are specific to the Fund, as illustrated in the following table. The LGIP -MMF
offers daily contributions and withdrawals.
FUND SNAPSHOT
The table below provides a summary comparison of the Fund's investment types and sensitivity to interest rate
risk. This current snapshot can be expected to vary over time.
LGIP -Money Market Fund
Current Investments (as of November
1, 2013)
Fees and Expenses
Cash
Bank Deposits
US Treasury bills
Repurchase agreements
US Government aeencv
60 days
Administrative Fee. The State Treasurer charges pool participants a fee representing administration and recovery
costs associated with the operation of the Fund. The administrative fee accrues daily from pool participants'
earnings prior to the earnings being posted to their account. The administrative fee will be paid monthly. In the
event that there are no earnings, the administrative fee will be deducted from principal.
The chart below illustrates the operating expenses of the LGIP -MMF for past years, expressed in basis points as a
percentage of fund assets.
Local Government Investment Pool -MMF
Operating Expenses by Fiscal Year (in Basis Points)
2006 2007 2008 2009 2010 2011 2012 2013
Total Operating Expenses 1.12 0.96 0.84 a88 0.64 a81 0.68 0.87
(1 basis point = 0.01 %)
Because most of the expenses of the LGIP -MMF are fixed costs, the fee (expressed as a percentage of fund assets)
will be affected by: (i) the amount of operating expenses; and (ii) the assets of the LGIP -MMF. The table below
shows how the fee (expressed as a percentage of fund assets) would change as the fund assets change, assuming
an annual fund operating expenses amount of $800,000.
Fund Assets $6.0 bn $8.0 bn $10.0 bn
Total Operating Expenses (in Basis Points) 1.33 1.0 .80
Portfolio Turnover: The Fund does not pay a commission or fee when it buys or sells securities (or "turns over" its
portfolio). However, debt securities often trade with a bid /ask spread. Consequently, a higher portfolio turnover
rate may generate higher transaction costs that could affect the Fund's performance.
II. Local Government Investment Pool - Money Market Fund
Investment Objective
The LGIP -MMF will seek to effectively maximize the yield while maintaining liquidity and a stable share price of
$1.
Principal Investment Strategies
The LGIP -MMF will seek to invest primarily in high - quality, short term money market instruments. Typically, at
least 55% of the Fund's assets will be invested in US government securities and repurchase agreements
collateralized by those securities. The LGIP -MMF means a sub -pool of the LGIP whose investments will primarily
be money market instruments. The LGIP -MMF will only invest in eligible investments permitted by state law. The
LGIP -MMF will not be an SEC - registered money market fund and will not be required to follow SEC Rule 2a -7.
Investments of the LGIP -MMF will conform to the LGIP Investment Policy, the most recent version of which will be
posted on the LGIP website and will be available upon request.
Principal Risks of Investing in the LGIP -Money Market Fund
Counterporty Credit Risk. A party to a transaction involving the Fund may fail to meet its obligations. This could
cause the Fund to lose the benefit of the transaction or prevent the Fund from selling or buying other securities to
implement its investment strategies.
Interest Rate Risk. The LGIP -MMF's income may decline when interest rates fall. Because the Fund's income is
based on short -term interest rates, which can fluctuate significantly over short periods, income risk is expected to
be high. In addition, interest rate increases can cause the price of a debt security to decrease and even lead to a
loss of principal.
4
Liquidity Risk. Liquidity risk is the risk that the Fund will experience significant net withdrawals of Fund shares at a
time when it cannot find willing buyers for its portfolio securities or can only sell its portfolio securities at a
material loss.
Management Risk. Poor security selection or an ineffective investment strategy could cause the LGIP -MMF to
underperform relevant benchmarks or other funds with a similar investment objective.
Issuer Risk. The LGIP -MMF is subject to the risk that debt issuers and other counterparties may not honor their
obligations. Changes in an issuer's credit rating (e.g., a rating downgrade) or the market's perception of an issuer's
creditworthiness could also affect the value of the Fund's investment in that issuer. The degree of credit risk
depends on both the financial condition of the issuer and the terms of the obligation. Also, a decline in the credit
quality of an issuer can cause the price of a money market security to decrease.
Securities Lending Risk and Reverse Repurchase Agreement Risk. The LGIP -MMF may engage in securities lending
or in reverse repurchase agreements. Securities lending and reverse repurchase agreements involve the risk that
the Fund may lose money because the borrower of the Fund's securities fails to return the securities in a timely
manner or at all or the Fund's lending agent defaults on its obligations to indemnify the Fund, or such obligations
prove unenforceable. The Fund could also lose money in the event of a decline in the value of the collateral
provided for loaned securities or a decline in the value of any investments made with cash collateral.
Risks Associated with use of Amortized Cost. The use of amortized cost valuation means that the LGIP -MMF's
share price may vary from its market value NAV per share. In the unlikely event that the State Treasurer were to
determine that the extent of the deviation between the Fund's amortized cost per share and its market -based NAV
per share may result in material dilution or other unfair results to shareholders, the State Treasurer may cause the
Fund to take such action as it deems appropriate to eliminate or reduce to the extent practicable such dilution or
unfair results.
An investment in the LGIP -MMF is not a bank deposit and is not insured or guaranteed by the Federal Deposit
Insurance Corporation or any other government agency. Although the Fund seeks to preserve the value of
investments at $1 per share, pool participants could lose money by investing in the LGIP -MMF. There is no
assurance that the LGIP -MMF will achieve its investment objective.
Performance
The following information is intended to address the risks of investing in the LGIP -MMF. The information
illustrates changes in the performance of the LGIP -MMF's shares from year to year. Returns are based on past
results and are not an indication of future performance. Updated performance information may be obtained on
our website at www.tre. wa.gov or by calling the LGIP toll -free at 800- 331 -3284.
Fiscal Year -by -Year Returns: Net Yield
Local Government Investment Pool
6.00%
5.21%
5.00%
414 %� ;. 4.04%
4.00%
3.00%
2.13%
2.00% i.46%
1:05% -ter
1.00%
y! n Mlo 0.22%
0.14%
0.00%
-1.00%
-2.00%
-3.00% , . .., ..
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
Local Government Investment Pool -Money Market Fund
Average Accrued Net Yield
1 Year 3 years 5 year 10.vears
0.17% 0.19% .52% 1.94%
Transactions: LGIP -MMF
General Information
The minimum transaction size (contributions or withdrawals) for the LGIP -MMF will be five thousand dollars. The
State Treasurer may, in its sole discretion, allow for transactions of less than five thousand dollars.
Valuing Shares
The LGIP -MMF will be operated using a net asset value (NAV) calculation based on the amortized cost of all
securities held such that the securities will be valued at their acquisition cost, plus accrued income, amortized
daily.
The Fund's NAV will be the value of a single share. NAV will normally be calculated as of the close of business of
the NYSE, usually 4:00 p.m. Eastern time. If the NYSE is closed on a particular day, the Fund will be priced on the
next day the NYSE is open.
5
NAV will not be calculated and the Fund will not process contributions and withdrawals submitted on days when
the Fund is not open for business. The time at which shares are priced and until which contributions and
withdrawals are accepted is specified below and may be changed as permitted by the State Treasurer.
To the extent that the LGIP -MMF's assets are traded in other markets on days when the Fund is not open for
business, the value of the Fund's assets may be affected on those days. In addition, trading in some of the Fund's
assets may not occur on days when the Fund is open for business.
Transaction Limitation
The State Treasurer reserves the right at its sole discretion to set a minimum and /or maximum transaction amount
from the LGIP -MMF and to limit the number of transactions, whether contribution, withdrawal, or transfer
permitted in a day or any other given period of time.
The State Treasurer also reserves the right at its sole discretion to reject any proposed contribution, and in
particular to reject any proposed contribution made by a pool participant engaged in behavior deemed by the
State Treasurer to be abusive of the LGIP -MMF.
A pool participant may transfer funds from one LGIP -MMF account to another subject to the same time and
contribution limits as set forth in WAC 210.10.060.
Contributions
Pool participants may make contributions to the LGIP -MMF on any business day. All contributions will be effected
by electronic funds transfer to the account of the LGIP -MMF designated by the State Treasurer. It is the
responsibility of each pool participant to pay any bank charges associated with such electronic transfers to the
State Treasurer. Failure to wire funds by a pool participant after notification to the State Treasurer of an intended
transfer will result in penalties. Penalties for failure to timely wire will be assessed to the account of the pool
participant responsible.
Notice. To ensure same day credit, a pool participant must inform the State Treasurer of any contribution over
one million dollars no later than 9 a.m. on the same day the contribution is made. Contributions for one million
dollars or less can be requested at any time prior to 10 a.m. on the day of contribution. For all other contributions
over one million dollars that are requested prior to 10 a.m., a pool participant may receive same day credit at the
sole discretion of the State Treasurer. Contributions that receive same day credit will count, for earnings rate
purposes, as of the day in which the contribution was made. Contributions for which no notice is received prior to
10:00 a.m. will be credited as of the following business day.
Notice of contributions may be given by calling the Local Government Investment Pool (800- 331 -3284) OR by
logging onto State Treasurer's Treasury Management System ( "TMS "). Please refer to the LGIP -MMF Operations
Manual for specific instructions regarding contributions to the LGIP -MMF.
Direct deposits from the State of Washington will be credited on the same business day.
Pricing. Contribution requests received in good order will receive the NAV per unit of the LGIP -MMF next
determined after the order is accepted by the State Treasurer on that contribution date.
Withdrawals
Pool participants may withdraw funds from the LGIP -MMF on any business day. Each pool participant shall file
with the State Treasurer a letter designating the financial institution at which funds withdrawn from the LGIP -MMF
shall be deposited (the "Letter "). This Letter shall contain the name of the financial institution, the location of the
financial institution, the account name, and the account number to which funds will be deposited. This Letter shall
be signed by local officials authorized to receive and disburse funds, as described in WAC 210 -10 -020.
7
Disbursements from the LGIP -MMF will be effected by electronic funds transfer. Failure by the State Treasurer to
wire funds to a pool participant after proper notification to the State Treasurer to disburse funds to a pool
participant may result in a bank overdraft in the pool participant's bank account. The State Treasurer will
reimburse a pool participant for such bank overdraft penalties charged to the pool participant's bank account.
Notice. In order to withdraw funds from the LGIP -MMF, a pool participant must notify the State Treasurer of any
withdrawal over one million dollars no later than 9 a.m. on the same day the withdrawal is made. Withdrawals for
one million dollars or less can be requested at any time prior to 10 a.m. on the day of withdrawal. For all other
withdrawals from the LGIP -MMF over one million dollars that are requested prior to 10 a.m., a pool participant
may receive such withdrawal on the same day it is requested at the sole discretion of the State Treasurer. No
earnings will be credited on the date of withdrawal for the amounts withdrawn. Notice of withdrawals may be
given by calling the Local Government Investment Pool (800- 331 -3284) OR by logging on to TMS. Please refer to
the LGIP -MMF Operations Manual for specific instructions regarding withdrawals from the Fund.
Pricing. Withdrawal requests with respect to the LGIP -MMF received in good order will receive the NAV per unit
of the LGIP -MMF next determined after the order is accepted by the State Treasurer on that withdrawal date.
Suspension of Withdrawals. If the State Treasurer has determined that the deviation between the Fund's
amortized cost price per share and the current net asset value per share calculated using available market
quotations (or an appropriate substitute that reflects current market conditions) may result in material dilution or
other unfair results, the State Treasurer may, if it has determined irrevocably to liquidate the Fund, suspend
withdrawals and payments of withdrawal proceeds in order to facilitate the permanent termination of the Fund in
an orderly manner. The State Treasurer will distribute proceeds in liquidation as soon as practicable, subject to the
possibility that certain assets may be illiquid, and subject to subsequent distribution, and the possibility that the
State Treasurer may need to hold back a reserve to pay expenses.
The State Treasurer also may suspend redemptions if the New York Stock Exchange suspends trading or closes, if
US bond markets are closed, or if the Securities and Exchange Commission declares an emergency. If any of these
events were to occur, it would likely result in a delay in the pool participants' redemption proceeds.
The State Treasurer will notify pool participants within five business days of making a determination to suspend
withdrawals and /or irrevocably liquidate the fund and the reason for such action.
Earnings and Distribution
LGIP -MMF Daily Factor
The LGIP -MMF daily factor is a net earnings figure that is calculated daily using the investment income earned
(excluding realized gains or losses) each day, assuming daily amortization and /or accretion of income of all fixed
income securities held by the Fund, less the administrative fee. The daily factor is reported on an annualized 7 -day
basis, using the daily factors from the previous 7 calendar days. The reporting of a 7 -day annualized yield based
solely on investment income which excludes realized gains or losses is an industry standard practice that allows for
the fair comparison of funds that seek to maintain a constant NAV of $1.00.
LGIP -MMF Actual Yield Factor
The LGIP -MMF actual yield factor is a net daily earnings figure that is calculated using the total net earnings
including realized gains and losses occurring each day, less the administrative fee.
8
Dividends
The LGIP -MMF's dividends include any net realized capital gains or losses, as well as any other capital changes
other than investment income, and are declared daily and distributed monthly.
Distribution
The total net earnings of the LGIP -MMF will be declared daily and paid monthly to each pool participant's account
in which the income was earned on a per -share basis. These funds will remain in the pool and earn additional
interest unless withdrawn and sent to the pool participant's designated bank account as specified on the
Authorization Form. Interest earned will be distributed monthly on the first business day of the following month.
Monthly Statements and Reporting
On the first business day of every calendar month, each pool participant will be sent a monthly statement which
includes the pool participant's beginning balance, contributions, withdrawals, transfers, administrative charges,
earnings rate, earnings, and ending balance for the preceding calendar month. Also included with the statement
will be the monthly enclosure. This report will contain information regarding the maturity structure of the portfolio
and balances broken down by security type.
Ill. Management
The State Treasurer is the manager of the LGIP -MMF and has overall responsibility for the general management
and administration of the Fund. The State Treasurer has the authority to offer additional sub -pools within the LGIP
at such times as the State Treasurer deems appropriate in its sole discretion.
Administrator and Transfer Agent. The State Treasurer will serve as the administrator and transfer agent for the
Fund.
Custodian. A custodian for the Fund will be appointed in accordance with the terms of the LGIP Investment Policy.
IV. Miscellaneous
Limitation of Liability
All persons extending credit to, contracting with or having any claim against the Fund offered in this Prospectus
shall look only to the assets of the Fund that such person extended credit to, contracted with or has a claim
against, and none of (i) the State Treasurer, (ii) any subsequent sub -pool, (iii) any pool participant, Livj the LGIP, or
(vl the State Treasurer's officers, employees or agents (whether past, present or future), shall be liable therefor.
The determination of the State Treasurer that assets, debts, liabilities, obligations, or expenses are allocable to the
Fund shall be binding on all pool participants and on any person extending credit to or contracting with or having
any claim against the LGIP or the Fund offered in this Prospectus. There is a remote risk that a court may not
enforce these limitation of liability provisions.
9
Amendments
This Prospectus and the attached Investment Policy may be amended from time to time. Pool participants shall
receive notice of changes to the Prospectus and the Investment Policy. The amended and restated documents will
be posted on the State Treasurer website: www.tre.wa.gov.
Should the State Treasurer deem appropriate to offer additional sub -pools within the LGIP, said sub -pools will be
offered by means of an amendment to this prospectus.
LGIP -MMF Contact Information
Internet: www.tre.wa.eov Treasury Management System /TMS
Phone: 1- 800 - 331 -3284 (within Washington State)
Mail:
Office of the State Treasurer
Local Government Investment Pool
PO Box 40200
Olympia, Washington 98504
FAX: 360-902-9044
10
LOCAL GOVERNMENT INVESTMENT POOL
TRANSACTION AUTHORIZATION FORM
Please fill out this form completely, including any existing information, as this form will rtepl ace the previous form.
Name of Entity: City of Pasco
Mailing Address: PO Box 293
Pasco WA 99301
Fax Number: 509 -544 -3082
E -mail Contact: masond @ pasco - wa.gov
Do you wish to have your monthly LGIP statements faxed to the number listed above?
Please note — if you choose to receive statements via fax, you will not receive another copy via U.S. mail.
❑✓ YES, please fax statements El No, please send statements via U.S. mail
Bank account where funds will be wired when a withdrawal is requested.
(Note: Funds will not be transferred to any account other than that listed).
Bank Name:
US Bank
Branch Location:
Pasco
Bank Routing Number:
125000105
Account Number:
153501454992
Account Name:
General - TDs
Persons authorized to make deposits and withdrawals for the entitv listed above.
Name
Title
Signature
Telephone Number
Dunyele Mason
Finance Manager
/
Y�
509 - 544 -3065
Stan Strebel
Deputy City Manager
E-mail Ad
509- 543 -5760
Richard Terway
ACS Director
/ D
509 - 543 -5775
By sieftature below. I cartifv I am authorized to represent the mstitution/a encv for the purpose of this transaetion_
Any changes to these instructions must be submitted in writing to the Office of the State Treasurer. Please mail
this form to the address listed below:
OFFICE OF THE STATE TREASURER
LOCAL GOVERNMENT INVESTMENT POOL
PO Box 40200
OLYMPIA, WA 98504 -0200
FAx: (360) 902-9044
Date Received:
Fund Number:
(for LGIP use only)
State of Washington )
County of SS.
Signed or attested before me by
Dated this _ day of 20_.
SEAL OR STAMP
Signature of Notary
Typed or printed name of Notary
Notary Public in and for the State of Wash.
My appointment expires:
Finance Manager
6/16/14
AuthodZed SY nature
tae
e
Dunyele Mason
masond @pasco - wa.gov
509 - 544 -3065
(Print Authorimd Signature)
E-mail Ad
(Telephone number)
Any changes to these instructions must be submitted in writing to the Office of the State Treasurer. Please mail
this form to the address listed below:
OFFICE OF THE STATE TREASURER
LOCAL GOVERNMENT INVESTMENT POOL
PO Box 40200
OLYMPIA, WA 98504 -0200
FAx: (360) 902-9044
Date Received:
Fund Number:
(for LGIP use only)
State of Washington )
County of SS.
Signed or attested before me by
Dated this _ day of 20_.
SEAL OR STAMP
Signature of Notary
Typed or printed name of Notary
Notary Public in and for the State of Wash.
My appointment expires: