Loading...
HomeMy WebLinkAbout2014.06.09 Council Workshot PacketAGENDA PASCO CITY COUNCIL Workshop Meeting 7:00 p.m. June 9, 2014 I. CALL TO ORDER 2. ROLL CALL: (a) Pledge of Allegiance. 3. VERBAL REPORTS FROM COUNCILMEMBERS: 4. ITEMS FOR DISCUSSION: (a) WCIA Insurance Summary Update. (NO WRITTEN MATERIAL ON AGENDA) Presentation by: Stan Strebel, Deputy City Manager. (b) Fire Safety Inspection Program: 1. Agenda Report from Rick White, Community & Economic Development Director dated June 4, 2014. 2. Fire Safety Inspection Program - Proposed Resolution. (c) Irrigation System Master Plan: 1. Agenda Report from Ahmad Qayoumi, Public Works Director dated June 5, 2014. 2. Irrigation System Master Plan - Proposed Resolution. 3. Irrigation System Master Plan - Proposed Capital Improvements List. 4. Irrigation System Master Plan - Plan. (d) Six -Year Transportation Improvement Plan 2015 -2020: I. Agenda Report from Ahmad Qayoumi, Public Works Director dated June 5, 2014. 2. Six -Year Transportation Improvement Plan 2015 -2020 - Proposed Plan. 3. Six -Year Transportation Improvement Plan 2015 -2020 -Resolution. 4. Six -Year Transportation Improvement Plan 2015 -2020 - Map. (e) Billing & Collection Processes: 1. Agenda Report from Dunyele Mason, Finance Manager dated June 2, 2014. 2. Billing & Collection Processes - Proposed Ordinance. (f) Local Government Investment Pool: 1. Agenda Report from Dunyele Mason, Finance Manager dated May 23, 2014. 2. Local Government Investment Pool - Proposed Resolution. 3. Local Government Investment Pool - Prospectus. 4. Local Government Investment Pool - Transaction Authorization Form, 5. OTHER ITEMS FOR DISCUSSION: (a) (b) (c) 6. EXECUTIVE SESSION: (a) (b) (c) 7. ADJOURNMENT REMINDERS: 1. 11:45 a.m., Monday, June 9, Pasco Red Lion - Pasco Chamber of Commerce Membership Luncheon. (Presenters: Tri-City Dust Devils General Manager, Derrel Ebert and Team Manager, Drew Saylor) 2. 6:00 -7:00 p.m., Wednesday, June 11, Pasco Red Lion "Silver Room" - City Manager Candidate Executive Session with Councilmembers. 3. 7:00 -9:00 p.m., Wednesday, June 11, Pasco Red Lion "Silver Room" - City Manager Candidate "Meet and Greet" Session. (ALL COUNCILMEMBERS INVITED TO ATTEND) 4. 7:00 a.m., Thursday, June 12 - BFCG Tri-Mats Policy Advisory Committee Meeting. (COUNCILMEMBER BOB HOFFMANN, Rep.; REBECCA FRANCIK, Alt.) 5. 7:30 a.m. - 5:00 p.m., Thursday, June 12, Pasco City Hall - Council to interview and evaluate candidates for the position of City Manager (Executive Session). 6. 7:00 p.m., Thursday, June 12 - Ben - Franklin Transit Board Meeting. (MAYOR MATT WATKINS, Rep.; MIKE GARRISON, Alt.) 7. 9:00 a.m., Saturday, June 14, Boys & Girls Club - RSC- AmeriCorps "Summer Safety Fun Fair." (COUNCILMEMBER REBECCA FRANCIK) AGENDA REPORT FOR: City Council TO: Gary Crutchfie C' Manager FROM: Rick White, Community & Economic Development Director )Z [(J SUBJECT: Fire Safety Inspection Program I. REFERENCE(S): 1. Fire Safety Inspection Program — Proposed Resolution June 4, 2014 Workshop Mtg.: 6/9/14 II. ACTION REQUESTED OF COUNCIL / STAFF RECOMMENDATIONS: 6/9: DISCUSSION III. FISCAL IMPACT: Estimated at $65,000. IV. HISTORY AND FACTS BRIEF: V A. The City of Pasco has not had a formal fire safety inspection program since 1987. During this time the City has experienced rapid commercial and industrial development. In the last rating by the Washington Survey and Rating Bureau (Bureau) in 2007, the City received 595 deficiency points out of a possible 650 in fire safety control. B. Pasco will receive a revised rating from the Bureau in 2015 or 2016. With the continued growth since the 2007 rating, the City could receive additional deficiency points and a re- classification. The Bureau and local commercial insurance vendors estimate that changes up or down from our current class 5 would result in an increase or decrease in the overall insurance premium between 5% and 10% depending on occupancy type, building construction, loss history and occupancy risk. C. Efforts already undertaken to improve the City's rating include automatic aid for building fires, training program improvements, ongoing regionalization of the communications system, smoke detector services, public fire safety educator certification and fire safety education programs, fire investigation certification program and juvenile fire setting intervention. The implementation of a Fire Safety Inspection Program will result in the highest chance to improve the City's rating from the Bureau. D. The Uniform Fire Code (UFC) is adopted by the City in conjunction with the adoption of the State Building Code, and through the UFC, the City has the authority to implement an Inspection Program and establish appropriate fees. E. City Council received a preliminary report on possible implementation of a Fire Safety Inspection Program at the January 13, 2014 Council Workshop. There was concurrence to move forward with establishing the program. DISCUSSION: A. To determine possibilities for a Fire Safety Inspection Program, the number of active City business licenses was inventoried. This resulted in a determination of 1,500 various types of commercial business licenses. These business licenses were broken down into the following categories: • Low Hazard Licenses (559) such as retail stores, beauty salons, business offices or small groceries without food preparation or fuel services... • Moderate - Hazard Licenses (730) such as restaurants, contractors with construction equipment and/or storage, used tire businesses, larger retail stores and dance halls or nightclubs... • High- Hazard Licenses (130) such as food processing and warehousing, automotive repair or body shops, welding, painting, roofing companies, materials storage, auto wrecking... • Others (49) such as schools, day cares, motels... 4(b) B. The Fire Safety Inspection Program is proposed to include a yearly inspection of all high hazard occupancies and a biennial inspection for all moderate hazard occupancies. Low hazard occupancies are not proposed for regular inspections. C. Apartments and multi - family units will be inspected through the existing Rental Inspection Program with revisions to the existing inspection checklist. The inspections will include adequacy and placement of fire extinguishers, door closures, automatic lighting and other fire related safety provisions. D. The Inspection Program will use an existing City building inspector. The resulting service gap with the construction inspection workload will be made up by the use of a contract building inspector. This will enable the Fire Safety Program to be initiated in- house. Any downtime in the construction inspection demand can be accommodated by deferring use of the contract inspector. Any downtime in the Fire Safety Program can be accommodated by using the existing building inspector for construction inspections. E. The construction inspector will be needed for the estimated 1200 hours that the existing building inspector will be devoting to the Fire Safety Program. In preliminary discussions with a private inspection service, this will result in a yearly cost for a contract inspector of approximately $65,000. This cost is proposed to be recovered through a fee for both initial fire inspections and re- inspections. A fee of $75 per inspection would recover all of the expected cost. A fee of $60 per inspection would recover $52,500 resulting in a City subsidy of $12,500 or about 20% of the Program costs. F. The Inspection Program for the High Hazard occupancies and a portion of Moderate Hazard occupancies can be initiated at the beginning of 2015 in conjunction with business license renewals. The remaining Moderate Hazard occupancies would be scheduled for inspections in 2016. G. The proposed resolution (Reference #1) would establish the Inspection Program. Once direction from Council oil the fee is received, staff will prepare an ordinance amending the existing Fee Schedule for Council action. RESOLUTION NO. A RESOLUTION ESTABLISHING A FIRE SAFETY INSPECTION PROGRAM FOR THE CITY OF PASCO. WHEREAS, the City is preparing for a Washington Survey and Rating Bureau rating process in 2015 or early 2016; and WHEREAS, adoption of the Uniform Fire Code provides the authority for the City to establish a Fire Safety Inspection Program and related fees; and WHEREAS, Implementation of a Fire Safety Inspection Program is likely to improve the City's Fire Rating, thereby minimizing increases or potentially realizing decreases in insurance rates; and WHEREAS, an effective Fire Safety Inspection Program is likely to reduce loss and injuries from fires and evacuations; and WHEREAS, a review of existing City business licenses indicates that there are approximately 130 High Hazard Occupancies and 730 Moderate Hazard Occupancies conducting business within Pasco; and WHEREAS, an effective Fire Safety Inspection Program will consist of yearly inspection of High Hazard Occupancies and biennial inspections of Moderate Hazard Occupancies; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO: Section 1. The City Manager is hereby authorized and directed to establish the following Fire Safety Inspection Program effective July 1, 2015: In conjunction with the annual business license renewal cycle, the City will provide advance notice of the requirement for a fire safety inspection and a fire inspection checklist to High Hazard and Moderate Hazard occupancies. High Hazard occupancies will require an annual inspection and Moderate Hazard occupancies will require a biennial inspection. Apartments and multi - family units will have fire safety inspections conducted through the existing biennial rental inspection program. Section 2. The City Manager shall report annually to the City Council as to the cost and effectiveness of the Fire Safety Inspection Program. Passed by the City Council of the City of Pasco this _day of , 2014. Matt Watkins, Mayor ATTEST: Debbie L. Clark, City Clerk APPROVED AS TO FORM: Leland B. Kerr, City Attorney AGENDA REPORT NO. 18 FOR: City June 5, 2014 TO: Gary Crutc -ty Manager FROM: Ahmad Qayo i, Public Works Director Workshop Mtg.: 06/09/2014 Mtg.: 06/16/2014 SUBJECT: Irrigation System Master Plan Re gu lar I. REFERENCE(S): 1. Irrigation System Master Plan — Proposed Resolution 2. Irrigation System Master Plan — Proposed Capital Improvements List 3. Irrigation System Master Plan — Plan II. ACTION REQUESTED OF COUNCIL / STAFF RECOMMENDATIONS: 06/09: Discussion: 06/16: MOTION: I move to approve Resolution No. adopting the Irrigation System Master Plan. III. FISCAL IMPACT: IV. HISTORY AND FACTS BRIEF: A) On May 20, 2013, City Council approved a professional services agreement with MSA to complete a study of the City's water rights and a way to manage the available rights. The City owns and operates two water systems; one for domestic use and one for irrigation use. These systems are supplied by surface and ground water and include a surface water intake from the Columbia River, a system of 10 wells, with associated pumping and treatment equipment. B) The irrigation system has grown to include ten well sites, one river pump station, and a three million gallon standpipe, and now serves over 6,000 residential customers. In addition to the residential water users, the system also supplies irrigation for a soccer complex, five residential parks, two schools, and numerous landscaping areas maintained by the City. Service is provided from April through October. V. DISCUSSION: A) MSA has completed the Irrigation System Master Plan, including capital improvements for the irrigation system for the near and long term. B) Staff recommends Council's approval of the Irrigation System Master Plan by Resolution. 4(c) RESOLUTION NO. A RESOLUTION accepting the Irrigation System Master Plan prepared by MSA Associates. WHEREAS, the city presently provides irrigation water to more than 6,000 citizens and the city's population is expected to continue to grow; and WHEREAS, the city relies on approximately 932 acre feet of water from the Columbia River and 11 well sites for its irrigation water supply; and WHEREAS, withdrawals from the Columbia River are strictly regulated by the state in its effort to balance the needs of various user interests and it is, therefore, expected that additional withdrawals from the Columbia River will become increasingly difficult; and WHEREAS, the city acquired and has greatly expanded an irrigation system serving much of the Pasco plateau, thus partially mitigating the consumption of domestic raw water supply associated with urban growth on the plateau; and WHEREAS, the city recognizes the increasing need to preserve and conserve its irrigation supply as well as optimize the use and benefit of the wells it owns and operates; and WHEREAS, the city's consultant, MSA Associates, has studied the city's domestic and irrigation system supplies and has developed a management plan designed to optimize long -term use of the city's limited water supplies; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF PASCO, WASHINGTON, DO RESOLVE AS FOLLOWS: Section 1. That the City Council hereby accepts the Irrigation System Master Plan prepared by MSA Associates, attached hereto as Exhibit A, to be used as a guide by staff and Council in making various decisions about the city's irrigation system. PASSED by the City Council of the City of Pasco at its regular meeting this _ day of , 2014. Matt Watkins, Mayor ATTEST: APPROVED AS TO FORM: Debra Clark, City Clerk Leland B. Kerr, City Attorney � x � x a "a a s s a q s a a 3 a s $ q � $ dx p a a s Y _ s $ a s a a r $x x i a � $ $ a q F s - s a x Y ;gy if �s � a£§ yn SSF p 3 gggy � 8° S pppptl E q� P Z� pRg � a YY g�g e k 55 g gg gg ggg R e P S9 QQ ry b 6 gQUn y F a y g§ {) $ Y yy33 C b g a ggggg @ � B a S g 3 $ 9 � .rvrv,..,ew ry +ues mu..uwa gy l 6 �l $ 3 Will al' °8885 cm w. n,..s rvmas u•a aww.w r x � a a s a q a $ q � a s s $ a a r $x x i a � q F s s a x � h k P S9 b 6 gQUn y F a y {) $ Y yy33 C b � B S g 3 $ 9 �y a � gy l 6 �l $ 3 Will al' °8885 i 5 �y� ° �' ° � xew�rv+wtls..u.swxa ��.� warvb.y wms Ytlrvl w..s s+IVrv9 a.. s.rv+.w ry 0 r z CITY OF PASCO, WASHINGTON IRRIGATION SYSTEM MASTER PLAN December 2013 MSA V,- 31wrn'.SmshBPvotltics,luc. Water Solutions, Inc. IRRIGATION SYSTEM MASTER PLAN 1" THE CITY OF PASCO, WASHINGTON DECEMBER 2013 44. 13 MURRAY, SMITH & ASSOCIATES, INC. 1145 Broadway Plaza, Suite 1010 Tacoma, Washington 98402 -3542 253.627.1520 In association with GSI WATER SOLUTIONS, INC. 55 Southwest Yamhill Street, Suite 300 Portland, Oregon 97205 971.239.8799 13- 1444.407 ACKNOWLEDGEMENTS The following City of Pasco staff contributed to the development of this Irrigation System Master Plan: Ahmad Qayoumi, Public Works Director Teresa Reed - Jennings, Senior Utilities Engineer Cameron Magelsen, Irrigation System Manager Curtis Glines, Irrigation System Operations Reuel Klempel, Wastewater Treatment Plant Manager Doyle Heath, Engineering Technician The following GSI Water Solutions, Inc. staff contributed to the development of this Irrigation System Master Plan: Phillip A. Brown, RG LHg Kenny Janssen, RG 13- 1444.407 i Irrigation System Master Plan December 2013 Acknowledgements k: \tac�ojMa \13 \1494 -P— .resat Y0 0] mn g City of Pasco P prryan[bn \irtigatlon syatan maakr planWkmwlMgemenu page fi�ul.EOCx TABLE OF CONTENTS EXECUTIVE SUMMARY Authorization................................................................................ ...........................ES -1 Background................................................................................... ...........................ES -1 Purpose.......................................................................................... ...........................ES -1 Irrigation System Plan Overview .................................................. ...........................ES -1 ExistingSystem ............................................................................. ...........................ES -2 Supply................................................................................ ...........................ES -2 Groundwater Supplies ............................................ ...........................ES -2 Surface Water Supplies .......................................... ...........................ES -4 Water Rights Summary .......................................... ...........................ES -5 Storage............................................................................... ...........................ES -6 PressureZones ................................................................... ...........................ES -6 BoosterPump Stations ....................................................... ...........................ES -6 DrySystems ....................................................................... ...........................ES -6 Irrigation Water Demands ............................................................. ...........................ES -7 Irrigation System Analysis and Findings ...................................... ...........................ES -7 HydraulicModel ................................................................ ...........................ES -7 AnalysisCriteria ................................................................ ...........................ES -8 Flow Velocities ...................................................... ...........................ES -8 Irrigation System Pressures .................................... ...........................ES -8 Model Analysis and Findings ............................................ ...........................ES -8 Existing Conditions ................................................ ...........................ES -8 FutureConditions ................................................... ...........................ES -9 StorageAnalysis ............................................................... ..........................ES -12 Well Condition Assessment ......................................................... ..........................ES -12 Recommendations ........................................................................ ..........................ES -12 1. INTRODUCTION Authorization.............................................................................. ............................... 1 -1 Background.................................................................................... ............................1 -1 Purposeand Scope ...................................................................... ............................... 1 -1 Irrigation System Plan Overview ................................................ ............................... 1-1 2. EXISTING SYSTEM Introduction................................................................................. ............................... 2 -1 ExistingIrrigation System ........................................................... ............................... 2 -1 Supply.............................................................................. ............................... 2 -4 GroundwaterSupplies ............................................. ............................2 -4 13- 1444.407 n Irrigation System Master Plan December 2013 Table of Contents City of Pasco k:Macy \*UV -p wets rem "y 7p\ W =lion\ i6ationrytemm tw pjmvV le ofcot .&m SurfaceWater Supplies ........................................... -4 ............................2 Water Rights Summary ........................................ ............................... 2 -4 Storage............................................................................. ModelLayout ................................................................... ............................... ............................... 2-4 Distribution...................................................................... ............................... 2 -7 PressureZones ..................................................... ............................... 2 -7 BoosterPump Stations ......................................... 2 ............................... DrySystems -7 ......................................................... ............................... Interties 2-8 to Other Systems ...... ............................... .............................. IrrigationSystem Demands 2 -8 ......................................................... ............................... ProductionRecords 2 -8 .......................................................... ............................... 2 -8 OverallSystem ExistingConditions .............................................. ............................... Usage ...................................................... ............................... ResidentialDemands 2-8 .................................................:... ............................... 2 -10 CommercialDemands Operations and Maintenance Problems ........................... ............................... ................................................... ............................... 2 -10 AgriculturalDemands Freshwater Mussels .............................................. ............................... .................................................... ............................... 2 -11 General Operating Procedures Interstate Highway 182 Crossing ......................... ............................... .................................................. ............................... WaterQuality ................................................................................ 2 -11 ...........................2 Agreements with Kidwell Farms, Inc ....................................... ............................... -12 2 -12 RateSchedule ............................................................................ ............................... 2 -12 Summary................................................................................... ............................... 2 -12 3. CRITERIA, ANALYSIS, AND FINDINGS Introduction................................................................................. ............................... 3 -1 IrrigationSystem Analysis .......................................................... ............................... 3 -1 ModelLayout ................................................................... ............................... 3-1 Pipe Characteristics ......................................................... ............................... 3 -1 Water Demand Distribution ............................................. ............................... 3 -2 Wells................................................................................ ............................... 3 -2 ModelCalibration ............................................................ ............................... 3 -2 AnalysisCriteria .............................................................. ............................... 3 -3 FlowVelocities .................................................... ............................... 3 -3 Irrigation System Pressures .................................. ............................... 3 -3 SystemStorage ..................................................... ............................... 3 -4 Model and Analysis Findings .......................................... ............................... 3 -4 ExistingConditions .............................................. ............................... 3 -4 FutureConditions ................................................. ............................... 3 -5 Storage.................................................................. ............................... 3-5 Operations and Maintenance Problems ........................... ............................... 3 -8 Northwest Commons Well Use ............................ ............................... 3 -8 Freshwater Mussels .............................................. ............................... 3 -8 Access to Pipes in Island Estates and Sunny Meadows ...................... 3 -8 Interstate Highway 182 Crossing ......................... ............................... 3 -8 Telemetry System and Communications ............................ ............................3 -9 Well Condition Assessment ........................................................ ............................... 3 -9 13- 1444.407 iii Irrigation System Master Plan December 2013 Table of Contents k: \tacyrejaYS \I] \I&W -pucp water resource studYA07 plan prepmarion\irriSazion system muter City of Pasco planUahle of COnfmlz docx Data Review and Gap Analysis ....................................... ............................... 3 -9 Observations and Analysis ............................................ ............................... 3 -10 Summary................................................................................... ............................... 3 -10 4. RECOMMENDATIONS Introduction................................................................................. ............................... 4 -1 Improvements Completed Since 2005 ........................................ ............................... 4 -1 Distribution System Improvements ............................................. ............................... 4 -2 Irrigation Main Improvements ......................................... ............................... 4 -2 Interstate Highway 182 Crossing Isolation Valve Improvements .................. 4 -2 Island Estates and Sunny Meadows Distribution Isolation Valve Improvements.................................................................. ............................... 4 -3 Northwest Commons Well and Pivot .............................. ............................... 4 -3 Telemetry Improvements ............................................................ ............................... 4 -3 Source and Storage Improvements .............................................. ............................... 4 -3 Storage............................................................................. ............................... 4 -4 Irrigation Well Improvements ......................................... ............................... 4 -4 Well Assessment and Rehabilitation Pl an ............ ............................... 4 -4 Well Data Acquisition .......................................... ............................... 4 -5 Village of Pasco Heights Well Replacement ....... ............................... 4 -6 Construction of New Irrigation Wells .................. ............................... 4 -7 WellHouses ......................................................... ............................... 4 -7 Well Performance Monitoring Program ............... ............................... 4 -7 DrySystems .............................................................................. ............................... 4 -8 Recommendations for Further Study and Planning .................... ............................... 4 -8 WellField Study .............................................................. ............................... 4 -8 FreshwaterMussels ......................................................... ............................... 4 -8 RateStructure Study ........................................................ ............................... 4 -8 Irrigation System Master Plan Update ............................. ............................... 4 -9 ProjectCost Estimates ................................................................. ............................... 4 -9 Summary..................................................................................... ............................... 4 -9 APPENDICES Appendix A: Water Quality Data Appendix B: 2007 Residential Water Use Study Memorandum Appendix C: Operating Agreements Appendix D: Project Cost Estimates 13- 1444.407 iv Irrigation System Master Plan December 2013 Table of Contents City of Pasco kltwo wjc \13\1444 -p wm rum "y407 Plan prepentm \mgwion system mete plwtable ofwnt W.doa LIST OF FIGURES Figure ES -1: Existing Irrigation System ...................................... ...........................ES -3 Figure ES -2: Total System Production ........................................ ...........................ES -7 Figure ES -3: Hydraulic Modeling Results for Existing Conditions ..................... ES -10 Figure ES -4: Hydraulic Modeling Results for Future Conditions ........................ ES -11 Figure 2 -1: Existing Irrigation System .................................... 2 Figure 2 -2: ............................... Existing Irrigation System Hydraulic Profil e ....... ............................... -2 2 -3 Figure 2 -3: Total System Production ...................................... 2 -9 Figure 3 -1: ............................... Hydraulic Modeling Results for Existing Conditions ......................... 3 -6 Figure 3 -2: Hydraulic Modeling Results for Future Conditions ............................ 3 -7 Figure 4 -1: Proposed Irrigation System Improvements ........ ............................... 4 -14 LIST OF TABLES Table ES -1: Irrigation Main Inventory by Size .......................... ...........................ES -2 Table ES -2: Irrigation Well Summary ....................................... ...........................ES -4 Table ES -3: Irrigation Water Rights Summary .......................... ...........................ES -5 Table ES -4: Dry System Summary ............................................ ...........................ES -6 Table ES -5: Recommended Capital Improvement Budget Summary ................ES -13 Table ES -6: Near -Term Capital Improvement Program Summary ....................ES -14 Table ES -7: Long -Term Capital Improvement Program Summary .................... ES -16 Table 2 -1: Irrigation Main Inventory by Size ........................ ............................... 2 -1 Table 2 -2: Irrigation Well Summary ..................................... ............................... 2 -5 Table 2 -3: Irrigation Water Rights Summary ........................ ............................... 2 -6 Table 2 -4: Pressure Zone Summary ...................................... 2 -7 Table 2 -5: ............................... Dry System Summary .......... :.............................................................. 2 -8 Table 2 -6: Peaking Factor Summary ..................................... ............................... 2 -9 Table 2 -7: Irrigation System Connections Summary .......... ............................... 2 -10 Table 2 -8: Summary of Agricultural Demands ................... ............................... 2 -11 Table 2 -9: Irrigation Utility Fees and Rates Summary ........ ............................... 2 -13 Table 3 -1: Hydraulic Modeling Calibration Summary .......... ............................... 3 -3 Table 3 -2: Irrigation Well Data Summary and Gap Analysis ............................ 3 -11 Table 3 -3: Irrigation Well Ranking Summary ..................... ............................... 3 -12 Table 3 -4: Well Condition Assessment Summary ............... ............................... 3 -12 Table 4 -1: Irrigation System Improvements Completed Since 2005 ................... 4 -1 Table 4 -2: Recommended Well Rehabilitation and Performance Testing Activity Summary ................................... ............................... 4 -6 Table 4 -3: Irrigation Well Data Acquisition Recommendations Summary ......... 4 -6 Table 4 -4: Near -Term Capital Improvement Program Summary ...................... 4 -10 Table 4 -5: Long -Term Capital Improvement Program Summary ...................... 4 -12 Table D -1: Irrigation Main Project Cost Summary ............... ............................... D -1 Table D -2: Well Rehabilitation and Assessment Project Cost Summary ............ D -2 Table D -3: Village of Pasco Heights Well Replacement 13- 1444.407 v Irrigation System Master Plan December 2013 Table of Contents City f Pasco LVUc wi ]3 \1444 -p water ran aWyWd7 plan pmp"M \irrigations =masts plmn le ofwm M.doc y Project Cost Summary ......................................... ............................... D -4 Table D -4: New Irrigation Well Project Cost Summary ....... ............................... D -5 13- 1444.407 vi Irrigation System Master Plan December 2013 Table of Contents City of Pasco kltwjwje 13 \1444 -p We Msow x y4w Plan Pfepa ,ion\bripfion mtm m tefplmvl le ofcomeetadoa EXECUTIVE SUMMARY EXECUTIVE SUMMARY Authorization On June 4, 2013, Murray, Smith & Associates, Inc. (MSA) was authorized by the City of Pasco (City) to prepare this plan. Background The City of Pasco owns and operates an irrigation water utility that provides water to residential customers and a limited number of commercial customers. Providing a system for irrigation water separate from the potable water utility allows the City's customers to avoid using treated drinking water to irrigate. The City's existing irrigation system is supplied by water from 11 groundwater wells and water pumped from the Columbia River. The City acquired the first portions of the system in 2002 from a private irrigation utility. The system has grown considerably since that time. The City uses the irrigation system annually from April 1' to October 31'. The City has established the goal of developing a capital improvements plan for the irrigation system to ensure the continued delivery of economical irrigation water to City residents. Purpose The purpose of this plan is to provide a basis for identifying, analyzing, and planning capital improvements to the irrigation system. The study includes a hydraulic analysis of the existing system which compares the existing system's performance to analysis criteria in order to identify deficiencies and develop system improvements. A capital improvements plan is developed to assist in planning future projects. Included with this plan are conceptual level project cost estimates. The system's existing groundwater wells will also be evaluated through a tabletop review of existing data. The results of this review will be used to develop preliminary recommendations for improvements, further assessment, and rehabilitation work. Irrigation System Plan Overview This plan is organized by sections. Section 2 presents an inventory of the irrigation system and its components as they currently exist and operate. The City's irrigation water rights are also discussed in Section 2. Section 3 presents analysis criteria that form the basis for identifying deficiencies in system performance and planning improvements to the irrigation system. Section 3 also includes a description of the hydraulic model and the results of the modeling analysis work. Groundwater well condition assessments are also documented in this section. Section 4 presents recommendations for improvements to the system and to the groundwater wells, as well as recommended further study and planning work. 13- 1444.407 Page ES -1 Irrigation System Master Plan December 2013 Executive Summary City of Pasco r-\TA(_P,.s \13 \1444 -Pasco Water RS.. Swdy \407 Plan Prepaz W.\hliptWo System Ma Plan\Se W0- Executive Summa ft. Existing System The City's irrigation system piping is polyvinyl chloride (PVC), ductile iron (DI), and steel distribution pipes ranging from 3 inches to 24 inches in diameter. Table ES -1 shows a summary of irrigation main sizes in the distribution system. Figure ES -1 shows an overview of the irrigation system. Table ES -1 Irrigation Main Inventory by Size Diameter inches Len ft Length miles < 6 356,347 67.49 6 125,506 23.77 8 80,678 15.28 10 5,122 0.97 12 96,254 18.23 15 8,078 1.53 16 27,878 5.28 18 4,488 0.85 24 1 483 1 0.09 Total 1 711,797 1 134.81 The oldest parts of the system are approximately 15 to 20 years old, with most of the system constructed less than 10 years ago. Parts of the irrigation system were first acquired by the City in 2002 from Kidwell Farms, Inc., a private irrigation utility owner. This utility was part of subdivisions built by private developers. Supply The City's irrigation system is supplied by groundwater produced from 11 wells located throughout the system and surface water pumped from the Columbia River. All sources of supply pump to the system's main service zone, referred to as the 639 pressure zone. Supply to lower zones is accomplished through the use of pressure - reducing stations. Groundwater Supplies The City's irrigation wells range between 135 and 245 feet deep and are completed in an unconfined alluvial aquifer consisting mainly of sand and gravel. The wells range between and 39 years old. Roughly half of the wells are constructed with perforated casing and the others with stainless steel, wire wrap well screen. The reported production capacities range between 450 and 2,500 gpm. Table ES -2 summarizes the City's irrigation wells. 13- 1444.407 Page ES -2 Irrigation System Master Plan December 2013 Executive Summary City of Pasco K \TAC_Projea W \1444'Pum WuerEw -u Sn Y\407PWPrepao -Urt9 - S,t.M=.Pl.\SmU.0 -E..6w Suaunery.daa MAINE c.%,=,-. Master Plan XISTING CITY IRRIGATION SYSTEM -SA P. - ----------- - AFLL ware CITY OF PASCO C A I 4j A PE.EA r — , ri F- pw TTT t �m p Table ES -2 Irrigation Well Summary Well Name Year Constructed Depth Pump Type Fixed/ Variable Average Production M (tBo�S)IZe (BGS') Speed Rate m ) Desert Estates 1951 152 Submersible Fixed 650 75 Desert Sunset 1929 202 Vertical Turbine Variable 1,450 150 First Place 2007 123 Vertical Variable 2,500 350 Turbine Island Estates 1976 190 Submersible Fixed 450 50 I -182 Unknown 134 Vertical Variable 1,850 200 Turbine Linda Lovi sa 2012 205 Turbine Fixed 1,100 150 Northwest Commons Unknown 203 Vertical Turbine Variable 1,300 150 Powerline Vertical Road 1980 171 Turbine Fixed 1,900 200 Road 52 2006 185 Vertical Variable 2,350 250 Turbine Sirroco 1976 222 Vertical Variable 1,400 150 Turbine Village of Pasco 1975 184 Submersible Fixed 1,000 125 Hei is Notes 1. Below ground surface 2. Gallons per minute 3. Horsepower Surface Water Supplies In addition to groundwater wells, the City uses water pumped from the Columbia River for irrigation supply. The river intake pump station conveys water directly to the Road 108 Booster Pump Station located on the west side of the system. The Road 108 Booster Pump Station pumps the irrigation water to the irrigation distribution system. Irrigation water pumped from the river is metered through a master meter at the Road 108 Booster Pump Station. 13- 1444.407 Page ES -4 Irrigation System Master Plan December 2013 Executive Summary City of Pasco K: \TACP ja \13 \1444 -Pww WuerBao So YWW Pl PCp ionU oMian SystemM Plan\Segion0 -EU.&i Suwry c Water Rights Summary The City's current irrigation water rights are a combination of water rights issued by the Washington State Department of Ecology (DOE) and water rights which were given to the City by private parties. The City's annual irrigation water rights total 7,592.9 acre -ft. Table ES -3 shows a summary of the City's existing irrigation water rights. Table ES -3 Irrigation Water Rights Summary Well Name Water Right3 Q; (gpm) Q, acre -ft Approximate Pumping Capacity m First Place G3- 01243C 1,400 558.0 2,500 Desert Sunset G3-20243P(B)l 214 107.9 1,450 G3-20243P(C) 1,174 441.6 Island Estates G3- 20242C 1,134 504.0 450 Sirocco G3-20243P(B)l 214 107.9 1,450 G3- 28452C 450 172.0 Road 52 G3- 20242P(A ) 1,430 636.0 2,350 Village of Pasco Heights G3- 23525C 1,300 660.0 1,000 Northwest Commons G3- 20243P(A 1,612 483.6 1,300 G3-20243P (B)' 214 107.9 Desert Estates G3- 24981C A 80 41.9 750 G3- 24981C(B) 400 155.9 Linda Loviisa G3- 20244C 1,880 759.8 1,000 G3- 24978C 1,600 660.0 G3- 26368C 400 164.0 I -182 G3- 24978C 1,600 660.0 1,850 G3- 26368C 400 164.0 Powerline Road G3-27413P(B) 270 108.1 1,900 G3- 27413P(C )I,z 573.75 203.4 G3- 27413P 281.25 112.6 G3- 27413P(F) 270 108.0 Road 108 Booster Pump Station G3- 27413P (C) 573.75 203.4 3,000 53- 28615C 1,643 732.0 53- 28788C 139 56.0 53- 28789C 121 48.0 53- 28790C 195 200.0 53- 28932C 597 240.0 Total Rights 17,164 7152.8 19,000 Notes 1. Indicates that water right is shared 2. This water right has two points of withdrawal 3. G indicates a groundwater right; S indicates a surface water right. 4. Q; is the instantaneous allowable flow; Q. is the average annual allowable volume 13- 1444.407 Page ES -5 Irrigation System Master Plan December 2013 Executive Summary City of Pasco K1TACProjects \13 \1494 - Paves Wazeraesomces SWyW07 Pl Prryata,ion\Erigatian Sptm MutpPW\=m 0 -Ex ive Sum ..doa Storage The irrigation system has one storage tank located near the intersection of Sandifur Parkway and Road 76. The storage tank sets the hydraulic grade for most of the City's system. The storage tank serves the 639 pressure zone by gravity, so the water is able to serve the other pressure zones at lower elevations through pressure - reducing stations. The City currently operates the tank below full at a volume of 2.28 million gallons (MG). Pressure Zones The irrigation system has six pressure zones. The zones are separated by pressure - reducing stations which allow zones with a higher hydraulic grade to supply zones having a lower hydraulic grade with water. Booster Pump Stations The City currently has one booster pump station in its irrigation system. This is the Road 108 Booster Pump Station located at the intersection of Road 108 and Crescent Road in the western portion of the irrigation service area. The design capacity of this station is 3,000 gpm. This station is used to boost water pumped from the Columbia River Intake Station to the 639 Pressure Zone. Another pump station is planned for construction in 2013. This station will be called the Harris Road Booster Pump Station and will be located on Harris Road near Interstate 182. This booster pump station has a design capacity of 3,125 gpm. The station will also pump water supplied by the Columbia River Intake Station to the distribution system. Dry Systems The City's irrigation system includes portions that are installed and ready for use, but not currently used. These systems are referred to as dry systems. The existing dry systems are shown in Figure ES -1. Table ES -4 shows a summary of the current dry systems. Table ES -4 Dry System Summary Subdivision Name Number of New Connections Estimated Acreage ac Broadmoor Estates 304 90.67 Broadmoor Place 233 62.33 Desert Oasis 170 54.17 Desert Plateau 304 108.48 Total 1011 315.65 13- 1444.407 Page ES -6 Irrigation System Master Plan December 2013 Executive Summary City of Pasco K1TACPwjeas\13\14N- Pasco Wne Resource Swdy \407 Pbn Pr =twnUmigatfon System Mane Plea\4 ion 0- fiative&u .doc Irrigation Water Demands The City typically uses its irrigation system from April to October every year. Production is monitored and recorded by meters on each of the system's wells. Some large users are metered, but most connections to the system are not currently metered. Total system production is the sum of water produced by the irrigation system wells and water pumped from the Columbia River. Figure ES -2 shows total system production from 2006 to 2012. As seen from the figure, system production has increased steadily from 2006 to 2012. 7,000 r: 6,000 d u 5,000 a 0 4,000 'C 0 L 3,000 0 y H r 2,000 W F 1,000 Figure ES -2 Total System Production 2006 2007 2008 2009 2010 2011 2012 Year Irrigation System Analysis and Findings The analysis of the irrigation system uses a hydraulic model to simulate pressure and flow conditions in the system under several demand conditions. The results are compared to . analysis criteria and form the basis for identifying deficiencies. Hydraulic Model The initial layout of the hydraulic model was completed by tracing pipes and junctions over the City's GIS data. Graphical and tabular data provided by the City were used to locate critical hydraulic elements such as the Road 68 Irrigation Tank, wells, pumps, and pressure - reducing stations. The demands presented in Section 2 were distributed throughout the 13- 1444.407 Page ES -7 Irrigation System Master Plan December 2013 Executive Summary City of Pasco KATAC_Pmia WU1 -Pa Water Reso urce SmdyN07 Plan PrepuetiontLxigation SVt --M-s PJ.\SWion0- Executive SumnmryAO. model using a nearest node method. The nearest node method assigns known demands with a known spatial distribution to the nearest node in the system. Model calibration was completed using data collected by the City's SCADA system. The system collects and logs information from the system every 30 to 60 minutes. Monitoring points on the system include well discharges, booster pump station discharges, and the storage tank. Analysis Criteria The analysis criteria used to evaluate the hydraulic performance of the irrigation system include minimum system pressures and maximum flow velocities. Any result not meeting these criteria is subject to further investigation and potential corrective action. Flow Velocities Pipes whose flow velocities exceed 5 feet per second (fps) under average day demand conditions are considered to have inadequate capacity. Pipe flow velocities are allowed to increase up to 8 fps during peak hour demand (PHD) conditions. Any pipes with flow velocities above 8 fps under PHD conditions are considered to have inadequate capacity. Irrigation System Pressures The City's pressure criteria at service connections are summarized below. These pressure criteria are based on industry standards, Uniform Plumbing Code requirements, and a review of landscape irrigation equipment water pressure requirements. 1. Each service connection should maintain a minimum water pressure of 30 pounds per square inch (psi) during all demand conditions. 2. No service connection should exceed a water pressure of 120 psi. Individual customers are responsible for reducing water pressures over 80 psi if they desire to do so. 3. During a failure of any part of the system, the maximum water pressure at customer meters will not exceed 150 psi. Model and Analysis Findings The calibrated model was used to simulate two scenarios: year 2012 conditions and an anticipated future demand condition. Modeling for the future condition included the City's existing dry systems, but did not include any new pipes or new developments. The results of each analysis are described below. Existing Conditions Existing conditions were modeled using 2012 PHD conditions. Two pipes in the system exceed the flow velocity criteria of 8 fps under PHD conditions. These pipes are 4 inches in diameter and located adjacent to the Sirocco Well discharge. All analysis criteria were 13- 1444.407 Page ES -8 Irrigation System Master Plan December 2013 Executive Summary City of Pasco K: \TAC_Proje 13 \1494 -Pasco WaaaaOw SnyA07 Pl FrapuationWngat SAtm Maeta FWa SWmO- Executive SlmamyAo= satisfied with regard to system pressures. The results are summarized below. A graphical summary of modeling results for the existing conditions scenario is shown in Figure ES -3. • The system does not experience pressures over 120 psi under any demand condition. In order to verify that maximum allowable pressures were not exceeded, a low - demand condition was used to approximate static conditions. • The system experiences pressures over 80 psi near discharges for wells and the Road 108 Booster Pump Station during high production. None of the locations which experience pressures between 80 and 120 psi serve customers. They are typically located on dedicated transmission mains and are caused by topography. • Low system pressures were not predicted by the model under this scenario during normal tank levels. If the storage tank water surface elevation reaches 600 feet above mean sea level (AMSL), the system begins to experience isolated low pressures. • No part of the system experiences pressures over 150 psi during a failure of pressure - reducing valves. It is possible that pumps could fail in such a manner as to cause high system pressures downstream of their discharges. Future Conditions The calibrated model was used to predict the hydraulic performance of the City's irrigation system under anticipated future conditions. The future condition assumptions are: • All of the City's current dry systems are connected and in use • All of the City's existing subdivisions are fully developed • All of the City's sources are producing the maximum allowed flows simultaneously These assumptions represent near -term conditions that could occur within the next two to five years. The actual timing of these conditions is dependent on a number of variables. Any changes in the following conditions would alter the analysis results: Expansion of the irrigation system service area beyond assumed service limits Additional sources of supply Changes in water rights High system pressures were found near the discharges of wells and pump stations as in the 2012 PHD scenario. No pipes that serve customers directly experienced high pressures. No low system pressures were found by the model. High flow velocities were found by the model at two locations: Near the discharge of the Sirocco Well as observed in the 2012 PHD scenario North of the intersection of Road 52 and Sandifur Parkway A graphical summary of modeling results for the future conditions scenario is shown in Figure ES -4. 13- 1444.407 Page ES -9 Irrigation System Master Plan December 2013 Executive Summary City of Pasco K\TAC Projects \13 \1444.Pasm Wazer omos SNdy \407Plan Prp tlon\h7ipdon Sya Maslen PlarMW!on0 -Ex ve Sun ..&m Q v. EE-E--s city Of Pasco .at., Pin SURE RESULTS FOR it CONDITIONS ll�� 4" kplil Y4+N'ry II LL Iiiiassis. pooss, M SUL .a. s. �I,r 4 A CITY OF PASCO 1p a— as, 4- ZM iTi \ k, x, �11� K �l F CITYOF PASCID 7, Tj 1. 1, If T '—T T1 r E1,V7, i j 14 FS— ES4 Clty lrig=y.l.. Master Plan HYDRAULIC MODELING RESULTS FOR FUTURE CONDITIONS MSA wr 7 CITYOF PASCID 7, Tj 1. 1, If T '—T T1 r E1,V7, i j 14 Storage Analysis The system storage was evaluated at projected peak hour demand conditions to determine whether or not enough storage is available in the system. The analysis concluded that the existing irrigation system reservoir has adequate capacity to meet projected storage needs as long as the water level in the tank is raised. Modeling confirmed that raising the water level does not have any adverse impacts on the distribution system. Well Condition Assessment A tabletop condition assessment of the City's groundwater supply wells was completed as part of this plan. The assessment consisted of gathering and analyzing available information. The objective of this analysis is to identify wells having apparent construction, performance, or water quality issues that may be limiting production with the purpose of developing a targeted approach at candidate wells to regain performance and optimize individual and combined system production. The results of the well condition assessments are summarized as follows: • Review of available information for the Desert Sunset, Sirocco, NW Commons, Island Estates, I -182, and Powerline Road wells indicated the presence of biofouling and incrustation which are possibly plugging screens and perforations. Significant accumulations of sediment or debris in the wells are also noted. • Observations indicated minor mineral and biological deposits within the First Place and Desert Estates wells. • Based on the information provided and relatively newer construction, the apparent conditions of the Road 52 and Linda Loviisa Wells are considered good. Recommendations Recommendations for improvements to wells, improvements to the irrigation system, and opportunities for further planning and study were developed as part of this report. The recommendations are separated into near -term improvements and long -term improvements. Near -term improvements are those which should be completed within the next one to five years. Long -term improvements should be completed in six to twenty years. The recommended capital improvement program totals approximately $800,000 for near- term improvements. The sum of recommended budget for long -term improvements is $6.87 million and does not include the $800,000 of near -term recommended investment. Table ES- 5 shows a summary of the recommended capital improvement budgets. Tables ES -6 and ES- 7 include tabulated summaries of all recommended improvements and their associated estimated project costs. 13- 1444.407 Page ES -12 Irrigation System Master Plan December 2013 Executive Summary City of Pasco K: \TAC PMjwls \l3 \1444 - Paso Wanrkaaurar SmdyWW Plan Prep 60n\htllnlion SW= Massa Plan\Smlion0 -Ex Live Sum .&m Table ES -5 Recommended Capital Improvement Budget Summary Near -Term $800,000 Long-Tenn $6,867,000 Total $7,667.000 13- 1444A07 Page ES -13 Irrigation System Master Plan December 2013 Executive Summary City of Pasco K: \TAC Pmjxh \Il \1444 - Pssco WazerKaourcrs $Wtl)' \40'1 Plan PrepmationVrtigation Syuem Maata PW\Sxtion 0 - iucutive Snmmucy.tloa Table ES-6 Near -Term Capital Improvement Program Summary Group ID Project Location or Name Project Limits Project Estimated Pro'ect Cost Road 56 to Road Extend existing 16 -inch diameter main east to Road 52. The new IR.2 Powerline Road 52 main may be built in right of way that is being platted as part of $186,000 the construction of a new elementary school at the intersection. West along Sahara Extend two 4 -inch diameter distribution mains on Sahara Drive IRA Drive from end of west to the existing 12 -inch diameter main on Road 44. This Sahara Drive existing mains to improvement provides a redundant connection to the rest of the $46,000 �Road 44 system if the connection at Burden Boulevard is out of service for y an rmwn. Install approximately 1,200 linear feet of new 6 -inch diameter a Sahara Drive to distribution piping near the discharge of the Sirocco Well, The IR.5 Sirocco Drive Saguaro Drive new pipes should be installed in public right of way. The existing $90,000 E pipes should be abandoned to eliminate pipe crossings in the rear of 'vate lots. r" e Isolation Valve Island Estates and Installation of up to 52 isolation valves in public right of way will p D.2 Improvements Sunny Meadows reduce the need for City staff to access back yards during $156,000 a Phase 1 Subdivisions maintenance and repairs and allow more customers to stay online during emergencies. Isolation Valve Interstate Installation of two isolation valves in the vicinity of the crossing D.3 Improvements Highway 182 may help to prevent complete shutdown of the crossing during $10,000 Phase 2 Crossin maintename and repair activities. This improvement would tie the Northwest Commons irrigation Northwest Northwest pivot directly to the irrigation system and meter the pivot at the DA Commons Pivot Commons point of withdrawal. This will allow the City to operate the $30,000' Improvements Subdivision Northwest Commons Well independently of the pivot. Proposed i e is 8 inches in diameter. e Activate Dry This improvement is an operational improvement that consists of fa .. DS Systems - activating the portions of the City's irrigation system which are - currently not in me. t 13- 1444.409 Page ES- 14 December 2013 Executive Summ Irrigation System Master Plan xu�e�ornvnmiaaa. esswwnaa��e, sw�wrewe�mowyiaosYn ®wn :em�smwa. �r s.�y: � City of Pasco Table ES -6 Near -Term Capital Improvement Program Summary (continued) Group ID Project Location or Name Project Limits Project Description Estimated Project Cost This improvement proposes to change the maximum water level 5 Road 68 Irrigation in the Road 68 Irrigation Tank from 639 to 641.5. It is an e w S.l Tank - operational change and requires no capital investment. This $10,000 d Improvements project also includes inspection and repair or replace level e $ sensing equipment inside the Road 68 litigation Tank a S.2 Irrigation Well Rehabilitation _ Rehabilitation and data acquisition on all wells except Village at $220,000 Program Pasco Heights Well' E Freshwater Mussel Conduct a study to determine the most effective way to address is P' l Study freshwater mussel colonization of distribution piping exposed to $25,000 $ Columbia River Water. h e m Linda Lovdsa Conduct a well field study in order to determine the optimal o P.2 Well Field Study - locations and sizes of new irrigation wells in the Linda Loviisa $24,000 area. a p' Data Acquisition This recommendation consists of gathering data consistent with P.3 on Existing Wells - Table 4 -3 as presented is Section The City has resources to - accomplish this project so there is no project cost. n Total Budget Recommended for all Near -Term Capital Im roveroems $797 000 Notes I. For cost estimating purposes, 200 linear fat of 6 -inch diameter PVC was assumed and $15,000 was added for installation of anew meter and valves. 2. See Figure 2 -1 for the location of the City's existing dry systems. 3. See text for detailed description of rehabilitation activities and wells involved. 13- 1444.407 Page ES -15 Irrigation System Master Plan December 2013 Executive Summary City of Pasco K:T mob Al3UW.V. wnva.owas swyam Px nR.nvouwroarnSp=i&mnemvsmma -m ,w s�.do Table ES -7 Long -Term Capital Improvement Program Summary Group P D Project Location or Name Project Limits Project Description Estimated Project Cost Ill. 1 Powerline Road Road 90 to Extend existing 16 -inch diameter main west to Road 90 to B Convention Drive improve flow and eliminate dead ends. $1,000,000 > Extend existing dead -end 8 -inch diameter main on Sandifur i M IR.3 Sandifur Parkway Porto Lane to Parkway near Porto Lane along east side of Road 44 south to E ., and Road 44 Burden Boulevard Bunten Boulevard. Correct all dead -end distribution mains $325,000 E along Road 44 to the new main. Road 68 east to elation of a 12 -inch diameter main between existing m [R.6 Wrigley Drive Convention Drive distribution mains on Road 68 and Convention Drive. This $212,500 rovement requires additional right -of -way. cThis improvement proposes installation of a redundant 12 -inch 600 Zone PRV diameter some of supply to the 600 Zone. The ultimate size and D.1 Supply 600 Zone muting of the pipe and source zone would be chosen by the City $915,000, O at a later time once right of way, easements, or land can be ac uired between the two zones. � v .� E This improvement proposes installation of a signal converting a, > T.1 Road 52 Telemetry Road 52 station to improve communications from the central telemetry d � Improvements P system to the Powerline Road Well, Road 52 Well, and $35,000 1"' B Northwest Commons Well. d S.3 Village at Pasco Heights Well Village at Pasco Construction of a new well at Village of Pasco Heights. This m eReplacement Heights project assumes that the existing pump and motor will be reused. $ 173,000 y � a E Construction of well houses to enclose existing wells and S.4 Well Houses - associated equipment. It is assumed that a total of seven well $455,000 houses will be built at a project cost of $65,000 per well house. 13- 1444.407 Page ES -16 Irrigation System Master Plan December 2013 - Executive Summary r12Kx ]M . Wasm Sm O?vs�,wan ®m M0.r_q,S,_ Cil y ofPasco Table ES -7 Long -Term Capital Improvement Program Summary (continued) Group ID Project Location Project Limits Project Description Estimated or Name Project Cost F $ E Construction of Up to six new irrigation wells could be necessary to improve the e o S.5 New Irrigation - irrigation system capacity. For budgeting purposes, a project cost $3,696,000' h $ Wells of $616,000 per well has been assumed.' E V Conduct a rate study to see if irrigation system rates are adequate. 0 P.4 Rate Study - The rate study will be informed by the selection of a capital $25,000 aimprovements Program. .G y Irrigation System Update of this irrigation system master plan following major n P.5 Master Plan - changes to the irrigation system or after five years, whichever $30,000 Update occurs first. Total. Budget Recommended for all Lone-Term Capital Improvements $067.000 Notes 1. For cost estimating purposes, 6,5001incor feet of 12 -inch diameter PVC was assumed and $100,000 was added for a pressure - reducing station. 2. The location of new wells will depend on data acquisition and the Linda Loviisa well field study. 3. The project cost is $616,000 per new irrigation well. With a total of six wells, the total project cost is $3.70 million. It is possible that fewer than six new wells will be necessary. 13- 1444.407 Page ES -17 Irrigation System Master Plan December 2013 Executive Summary City of Pasco LITACjry{a. UAJ. -P W.. au. S�0] Sy Meuv PYOVSm'vm 0 -6ywiw Sumouey.Wu SECTI ®N 1 SECTION 1 INTRODUCTION Authorization On June 4, 2013, Murray, Smith & Associates, Inc. (MSA) was authorized by the City of Pasco (City) to prepare this plan. Background The City of Pasco owns and operates domestic and irrigation water utilities that provides water to residential customers and a limited number of commercial customers. Providing a system for irrigation water separate from the potable water utility allows the City's customers to avoid using treated drinking water to irrigate. The City's existing irrigation system is supplied by water from 11 groundwater wells and water pumped from the Columbia River. The City acquired the first portions of the system in 2002 from a private irrigation utility. The system has grown considerably since that time. The City uses the irrigation system annually from April Is` to October 31'. The City has established the goal of developing a capital improvements plan for the irrigation system to ensure the continued delivery of economical irrigation water to City residents. Purpose and Scope The purpose of this plan is to provide a basis for identifying, analyzing, and planning capital improvements to the irrigation system. The study includes a hydraulic analysis of the existing system which compares the existing system's performance to analysis criteria in order to identify deficiencies and develop system improvements. A capital improvements plan is developed to assist in planning future projects. Included with this plan are conceptual level project cost estimates. The system's existing groundwater wells will also be evaluated through a tabletop review of existing data. The results of this review will be used to develop preliminary recommendations for improvements, further assessment, and rehabilitation work. Irrigation System Plan Overview This plan is organized by sections. Section 2 presents an inventory of the irrigation system and its components as they currently exist and operate. The City's irrigation water rights are also discussed in Section 2. Section 3 presents analysis criteria that form the basis for identifying deficiencies in system performance and planning improvements to the irrigation system. Section 3 also includes a description of the hydraulic model and the results of the modeling analysis work. Groundwater well condition assessments are also documented in this section. Section 4 presents recommendations for improvements to the system and to the groundwater wells, as well as recommended further study and planning work. 13- 1444.407 Page 1 -1 Irrigation System Master Plan December 2013 Introduction City of Pasco K \TACPmjeas \13 \1444 -Pasco Waa Resolute Smdy\407Plan PrpaionWtiptbn Syuem MenaP \Smion1- Wmduaimfta :TION 2 SECTION 2 EXISTING SYSTEM Introduction This section describes the City's existing irrigation system's supply, storage, and distribution facilities. Water rights and historical production and demand data are presented. General operations are also discussed in this section. The information in this section forms the basis for building the hydraulic model and for developing the recommendations which result from analysis of the irrigation system. Existing Irrigation System The City's irrigation system piping is polyvinyl chloride (PVC), ductile iron (DI), and steel distribution pipes ranging from 3 inches to 24 inches in diameter. Table 2 -1 shows a summary of irrigation main sizes in the distribution system. Table 2 -1 Irrigation Main Inventory by Size Diameter inches Length (ft) Length (miles) < 6 356,347 67.49 6 125,506 23.77 8 80,678 15.28 10 5,122 0.97 12 96,254 18.23 15 8,078 1.53 16 27,878 5.28 18 4,488 0.85 24 483 0.09 Total 711,797 134.81 The oldest parts of the system are approximately 15 to 20 years old, with most of the system constructed less than 10 years ago. Parts of the irrigation system were first acquired by the City in 2002 from Kidwell Farms, Inc., a private irrigation utility owner. This utility was part of subdivisions built by private developers. The system has six pressure zones. The largest is the 639 pressure zone. All of the system's sources of supply and storage are located in this zone. The other five zones have a lower hydraulic grade line (HGL) and are supplied from the 639 pressure zone through pressure - reducing valves. Figure 2 -1 shows an overview of the existing system. Figure 2 -2 shows a hydraulic profile of the system. 13- 1444.407 Page 2 -1 Irrigation System Master Plan December 2013 Existing System City of Pasco KATAC_P j= \13 \1444 -POao WaWRaourca SWdyAVPlop Preps Whyipa nSy Maria PlanSww2- Existing Sys doc t m>a i I a,n�..a.�d..• 1 p. �..._. TI mo r/ 41 n 1 E CITY OF MSCO "ya \ \i v J FIG.. 2.1 Cv I,m Master Plan EXISTING CITY IRRIGATION SYSTEM n n.uarm I I�ir, I � I si 700 - ABMLV1ATON8 WEST e<. •13� xak EAST - 639 700 rc wnno. nn.riw xevcm w s.r I- V .xw��«c ..K ® w wr ZONE 600 — -®+v 600 — 600 ZONE 560 ZONE 547 ZONE P P P P 500 — C. - p _ 9 P — 500 @ d a x 400 — P P 400 RIVER 4 @ F MTAKE a 41 ZONE 300 — — 300 LEGEND ABMLV1ATON8 — zwzu ac sv'� xak sw ac m.� — a• pc s.n rc wnno. nn.riw xevcm w s.r I- V .xw��«c ..K ® w wr Supply The City's irrigation system is supplied by groundwater produced from 11 wells located throughout the system and surface water pumped from the Columbia River. All sources of supply pump to the system's main service zone, referred to as the 639 pressure zone. Supply to lower zones is accomplished through the use of pressure - reducing stations. Groundwater Supplies The City's irrigation wells range between 135 and 245 feet deep and are completed in an unconfined alluvial aquifer consisting mainly of sand and gravel. The wells range between 1 and 39 years old. Roughly half of the wells are constructed with perforated casing and the others with stainless steel, wire wrap well screen. The reported production capacities range between 450 and 2,500 gpm. Table 2 -2 summarizes the City's irrigation wells. Most of the City's irrigation wells are located on concrete pads and are open to the atmosphere with nearby electrical equipment in weatherproof enclosures. The Desert Sunset and Sirocco Wells are enclosed within buildings. The City has current capital improvement projects planned to construct new well houses around the First Place Well and the Linda Loviisa Well. The construction of these well houses is intended to prevent damage to equipment from exposure and reduce noise levels to nearby properties when the pumps are operating. None of the wells have backup power supply. Surface Water Supplies In addition to groundwater wells, the City uses water pumped from the Columbia River for irrigation supply. The river intake pump station conveys water directly to the Road 108 Booster Pump Station located on the west side of the system. The Road 108 Booster Pump Station pumps the irrigation water to the irrigation distribution system. Irrigation water pumped from the river is metered through a master meter at the Road 108 Booster Pump Station. Since there are no services between these two stations, all of the water pumped is metered prior to distribution and use. Water Rights Summary The City's current irrigation water rights are a combination of water rights issued by the Washington State Department of Ecology (DOE) and water rights which were given to the City by private parties. The City's annual irrigation water rights total 7,592.9 acre -ft. Table 2 -3 shows a summary of the City's existing irrigation water rights. Storage The irrigation system has one storage tank located near the intersection of Sandifur Parkway and Road 76. The storage tank sets the hydraulic grade for most of the City's system. The 13- 1444.407 Page 2 -4 Irrigation System Master Plan December 2013 Existing System City of Pasco K\TAC_Projega \13 \1444- Pax. Watnr Reawrces StaAyW7 Plan PnVanitionWrigation System Master PlansStxtion 2 - Existing System.&& storage tank serves the 639 pressure zone by gravity, so the water is able to serve the other pressure zones at lower elevations through pressure - reducing stations. Table 2 -2 Irrigation Well Summary Notes 1. Below ground surface 2. Gallons per minute 3. Horsepower The storage tank is referred to as the Road 68 Irrigation Tank. Construction of the tank was completed in 1992 and it was originally used as a potable water storage tank. The tank was repurposed for use in the irrigation system in 2006. The tank is a welded steel standpipe with an approximate volume of 2.62 million gallons (MG) when full. The City currently operates the tank below full at a volume of 2.28 MG. The tank has a diameter of about 55 feet and the current water storage height is 126.5 feet which corresponds to an elevation of 639 feet above mean sea level (AMSL). The maximum water storage height is 147.5 feet or 660 feet AMSL. The tank has approximately 18,000 gallons of storage per vertical foot of storage 13- 1444.407 Page 2 -5 Irrigation System Master Plan December 2013 Existing System City of Pasco K \TACPjwu \13 \1444 - Pasco Waza Racmca Smdy \407 Pbn RcpmmionVrdprion Sym=Mana Plnn\9ation 2 -a Wwg Syste . Fixed/ Average Well Name Year Constructed Depth (BGS) Pump Type Variable Production Motor Size (HP) Seed Rate m2 Desert 1951 152 Submersible Fixed 650 75 Estates Desert 1929 202 Vertical Variable 1,450 150 Sunset Turbine First Place 2007 123 Vertical Variable 2,500 350 Turbine Island 1976 190 Submersible Fixed 450 50 Estates I -182 Unknown 134 Vertical Variable 1,850 200 Turbine Linda 2012 205 Vertical Fixed 1,100 150 Loviisa Turbine Northwest Unknown 203 Vertical Variable 1,300 150 Commons Turbine Powerline 1980 171 Vertical Fixed 1,900 200 Road Turbine Vertical Road 52 2006 185 Turbine Variable 2,350 250 Siroco 1976 222 Vertical Variable 1,400 150 Turbine Village of Pasco 1975 184 Submersible Fixed 1,000 125 Heights Notes 1. Below ground surface 2. Gallons per minute 3. Horsepower The storage tank is referred to as the Road 68 Irrigation Tank. Construction of the tank was completed in 1992 and it was originally used as a potable water storage tank. The tank was repurposed for use in the irrigation system in 2006. The tank is a welded steel standpipe with an approximate volume of 2.62 million gallons (MG) when full. The City currently operates the tank below full at a volume of 2.28 MG. The tank has a diameter of about 55 feet and the current water storage height is 126.5 feet which corresponds to an elevation of 639 feet above mean sea level (AMSL). The maximum water storage height is 147.5 feet or 660 feet AMSL. The tank has approximately 18,000 gallons of storage per vertical foot of storage 13- 1444.407 Page 2 -5 Irrigation System Master Plan December 2013 Existing System City of Pasco K \TACPjwu \13 \1444 - Pasco Waza Racmca Smdy \407 Pbn RcpmmionVrdprion Sym=Mana Plnn\9ation 2 -a Wwg Syste . height. The tank is equipped with an impressed current cathodic protection system. It was fully recoated in 2008. Table 2 -3 Irrigation Water Rights Summary Well Name Water Right3 Q; m) Q„ 4 acre-ft) Approximate Pumping Ca aci m) First Place G3- 01243C 1,400 558.0 2,500 Desert Sunset G3- 20243P(B )' 107.9 1,450 G3-20243P(C) 1,174 441.6 Island Estates G3-20242C(B) 1,134 504.0 450 Sirocco G3- 20243P 214 107.9 1,450 G3- 28452C 450 172.0 Road 52 G3-20242P(A) 1,430 636.0 2,350 Village of Pasco Heights G3- 23525C 1,300 660.0 1,000 Northwest Commons G3-20243P(A) 1,612 483.6 1,300 G3-20243P(B)l 214 107.9 Desert Estates G3- 24981C(A) 80 41.9 750 G3-24981C(B) 400 155.9 Linda Loviisa G3-20244C2 1,880 759.8 1,000 G3- 24978C 1,600 660.0 G3- 26368C 400 164.0 I -182 G3- 24978C 1,600 660.0 1,850 G3- 26368C 400 164.0 Powerline Road G3-27413P(B) 270 108.1 1,900 G3-27413P(C)1,2 573.75 203.4 G3-27413P(D) 281.25 112.6 G3-27413P(F) 270 108.0 Road 108 Booster Pump Station G3- 27413P(C) 573.75 203.4 3,000 S3- 28615C 1,643 732.0 S3- 28788C 139 56.0 S3- 28789C 121 48.0 S3- 28790C 195 200.0 S3- 28932C 597 240.0 LTotal Rights 17,164 7152.8 19 000 Notes 1. Indicates that water right is shared 2. This water right has two points of withdrawal 3. G indicates a groundwater right; S indicates a surface water right. 4. Q; is the instantaneous allowable flow; Qn is the average annual allowable volume 13- 1444.407 Page 2 -6 Irrigation System Master Plan December 2013 Existing System City of Pasco K\TAC_Prge X1RAM -P. Water aee..St.dyW07 Plan PrepmmionVtrigaLion System MWa P1m\SWion I- Existing Systemdoa Distribution The distribution system consists of pipe ranging from 3 inches in diameter to 24 inches in diameter. The majority of the system piping is PVC with parts of the system in ductile iron (DI) or steel. Pressure Zones The irrigation system has six pressure zones. The zones are separated by pressure- reducing stations which allow zones with a higher hydraulic grade to supply zones having a lower hydraulic grade with water. Table 2 -4 summarizes the pressure zones. Table 2 -4 Pressure Zone Summary Zone Maximum Hydraulic Storage Supply Facilities General Location or Name Grade (ft AMSL Facilities Service Area Road 68 All groundwater Main portion of 639 639 Irrigation wells irrigation system Tank 600 600 No storage No supply Chapel Hill facilities facilities subdivision 594 594 No storage No supply Desert Estates facilities facilities subdivision 560 560 No storage No supply Loviisa Farms facilities facilities 547 547 No storage No supply First Place facilities facilities subdivision River No storage Columbia River Intake near I -182 Intake 549 facilities Intake Station bridge over Columbia Booster Pump Stations The City currently has one booster pump station in its irrigation system. This is the Road 108 Booster Pump Station located at the intersection of Road 108 and Crescent Road in the western portion of the irrigation service area. The design capacity of this station is 3,000 gpm. This station is used to boost water pumped from the Columbia River Intake Station to the 639 Pressure Zone. Another pump station is planned for construction in 2013. This station will be called the Harris Road Booster Pump Station and will be located on Harris Road near Interstate 182. This booster pump station has a design capacity of 3,125 gpm. The station will also pump water supplied by the Columbia River Intake Station to the distribution system. 13- 1444.407 Page 2 -7 Irrigation System Master Plan December 2013 Existing System City of Pasco KATAC_Pwj�\13\1494 - Pmw Water Reno Sn yW Plea PCeCVatwn*igetm Syt=Mazda Plan =Wn3 -P mft Sy mdoa Dry Systems The City's irrigation system includes portions that are installed and ready for use, but not currently used. These systems are referred to as dry systems. The existing dry systems are shown in Figure 2 -1. Table 2 -5 shows a summary of the current dry systems. Table 2 -5 Dry System Summary Subdivision Name Number of New Connections Estimated Acreage (ac Broadmoor Estates 304 90.67 Broadmoor Place 233 62.33 Desert Oasis 170 54.17 Desert Plateau 304 108.48 Total 1,011 315.65 Interties to Other Systems The irrigation system is not connected to any other irrigation or water distribution systems. The irrigation system was formerly connected to the City's potable water distribution system through a backflow prevention device. The City completely removed the connection in 2006. Irrigation System Demands This section presents information on irrigation water production and demands. The City typically uses its irrigation system from April to October every year. Production is monitored and recorded by meters on each of the system's wells. Some large users are metered, but most connections to the system are not currently metered. Production Records Total system production is the sum of water produced by the irrigation system wells and water pumped from the Columbia River. Figure 2 -3 shows total system production from 2006 to 2012. As seen from the figure, system production has increased steadily from 2006 to 2012. The City performed two studies related to water use: one in 2001 and one in 2007. The study from 2001 includes information cited in this report on irrigation water use for public facilities and agriculture. The 2007 study contains more recent data on residential irrigation water usage which are also used in this report. Overall System Usage Historical production data was used to calculate overall system usage and peaking factors. The City has collected hourly data on all of its source meters and its storage tank for the past 13- 1444.407 Page 2 -8 Irrigation System Master Plan December 2013 Existing System City of Pasco K\TAC_Projec W \1444 -Paco We Resom Smdy\407 Plan Prepazatmo gam System Malta Plan\Seaion3- Existing Syamm.dom three years. This data was used to analyze variations in demand and to develop the average day demand (ADD), maximum day demand (MDD), and peak hour demand (PHD). The results of this analysis are shown in Table 2 -6. 7,000 w 6,000 w L v 5,000 A O l� a 4,000 'fl O 3,000 d m r �, 2,000 F 1,000 M Figure 2 -3 Total System Production 2006 2007 2008 2009 2010 Year Table 2 -6 Pealing Factor Summary 2011 2012 Year 2012 2011 2010 5,786 1,885.28 5,439 155261 Average Day Demand m 6,118 5,572 4,765 m d 8.810 8.282 4,527 Maximum Day Demand 3,513 4,062 8,487 9,704 m d 13.968 12.221 13.973 3,000 8/8/2012 1 8/2/2011 8/8/2010 Peak Hour Demand m 17,529 15,116 16,077 m d 25.241 21.767 23.151 Hour 6:00 AM 10:00 AM 6:00 AM MDD /ADD rage: 1.662 1.586 1.476 1.926 2006 2007 2008 2009 2010 Year Table 2 -6 Pealing Factor Summary 2011 2012 Year 2012 2011 2010 Total System Production G 1,885.28 1,722.40 155261 Average Day Demand m 6,118 5,572 5,038 m d 8.810 8.282 7.255 Maximum Day Demand m 9,700 8,487 9,704 m d 13.968 12.221 13.973 Date 8/8/2012 1 8/2/2011 8/8/2010 Peak Hour Demand m 17,529 15,116 16,077 m d 25.241 21.767 23.151 Hour 6:00 AM 10:00 AM 6:00 AM MDD /ADD rage: 1.662 1.586 1.476 1.926 PHD/MDD (Average: 1.748 1.807 1381 1.657 PHD /ADD (Average: 2.895 2.865 2.628 1 3.191 13- 1444.407 Page 2 -9 Irrigation System Master Plan December 2013 Existing System City of Pasco KATAC_Pmjens \13 \1444 -Pasco Waal Keso. Study \407 PlanriePWMW,igwm System Mesta MMSection 2- Exiaeng Sy=m cx The irrigation system has grown since the City began acquiring the system in 2002. The City classifies connections to the system as either residential, billed on a flat fee basis, or connections for customers billed by the acre. These larger accounts are typically commercial irrigation customers and include public schools, parks, apartment complexes, and sports facilities. Table 2 -7 shows the number of connections to the system each year. Table 2 -7 Irrigation System Connections Summary Year Residential Connections Customers Billed by Acre 2006 2,964 2007 3,351 2008 4,053 2009 4,403 2010 4,812 - 2011 1 5,159 1 22 2 5,379 23 M 5,434 25 Production has kept uniform pace with the number of connections to the system on an annual basis. Since 2006, the production per residential connection to the system has remained relatively constant at 1,575 gallons per day per connection per year. Residential Demands The City does not meter water use on residential connections to the irrigation system. Residential irrigation use vanes widely across the City's service area and is dependent on economic factors, maturity of the landscaping, and whether or not the property is irrigated using domestic or irrigation water. The City studied residential water use patterns in a 2007 memorandum and determined that residential irrigation usage averages 3.18 acre -ft per gross acre per year or 5.31 acre -ft per irrigated acre per year. The memorandum is attached as Appendix B. Commercial Demands Commercial users of the City's irrigation system include public schools and the City of Pasco Department of Parks and Recreation. Irrigated facilities include a soccer complex, a track facility, a softball complex, and five residential City parks. The soccer complex is metered. Commercial irrigation usage varies according to the facility. City park use vaned from 19 gallons per square foot to 34 gallons per square foot. Water use at the athletic facilities averaged 40 gallons per square foot which is higher than the rest of the system. 13- 1444.407 Page 2 -10 Irrigation System Master Plan December 2013 Existing System City of Pasco KATAC_Projeras\13 \1444 -F. Wa.a..Swdy \407Plan Prepar nUnigMinSy&enl Mauer PIM�wion2 -Ex6ft Sy�&ac Agricultural Demands The City of Pasco supplies irrigation water to three pivots from its system. Crops which are commonly grown at the three sites vary annually and include wheat, alfalfa, and potatoes. The pivots and land are not owned by the City. They include: • A single pivot located at Linda Loviisa Farms • A single pivot near the Northwest Commons Well • A single pivot north of Powerline Road near the Powerline Well All of the pivots are served directly by the system except for the pivot at the Northwest Commons Well. The Northwest Commons pivot may only run when the Northwest Commons Well is operating. Each pivot connection is metered. Pivot acreages were calculated by scaling aerial photo maps. An annual demand of 3.30 acre -ft per acre was used to estimate the annual water usage of each of these pivots. This estimated demand was calculated as part of a water usage study prepared by the City in 2001. Table 2 -8 shows a summary of the agricultural demands. Table 2 -8 Summary of Agricultural Demands General Operating Procedures City staff use a process referred to as staging to operate the irrigation system. In each stage, various wells or combinations of wells are selected for production. Each stage includes more pumps than the previous stage. When an additional pump is called to operate, it is referred to as a step up. When a pump is called to stop, it is called a step down. The system uses a delay between stepping up or stepping down to minimize pump cycling and prevent dramatic increases or decreases in pressure and flow. The order of pumps is chosen by the operator and varies on a regular schedule. The maximum number of stages is set by the operator and varies up to 11, which is the number of well pumps in the system. The system has the ability to operate manually or automatically via a master telemetry unit. Under automatic control, pumps are called to operate based on signals from pressure sensors within the system. The Island Estates Well, Sirocco Well, 1-182 Well, and Desert Sunset 13- 1444.407 Page 2 -11 Irrigation System Master Plan December 2013 Existing System City of Pasco KATAC_PjeaW \1444 -PUm Waw Rao St y1407 Plan Pr p a on\hnpon Syn MU Ptan\=m2 -Euft Sotem8o Instantaneous Estimated Irrigated Estimated Annual Pivot Demand m Acreage acres Usage acre -ft Powerline Road 380 125.7 414.8 Linda Loviisa 580 72.1 237.9 Northwest 560 73.5 242.6 Commons Total 1,520 271.3 895.3 General Operating Procedures City staff use a process referred to as staging to operate the irrigation system. In each stage, various wells or combinations of wells are selected for production. Each stage includes more pumps than the previous stage. When an additional pump is called to operate, it is referred to as a step up. When a pump is called to stop, it is called a step down. The system uses a delay between stepping up or stepping down to minimize pump cycling and prevent dramatic increases or decreases in pressure and flow. The order of pumps is chosen by the operator and varies on a regular schedule. The maximum number of stages is set by the operator and varies up to 11, which is the number of well pumps in the system. The system has the ability to operate manually or automatically via a master telemetry unit. Under automatic control, pumps are called to operate based on signals from pressure sensors within the system. The Island Estates Well, Sirocco Well, 1-182 Well, and Desert Sunset 13- 1444.407 Page 2 -11 Irrigation System Master Plan December 2013 Existing System City of Pasco KATAC_PjeaW \1444 -PUm Waw Rao St y1407 Plan Pr p a on\hnpon Syn MU Ptan\=m2 -Euft Sotem8o Well are equipped with pressure sensors that communicate with the telemetry system. If a low pressure is registered at any of these sites and lasts for 30 seconds, a new pump is called to operate. This is called a low pressure step -up. When a pressure sensor sends a high pressure alarm that lasts for 10 seconds, the stage will step down. This is called a high pressure step -down. When the tank level is low, the stage is stepped up. This is referred to as a low tank level step -up. As long as the level remains low, additional pumps will be called to operate until the level rises above the low tank set point or the maximum stage is reached. If there is a high tank level signal, the stage is stepped down until the tank level falls below the high tank set point. Water Quality Water for the irrigation system is not treated. Available water quality data is attached in Appendix A. Agreements with Kidwell Farms, Inc. The City supplies irrigation water to three sites owned by Kidwell Farms, Inc. The three sites are the Northwest Commons subdivision, the Linda Loviisa Subdivision, and land leased from the Washington State Department of Natural Resources in Section 16, T -9 -N, R- 29-E. The City leases use of the Northwest Commons Well for an annual flat fee. The other pivots are connected to the system and a flat fee is paid to the City by Kidwell Farms for the connection. The fee varies by site and Kidwell Farms agrees to pay all maintenance and electrical costs associated with its use of the City facilities. Rate Schedule The City bills most of its customers based on a flat fee for connection to the irrigation system. Some large users are billed by the number of irrigated acres. Some users are billed by an irrigation unit which is defined as 5,000 square feet of irrigated area. The City's rate schedule and fees associated with the irrigation utility are summarized in Table 2 -9. Summary This section presented information on the existing irrigation system including sources of supply, storage facilities, and the distribution system. Current demand data and trends were documented. General operation of the system was explained and the irrigation rates charged to customers are shown. The next section will present the hydraulic analysis of the irrigation system and the well condition assessments. Findings from each of these analyses will be discussed. 13- 1444.407 Page 2 -12 Irrigation System Master Plan December 2013 Existing System City of Pasco KATACPmje \13 \1444 - Pawn Winer Resources SwdY\407 Plan Preparation \Wption Sy9=Mww P1WSwtion 2 -E i t gSynm &d Table 2 -9 Irrigation Utility Fees and Rates Summary Irrigation Service Type Fee/Charge Reference Irrigation water service; monthly rate during irrigation season: Base rate per unit for single-family residential properties $26.00 13.61.190(A Base rate per unit for non-single-family residential property $26.00 13.61.190(B) Per irrigation unit $8.12 13.61.190(C) Per irrigated acre (public parks, playgrounds, and open aces) $75.81 13.61.190(D) Unauthorized turn -on (any repair cost additional) $50.00 13.61.090 Disconnect/connect service due to violation $50.00 13.61.100 Annual system availabili fee $88.00 16.61.060 13- 1444.407 Page 2 -13 Irrigation System Master Plan December 2013 Existing System City of Pasco KATAC_P je \13 \14 -Pa We Raom SWIM07 Plan P,.tbo Vm,tion System Ma Fiar wion2- aisthv Syat &m MSA SECTI ®N 3 SECTION 3 CRITERIA, ANALYSIS, AND FINDINGS Introduction Section 3 presents a hydraulic analysis of the City's irrigation system and an assessment of the City's irrigation wells. The irrigation system analysis criteria include pressure, flow velocity, and storage criteria. A description of the analyses and associated findings are also presented. Irrigation System Analysis This section describes analysis of the irrigation system which uses a hydraulic model to simulate pressure and flow conditions in the system under several demand conditions. Model Layout The initial layout of the hydraulic model was completed by tracing pipes and junctions over the City's GIS data. Graphical and tabular data provided by the City were used to locate critical hydraulic elements such as the Road 68 Irrigation Tank, wells, pumps, and pressure reducing stations. Once initial layout was completed, the irrigation piping system was then skeletonized to simplify the layout and increase modeling efficiency. Skeletonization is a process that consolidates multiple real pipes into hydraulically equivalent single pipes. For this model, the majority of skeletonization converted dead ends to demands at a single node where the real pipe branches away from the system. Skeletonization was not performed on pipes larger than 8 inches in diameter. The modeling software's terrain extraction (TREX) program was used to apply elevations to the model nodes. The TREX program has the ability to apply elevations to hydraulic model nodes using a representation of a three - dimensional surface. The representation, usually contours, can be constructed using United States Geological Survey (USGS) data. The contours are superimposed on the model layout and the distance to the nearest two contours is used to interpolate the elevation of every node in the model. The final node elevations in the model are indicative of the surface elevation. The accuracy of the data and the final product is within 5 feet, which gives calculated pressures accurate to approximately 2 pounds per square inch (psi). Pipe Characteristics The hydraulic modeling software uses default modeling properties for common pipe materials. The City's irrigation system was modeled using the Hazen - Williams theory of 13- 1444.407 Page 3 -1 Irrigation System Master Plan December 2013 Criteria, Analysis, and Findings City of Pasco & %TAC ProjeclsUMIM -Pasw Waar Resources StudyW09 Plan Preen ni.Mfi igmioa System Mute PlanSendon 3 - Analysis and Fmdiayadnca pressurized flow. For PVC pipe, an initial C value of 150 was used. An initial value of 140 was used for steel pipe and 120 for ductile iron pipe. Water Demand Distribution The demands presented in Section 2 were distributed throughout the model using a nearest node method. The nearest node method assigns known demands with a known spatial distribution to the nearest node in the system. ArcGIS, a GIS software program, was used to identify irrigated parcels. The area and the geographic center of each parcel was calculated by the GIS program. This information was used to assign the geographic area of each parcel, in acres, to the nearest node in the model. To convert each node's area assignment to a water demand, the demands from Section 2 were used. The total irrigated area in 2012 was approximately 1,492 acres. The PHD from 2012 was approximately 17,529 gpm. The known point demands were subtracted from this total and assigned to the appropriate location in the model. Based on information received from prior water demand studies performed by the City, it was determined that the remaining total irrigation system demand could be distributed evenly across the irrigated area. This method gives an average demand of 11.75 gpm/acre which was then applied universally to all of the nodes in the hydraulic model. The modeled demand is within 1 percent of the demand measured by the City's SCADA system. Wells Wells were modeled using flow control valves attached to virtual reservoirs with a HGL higher than the rest of the City's system. The flow control valves were set to reflect the documented production rates of each well. Model Calibration Model calibration was completed using data collected by the City's SCADA system. The system collects and logs information from the system every 30 to 60 minutes. Monitoring points on the system include well discharges, booster pump station discharges, and the storage tank. Pressure and flow data were known at each pump discharge point within the system during the peak hour. The tank level was not known, so it was estimated using data from nearby points within the system. Flows from each of the wells were modeled using flow control valves. The initial simulation of the model produced hydraulic grade calculations at each well. These calculated hydraulic grades were then compared to the known hydraulic grades collected by the SCADA system and served as the primary calibration criteria. After several iterations, pipe roughness coefficients were universally lowered to a value of 130. All of the hydraulic grades were then within 4 percent of the target grades. Well calibrated models typically have discrepancies of 10 percent or less. Table 3 -1 shows the results of the calibration. 13- 1444.407 Page 3 -2 Irrigation System Master Plan December 2013 Criteria, Analysis, and Findings City of Pasco K \TAC PI.I m%13 \1444 -Paco WmerR..Smy\407Plan Prepaat.Urligelion System Mash Plan \genlion3 -Alu isand FiM,,doa Table 3 -1 Hydraulic Modeling Calibration Summary well Flow Target (gpm) Flow from Model m HGL Target HGL from Model Discrepancy Island Estates 590 590 610.5 612.47 0.3 Linda Loviisa 443 443 628.6 611.92 -2.7 I -182 1238 1,238 651.6 638.94 -1.9 First Place 1663 1,663 649.9 642.72 -1.1 Sirroco 1415 1,415 640.0 653.29 2.1 Desert Estates 491 491 634.4 617.16 -2.7 Desert Sunset 1418 1,418 628.2 618.46 -1.6 Northwest Commons 0 0 629.1 627.01 -0.3 Road 52 2125 2,125 644.4 634.34 -1.6 Powerline 1758 1,758 657.8 637.53 -3.1 Village Pasco Heights 936 936 622.6 614.52 -1.3 Analysis Criteria Once the physical layout and calibration of the model were completed, the model could be used to analyze flow velocities and pressures within the system. The analysis criteria used to evaluate the hydraulic performance of the irrigation system include minimum system pressures and maximum flow velocities. Any result not meeting these criteria is subject to further investigation and potential corrective action. Flow Velocities For this analysis, pipes whose flow velocities exceed 5 feet per second (fps) under average day demand conditions are considered to have inadequate capacity. Pipe flow velocities are allowed to increase up to 8 fps during PHD conditions. Any pipes with flow velocities above 8 fps under PHD conditions are considered to have inadequate capacity. These velocity limits reflect standard industry practices for acceptable flow velocities in pressurized piping systems. They are chosen to limit excessive head loss in the system. Irrigation System Pressures The City's pressure criteria at service connections are summarized below. These pressure criteria are based on industry standards, Uniform Plumbing Code requirements, and a review of landscape irrigation equipment water pressure requirements. Each service connection should maintain a minimum water pressure of 30 psi during all demand conditions. 13- 1444.407 Page 3 -3 Irrigation System Master Plan December 2013 Criteria, Analysis, and Findings City of Pasco KATAC_P ja \13 \1444 -Pasco Waeraaom SwdyW07 Plan Prepm&m*ftwion S,a Marta PW\Se wn3- Aiulyeis and Fwdinga.doa 2. No service connection should exceed a water pressure of 120 psi. Individual customers are responsible for reducing water pressures over 80 psi if they desire to do SO. 3. During a failure of any part of the system, the maximum water pressure at customer meters will not exceed 150 psi. System Storage This analysis uses standby storage recommendations provided by the Washington State Department of Health (DOH) for drinking water systems as water storage criteria because the City does not have established water storage criteria for its irrigation system. The DOH typically recommends that drinking water systems provide 150 minutes of water storage during peak demand conditions and that this storage be available to all customers at a minimum pressure of 30 psi. The City does not use the irrigation system to provide fire suppression, so no fire suppression storage is provided. Model and Analysis Findings The calibrated model was used to simulate two scenarios: 2012 conditions and an anticipated future demand condition. Modeling included the City's existing dry systems, but did not include any new pipes or new developments. The results of each analysis are described below. Existing Conditions Existing conditions were modeled using 2012 PHD conditions. These conditions are the same as those used for the calibration of the hydraulic model. Two pipes in the system exceed the flow velocity criteria of 8 fps under PHD conditions. These pipes are 4 inches in diameter and located adjacent to the Sirocco Well discharge. All analysis criteria were satisfied with regard to system pressures. The results are summarized below: • The system does not experience pressures over 120 psi under any demand condition. In order to verify that maximum allowable pressures were not exceeded, a low - demand condition was used to approximate static conditions. • The system experiences pressures over 80 psi near discharges for wells and the Road 108 Booster Pump Station during high production. None of the locations which experience pressures between 80 and 120 psi serve customers. They are typically located on dedicated transmission mains and are caused by topography. • Low system pressures were not predicted by the model under this scenario during normal tank levels. If the storage tank water surface elevation reaches 600 feet AMSL, the system begins to experience isolated low pressures. • No part of the system experiences pressures over 150 psi during a failure of pressure - reducing valves. It is possible that pumps could fail in such a manner as to cause high system pressures downstream of their discharges. 13- 1444.407 Page 3-4 Irrigation System Master Plan December 2013 Criteria, Analysis, and Findings City of Pasco K\TAC Projeala \13 \1444 - Pesco Water Resource Smdy`409 Plan PrepvatbnVrtigation System MasICPWVSection 3 - Awyrsis aM Fwdings.d«x A graphical summary of modeling results for the existing conditions scenario is shown in Figure 3 -1. Future Conditions The calibrated model was used to predict the hydraulic performance of the City's irrigation system under anticipated future conditions. The future condition assumptions are: • All of the City's current dry systems are connected and in use • All of the City's existing subdivisions are fully developed • All of the City's sources are producing the maximum allowed flows simultaneously These assumptions represent near -term conditions that could occur within the next two to five years. The actual timing of these conditions is dependent on a number of variables. Any changes in the following conditions would alter the analysis results: • Expansion of the irrigation system service area beyond assumed service limits • Additional sources of supply • Changes in water rights High system pressures were found near the discharges of wells and pump stations as in the 2012 PHD scenario. No pipes that serve customers directly experienced high pressures. No low system pressures were found by the model. High flow velocities were found by the model at two locations: Near the discharge of the Sirocco Well as observed in the 2012 PHD scenario North of the intersection of Road 52 and Sandifur Parkway A graphical summary of modeling results for the future conditions scenario is shown in Figure 3 -2. Storage The system storage was evaluated at projected peak hour demand conditions to determine whether or not enough storage is available in the system. The City currently operates the tank at a water level of 126.5 feet which corresponds to an elevation of 639 feet. At this level, the tank provides a total storage of 2.28 MG. The overflow of the tank is at elevation 660 feet. Water stored below elevation 597.5 feet is considered dead storage according to the storage criteria described above. The volume of dead storage in the tank is approximately 1.51 MG and the volume of active storage in the tank, as currently operated, is approximately 0.77 MG. The maximum possible average day demand was calculated by dividing the sum of the City's annual irrigation water rights by the days in service. This demand, 7,744 gpm, was used to 13- 1444.407 Page 3 -5 Irrigation System Master Plan December 2013 Criteria, Analysis, and Findings City of Pasco K1TAc_jws \13 \1444 -Pam Water Rao=w SNdy\407 Plan PrepantionWrisation SyI=Mata PUMSMion 3- Analyse ud Fmdin doa � B.1 „ it nig :kF 4�f.M-j 11 IN MEN oqw.; I cm BMW, Mo t na I :z ®R ID it T- 0— AV F 1 71 yes, bN.I A ..P; rP f 77t , , i- I .1 1] -T 14 1 j - A PT: .7, Wieser samess, Figum 3-2 CITY Of Flats, mistation System Master Plan HYDRAULIC MODELING RESULTS FOR FUTURE CONDITIONS A I , tatt� PT: .7, Wieser samess, calculate a projected peak hour demand of 22,419 gpm. A peak hour demand peaking factor of 2.895 was used. This demand would be met by a combination of the City's wells and storage. It was assumed that all of the City's sources would be pumping at the current instantaneous water right of 17,164 gpm. The tank would need to provide approximately 5,255 gpm for 150 minutes at a minimum pressure of 30 psi. Based on this analysis, the system requires approximately 788,250 gallons of storage for the projected peak demand, not including dead storage. Based on this analysis, the existing irrigation system reservoir has adequate capacity to meet these storage needs. Operations and Maintenance Problems The City experiences some operations and maintenance problems with the irrigation system which are described below. Northwest Commons Well Use The Northwest Commons well is plumbed so that it supplies the City's irrigation system and a nearby agricultural pivot simultaneously. Whenever the well is being operated, the pivot must also operate. Any water produced in excess of the pivot's requirements flows to the irrigation system. The City currently allows a private third party to use the well to operate the pivot, limiting the City's ability to use the well. The agreement under which this well is operated is attached as Appendix C. Freshwater Mussels Some parts of the irrigation system which convey water drawn from the Columbia River experience annual buildup of freshwater mussels in the piping. The most problematic area of the mussel infestation is in the piping between the Road 108 Booster Pump Station and the crossing under Interstate I -182. During the summer, high flows dislodge some mussels from the pipe walls which can cause operational problems such as plugging. Access to Pipes in Island Estates and Sunny Meadows The original irrigation system piping that was constructed by private developer Water, Inc. is located in the Island Estates and Sunny Meadows subdivisions. These pipes were installed in easements located in the less accessible alignments on private property. City operations staff may have difficulty accessing these areas for routine or emergency maintenance. Interstate Highway 182 Crossing Irrigation water supplied by pumps from the river intake station and the Road 108 Booster Pump Station is conveyed underneath Interstate Highway 182 to serve the majority of the City's irrigation system. The crossing ties into a pipe near Quadra Drive adjacent to the 13- 1444.407 Page 3 -8 Irrigation System Master Plan December 2013 Criteria, Analysis, and Findings City of Pasco K: \TACPrrxu \13 \1444 -Pa Wwer P.ao Shad 07Plan Prey nUmption System Mann Plan\S=Hon 3 -Awl is Fin Ws.doa interstate highway. Discussions with City staff indicate that a complete shutdown of the highway crossing is usually necessary to perform system maintenance and repairs in this area because of inadequate local isolation valving. Telemetry System and Communications According to discussions with City staff, the Powerline Well, Road 52 Well, and the Northwest Commons Well all rely on the same radio for communication with the system. If this single radio were to fail or be compromised, communication and control at all three sites would fail. City staff have indicated that the radio has experienced some irregular communication problems in the past. Data collected by the City's supervisory control and data acquisition (SCADA) system indicate that there is a problem with the remote level sensor in the Road 68 Irrigation Tank. Data received for the last several years does not include accurate or consistent readings on the tank water level. Well Condition Assessment A tabletop condition assessment of the City's groundwater supply wells was completed as part of this plan. The assessment consisted of gathering and analyzing available information. The objective of this analysis is to identify wells having apparent construction, performance, or water quality issues that may be limiting production with the purpose of developing a targeted approach at candidate wells to regain performance and optimize individual and combined system production. The results of this assessment are discussed below. Data Review and Gap Analysis The following information was provided by the City and was used in assessing the irrigation supply system: • Water Rights • Driller's well logs • Well construction records • Aquifer test results • Specific capacity • Well inspection reports • Well video surveys • Water quality data • Well usage information • General notes and observations gathered by City operations staff 13- 1444.407 Page 3 -9 Irrigation System Master Plan December 2013 Criteria, Analysis, and Findings City of Pasco KATAC_Proje \13 \1494 - Pasco Water Kesomces SsadyW PWPW=p n\lrrapon Sy=Mara Plao\$Mion 3 -AWl is Fwdings.doc All of the wells have some information available, but there are some data gaps that result in recommendations for further assessment. A tabular summary identifying the data available and the data gaps is presented in Table 3 -2. Observations and Analysis The results of the well condition assessments are summarized as follows: • Review of available information for the Desert Sunset, Sirocco, NW Commons, Island Estates, I -182, and Powerline Road wells indicated the presence ofbiofouling and incrustation which are possibly plugging screens and perforations. Significant accumulations of sediment or debris in the wells are also noted. • Observations indicated minor mineral and biological deposits within the First Place and Desert Estates wells. • Based on the information provided and relatively newer construction, the apparent conditions of the Road 52 and Linda Loviisa Wells are considered good. Table 3 -3 ranks the wells in terms of priority, potential for improvement, and overall condition assessment. The Desert Sunset Well received the highest priority ranking which means that it should be the first well to receive maintenance and rehabilitation. The Sirocco well has the highest potential for improvement which means that its capacity could be improved the most. The Desert Sunset Well received the highest condition assessment ranking indicating that it is in the worst overall condition. The overall assessment found that there are opportunities for well performance and yield improvements. The three highest - ranking wells in need of improvements are the Desert Sunset Well, the Sirocco Well, and the Northwest Commons Well. Table 3 -4 presents a summary of the well condition assessments. Summary This section presented an analysis of the City's irrigation system. The distribution system was analyzed using a hydraulic model. Current conditions and an anticipated future condition were modeled. Low pressures and high velocities, as defined by the analysis criteria, were noted. The irrigation system storage was analyzed for deficiencies. The condition of the City's groundwater supply wells was also assessed. The results of these analyses will be used in Section 4 to develop recommendations for improvements to the irrigation system. 13- 1444.407 Page 3 -10 Irrigation System Master Plan December 2013 Criteria, Analysis, and Findings City of Pasco K \TAC P jro UM1444 -Pas. WUa X. mcs Swdy40Pon Repazazion\Gngalion Sygm Ma WPlan\Smion3- Amlysisand Find p.doa ' bk Y2 krigedov WM Mm Summary aced Cep "Wyaial N.be 1. Anrk Jf9iwiralabeYqualirydWew AMA OfO WM WroaeU avukble 2. SpxifiammdV 13.I.Al Peg<3 -II 4ngaWnSyaw Plan Dsembn Lll3 Crilerie. AOdylu, eM F tinl L1ry.fP W., Unlbe D,,n... W.II A wfn TM q S,mift Wal IA".oUe.ec W.. W.I. We11 NV& Ncln w/ Weg R.O. Mep WYIUg G.Yrvelbe Den wtl Ceped' R,beW114HOV VIMV QuJlty I.Parwlbv Ob.—.. Comme.n wtl Dne Cepa Ap ab Meteuremwu R erl s— D.. •40)gpmYt (romw:9 -W pwµ Wlby myw) •CovWmti.v. tl.<aua m+l<LtliillMa D6CIFNttt 4 6 1 1 1 9 4 1 0 2 q ..IlPrwvvih.lve bg.rtilye �c,ti.n aheN • Fxnmive bufwLry abwved NsmH well viMO awrxy luaea evmtaf<uew� mMiavv -3,59L nmu mMUCWby SeY^<.3 nep<, w�h fins lwn vNy bstin1 nPpex. lOntineech .1SC(mmce:3i Wl61 Fim Plete 2 6 I 9 3 2 q q 0 2 q uIP) •• m:MSA $36 C(w -hw p euro. is q q 9 2 x q q 0 2 q weblc n byGntA VAIk y Wm Sc—,, quJIiV oft n etMu Pq. Hd hV g mvaWertE <W.HFVNM9CxA • MSA) SmeMi.m pwrq n,laovgrlfle {bulnn &nM DeA. S—el 4 4 ] 3 0 z 4 a 1 2 q cli— a24 <na •34v Ni.N.N ea ledm]/NfW3 •N Lu pleN 9,nlet 3 I 4 1 0 0 a 9 1 x 4 AAAAAbleaquJerluu.g •CO.emmi.vwud onyiller'v lvgnvi <onsiuew wilt vidml.g •I Nio YL" Iwn Ml. ),, • I I,]3] p MSA); Wbiktl xell tlen 9-N . I -IH2 3 4 4 4 0 1 R q 1 2 3 .SH 1 IW an ] /brzWS NLM cw • 1.331 gpmM SC w<g W by myw]; 2100 etw'D WII SC SC WA) • W01 wpeeem �ns tlO rn gJe ebg RaaE tx z 4 a q 0 x z i o z ] - WWI «p.m ti0 Mwoff,epenivu Mwrvn,. <ppewnm<Wh MmAl5N IL —Mews A 1 i—; I.&mmlrm •NvAxi lug Provitledf.<miew;existingurdiWIA rol6eemrcp.eaibk unwoN<rv<uauvde tlunng —111 wli Pewnlioe sw x 4 q q 0 0 o q o z a •Lick NY.v,mble •PVr imwnag,P•a.w< v<rea<a sal Sb.� 2 q q q o 0 0 4 1 x x muabw -CtiwroM N7MN5slvH: dnl� LI J.'; NLA. •29 NSC(mw I A)]/N1003 • 111 HFmR 9C Imwm: MSA) •mi.)nrw Drc<mM 100] (movie bb,0y. pYUg b remove xdimmp Nwlhwa z a 1 1 0 z a z 0 z a •w<hm nc'ore�aww weti.m r mmm< awu 1, •W<Ilmrewnivn uJpvYU.n Wkv fiam well irwpecU- d wNle,li.n LiwalmiW z a a s 0 0 0 o a 1 0 •N<wweuw� :I.�iw Deanabn 301: N.be 1. Anrk Jf9iwiralabeYqualirydWew AMA OfO WM WroaeU avukble 2. SpxifiammdV 13.I.Al Peg<3 -II 4ngaWnSyaw Plan Dsembn Lll3 Crilerie. AOdylu, eM F tinl L1ry.fP Table 3 -3 Irrigation Well Ranking Summary Well Improvement Priority Rank Improvement Potential Rank Condition Assessment Rank Desert Sunset 1 4 1 Sirocco 2 1 4 Northwest Commons 3 3 3 Island Estates 4 2 5 I -182 5 7 6 Powerline Road 6 7 7 First Place 7 6 10 Desert Estates 8 6 8 Village at Pasco Heights 9 5 2 Road 52 1 9 7 9 Linda Loviisa 1 9 1 6 11 Table 3-4 Well Condition Assessment Summary Well Observations and Findin s • Well is 39 years old and is approaching the typical life expectancy for groundwater supply infrastructure (commonly assumed to be between 30 and 50 years in normal groundwater environments). • Flow to well is through perforated casing rather than a more efficient, engineered well screen. Desert Sunset ' Static and pumping water levels are within perforated interval. • Approximately 45 ft of accumulated sediment/debris possible (video depth < reported depth) • Bottom depth of open - interval span not ]mown. • Accumulated sediment/debris in well approaching intake depth setting. • Heavy biofouling; precluded adequate assessment of existing conditions from video survey. • Moderate incrustation of perforations previously reported. • Well is 37 years old and is approaching the typical life expectancy for groundwater supply infrastructure (commonly assumed to be between 30 and 50 years in normal groundwater Sirocco environments). • Flow to well is through perforated casing rather than a more efficient, engineered well screen. • Major biofouling present, mostly encompassing and possibly plugging perforations. • 17 ft of sediment/debris buildup in bottom of well? video depth < reported depth) • Well age is unknown. • Previously rehabilitated (Dec -07). Northwest • Flow to well is through perforated casing rather than a more efficient, engineered well screen. Commons • Major biofouling present, mostly encompassing and possibly plugging perforations. • Approximately 3 ft of accumulated sediment /debris in bottom of well. • Accumulated sediment/debris near intake. 13- 1444.407 Page 3 -12 Irrigation System Master Plan December 2013 Criteria, Analysis, and Findings City of Pasco K \TACPmj.A13V"4- P.. W.R.. SNdy\407 Pl Prgiv nVniguion SAIM MWWPW\=ion 3 -A u J is uA Finding&= Table 3 -4 Well Condition Assessment Summary (continued) Well Observations and Findings • Well is 38 years old and is approaching the typical life expectancy for groundwater supply infrastructure (commonly assumed to be between 30 and 50 years in normal groundwater environments). Island Estates • Approximately 9 feet of sediment/debris buildup blocking three feet of perforated interval? (video depth < reported depth) • Flow to well is through perforated casing rather than a more efficient, engineered well screen. • Major biofouting present, mostly encompassing and possibly plugging perforations. • Well is 34 years old. I -182 • Approximately 2 feet of sediment/debris accumulation in well? (video depth < reported depth) • Some biofouling and incrustation of well screen present, blocking roughly 25% of open area. Powerline Road ' Well is 33 years old. • Varying degree of biofoulin resent minor to major). First Place ' Well is 6 years old. • Minor biofouling present at top and bottom of well screen. • Well is 31 years old. Desert Estates • Minor scale/mineral deposits on well screen. • Some minor corrosion observed near bottom of screen. • Well is 38 years old and is approaching the typical life expectancy for groundwater supply infrastructure (commonly assumed to be between 30 and 50 years in normal groundwater environments). • Approximately 1 ft of sediment/debris accumulation in well/screen bottom? • Heavy incrustation/mineral deposits; approximately 50 to 80% of screen open area estimated to be blocked . Village at Pasco • The well is equipped with a sand filter. Heights • Casing noted to have been pulled back to 159 ft bgs during screen exposure, roughly 3 ft above top of screen assembly. • Gap from casing pullback could be allowing formation material to enter well. • Small gap noted during review of video survey, though may be from separated casing joint/weld • Blasting cap debris previously observed in well; possibly from previous rehabilitation. May have caused the separation noted above. • Well is 7 years old. • Inspection report notes damage to top of well screen; no video log available for review to Road 52 confirm or assess. • Besides noted damage, the well screen (based on inspection report photos) appears in relatively good condition. • Inspection report notes stainless steel banding material in well. Linda Loviisa ' New well constructed December 2012 • No inspection reports or well video survey available for review 13- 1444.407 Page 3 -13 Irrigation System Master Plan December 2013 Criteria, Analysis, and Findings City of Pasco K \TAC Pmjwm\]3 \1444 -Pow WU9ra wwa SwdyA07 PUn Pm "iongffiption Syamm Marla PlanlSw m3 -Atu is aM Hnding &a - - SECTI ®N 4 SECTION 4 RECOMMENDATIONS Introduction Section 4 presents recommendations based on the analysis and findings of Section 3. Recommendations for improvements to wells, improvements to the irrigation system, and opportunities for further planning and study are provided. Improvements Completed Since 2005 The City of Pasco has completed irrigation system improvements that were recommended as part of its 2005 I -182 Corridor Irrigation System Plan (2005 Plan). Table 4 -1 shows a summary of the improvements recommended in the 2005 Plan that have since been completed. Table 4 -1 Irrigation System Improvements Completed Since 2005 Improvement Number from 2005 Plan Project Description IW -1 Construction of the First Place Well IW -2 Existing Well Rehabilitation IW -3 Existing Well Rehabilitation IW -4 Future Well Rehabilitation IW -5 Future Well Rehabilitation IW -6 Future Well Rehabilitation IS -1 Conversion of Road 68 Standpipe from domestic system to irrigation system 113-1 Construction of the Harris Road Booster Pump Station (currently under construction IR 1.1 16 -inch diameter irrigation main from Court Street to Harris Road Booster Pump Station (currently under construction 16 -inch diameter main along Harris Road from Harris Road Booster IR 1.2 Pump Station to Broadmoor Boulevard (currently under construction IR 1.3 16 -inch diameter main from Broadmoor Boulevard to Sandifer Parkway IR 1.5 Construction of 10 -inch diameter PVC main from I -182 Well to s stem IR 1.7 16 -inch diameter irrigation main along Road 52 from Leopard Drive (Powerline Road) to Sandifur Parkway In addition to these improvements as described by the 2005 Plan, the City has completed the construction of two additional new irrigation wells. Construction of improvement IR 1.4 is 13- 1444.407 Page 4 -1 Irrigation System Master Plan December 2013 Recommendations City of Pasco K\rnc Pbjw\1A144 -Paco W%"K=ve4 sowrw07 Pwn PrapvawnWngazwn sn�rz aPw voo4- R«o�ww.do< no longer necessary because the City constructed an irrigation main along Sandifur Parkway to the tie -in point proposed by improvement IR 1.4. The main along Sandifur Parkway accomplishes the same hydraulic task as the main which had been proposed by IR 1.4. The City is currently completing design for a project proposing construction of a new river intake near the City's existing river intake station. The new intake would be used exclusively for drinking water and the old intake would be converted to irrigation use. Distribution System Improvements Recommended improvements to the distribution system include irrigation main extensions, replacement of undersized mains, looping improvements, isolation valve installation, and other minor improvements. Each is discussed below. Irrigation Main Improvements Irrigation main improvements include replacing undersized pipes to reduce head loss, extending existing mains, and looping mains to improve connectivity and reliability of the system. Recommended irrigation main projects are: • Extend arterial main on Powerline Road west to Road 90 • Extend arterial main on Powerline Road east to Road 52 • Extend arterial main on Sandifur Parkway east and south along Road 44 to tie in at Burden Boulevard • Extend distribution mains on Sahara Drive west to Road 44 • Replace small- diameter pipes on Sirocco Drive near Sirocco Well discharge with larger pipes • Extend existing main on Wrigley Drive from North Road 68 to Convention Drive. Completing this improvement requires right of way or easement acquisitions. Approximately 22,000 linear feet of new irrigation main are recommended for construction. The total estimated project cost for these improvement is approximately $2.77 million. An itemized tabulation of irrigation main projects and their associated costs is included later in this section. Interstate Highway 182 Crossing Isolation Valve Improvements It is possible to make complete shutdown of the Interstate Highway 182 crossing less frequent by installing isolation valves in the system nearby. This would allow operations staff to shut off portions of the line along Quadra Drive instead of the main crossing in order to make repairs. Repairs on the main crossing would still require the crossing to be shut down. 13- 1444.407 Page 4 -2 Irrigation System Master Plan December 2013 Recommendations City of Pasco K:\TAC_Proj.M\13U1 - P- -W-tra ourcee SIdIA07 4- A�om.doc Based on a review of available information, it is recommended that the City install two 12- inch diameter isolation valves near the highway crossing. For budgeting purposes, a project cost of $5,000 per valve has been allowed for a total project cost of $10,000. It is recommended that the installation of the valves be done between October 31 and April 1 when the irrigation system is not in use. Island Estates and Sunny Meadows Distribution Isolation Valve Improvements The Island Estates and Sunny Meadows subdivisions have irrigation systems that were installed in easements that run through the rear of residential lots. When one of these older mains breaks, City operations staff have difficulty getting access to residents' back yards to make repairs. Where possible, it is recommended that isolation valves be installed so that mains can be turned off from public right -of -way while repairs are made. It is recommended that the installation of the valves be done between October 31 and April 1 when the irrigation system is not in use. It is recommended that an estimated preliminary budget of $156,000 be provided to complete these improvements. This estimated budget is based on the installation of up to 52 valves at $3,000 per installation. The number of proposed isolation valves recommended is based on a review of the City's GIS data. It is further recommended that City staff identify final locations of the isolation valve improvements and confirm the final budget for this work. Northwest Commons Welland Pivot The Northwest Commons Well is currently plumbed to serve the nearby irrigation pivot and the City's irrigation system. It is recommended that the City install piping and valves near the well that allow the irrigation pivot to be supplied from the system instead of just the well. This new connection should be metered. The direct connection from the well to the pivot should be abandoned. This will allow the City to use the Northwest Commons well on its own schedule and allow the pivot owner to operate the pivot without operating the well. The estimated project cost for this recommendation is approximately $68,000. Telemetry Improvements Based on discussions with City staff, it is recommended that the City upgrade communication capacity along Powerline Road with the installation of a fiber optic line. The fiber optic line would serve as a more reliable means of communication from the central telemetry unit to the Powerline Well, Road 52 Well, and Northwest Commons Well. Having two ways to communicate to the wells makes the system more reliable as well. The estimated project cost for this recommendation is approximately $35,000. Source and Storage Improvements Recommendations for storage and irrigation well improvements are discussed below 13- 1444.407 Page 4 -3 Irrigation System Master Plan December 2013 Recommendations City of Pasco K:\TAC Pmjea l3 \1444.Pam WaWRoo Stodywal Plan PteP nWngation SpWmMasts Plan\Smion4- Reconn=Utbm.dom Storage The storage analysis presented in Section 3 found that the existing irrigation system reservoir has adequate storage capacity for the future conditions described if the reservoir is operated at a higher water level. It is also recommended that existing new water level sensing equipment be repaired or replaced to obtain more accurate water level readings. The estimated project cost for this recommendation is $10,000. Irrigation Well Improvements The results of the analysis presented in Section 3 were used to develop recommendations on irrigation well assessment, rehabilitation, replacement, and monitoring. A discussion of these recommendations is presented below. Well Assessment and Rehabilitation Plan The analysis presented in Section 3 was used to develop a well assessment and rehabilitation plan. The plan prioritizes candidate wells for further assessment and potential rehabilitation for the purposes of optimizing individual well performance and maintaining the value of the City's irrigation assets. This plan is developed to ensure that this asset remains in service for the long term at minimal operating costs. The main objective for rehabilitating a well is to restore or prevent losses in both production capacity and well efficiency. Conditions routinely found to contribute to declining well performance include incrustation, biofouling, physical plugging of formation or screen or both, and corrosion. These conditions could be caused by inherent characteristics of the aquifer, well design and construction, water quality, well operations, or combinations thereof. Rehabilitation techniques used to address these conditions in attempts to restore or recondition wells include: Mechanical methods such as brushing, surging, and airlift pumping to loosen and remove incrustation, organic material, and accumulated sediment Chemical treatments designed to dissolve and weaken encrusting minerals and biological slimes Impulse generation methods (e.g., Hydropuls®) that generate high- pressure pulses that loosen mineral and biological deposits in the well and adjacent formation. This technology is typically used in combination with other mechanical and /or chemical methods to increase its effectiveness A combination of mechanical, chemical, and impulse generation well rehabilitation methods are recommended for the following wells: • Desert Sunset • Sirocco 13- 1444.407 Page 44 Irrigation System Master Plan December 2013 Recommendations City of Pasco &ATAC_PT,l"U3n444 -P.. W.W Resources SWdy\4M Plan Prepavt .Vr lgazim System Mutes PUMSenion4 - Reconvnendazbnsdecx • Northwest Commons • Island Estates • I -182 • Powerline Road The recommended order of activities is as follows: 1. Conduct a one -hour specific capacity test to establish baseline conditions pre - rehabilitation and collect a groundwater quality sample for inorganic chemistry and bacterial assessment. 2. Remove pumping equipment and install rehabilitation equipment. 3. Brush and surge well to loosen buildup and airlift pump to remove debris. 4. Tremie dissolved chemical solution into the water column and agitate by surging to penetrate the formation and enhance the effectiveness of the treatment. 5. Apply impulse generation technology. 6. Remove the loosened debris by airlift pumping. 7. Conduct a video survey of the well, disinfect the well, and reinstall pumping equipment. 8. Conduct a one -hour specific capacity test to evaluate the effectiveness of the rehabilitation and assess the post - rehabilitation well performance. A combination of mechanical and chemical methods is recommended for the First Place and Desert Estate Wells to address the minor mineral and biological deposits observed. Activities to be performed would be those identified above, excluding the impulse generation efforts. Based on the information provided and relatively newer construction, the apparent conditions of the Road 52 and Linda Loviisa Wells are considered good and no rehabilitation efforts are recommended at this time. It is recommended that well video surveys be completed at these wells to verify existing conditions and monitoring each well's yield and drawdown. This work will establish baseline performance conditions and monitor for potential performance declines over time. It is recommended that no rehabilitation work be completed for the Village at Pasco Heights Well due to its age and poor condition. Based on an evaluation of the well rehabilitation is not likely to adequately address the significant incrustation, poor casing condition, and sanding conditions at this well. The recommended rehabilitation activities for each well are summarized in Table 4 -2. Well Data Acquisition Section 3 identified gaps in the available information concerning the City s existing irrigation water supply wells. A list of recommendations to fill those data gaps was developed and is presented in this section. Table 4 -3 shows a summary of the proposed data acquisition 13- 1444.407 Page 4 -5 Irrigation System Master Plan December 2013 Recommendations City of Pasco K \TAC_P ja W \1444 -Palm Waffa on SW YA0'1 Plan Pnyaarionllrtigatpn Slag Manta Plan \Smion4 - amommaMatiow.doa activities. It is assumed that the City has the resources necessary to complete the recommended activities, so a project cost was not developed for this work. Table 4 -2 Recommended Well Rehabilitation and Performance Testing Activity Summary Table 4 -3 Irrigation Well Data Acquisition Recommendations Summary Well Rehabilitation and Performance Testing Activities Well Mechanical Chemical Impulse Generation Pre- and Post- Performance Testing Video Survey Desert Sunset X X X X X Sirocco X X X X X NW Commons X X X X X Island Estates X X X X X I -182 X X X X X Powerline Rd. X X X X X First Place X X X X Desert Estates X X X X Road 52 X X Linda Loviisa X X Village at Pasco Heights Table 4 -3 Irrigation Well Data Acquisition Recommendations Summary Well Recommended Data Ac uisition Activities Northwest Conduct a specific capacity test to confirm yield and reassess whether the Commons yield can be increased at this well. Establish the pump intake depth setting. This can be done in conjunction I -182 with rehabilitation activities. Assess available drawdown and evaluate the abili to increase yield at this well. Conduct a specific capacity test. This test can be done in conjunction with Island Estates rehabilitation activities. Assess whether the yield can be increased at this well. A well field study should be performed to determine the optimal sizes and Linda Loviisa locations of new wells in the Linda Loviisa area. More information is resented below. Village of Pasco Heights Well Replacement It is recommended that a new well be drilled to replace the existing Village of Pasco Heights Well. To confirm the timing and need for this improvement, it is recommended that the well's yield and drawdown be monitored to assess changes in its performance over time and 13- 1444.407 Page 4 -6 Irrigation System Master Plan December 2013 Recommendations City of Pasco K:\TACPrejtaN13 \1444 -Pe Wawr om SmdyM7 Plan Prepmmiov\4tigation System Master Plan \S=iov4- Aecommevdazbrsdocx plan for replacement. The estimated project cost for a replacement well is approximately $173,000. A detailed cost summary is provided in Appendix D. Construction of New Irrigation Wells Based on the assessment presented in Section 3, up to six new wells could be necessary. These new irrigation wells would be a mixture of wells meant to replace some of the City's existing irrigation wells and wells improve the City's irrigation system capacity. For budgeting purposes, a project cost of approximately $616,000 per well has been developed. A detailed cost summary is available in Appendix D. The number of new irrigation wells that will be necessary will not be known until a well field study and data acquisition have been completed. The capital improvements program presented in this section assumes that all six wells will be necessary. Well Houses It is recommended that the City continue to improve its wells by enclosing them within well houses. Enclosures minimize potential damage to equipment from exposure and reduce noise levels. Well houses also improve the security of the well and add aesthetic value to the vicinity. The estimated project cost for this improvement is approximately $65,000 per well house. Well Performance Monitoring Program It is recommended that the City implement a monitoring program at all existing wells to track well performance and plan for periodic well maintenance, rehabilitation, and potential replacement. The recommended monitoring plan consists of bi- annual measurements of specific capacity from each well. The specific capacity measurements should be made prior to system start-up in the spring and following system shut -down in the fall. The process is described below: • Measure the static water level from a common measuring point during a period when the well has been idle. • Measure the pumping water level from the same measuring point after 30 and 60 minutes of pumping. • Maintain a constant pumping rate and record the flow rate at 30 and 60 minutes of pumping. • Calculate the specific capacity for each well. The specific capacity is the pumping rate divided by the amount of drawdown. Drawdown is calculated by subtracting the static water level from the pumping water level. The specific capacity measurements for each well should then be monitored over time to evaluate the need for maintenance and rehabilitation. Water levels should also be recorded 13- 1444,407 Page 4 -7 Irrigation System Master Plan December 2013 Recommendations City of Pasco KATAC_Projav \13 \1444 -Pasta Wau Resources SMdYAM Plan PM WnUrription System MasKr Ph"Wion4 -Rew= dawm.dom during periods when the well has been idle to assess whether apparent changes in specific capacity are actually related to well performance or groundwater level declines in the aquifer. Dry Systems It is recommended that the City begin using its existing dry systems. According to predictions based on hydraulic modeling, the City's existing irrigation system has the hydraulic capacity to support the new systems. This operational change does not have any associated capital cost as long as no new pipe is required to connect the dry systems to the existing system. Recommendations for Further Study and Planning During the course of this study, opportunities for further study that could improve planning efforts for the City's irrigation system were identified. This section presents those findings. Well Field Study It is recommended that a well field study be completed in order to determine the optimal locations and sizes of new irrigation wells in the Linda Loviisa area. These wells will increase the irrigation system capacity. A budget of $24,000 is recommended for this work. Freshwater Mussels It is recommended that the City conduct further investigation on the nature of the freshwater mussel infestation in the western portion of the system near the Road 108 Pump Station. Depending on the type of mussel, there may be federal or state regulations regarding acceptable ways to clear the pipes. The mussels should be identified and the extent of the infestation determined via television inspection or some other means. In the meantime, it is recommended that the City decrease pressure at the Road 108 Pump Station or limit its use. This may limit or halt the spread of the freshwater mussel colonization. A budget of $25,000 is recommended for this work. Rate Structure Study The City currently charges a flat rate to residential customers. Large customers are billed by irrigated acre. Some of its larger customers are served and billed according to undocumented verbal agreements. Industry experience has shown that the use of water under this rate structure is relatively uncontrolled. It is recommended that the City undertake a rate study and a financial review. The results of this work will assist the City in developing rates that ensure that the current level of service is maintained and that funds are available for capital projects and system growth. A budget of $25,000 is recommended for this work. 13- 1444.407 Page 4 -8 Irrigation System Master Plan December 2013 Recommendations City of Pasco K1TAC Pmjaa \13 \14J4 Puw Weer Resource SrudyWO] PW Preperaz "wnVrtiSetwn Syrian Mssta Plan\Senion4 - RewimnenEetunxdocx Irrigation System Master Plan Update As the City's irrigation system grows and additional water rights are acquired, the City should re- evaluate its capital improvements plan and check on the performance of the hydraulic system. This plan should be updated every five years or sooner to reflect major system expansions or changes as well as any significant changes in water rights. As part of this study it is recommended that the skeletonized hydraulic model be further developed to include all system piping. A budget of $30,000 is recommended for this work. Project Cost Estimates Project cost estimates were developed for all recommended irrigation system improvements. The project cost estimates include construction cost with a 10 percent contingency, sales tax, and a 35 percent allowance for administration, engineering, and legal services. The cost estimates developed are commensurate with a Class 4 cost estimate as defined by the American Association of Cost Engineers. The actual cost can vary from 30 percent under to 50 percent over the estimated cost. Appendix D includes data and detailed breakdowns of the project costs for the recommended system improvements. Since construction costs change periodically, an indexing method to adjust present estimates in the future is useful. The Engineering News Record (ENR) Construction Cost Index (CCI) is a commonly used index for this purpose. For purposes of future cost estimate updating, the September 2013 ENR CCI for Seattle, Washington is 10147.96. Summary This section presented recommendations for capital improvements to the irrigation system and maintenance programs. These recommendations were based on analysis of the system as presented in Section 3. Tables 4 -4 and 4 -5 include tabulated summaries of all recommended improvements and their associated estimated project costs. The recommendations are separated into near-term improvements and long -term improvements. Near -term improvements are those which should be completed within the next one to five years. Long- term improvements should be completed in six to twenty years. Figure 4 -1 shows the City's irrigation system with recommended improvements highlighted and the dry systems operational. 13- 1444.407 Page 4 -9 Irrigation System Master Plan December 2013 Recommendations City of Pasco K\TAC_P je \13\1444 -Pssm WazecRp --Sm YW07 Plan PrepazationWngal 'wn Syuem Maeio PpnVSa9ion4 -Rxommw w..d.. Table 44 Near -Term Capital Improvement Program Summary Group ID Project Location Name Project Limits pr oject Description Estimated or Project Cost Road 56 to Road Extend existing 16 -inch diameter [Hain east to Road 52. The new IR.2 Powerline Road 52 main may be built in right of way that is being platted as part of $186,000 the construction of a new elementary school at the intersection. West along Sahara Extend two 4 -inch diameter distribution mains on Sahara Drive Drive from end of west to the existing 12 -inch diameter main on Road 44. This IRA SaharaDrive existing mains to improvement provides a redundant connection to the rest of the $46,000 ROB system if the connection at Burden Boulevard is out of service for E any reason. Install approximately 1,200 linear feet of new 6 -inch diameter a IR.S Sirocco Drive Sahara Drive to distribution piping near the discharge of the Sirocco Well. The Saguaro Drive new pipes should be installed in public right of way. The existing $90,000 pipes should be abandoned to eliminate pipe crossings in the rear of private lots. Isolation Valve Island Estates and Installation of up to 52 isolation valves in public right of way will ° D.2 Improvements wnwY S Meadows reduce the need for City staff to access backyards during $156,000 Phase I Subdivisions maintenance and repairs and allow more customers to stay online during emergencies. Isolation Valve Interstate Installation of two isolation valves in the vicinity of the crossing O D.3 Improvements Highway 182 may help to prevent complete shutdown of the crossing during $10,000 Phase 2 Crossing maintenance and repair activities. This improvement would tie the Northwest Commons irrigation Northwest Northwest pivot directly to the irrigation system and meter the pivot at the DA Commons Pivot Continues point of withdrawal. This will allow the City to operate the $30,000' Improvements Subdivision Northwest Commons Well independently of the pivot. Proposed pipe is 8 inches in diameter. E Activate Dry This improvement is an operational improvement that consists of GDS Systems _ activating the portions of the City's irrigation system which are currently not in uses 13- 1444.407 Page 410 Irrigation System Master Pin December 2013 Recommendations s: rrnc_ r�oimn�niau. recow. wrt. w�swywmr�e. ��wwy.,:. osm ®�w„Qe,.otsmma.aoo.�me.m ®.m.. City Of Pasco Table 4 -4 Near -Term Capital Improvement Program Summary (continued) Group ID Project Location Project Limits Project Description Estimated or Name Project Cost This improvement proposes to change the maximum water level Road 68 Irrigation in the Road 68 Irrigation Tank from 639 to 641.5. It is an q w S.l Tank - operational change and requires no capital investment. This $10,000 Improvements project also includes inspection and repair or replace level sensing equipment inside the Road 68 Irrigation Tank rp E S.2 Irrigation Well Rehabilitation Rehabilitation and date acquisition on all wells except Village m � - Pasco Heights Well.' $220,000 m Freshwater Mussel Conduct a study to determine the most effective way to address P.1 Study y freshwater mussel colonization of distribution piping exposed to $25,000 E Columbia River Water. 9 C °i Linda Conduct a well field study in order to determine the optimal '2d P 2 Well Field Study tua dy - locations and sizes of new irrigation wells in the Linda Lovnsa $24,000 area. a a" Data Acquisition This recommendation consists of gathering data consistent with P.3 on Existing Wells - Table 4 -3 above. The City has resources to accomplish this - project so there is no project cost. Total Budget Recommended for all Near -Term Capital Improve $797,000 Notes 1. For cost estimating purposes, 200 linear feet of 6 -inch diameter PVC was assumed and $15,000 was added for installation of a new meter and valves. 2. See Figure 2 -1 for the location of the City's existing dry systems. 3. See text for detailed description of rehabilitation activities and wells involved. 13-1444.407 Page 4 -11 Irrigation System Master Plan December 2013 Recommendations City of Pasco x>TAC-P.gmniruw4. P. W. � S� 4 . P ®memetno Table 4 -5 Long -Term Capital Improvement Program Summary Group ID Project Location Name Project Limits Project Description Estimated or Project Cost Ml Powerline Road Road 90 to Extend existing 16 -inch diameter main west to Road 90 to $1,000,000 d Convention Drive improve flow and eliminate dead ends. E � Extend existing dead -end 8 -inch diameter main on Sandifer r°. 111.3 Sandifur Parkway Porto Lane to Parkway near Porto Lane along east side of Road 44 south to and Road 44 Burden Boulevard Burden Boulevard. Connect all dead-end distribution mains $325,000 along Road 44 to the new main. Road 68 east to Installation of a 12 -inch diameter main between existing m IR.6 Wrigley Drive Convention Drive distribution mains on Road 68 and Convention Drive. This $212,500 0 improvement requires additional right-of-way. This improvement proposes installation of a redundant 12 -inch 5 600 Zone PRV diameter source of supply to the 600 Zone. The ultimate size and D.1 Supply 600 Zone routing of the pipe and source zone would be chosen by the City $915,000' at a Inter time once right of way, easements, or land can be acquired between the two zones. O This improvement proposes installation of a signal converting Fd > T.1 Road 52 Telemetry Road 52 station to improve communications from the central telemetry $35,000 Improvements system to the Powerline Road Well, Road 52 Well, and F fi Northwest Commons Well. e U S.3 Village at Pasco Heights Well Village at Pasco Construction of a new well at Village of Pasco Heights. This Replacement Heights project assumes that the existing pump and motor will be reused. $173,000 h � Construction of well houses to enclose existing wells and 5.4 Well Houses - associated equipment. It is assumed that a total of seven well $455,000 houses will be built at a project cost of $65,000 per well house. 13- 1444.407 Page 4 -12 brigation System Master Plan December 2013 Recommendations z�rnc_rw�Winua. e.�m wnaxew� swswat ewxeGanrmwgrm syu ®wnayso�seawa. e«m�mm�a�a City of Pasco Table 4 -5 Long -Term Capital Improvement Program Summary (continued) Group ID Project Location Name Project Limits Project Description Estimated or Project Cost e E Construction of Up to six new irrigation wells could be necessary to improve the 0 o S.5 New Irrigation - irrigation system capacity. For budgeting purposes, a project cost $3,696,000' m `a Wells of $616,000 per well has been assumed.' E e Conduct a rate study to see if irrigation system rates me adequate. m P.4 Rate Study - The rate study will be informed by the selection of a capital $25,000 :D improvements program. ° m m hrigation System Update of this irrigation system master plan following major P.5 Master Plan - changes to the irrigation system or after five years, whichever $30,000 °i Update occurs first. Total Budget Recommended for all Long-Term Capital Improvements $6,867,000 1. For cost estimating purposes, 6,500 linem feet of 12 -inch diameter PVC was assumed and $100,000 was added for a pressure - reducing station. 2. The location of new wells will depend on data acquisition and the Linda Loviisa well Held study. 3. The project cost is $616,000 per new irrigation well. With a total of six wells, the total project cost is $3.70 million. It is possible that fewer than six new wells will be necessary. 13- 1444.407 Page 4-13 Irrigation System Master Plan December 2013 Recommendations xv eAmr.ur,�uo -v.,m wnae.,., somas+wreme. Hwy .,msmms+.. =emwmmna- a�ww®aw City ofPasco ]lei Cily of Pasco lrr 1 IMPROVEMENTS �NENNIENNN, ­ ------- ------ 417 iii L ,2 ------ POPE tZEE aaa� -ZONE r ........... lu'll 11 J —1.1 . - . f-'r* E N. FAR _jn' aaaaw E"­ —ATES VIL W T. 4 as ZZWOFIV1,00 MSA APPENDIX A APPENDIX A WATER QUALITY DATA Appendix A includes water quality information for the water supplied by the Cityts irrigation system wells. Available water quality data is attached on the following pages. 13- 1444.407 A -1 Irrigation System Master Plan December 2013 Appendix A: Water Quality Data City of Pasco k:\m0jtgecUU3 \1444. PascowNerresomca9WY\ 407 In prepmati0n \iai8ati0n system toasterplan\app imeappaAix a- wta9wiky&t&d x System Review ID M 664003 Type: A -COMM Services System Name: Pasco Water Department ._ t Residentia_. 6606 _ _. Res_ Popufalion: 24746 County: Franklin Permit Color: Yellow iouc Bs08 Approved: Coliform Summary First 12 Months Second 17 Mnnthc Year _ _ Month 02 Mar _ 02_ Fea _02 _ 01 1 Dan Dec 01 __Ot • NOV Oct O7_ SeP in __ 01_ Aug Jul 01 Jun 01 May 01 Apr Measurement 01__01 Mar _ 01 Feb Jan . 00 ' Cec _ 00 Nov 00 pct ;_ 00 _ Sep .00___.00 Aug Jul�,un 00 W _ -+ Ma rr: Required Samples ._._?0._. 30 _: 30 `30_,_30._30._.30 30...x_. x._30._ -30 Routines Taken 32 40 39 39 38 ' 37 38 40 1 37 39 39 30 30 _30__30 � 30 � 30 30 30 3C 30 30 29 31 31 34 32 31 31 32 37 3; 30 3C Present Routines 1 THM 92 3 2 1 Present FecallE Coll DON Parameter Required Repeats 2941 27 Repeats Taken 27.5000 2943 Water Quality Violations Violation Parameter M Violation Date Group # Name S Type 04/30192 COLT 1 Total Coliform M Minor Repeat 10/31/91 COLI 1 Total Coliform S Non -Acute Lead and Copper Monitoring Summary Monitoring Period Lead Copper Samples Start to End 90th High 90th High Act Req 0711992 1211992 0.0070 0.0550 0.2300 0.7020 70 60 0111993 0611993 0.0040 0.0140 0.4500 0.8280 60 60 0711993 1211993 O.DD40 0.0080 0.4000 0.6700 36 30 0111994 0611994 0.0090 0.0190 0.3420 0.4100 32 30 0711994 1211994 0.0030 0.0050 0.2370 01700 32 30 0111995 1211995 0.0070 0.0140 0.5570 0.7750 44 30 0111996 1211998 0.0020 0.0020 0.1810 0.2440 30 30 Volatile Organic Chemical Samples Sample # Collected Type SOP Detects No 0 Not A 046.11531 12/12/01 THM 92 3 2 1 EPA DOH Parameter Measurement 2941 27 Chloroform 20.1000 2943 28 Bromo- Didiloromethane 3.1000 2950 31 Total Tri-Halomethane 23.2000 046-08765 09124/01 THM 92 3 2 1 EPA DON Parameter Measurement 2941 27 Chloroform 27.5000 2943 28 ammo- Dichloromemane 3.3000 2950 31 Total Tn- Nalomemane 31.0000 046 -05160 06/13/01 THM 92 4 1 1 EPA DON Parameter Measurement 294' 27 Chloroform 38.7000 2943 28 Bromo- Dichloromethane 5.3000 2944 29 Dibromo- Cholomlethane 0.5000 2950 31 Total Td- Halomelhane 44.5000 046-02032 03/14101 THM 92 3 2 1 EPA DON Parameter Measurement 2941 27 Chloroform 20.7000 2943 28 Bromo-Dichlommetnane 1.9000 2950 31 Total Td- Halomethane 22.6000 046 -11010 12112/00 THM 92 3 2 1 046-08242 09/20/00 THM 92 3 2 1 04644569 06/07/00 THM 92 3 2 1 Inactive Sources S02 Name_ _ p _Use _ � Type _ W Use E -- Well #1A &8 ___gpm__ 200 Depth 180 _,N 9 R: E Section _ 'S•`: _ - _NE -NW Treated: Disinfection. Chlorination. Hypochlome Raoium 226 LT 1.000 Inorganic Chemical Samples Sample# Collected Type SO# Detects No Not 062 -00466 EPA 08/20/93 Ichem DON Parameter 02 1 Measurement 1040 20 Nitrate -N 3SCO SOS -- _...._. Name _ _ p _Use _ 101 -04030 Dradie ST Weli #4 W E _gpm N R: E Section 350 130 1 9 29 22 NE - NE Inorganic Chemical Samples Sample# Collected Type SO# Detects No Not 062- 00571 08/30/94 NIT 05 1 EPA DON Parameter Measurement 1040 20 Nhrate-N 16.43 062-00343 05/25/94 NIT 05 1 EPA DON Parameter Measurement 1040 20 Nitrate -N 1740 062-00123 02/16194 NIT 05 1 EPA DON Parameter Measurement 1040 20 Nitrate -N 17.30 062 -00858 11/30/93 Ichem 05 1 051.14434 04106/93 Ichem 05 22 Synthetic Organic Chemical Samples Sample # Collected Type SO# Detects No D Not A 095.12212 12/18/95 547 05 1 095.12212 12/18195 549 05 1 1 Radionuclide Samples Sample # Collected Type SO# Detects No D Not A 101 -04030 04105193 RAO 05 3 EPA DOH Parameter Measurement 4020 39 Raoium 226 LT 1.000 4000 41 Gross Alpha (Minus Uranium) 5.900 4100 42 Gross Beta LT 10.00 System Review Permanent Sources 801 - �Coluitia Name Tyke Use `S Volatile Organic Chemical Samples River p Sample # Collected Type SO# Detects No D Not A om Depth I T: N i R: E Senion i 'G•' /. 046.09521 10/15101 524.2 01 3 56 4 18000 0 9 I 30 1 3 M -NE EPA DOH Parameter Measurement Suscaptlbilily Vulnerability Renewed 2941 27 Chloroform 10.80 " -- 2943 28 Bmmo -0ichlommelhane 2.400 Treated: Taste l Odor Control B DeChlormation Permanganate 2950 31 Total Td- Halomethane 13.20 Particulate: Filtration. Rapid Sand 046.06214 07/12101 524.2 01 3 56 4 Rapid Rapid Mix /In -Line Blender EPA DOH Parameter (Turbidity): Measurement Coagulation 2941 27 Chloroform 16.00 Removal Flomlation 2943 28 Bromo-Dichloromethane 3.100 Disinfection: Chlorination. Gaseous 2950 31 Total Trf- Halomethane 19.40 Chlorination Hvpochlodte 046 -03230 04118101 524.2 01 3 56 4 Corrosion Control: Ph Adjustment Inorganic Chemical Samples EPA DOH Parameter Measurement 2941 27 chloroform 6.900 Sample If Collected Type SO# Detects No Not 2943 28 Bronno-0ichloromethane 2.700 046-05158 06/13/01 IOC 01 9 19 15 2950 31 Total Tri- Halomethane 12.00 EPA DOH Parameter Measurement 1025 19 Fluoride 0.770 046 -00623 01123/01 524.2 01 3 56 4 1041 114 Nitrite -N NO EPA DOH Parameter Measurement 1040 20 Nitrate -N 0.590 2941 27 Chloroform 8.900 1038 161 Total (N031 NO3.) 0.590 2943 28 Bromo-Dichloromethane 2.700 1028 8 Iron NO 2944 29 Dibromo- Cholormethane NO 1032 10 Manganese NO 2950 31 Total Td4lalomethane 12.00 1915 15 Hardness 68.90 1064 16 Conductivity 177.0 046 -09306 10116100 524.2 01 3 56 3 0100 17 Turbidity 0.200 046.06003 07/ 19100 524.2 01 3 56 3 1905 18 Color 6.000 046 -03260 04/25/00 5242 01 3 56 3 1057 26 TDS- Total Dissolved Solids NA 046 -01549 02/29100 524.2 Oi 3 56 3 04644567 06107/00 ICC 01 5 23 15 046-03459 05/04/99 524.2 01 3 56 3 EPA DOH Parameter Measurement 046-04812 07108198 THM 01 3 2 1 1915 15 Hardness 58.40 046 -01064 02123/98 524.2 Ot 3 56 2 1064 16 Conductivity 155.0 D46 -00432 01126/98 THM 01 3 2 1 0100 17 Turbidity 0.200 1905 18 Color ND Synthetic Organic Chemical Samples 1025 1040 19 20 Fluoride NNrate•N NO No Sample# Collected Type SO# Detects No Not 1055 22 Sulfate 18.60 D46 -05161 08!13/01 515.1 01 14 3 1057 26 TDS -Total Dissolved Solids NA 046 -04570 06/07100 531.1 01 10 1041 114 Niuite -N NO 046-04570 06/ 07100 525.2 01 60 3 046-04570 06107/00 515.1 01 14 3 119. 95462 06/14199 ASB 01 1 04643458 05/04/99 515.1 01 14 3 EPA DOH Parameter Measurement 046 -03458 05/04/99 525.2 01 60 3 1094 115 Asbestos LT 0.098 046 -03458 05/04199 531.1 Ot 10 046 -03457 05104/99 10C 01 5 23 15 046-01046 02123198 525.2 01 59 3 EPA DOH Parameter Measurement 046 -01D46 02123/98 515.1 01 14 3 1915 15 Hardness 73.90 046-01046 02123198 531.1 01 10 1064 16 Conductivity 182.0 046 -03308 08118197 515.1 01 13 4 0100 17 Turbidity 0.200 046-MB 07101197 525.2 01 21 41 1905 18 Color NO 1025 19 Fluoride NO Radionuclide Samples 1040 20 N9nte -N No 1055 22 SuBate 19.60 Sample # Collected Type SO# Detects No D Not A 1057 26 TDS -Total Dissolved Solids NA 023.68311 04/18101 RAO 01 3 7 EPA DOH Parameter Measurement 046 -01045 02/23/98 IOC 01 8 21 14 4000 41 Gross Alpha (Minus Uranium) NO 4100 42 Gross Beta NO 046-03304 07101/97 IOC 01 7 21 15 4102 43 Tritium NO 02367752 10/16100 RAD Ot 3 7 062-00338 10/13196 NIT 01 1 2 EPA DOH Parameter Measurement 046-04111 10101196 IOC 01 7 21 15 4000 41 Gross Alpha (Minus Uranium) NO 4100 42 Gross Beta NO 111.99186 11103195 10C 01 28 15 4102 43 Tritium NO IIII System Review Emergency Sources S06 __. Name_ __ Type_ Use WP WFI S07S07,S08, S09, Si0 WF E Repo N R E Section 'G • 1: 500 160. _ __9 ._- .. z9.- _- _.._18-- ' -NE•_NW Treated: Disinfection, Chlorination. H pochlonte S03 ---- - --- -- Name .__. - -- - - - - _IYP.E -- 15 Hardness WP- Well #2 1 WW I E ,_.9pm Depth T: N R: E Section %116 1400 160 -NW Inorganic Chemical Samples Sample # Collected Type SON Detects No D Not A 062 -00160 04/15193 Ichem 03 1 EPA DOH Parameter Measurement 1040 20 Nkote•N 15.70 17 SO4 _.____ ._..__ Name -- - ___TYpe _Use 0.300 WP•Wall#3 WW E - ...- 9Pm. -- --_. Rep th.__ __L,N R: E.__._. Section Y.• %. 300 200 _ 9 29 18 NE • NW S07 -- Name _ Type __ ^Use ND WP• Well 1A WW . E _. _9Pm__. 0th.. T_N_ R: E Section '/. • Y. _ _ 100 160 9 ., 29_.... ____ .__.1x_..__. - -tit -.NW .. I— SOB —__ _ Name _ _ Ty e1� Usa SuNate WP•WellIS WW E __.9Pm.._. -.. -Depth T_N R:E `Section ' /.•' /. 108 179 __ 9 29 18 NE -NW] Inorganic Chemical Samples Sample # Collected Type SO# Detects No 0 Not A 062-00434 10115/99 NIT 06 1 2 EPA DOH Parameter Measurement 1040 20 Nitrate -N 3.300 046-06753 08112199 NIT 06 1 2 EPA DOH Parameter Measurement 1040 20 Nitrate•N 4.200 062-00241 06114199 NIT 06 1 2 EPA DOH Parameter Measurement 1040 20 Nitrete•N 6.100 062-00087 03117199 NIT 06 1 2 EPA OOH Parameter Measurement 1040 20 Nitrate•N 5.900 046 -03305 07101/97 IOC 06 8 20 15 EPA DOH Parameter 3 Measurement 1915 15 Hardness 13 4 046 -03309 217.1 1064 16 Conductivity 046-03309 07/01197 542.0 0100 17 Turbidity 07/01/97 525.2E 0.300 1905 16 Color 41 LT 5.000 1025 19 Fluoride 5.00 ND 1040 20 Nkrete•N 4.800 1055 22 SuNate 56.30 1057 26 TDS -Total Dissolved Solids ND 046 -04088 09/30/96 NIT 06 1 2 062 -00569 08130/94 NIT 06 2 062-00345 05/25/94 NIT 06 1 062 -00122 02/16194 NIT 06 1 Volatile Organic Chemical Samples Sample # Collected Type SON Detects NOD Not A 046.03307 07/01/97 524.2 06 3 55 3 EPA DOH Parameter Measurement 2943 28 Bmmo- Dichlommethane 140 2944 29 Dibromo- Choiormethane 760 2942 32 Bromolorm 200 111 -96210 06/20196 THM 06 111 -99909 02/07/95 THM 06 2 3 1 EPA DOH Parameter Measurement 2941 27 Chloroform 1.10 2950 31 Total Td- Halometnane 1.10 Synthetic Organic Chemical Samples Sample # Collected Type SO# Detects No D Not A 046 -07733 10128/98 504 06 3 046 -03309 07/01197 515.1 06 13 4 046 -03309 07/01/97 531.1 06 10 046-03309 07/01197 525.2 06 52 046 -03309 07/01/97 525.2E 06 2 Radionuclide Samples Sample # Collected Type S0# Detects NOD Not A 101-04032 04/06/93 RAO 06 3 EPA DOH Parameter Measurement 4020 39 Radium 226 LT 100 4000 41 Gross Alpha (Manus Uranium) 5.30 4100 42 Gross Beta 8.60 101 -04031 04/06/93 RAD 06 2 EPA DOH Parameter Measurement 4000 41 Gross Alpha 1Minus Uraniuml LT 5.00 4100 42 Gross Beta LT 5.00 III /� /S iOR/!fj t j%1HYLl�M [MfM Cw C ^iTY l'wNb7) C„ +c71.S U.;i7J /•�= Center Fw LAberatwy Sciences RJ Lee Group, Inc. 2715 SL Andrews LP Sale c Pasco, WA 90301 l608LFe6-0999 Moat. -N LABORATORY REPORT any of Pasco P.O. Box 293 RJ Lea Group Job W.: WA0607200MM2 Pasw WA 99391 Samptea Raceivae: ]/fln2005 Ann: Dean Cenimlli RbPre ft e: ]/2112005 Phone.' (W9) 545-3469 Anal Olml Pr Data Cilanl P,No, WA Fax:(509)545-395 Purchaea Od0r NP.: Aneiaelr EPA 300.0 -WA Non -Poteble Weler sirocco WAOBW200.W W21104 ]Ay2005 Moat. -N EPA 300.0 -Wq t4onPOlebte Weiar shelf- 20 0.03 4112 WA060T20050002-002 T/ &2005 Nnlale -N EPA 3W.0 -WA Nen- POlabla Walar m L 2e o.03 Blhan WAWO]ZIW50002 -003 ]!52005 Date -N EPA 300.0 -WA Non -Poteble Weler .91L 25 0.03 Ibnd Eel T /&2006 NNmte -N EPA 3000 WA L i! 0.03 WA1190]2095W02L04 Nmn fc table Water thasonam T/ &2005 Nim. -N EPA 300.0 -WA m 24 O03 WA08W20050002-005 Nm POteble Water All sad meidclas reached on a tiny Weight basis unless Whenvise rated. These resWts tie sutala fe 1pursued fa RJ Lee Group! cane, (arms and carldaavu Masha eel d g,, canyrenys afW dad wenany an, fl nceWr WhaWUyproVlawis. No Groaal 6aaY waedb'fYl®aewmetl N-Uro mamerNVdayr bafmiasaausetl alnfemmfanc holeaamliae tin weep to for a, ours of my 0y Mb repaf. RJ l.ea Gmup wia shoe the aempba /w a peaotl MHdnfy (3p) days bolare discaNing. A shipphg erd hentlam lea will DB esdeuotl (a fhP mean Many samples. Aulhwised Request for Services Locslad Al RJ Lee Group, Inc. in pactneraphip with Columbia Basin College. / 1 4+ Drinking Water Sample bnl- FbY D9e Only V Sample PUryoae n In(orme8on n Regulatory Sampleanni9, (509) System IDs i "thlppstlm nanda ;Vmaa.n Com an _G'34 i7RlO Fax: (5 ,601089 Fax: (509 544.6010 Comaq: G DON Sources >�•i¢mpOggn Nemipt°U atpwaplaWecv- utw:er 4)'pN aigeea aY: Pro'eq Name: Project#: POe Guolaa Address: Q v'f Group Type o nB nOther 4 9ebe%cnadfed Git State: ZI _- _ PreservatloNMetrix/COnbiner rypa Key Phpne:S._.1 Fax:( 1 -meN: Pmervnbn Wy: Ceptaw NeY: Sam brjs)Signalure _E BnPes H2SO4 u'C HCl HNO3 NeOH Olhn Na50 eslevpter S- SaWSludae E =UW SWSwtaanvaler P =Gl"m OW=Onnkiipwaxr G =Glass 0-OX x =OBer —_ -- Re DNivery Imtrugloro: Email Resuaa7 YES / NO Fax Reauln7 YES / NO Tum Aroun_d Requeak __.. StanderN PdorM (ousnips tlan)' n nelyela Rapusetstl COmmenViNaetrYCNOna: O K ~ C y R 0 j Client Sample leentfioation CLS Sample ID Sample Semple tl U x of Date Tim e a .2 -C , S T -- 6 - - - - Tima: �'� ' Relinquished Sy (`1LI -- sempb0 ».. Qd1e ` _ Received 8y: Dale La linquished By Date: Time: _ Recalved BY:_ Relinquishe0 By: Data: Tile, _ . , / 1 4+ APPENDIX D APPENDIX B 2007 RESIDENTIAL WATER USE MEMORANDUM Appendix B contains a memorandum completed in 2007 to study residential water use patterns and trends. The memorandum is attached on the following pages. 13- 1444.407 B -1 Irrigation System Master Plan December 2013 Appendix B: 2007 Residential Water Use Memorandum City of Pasco k: \=c .ja \13 \1444 -p w— resources am YW07 plan p gmwion\hrigeti -y'—m 1e plan\appe im\appe mb- 200]miden w .,. nwn.dumdo. MEMORANDUM CH2MHILL Residential Water Use Study TO: Bob Alberts, Public Works Director FROM: Tony Krutsch, Project Manager CH2MHILL DATE: August 3, 2007 INTRODUCTION This Residential Water Use Study looks at residential water consumption at various locations throughout the City of Pasco. Approximately 360 residential housing units were included in the study representing 16 neighborhoods. Neighborhoods were selected to represent a cross section of older and newer construction, with both separate irrigation systems, and those lots dependent on the City domestic water system as the source of supply for irrigation. This study represents an update of a Water Usage Study prepared by the City of Pasco in September 2001. In various locations throughout this technical memorandum, information from September 2001 Water Usage Study is quoted. Water records for each residential lot selected for this study were obtained from the City of Pasco Finance Department for the period of January 2005 through June 2007. After the water records were obtained and entered into a spreadsheet, the records were purged to remove inconsistent data that could have affected the analysis and evaluation. Unlike the September 2001 Water Usage Study, this evaluation is primarily based on the residential lot rather than population. CITY WATER USAGE Chart 1 identifies the average daily residential lot water usage for the 2 -year evaluation period for all neighborhoods included in this evaluation. PASCO WATER USE STUOYIKEN COPYRIGHT 2013 BY CH2M HILL, INC. • COMPANY CONFIDENTIAL RESIDENTIAL WATER USE STUDY Chart 1. Residential Lot Water Usage - gallons per day •rr Water Usage - Entire City A�� T wrr - -� rr As c Ir1 rr T A 9 a Seriesi 0 A 6 0) Jan Feb Mar Apr May Jun Ad Aug Sep Oct Nov Dec months •rr :rr A A�� wrr - -� rr crr Ir1 rr The winter average daily residential lot water usage varies between older and newer neighborhoods. In older neighborhoods, winter usage averaged 237 gpd while in newer neighborhoods, winter usage averaged 155 gpd (average of 206 gpd for both older and newer neighborhoods). For those neighborhoods using the City domestic water system for residential lot irrigation, average daily domestic water usage was calculated at 883 gpd per unit, and the summer average daily water usage was calculated at 1,473 gpd per unit. The older Desert Plateau neighborhood had the highest summer average daily water usage at 2,939 gpd per unit. Older neighborhoods in central and east Pasco averaged 1,107 gpd per unit for the summer monthly period. Chart 2 identifies each of the 16 neighborhoods included in this evaluation and the average usage of City domestic water by neighborhood in ac -ft /month during the winter (Dec -Feb) and summer (June -Sept) periods. Chart 2. Seasonal Lot Water Usage - Acre -feet _v � O C o.0000 Unl< KENl7 -10.08 DEMAND STUDY TECH MEMO.DOC 2 COPYRIGHT 2013 BY CH2M HILL, INC. •COMPANY CONFIDENTIAL RESIDENTIAL WATER USE STUDY Chart 3 identifies each of the 16 neighborhoods and the total annual average usage of City domestic water by neighborhood in ac -ft /year. Chart 3. Annual Lot Water Usage - Acre -feet The average monthly domestic water consumption for all lots in the City was calculated at 0.0412 acre -ft per month and 0.4880 acre -ft per year. For those neighborhoods utilizing a separate irrigation system for irrigation, the average monthly domestic water consumption was calculated at 0.0191 acre -ft per month and 0.2249 acre -ft per year. In neighborhoods relying on the City domestic water supply system for irrigation, the average monthly domestic water consumption was calculated at 0.0729 acre -feet per month and 0.8264 acre - feet per year. The older Desert Plateau neighborhood has the highest monthly average and annual average usage of domestic water at 0.1540 acre -feet per month, and 1.7836 acre -feet per year respectfully. The central and east Pasco neighborhoods, which rely on the City domestic water supply system for irrigation had a monthly average domestic water consumption of 0.0644 acre -feet per month, and an annual water consumption of 0.7229 acre -feet per year. KEN17 -1608 DEMAND STUDY TECH MEMO.DOC 3 COPYRIGHT 2013 BY C142M HILL, INC. • COMPANY CONFIDENTIAL WATER USE STUDY Chart 4 provides a comparison of the 16 neighborhoods in terms of winter versus summer usage shown in gallons per day per unit. Chart 4. Seasonal Lot Water Usage - gallons per day Chart 5 identifies the average daily water usage in terms of gallons per day per unit of the 16 neighborhoods for the entire City (1), those neighborhoods served by a separate irrigation system (2), and those neighborhoods relying on the City domestic water supply system for irrigation (3). Chart 5. Annual Lot Water Usage for Entire City - gallons per day 1600 1400 1200 gallons per 1000 day /unit 800 600 400 200 0 Water Usage - Annual 2 3 1- Entire City, 2 -W separate irrig, 3 -W City irrig S2 S2- summer, 31 S1- winter KEN/7 -10.08 DEMAND STUDY TECH MEMO. DOG y COPYRIGHT 2013 BY CH2M HILL, INC. • COMPANY CONFIDENTIAL RESIDENTIAL WATER USE STUDY Chart 6 looks at the average daily water usage in terms of gallons per day per unit of all the older neighborhoods evaluated in this report (1), those older neighborhoods served by a separate irrigation system (2), and those older neighborhoods relying on the City domestic water supply system for irrigation (3). Chart 6. Annual Lot Water Usage for Older Neighborhoods - gallons per day Water Usage -Old Neighborhoods - Annual 1600 - - - - -� 1400 1200 gallons per 1000 800 day /unit 600 400 200 S2 01 S1 S2- summer, 1 2 S1- winter 3 1 -Entire City, 2 -W separate irrig, 3 -W City irrig Chart 7 looks at the average daily water usage in terms of gallons per day per unit of all the new neighborhoods evaluated in this report (1), those new neighborhoods served by a separate irrigation system (2), and those new neighborhoods relying on the City domestic water supply system for irrigation (3). Chart 7. Annual Lot Water Usage for New Neighborhoods - gallons per day Water Usage -New Neighborhoods - Annual 1000 l JSl I 800 gallons per 600 day /unit 400 200 0 S2 S2- summer1 2 S1- winter 3 t- Entire City, 2 -W separate irrig, 3 -W City irrig KENA -10-08 DEMAND STUDY TECH MEMOAOC COPYRIGHT 2013 BY CH2M HILL, INC. • COMPANY CONFIDENTIAL RESIDENTIAL WATER USE STUDY The September 2001 Water Usage Study evaluated 10 houses in 8 neighborhoods (total of 80 homes) throughout the City of Pasco. Chart 8 lists the 8 neighborhoods from the September 2001 report, and also identifies the results from this Residential Water Use Study separated into the same 8 neighborhoods. Chart 8. Average Daily Water Usage - gallons per day Neighborhood September 2001 Study Residential Use Study Sun Willows 601 gpd 771 gpd Ivy Glades 157 gpd 182 gpd Wilson 246 gpd 241 gpd Core City 570 gpd 669 gpd West Pasco 236 gpd 221 gpd I. Estate /S. Meadow 143 gpd 157 gpd Desert Plateau -1 934 gpd 1,651 gpd Desert Plateau - 2 - -- 285 gpd East Pasco 823 gpd 712 gpd As Chart a pomts out, ttiere are some differences between the two studies. These differences are likely the results of selecting more residential units in each neighborhood in this Residential Water Use Study, and the use of different residents within each neighborhood in each evaluation. Desert Plateau is shown with 2 listings in Chart 8. Desert Plateau -1 is an older neighborhood which utilizes the City domestic water supply system for irrigation water, while Desert Plateau - 2 is a newer neighborhood with smaller lot size and fewer records available for analysis. One of the calculations presented in the September 2001 report was the estimated percentage of City water used indoors vs. outdoors for those neighborhoods where no separate irrigation supply system was available. Chart 9 compares the results of this Residential Water Use Study with the September 2001 report. Chart 9. City Water Use - Indoor and Outdoor (gallon/year) Neighborhood Avg Mo Use-. Winter Total Avg based on Winter Total Actual Use % Indoors This Study (Sept 2001) %Outdoors This Study (Sept 2001) Desert Plateau -1 6,525 78,295 581,146 13.5%(27%) 86.5%(73%) Sun Willows 3,482 41,786 257,657 16.2% (23 %) 83.8% (77 %) Core City 9,073 108,878 232,943 46.7 °k (39 %) 53.3%(61%) East Pasco 8,320 99,839 238,160 42.0%(45%) 58.0% (55 %) Average 10,038 82,200 327,477 29.6% (33%) 70.4% (67%) KEN17 -16-08 DEMAND STUDY TECH MEMO.DOC COPYRIGHT 2013 BY CH2M HILL. INC. • COMPANY CONFIDENTIAL RESIDENTIAL WATER USE STUDY Chart 10 provides a comparison of the outdoor water usage from the September 2001 report and this Residential Water Use Study for those neighborhoods relying on the City domestic water supply system for irrigation supply. The average square feet of each lot irrigated is from the September 2001 report. Chart 10. Average Annual Gallons per square foot and acre -feet Neighborhood Gross Avg Total Gallons Density Gross Acre- Acre -ft per Lot Size' Lawn Outdoor per sq -ft of ft per year2 year per (sq ft) Size' Water This Homes This Study lawn area (sq ft) (gallons) Study per (Sept 01) (Sept 01) gross acre' Desert Plateau -1 10,390 8,100 502,851 62 (29) 3.5 5.39 (2.52) 8.30 Sun Willows 6,420 4,900 215,872 44 (31) 4.8 3.18 (2.24) 5.89 Core City 6,820 5,200 124,064 24 (20) 4.9 1.88(l.55) 3.63 East Pasco 6,970 5,400 138,321 26 (27) 4.8 2.07 (2.17) 3.42 Average 7,650 5,900 245,276 39 (26) 4.5 1 3.18 (2.12) 1 5.31 'From September 2001 Water Usage Study 2 Average sq -ft of lawn times number of homes per acre divided by 43,560 sq -ft, then multiplied by gallons per sq -ft, divided by 7.48 3 Total Outdoor Water usage divided by Avg Lawn Size, divided by 7.48 The September 2001 Water Usage Study noted that the Franklin Conservation District estimated that home lawns accounted for 37.7 inches (3.08 ac -ft or 23 gallons per sq -ft) of water annually. With an anticipated loss of up to 20 %, the application rate per lawn area would increase to 3.7 ac -ft or 27.7 gallons per sq -ft. In both the Desert Plateau -1 and Sun Willows neighborhoods, irrigation application rates are much higher than those anticipated by the Franklin Conservation District. The average application rate for irrigated lot area for the entire City of 5.31 ac -ft exceeds the anticipated application rate of 3.7 ac -ft (including losses) by approximately 44 %. WATER USE STUDY FINDINGS The following represents findings of this Residential Water Use Study and the evaluation of water consumption throughout the City of Pasco. 1. Residential Indoor Water Usage. In the older residential neighborhoods, daily domestic indoor water usage averaged 237 gallons per day (annual usage of 0.2655 acre -feet per year). For the new residential neighborhoods, daily domestic indoor water usage averaged 155 gallons per day (annual usage of 0.1736 acre -feet per year), or 53% less than older neighborhoods. For KENITID 08 DEMAND STUDY TECH MEMO.DOC COPYRIGHT 2013 BY CH2M HILL, INC. • COMPANY CONFIDENTIAL RESIDENTIAL WATER USE STUDY the new residential neighborhoods, it is highly likely that the plumbing fixtures and devices used have an improved efficiency over those in older neighborhoods. 2. Residential Outdoor Water Usage. For the 16 neighborhoods evaluated in this Residential Water Use Study, the volume of water consumed for domestic purposes was calculated at less than 50% of the total volume consumed for domestic plus irrigation. At the seven neighborhoods, utilizing the domestic water supply system for irrigation, the volume of water consumed for domestic purposes was calculated at about 30% of the total volume consumed for domestic plus irrigation (Over twice as much water was consumed by irrigation of a lot than was used for domestic purposes by each residential unit). In older residential areas (central and east Pasco), irrigation of the landscaped area of each lot was similar to that anticipated by the Franklin Conservation District (3.7 acre -ft per year) at 3.63 acre -ft per year (central) and 3.42 acre -ft per year (east) respectively. The central and east Pasco area residential units are of older construction, landscaping is considered to be mature and well established, and residents are generally considered to have moderate incomes. In newer residential areas (Sun Willows and Desert Plateau), irrigation of the landscaped area of each lot far exceeded the Franklin Conservation District anticipated average of 3.7 acre -ft per year. The Sun Willows neighborhood consists of relatively small landscaped areas (Average of 4,900 square feet) in a newly developed area. Residents are generally considered to have higher incomes. Irrigation application rates in the Sun Willows neighborhood were calculated at 5.89 acre -feet per year or nearly 60% greater than the Franklin Conservation District anticipated average. The Desert Plateau neighborhood evaluated for this study consists of residents with above average lot size, where income levels are generally considered to be high. Landscaping is generally 3 to 5 years old and irrigation application rates were calculated at 8.30 acre -feet per year. This application rate is 124% greater than the Franklin Conservation District anticipated average (3.7 acre -feet per year). Even if the actual irrigated area of lots within this Desert Plateau neighborhood were larger (by 25% to 10,000 square feet) than the average (8,100 square feet) calculated in the September 2001 Water Usage Study for Desert Plateau, the irrigation application rate to landscaped areas would be 6.72 acre -feet per acre or over 80% greater than the Franklin Conservation District anticipated average. APPLICATION TO WATER SYSTEM PLAN Based on this evaluation, the update of the City of Pasco Water System Plan will utilize the residential water consumption figures shown in Chart 11 for the projection of future domestic and irrigation supply demands for the existing and future residential neighborhoods throughout the Pasco Urban Growth Boundary. KEN17-1008 DEMAND STUDY TECH MEMO.DOC COPYRIGHT 2D13 BY C112M HILL, INC. • COMPANY CONFIDENTIAL RESIDENTIAL WATER USE STUDY Chart 11. Water Usage in Residential Areas - acre -feet per year per unit Residential Area With Separate With Domestic Separate Irrigation Irrigation System Water Irrigation Demand (acre- ft/year/unit) (acre- ft/year /unit) (acre- ft/year/unit) Old Neighborhood 0.2655 0.7229 0.5031 New Neighborhood 0.1736 0.9644 0.8699 Chart 12 identifies the average day domestic and average day irrigation demand per unit, and per gross acre of residential neighborhoods in terms of gallons per day. Chart 12. Per Unit Water Usage Residential Area With Separate Irrigation System (gpd) With Domestic Water Irrigation (gpd) Separate Irrigation Demand (gpd) unit gross acre unit gross acre unit gross acre Old Neighborhood 240 660 750 3.5 units/ acre 840 2,540 3,160 4.0 units /acre 960 2,900 3,300 4.5 units /acre 1,080 2,970 3,380 5.0 units/ acre 1,200 3,130 3,560 New Neighborhood 160 1,500 2,250 3.5 units /acre 560 6,300 9,450 4.0 units /acre 640 6,000 9,000 4.5 units /acre 720 6,410 9,610 5.0 units/ acre 800 6,750 10,120 KEN17 -1008 DEMAND STUDY TECH MEMO.DOC COPYRIGHT 2013 BY CH2M HILL, INC. • COMPANY CONFIDENTIAL MSA APPENDIX C APPENDIX C OPERATING AGREEMENTS Appendix C contains operating agreements that the City has with Kidwell Farms, Inc. These agreements include the use of the Northwest Commons well and annual contracts for irrigation water use at pivot sites. The agreements are attached on the following pages. 13- 1444.407 C -1 Irrigation System Master Plan December 2013 Appendix C: Operating Agreements City of Pasco k: \t ,.je \13\1444 -p.,. w... Au yW07 playp ..flo.\i igni. syg. non. pleo\aP i.a.pP duc - .p thg egce w.dou RECEIVED JUL 3 0 2008 PUBLIC WORKS 01111N. FILED FOR RECORD AT REQUEST OF: Zona G. L MeR Auditor, Frankkn County. WA. City of Pasco, Washington AFN s 1722639 Recorded 0713012008 at 02:31 P 13"Type: ASGN 4 Page(s) F11" Instrument 146. WHEN RECORDED RETURN TO: Recorded at the request ol: PASCO CITY OF City of Pasco, Washington 525 North 3rd Pasco WA 99301 ASSIGNMENT OF WELL EASEMENT (Including Well System) BY THIS ASSIGNMENT effective this day of l c 2008, Farm 2005, LLC, a Washington Limited Liability Company, hereinafter referred to as "Assignor ", does by these presents, assign to the City of Pasco, Washington, a Municipal Corporation, hereinafter referred to as "Assignee ", all of its right, title and interest as co- owner, to that certain easement and water well system described below according to the following terms and conditions. WHEREAS, that easement document which is the subject matter of this assignment, was entered into with Glacier Park Company, a Delaware Corporation, as Grantor therein, and Alford Farms, Inc., a Washington Corporation as Grantee therein, on December 20, 1989, designated as Easement Deed No. G -89 -3566, and recorded as Franklin County Auditor's No. 548122 ( "Easement "); and WHEREAS, such easement was assigned by the original Grantee to Kenneth G. Smith by Assignment of Easement dated November 25, 1997, and recorded December 23, 1997, in Franklin County, Washington, as Auditor's File No. 548122. Such easement was further assigned by Assignment of Easement dated November 30, 2007, between Kenneth G. Smith as Assignor to Pasco School District No, 1, a Washington Municipal Corporation, and Farm 2005, LLC, a Washington Limited Liability Company, as Franklin County Auditor's No. 1711948, as co- owners each having an undivided one -half interest therein; and WHEREAS, Farm 2005, LLC, and Pasco School District No. I have entered into a Water Well System Shared Use Agreement dated October 22, 2007, thereby establishing their respective interest and responsibilities regarding the water well related water pumping and piping infrastructure located upon and Assignment of Well Easement - I within the easement, this Agreement is assignable by their respective parties with their successors in interest being bound by the terms thereof; and WHEREAS, Farm 2005, LLC, desires to convey all of its right, title and interest in the easement and water well and related water pumping and piping infrastructure located thereon, and including all of its rights and responsibilities under the Water Well System Shared Use Agreement; NOW, THERFORE, IN CONSIDERATION OF MUTUAL COVENANTS CONTAINED HEREIN, and as a donation for public purposes, receipt of which is hereby acknowledged, the Parties agree as follows: 1. Assignment of Easement. Assignor does hereby assign to Assignee all its right, title and interest in that easement designated as Easement Deed No. G -89 -3566 dated December 20, 1989, for underground water line, overhead power line, and water well use, upon and over the surface of real property located in the: Southeast Quarter or the Southeast Quarter of the Southeast Quarter of Section 3, Township 9 North, Range 29 East, Willamette Meridian, Franklin County, Washington, more particularly described designated by diagram on the attached Exhibit A. Included in such Assignment are all fixtures located upon such premises consisting of the existing well system including pumps, panels, casings and piping infrastructure constituting the existing well system, including but not limited to: 1- GE 150 hp, Serial # OVJ210003 1- Layne Pump, # W2004033 1 - Service Disconnect Allen- Bradley 4 99454 with PUD Meter # 25879 Assignor warrants that it has the right to transfer its interest in the above - described equipment and further agrees to warrant and defend the transfer, assignment, conveyance, grant, and delivery of the well system and above - described equipment made hereby against all persons whomsoever, to take all steps reasonably necessary to establish the record of Assignor's title and at the request of the Assignee, to execute and deliver further instruments of transfer and assignment and take any other action Assignee may reasonably request to more effectively transfer and assign to and vest in Assignee each and every component of the well system, at the sole cost and expense of the Assignor. Assignment of Well Easement - 2 2. Assumption of Water Well System Shared Use Agreement. Assignee hereby accepts the assignment of well easement including the fixtures and components of the water well system described above, and Assignor's interest in the Water Well System Shared Use Agreement dated October 22, 2007, and agrees to be bound by and abide by each and every term and condition of said easement and Water Well System Shared Use Agreement, and hereby expressly assumes all obligations of the original Grantee thereunder except those liabilities arising out of acts or omissions occurring prior to the execution of this Agreement. 3. Reservation. This easement is subject to reservation reserved in the Grantor, Glacier Park Company, in the event that such premises shall cease to be used for underground waterlines, overhead power lines, and water well purposes for a period of twelve (12) months. 4. General Provisions. For the purpose of this Agreement, time is of the essence. In the event a dispute arises concerning the breach, enforcement or interpretation of this Agreement, the parties shall meet in a good faith attempt to resolve the dispute. In the event the dispute is not resolved either by agreement of the parties, or by voluntary mediation, the dispute shall be resolved by arbitration pursuant to RCW 7.04A, the Mandatory Arbitration Rules (MAR). Venue shall be placed in Franklin County, Washington, and the prevailing party shall be awarded its attorney fees and costs against the other. DATED this �C j day of, r► � ` 2008. ASSIGNOR Farm 2005, LLC CL Ch L. Berg, LLC Met er Assignment of Well Easement - 3 STATE OF WASHINGTON ) �y County of Franklin On this day personally appeared before me CHERYL L. BERG, Member of Farm 2005, LLC, described in and who executed the within and foregoing instrument, and acknowledged that she signed the same as her free and voluntary act and deed for the uses and purposes therein mentioned. �r ?uµut I I IV bb hall ss19 F� xe 3 �pZARY a pUB4�� a County of Franklin fiend ffic ?i aphis '2�dayof �(P ,2008 Notary Public in and f6rthf State of Washington Residing at Va S C. o My Commission Expires --j - ;k t. ^ 60 _._ ss On this day personally appeared before me GARY CRUTCHFIELD, City Manager of the City of Pasco, Washington, described in and who executed the within and foregoing instrument, and acknowledged that he signed the same as his free and voluntary act and deed for the uses and purposes therein mentioned. GIVEN under my hand and ' PUBOZ Assignment of Well Easement - 4 My at . . .lW"47A1NJJM and for PUBLIC WORKS /ENGINEERING DIVISION 509-545-344-4/ FAA 509 -543 293, 525 NORTH THIRD AVENUE, PASCO, Tom Kidwell Water, Inc. 2420 W. Court Pasco, WA 99301 RE: Pump Station Agreement Dear Mr. Kidwell: February 14, 2012 Ff6 ��VFD ,040 �� 2 zple u tors The city purchased from Water, Inc., all its facilities including the pump station situated on the FCID can: within Section 16. The purchase agreement provided that the parties would provide, by separate agreemen for your potential use of the pump station for irrigation of certain agricultural lands owned by you at th; time. Since that agreement, however, you have sold those certain properties; consequently, the city is n, obligated by the purchase agreement to provide for your use of the pump station for other lands. The city understands, however, your desire to use the pump station to irrigate the agricultural lands yt presently lease from the Washington State Department of Natural Resources (DNR). Based on our rece discussions, the city will permit your use of the pump station in strict accord with the following stipulatior In exchange for the city's permission to use the pump station for the 2012 growing season, you shall: I . be responsible for all electrical costs associated with pump station; 2. be responsible (to the city's satisfaction) for all maintenance and repair costs associated with the t of the pump station during the growing season; 3. pay $2,500 for the seasonal use with payment due not later than April 30, 2012; 4. provide evidence of liability insurance of at least $100,000 and naming the city as an additioi insured; 5, indemnify and hold the city harmless from any claims whatsoever associated with use of the pu station; 6. be responsible for all costs whatsoever to acquire water from the FCID canal; 7. assure that use of water transferred through the pump station shall be restricted to those lands wit Section 16 which you have legal authority to use, 8. no chemicals shall be sprayed in any form on the pump and control systems; 9. no chemicals are to be used in or with the irrigation system. 10. pay City $I001year lease for pump equipment. The applicant is responsible for relocation, electr costs and maintenance of equipment pump. Your signature hereunder will reflect your agreement with the foregoing provisions. Agreed to: Tom Kidwell Sincerely, Ahmad Qayoumi Public Works Director Date PUBLIC WORKS /ENGINEERING DIVISION 509.545 -3444 /FAX 509 -543 P.O. BOX 293, 525 NORTH Tom Kidwell Water, Inc. 2420 W. Court Pasco, WA 99301 RE: Well Agreement Dear Mr. Kidwell: WASHINGTON 99.301 Fury 14, 2012 n p&84tC 2 < 41917 S`2 C17" CaA� The City of Pasco acquired from the Northwest Commons subdivision, as part of the preliminary ph requirements, the water rights and well in 2006. The preliminary plat requirements provided that th owner /developer could negotiate a separate agreement with the City if they wish to continue to utiW water from the well for irrigation of agricultural lands. The City understands your desire to use the well to irrigate the agricultural lands you presently lease the subdivision site. The City will permit your use of the well in strict accord with the followh stipulations. In exchange for the city's permission to use the well for the 2012 growing season, yt shall: 1. adhere to the City's operation instructions; 2. be responsible for all electrical costs associated with farm irrigation; 3. be responsible (to the city's satisfaction) for all damage, maintenance and repair costs associat, with the use of the well during the growing season; 4. pay $1,500 for the seasonal use with payment due no later than April 30, 2012; 5. provide evidence of liability insurance of at least $100,000 and naming the City as an addition insured; 6. indemnify and hold the City harmless from any claims whatsoever associated with use of the well; 7. assure that use of water shall be restricted to those lands within the subdivision of Northwest Commons; 8. no chemicals shall be sprayed in any form on the pump and control systems; 9. no chemicals are to be used in or with the irrigation system. Your signature hereunder will reflect your agreement with the foregoing provisions. Sincerely, Ahmad Qayoumi Public Works Director AQfjv Agreed to: Tom Kidwell Date Tom Kidwell Water, Inc. 2420 W. Court Pasco, WA 99301 PUBLIC WORKS/ ENGINEERING DIVISION 509 -545 -3444 /FAX 509 -54: P.O. BOX 293,525 NORTH THIRD AVENUE, PASCO, WASHINGTON 99301 FO&q 14, 2012 f^�IV�� �fB T 4 Td IT PVeC1C wV�Kb #2 RE: Well Agreement at Linda Loviisa Subdivision Dear Mr. Kidwell: Gy The City understands your desire to use the well to irrigate the agricultural lands you presently lease; the Linda Loviisa subdivision site. The City will permit your use of the well in strict accord with ti following stipulations. In exchange for the city's permission to use the well for the 2012 growir season, you shall: L Connect your system at a location approved by the City and provide a meter and valving as deemed necessary by the City. 2. adhere to the City's operation instructions; 3. be responsible for all electrical costs associated with farm irrigation; 4. be responsible (to the city's satisfaction) for all damage, maintenance and repair costs associau with the use of the well during the growing season; S. pay $2,500 for the seasonal use with payment due no later than April 30, 2012; 6. provide evidence of liability insurance of at least $100,000 and naming the City as an addition insured; 7. indemnify and hold the City harmless from any claims whatsoever associated with use of the well; 8. assure that use of water shall be restricted to those lands within the subdivision of, 9, no chemicals shall be sprayed in any form on the pump and control systems; 10. no chemicals are to be used in or with the irrigation system. Your signature hereunder will reflect your agreement with the foregoing provisions. Sincerely, Abroad Qayoumi ` ~' Public Works Director AQ /jv Agreed to: L Tom Kidwell Date PUBLIC WORKS / ENGINEERING DATISION 509.545 -3444 / FAX 509 -54 P.O. BOX 293,525 NORTH THIRD AVENUE. PASCO, WASIUNGTON 99301 April 2, 2010 Tom Kidwell Water, Inc. 2420 W. Court Pasco, WA 99301 RE: Well Agreement at Linda Loviisa Subdivision Dear ?&. Kidwell: The City understands your desire to use the well to irrigate the agricultural lands you presently leas the Linda Loviisa subdivision site. The City will permit your use of the well in strict accord with following stipulations. In exchange for the city's permission to use the well for the 2010 grov season, you shall: I . Connect your system at a location approved by the City and provide a meter and valving as deemed necessary by the City. 2. adhere to the City's operation instructiorrs; 3. be responsible for all ell etrical costs associated with farm irrigation; 4. be responsible (to the city's satisfaction) for all damage, maintenance and repair costs associ with the use of the well during the growing season; 5. pay $2,500 for the seasonal use with payment due no later than April 30, 2010; 6. provide evidence of liability insurance of at least 5100,000 and naming the City as an additi, insured; 7. indemnify and hold the City harmless from any claims whatsoever associated with use of th well; 8. assure that use of water shall be restricted to those lands within the subdivision of; 9. no chemicals shall be sprayed in any form an the pump and control systems. Your signature hereunder will reflect your agreement with the foregoing provisions. sincerely,''/ Bob Alberts Public Works Director BAlV Agreed to: Tom Kidwell Date PUBLIC WORKS / ENGINEERING DIVISION 509 -545 -3444 / FAX 509 -542 P.O. BOX 293, 525 NORTH THIRD AVENUE, PASCO, WASHINGTON 99301 March 31, 2010 Tom Kidwell Water, Inc. 2420 W. Court Pasco, WA 99301 RE: Well Agreement Dew Mr. Kidwell: The City of Pasco acquired from the Northwest Commons subdivision, as part of the preliminary pl requirements, the water rights and well in 2006. The preliminary plat requirements provided that d owner /developer could negotiate a separate agreement with the City if they wish to continue to utili water from the well for irrigation of agricultural lands. The City understands your desire to use the well to irrigate the agricultural lands you presently least the subdivision site. The City will permit your use of the well in strict accord with the followi stipulations. In exchange for the city's permission to use the well for the 2010 growing season, y shall; 1. adhere to the City's operation instructions; 2. be responsible for all electrical costs associated with farm irrigafion; 3. be responsible (to the city's satisfaction) for all damage, maintenance and repair costs associai with the use of the well during the growing season; 4. pay $1,500 for the seasonal use with payment due no later than April 30, 2010; 5. provide evidence of liability insurance of at least $100,000 and naming the City as an additioi insured; 6. indemnify and hold the City harmless from any claims whatsoever associated with use of the well; 7. assure that use of water shall be restricted to those lands within the subdivision of Northwest Commons; 8. no chemicals shall be sprayed in any form on the pump and control systems. Your signature hereunder will reflect your agreement with the foregoing provisions. Sincerely, Bob Alberts Public Works Director BA jv Agreed to: Tom Kidwell Date PUBLIC: WORKS DEPARTMENT 1509► 543 -573 "),15 -!`77 7°: 4t rnurl Pawn. 1l ashin� kt ,n wlof March 19, 2013 Tom Kidwell Water, Inc. 2420 W. Court Pasco, WA 99301 RE: Well Agreement Dear Mr. Kidwell: 37 The City of Pasco acquired from the Northwest Commons subdivision, as part of the preliminary plat requirements, the water rights and well in 2006. The preliminary plat requirements provided that the owner /developer could negotiate a separate agreement with the City if they wish to continue to utilize water from the well for irrigation of agricultural lands. The City understands your desire to use the well to irrigate the agricultural lands you presently lease at the subdivision site. The City will permit your use of the well in strict accord with the following stipulations. In exchange for the city's permission to use the well for the 2013 growing season, you shall: I. pay for seasonal use $1,330 (which includes $151.34 applicable state leasehold taxes) by April 30, 2013; 2. be responsible for all electrical costs associated with farm irrigation; 3. be responsible (to the city's satisfaction) for all damage, maintenance and repair costs associated with the use of the well during the growing season; 4. adhere to the City's operation instructions: 5. provide evidence of liability insurance of at least $100,000 and naming the City as an additional insured; 6. indemnify and hold the City harmless from any claims whatsoever associated with use of the well; /. assure that use of water shall be restricted to those lands within the subdivision of Northwest Commons; 8. no chemicals shall be sprayed in any form on the pump and control systems; 9. no chemicals are to be used in or with the irrigation system; 10. maintain and test RP; 11. if chemical is used it must he preapproved by the City. Your signature hereunder will reflect your agreement with the foregoing provisions. Sincerely, Ahmad Qayoumi Public Works Director AQ /jv J Agreed to: Tom Kidwell 31N4 Date PUBLIC WORKS DEPARTMENT (5091543-57381 VAN (509) 543 -5737 jt'f) . HM j 1?_'r` NUnh t" %\CIIUCl Pqi poY ntt pl :nytH : "y March 19, 2013 Tom Kidwell Water, Inc. 2420 W. Court Pasco, WA 99301 RE: Well Agreement at Linda Loviisa Subdivision Dear Mr. Kidwell: The City understands your desire to use the well to irrigate the agricultural lands you presently lease at the Linda Loviisa subdivision site. The City will permit your use of the well in strict accord with the following stipulations. In exchange for the city's permission to use the well for the 2013 growing season, you shall: I. pay $2,215 for seasonal use (which includes $252.04 of applicable state leasehold taxes) by April 30, 2013; 2. be responsible for all electrical costs associated with farm irrigation: 3. be responsible (to the city's satisfaction) for all damage, maintenance and repair costs associated with the use of the well during the growing season; 4. connect your system at a location approved by the City and provide a meter and valving as deemed necessary by the City. 5. adhere to the City's operation instructions; 6, provide evidence of liability insurance of at least $100,000 and naming the City as an additional insured: T indemnify and hold the City harmless from any claims whatsoever associated with use of the we] I; 8. assure that use of water shall be restricted to those lands within the subdivision of; 9. no chemicals shall be sprayed in any form on the pump and control systems; Your signature hereunder will reflect your agreement with the foregoing provisions. Sincerely,{ Abroad Qayoumi Public Works Director Agreed for fom Kidwell Date PUBLIC WORKS DEPAR,rMENT (509) 543 -5738 / FAX (509) 543 -5737 P.U. Boa' 9715 ?: Vnnh �'d :'�ri nuri P,,o 1 aAm ton 99301 tcm m pa.0 a;r coy March 19, 2613 Ton) Kidwell Water, Inc. 2420 W. Court Pasco. WA 99301 RE: Pump Station Agreement Dear Mr. Kidwell: The city purchased from Water, Inc., all its facilities including the pump station situated on the FCID canal within Section 16, The purchase agreement provided that the parties would provide, by separate agreement, for your potential use of the pump station for irrigation of certain agricultural lands owned by you at that time. Since that agreement, however, you have sold those certain properties; consequently, the city is not obligated by the purchase agreement to provide for your use of the pump station for other lands. The city understands, however, your desire to use the pump station to irrigate the agricultural lands you presently lease from the Washington State Department of Natural Resources (DNR). Based on our recent discussions, the city will permit your use of the pump station in strict accord with the following stipulations. In exchange for the city's permission to use the pump station for the 2013 growing season, you shall: 1. pay $2,215 for the seasonal use of the pump station and $90 1year lease for pump equipment (which includes $262.28 of applicable state leasehold tax) by April 30, 2013. 2. be responsible for all electrical costs associated with pump station; 3. be responsible for relocation, electrical costs and maintenance of equipment pump. 4. be responsible (to the city's satisfaction) for all maintenance and repair costs associated with the use of the pump station during the growing season; 5. provide evidence of liability insurance of at least $100,000 and naming the city as an additional insured; 6. indemnify and hold the city harmless from any claims whatsoever associated with use of the pump station; 7. be responsible for all costs whatsoever to acquire water from the FCID canal; 8. assure that use of water transferred through the pump station shall be restricted to those lands within Section 16 which you have legal authority to use. Your signature hereunder will reflect your agreement with the foregoing provisions. Sincerely, -- AhmadQayoumi Agreed to: ! O Public Works Director Tom Kidwell — _ l r Date 1 NLBLIC WORKS DEPARTAtEV7 (509) 543 -5738 / FAX (509) 543 -5737 • P I1 BoN 293 1525 Nunh , "' 4ienurl Pa+cn N a,hmNwo 09101 March 19, 2013 Tom Kidwell Water, Inc. 2420 W. Court Pasco, WA 99301 RE: Well Agreement at Rd 52 Dear Mr. Kidwell: The City understands your desire to use the well to irrigate the agricultural lands you presently lease at the Rd 52 site. The City will permit your use of the well in strict accord with the following stipulations. In exchange for the city's permission to use the well for the 2013 growing season, you shall: I . pay $2,215 for seasonal use (which includes $252.04 of applicable state leasehold taxes) by April 30, 2013; 2. be responsible for all electrical costs associated with farm irrigation; 3. be responsible (to the city's satisfaction) for all damage, maintenance and repair costs associated with the use of the well during the growing season; 4. connect your system at a location approved by the City and provide a meter and valving as deemed necessary by the City. 5. adhere to the City's operation instructions; 6. provide evidence of liability insurance of at least $100.000 and naming the City as an additional insured; 7, indemnify and hold the City harmless from any claims whatsoever associated with use of the well; 8. assure that use of water shall be restricted to those lands within the subdivision of: 9. no chemicals shall be sprayed in any form on the pump and control systems; Your signature hereunder will reflect your agreement with the foregoing provisions. Sincerely, Ahmad Qayoumi AQ /Jv Public Works Director �� l i Agreed to: t Tom Kidwell Date MASS b APPENDIX D PROJECT COST ESTIMATES Appendix D contains detailed cost estimating data used to determine project costs as presented in Section 4. Irrigation Mains Irrigation main project cost estimating data was prepared using bid tabulations from nearby irrigation districts. Some of the City of Pasco's recent bid tabulations were also used. The costs assume PVC irrigation pipe. Construction costs represented total estimated construction cost per linear foot (LF) of pipe and included sales tax. A 10 percent contingency was added to bid costs to calculate a construction subtotal. To calculate project costs, a 35 percent contingency was added to account for administrative, legal, and engineering costs. Table D -I summarizes irrigation main project costs. Table D -1 Irrigation Main Project Cost Summary Pipe Diameter (inches Project Cost per Linear Foot $/LF 4 65 6 75 8 105 10 115 12 125 16 135 18 145 20 150 24 170 Well Rehabilitation and Assessment The total project cost for well rehabilitation work is estimated at $225,500. Well rehabilitation costs are summarized in Table D -2 and are based on the following assumptions: • New pump and motor costs are not included • The City will conduct the specific capacity testing recommended at each well • The City will conduct well video surveys • Administrative, legal, and engineering costs for this project are estimated at 50 percent of the construction cost instead of 35 percent to account for additional on -site engineering representation associated with rehabilitation activities. Rehabilitation activities typically require more on -site representation than construction of new facilities. 13- 1444.407 D -1 Irrigation System Master Plan December 2013 Appendix D: Project Cost Estimates City f Pasco LMWc jectaVAIW - pascowuaresoun UWYMI Pi P mtiun\mguionryuanm =p4QWp dic %app MU d -Mjm cost aNnu &s ty Table D -2 Well Rehabilitation and Assessment Project Cost Summary Description Quantity Unit Unit Price Total Desert Sunset, Sirocco, Northwest Commons, Island Estates, 1-182, and Powerline Road Wells Mobilization and Demobilization 6 LS $1,500.00 $9,000.00 Disconnect, Remove, and Reinstall Existing Equipment 72 HR $350.00 $25,200.00 Specific capacity testing 12 HR $0.00 $0.00 Onsite Hourly Work to Perform Rehabilitation 96 HR $350.00 $33,600.00 Miscellaneous E ui ment and Chemicals 6 LS $1,500.00 $9,000.00 Video Survey 121 EA 1 $0.00 $0.00 Disinfection 61 EA 1 $1,000.00 $6,000.00 Wastewater Containment and Disposal 6 1 EA $2,500A0 $15,000.00 Subtotal $97,800.00 First Place and Desert Estates Wells Mobilization and Demobilization 2 LS $1,500.00 $3,000.00 Disconnect, Remove, and Reinstall Existing Equipment 24 HR $350.00 $8,400.00 Specific Capacity Testing 4 HR $0.00 $0.00 Onsite Hourly Work to Perform Rehabilitation 16 HR $350.00 $5,600.00 Miscellaneous Equipment and Chemicals 2 LS $1,000.00 $2,000.00 Video Survey' 4 EA $0.00 $0.00 Disinfection 2 EA $1,000.00 $2,000.00 Wastewater Containment and Disposal 2 EA $2,500.00 $5,000.00 Subtotal $26,000.00 Road 52 and Linda Loviisa Wells Specific Capacity Testing' 4 HR $0.00 $0.00 Video Survey' 2 EA $0.00 $0.00 Disinfection 21 EA 1 $1,000.00 $2,000.00 Subtotal $2,000.00 Subtotal $125,800 Construction Contingency (10 percent) $12,580 Sales Tax (8.6 percent) $11,900 Construction Subtotal $150,280 Administrative, Legal, and Engineering Costs (50 percene) $75,140 Rounded Estimated Project Cost $225,500 Notes 1. Assumes City will conduct specific capacity testing and well video surveys. 2. Administrative, legal, and engineering costs are higher due to increased on -site engineering representation for rehabilitation activities. 13- 1444.407 D -2 Irrigation System Master Plan December 2013 Appendix D: Project Cost Estimates City of Pasco k:lucymi.\13W4- Pas. Y dyWo pUP praparetionVangarion rys�av mass. planVPPeMiceaVPR du a - M jw wa stun .&cx Village of Pasco Heights Well Replacement The total project cost to replace the Village of Pasco Heights Well is estimated at $172,400. Itemized costs are summarized in Table D -3 and are based on the following assumptions: • The well pump and motor in use at the existing Village of Pasco Heights Well are in good condition and can be reused in the new well. • Costs for infrastructure expansion for connection to existing water system are not included • No permitting costs are included • No cost for a well video survey is included since the City can perform the survey The total cost includes: • Aquifer and well performance testing (e.g., step -rate and constant -rate pumping tests) • Plumbness and alignment testing • Water quality analysis • 100 feet of 10 -inch diameter PVC discharge piping to connect to the existing irrigation system General New Irrigation Well Construction A general -use project cost was developed for use in budgeting construction of a new irrigation water supply well. The total estimated project cost is $616,000. Itemized costs are summarized in Table D -4. This estimated project cost can be used on a per -well basis and is based on the following generalized assumptions: • The total depth of the new well is 200 feet • The diameter of the well is 16 inches • The length of the stainless steel screen is 20 feet • The pump is a vertical turbine type pump with a 150 -HP motor equipped with a variable -speed drive • 500 feet of 10 -inch diameter PVC discharge piping will be needed to connect the well to the existing irrigation system • The City will perform well video surveys The total cost includes: • Aquifer and well performance testing (e.g., step -rate and constant -rate pumping tests) • Plumbness and alignment testing • Water quality analysis It is possible that individual well construction costs may vary from those presented here due to fluctuations factors such as depth, diameter, production rates, aquifer characteristics, and 13- 1444.407 D -3 Irrigation System Master Plan December 2013 Appendix D: Project Cost Estimates City of Pasco kAtwc ja \I3 \1444 -P WXa MOm "YW07 Pl Ptepa IMVmigmion SeWm m WPIMnAP icestap Wka - Mj=cos wtvmles.EOCx hydraulic conditions. To take these variations into account, a contingency of 20 percent was used to estimate the construction cost of the well. The project cost included in Table D-4 is a representative cost used for budgeting purposes only. Table D -3 Village of Pasco Heights Well Replacement Project Cost Summary Description Quantity Unit I Unit Price Total Mobilization and Demobilization 1 LS $10,000.00 $10,000.00 Site Preparation 1 LS $5,000.00 $5,000.00 Drilling 20 -inch Diameter Surface Seal 20 LF $240.00 $4,800.00 Furnish and Install 20 -inch Diameter Casing 20 LF $100.00 $2,000.00 16 -inch Diameter Drill Shoe 1 0 $1,000.00 16 -inch Diameter Drilling 180 $21,600.00 Furnish and Install 16 -inch Diameter Casing 200 $14,000.00 Install Surface Seal 20 0 VHR$525.00 $800.00 16 -inch Diameter Shoe Cut 1 $4,000.00 Hourly Operations 8 $4,200.00 Well Casing Alignment 1 EA $500.00 $500.00 16 -inch Diameter Telescoping Stainless Steel Screen 10 LF $200.00 $2,000.00 16 -inch Diameter Riser Pipe and Tail Pie 15 LF $70.00 $1,050.00 Silica Sand 40 BG $16.00 $640.00 Installation of Screen Assembly 16 HR $525.00 $8,400.00 Well Development 16 HR $325.00 $5,200.00 Remove existing pump and motor and Reinstall in New Well -Piping 180 LF $20.00 $3,600.00 Furnish and Install Discharge 100 LF $85.00 $8,500.00 Operate Test Pump 30 1 HR $240.00 $7,200.00 Well Disinfection 1 LS $500.00 $500.00 Well Head Completion 1 LS $350.00 $350.00 Water Quality Analysis 1 LS $1,500.001 $1,500.00 Subtotal Construction Contingency (10 percent) Sales Tax (8.6 percent) Construction Subtotal Administrative, Legal, and Engineering Costs (35 percent) Rounded Estimated Project Cost $106,840 $10,685 $10,110 $127,630 $44,670 $172,400 13- 1444.407 D-4 Irrigation System Master Plan December 2013 Appendix D: Project Cost Estimates City of Pasco kMacymj" \13\I4W- pesco water resoumu 9WY`A?1�N <Pereli- -Wdlmm ry.meta Plen*�di.\appeo d- pj..st alvwu.&. Table D -4 New Irrigation Well Project Cost Summary Description Quantity Unit I Unit Price Total Mobilization and Demobilization 1 LS $15,140.00 $15,140.00 Site Preparation 1 LS $5,000.00 $5,000.00 Drilling 20 -inch Diameter Surface Seal 20 LF $240.00 $4,800.00 Furnish and Install 20 -inch Diameter Casing 20 LF $100.00 $2,000.00 16 -inch Diameter Drill Shoe 1 EA $1,000.00 $1,000.00 16 -inch Diameter Drilling 180 LF $120.00 $21,600.00 Furnish and Install 16 -inch Diameter Casing 200 LF $70.00 $14,000.00 Install Surface Seal 20 LF $40.00 $800.00 16 -inch Diameter Shoe Cut 1 EA $4,000.00 $4,000.00 Hourly Operations 8 HR $525.00 $4,200.00 Well Casing Ali ent 1 EA $500.00 $500.00 16 -inch Diameter Telescoping Stainless Steel Screen 20 LF $200.00 $4,000.00 16 -inch Diameter Riser Pipe and Tail Pie 15 LF $70.00 $1,050.00 Silica Sand 40 BG $16.00 $640.00 Installation of Screen Assembly Well Development New Well Pump and 150 -HP Motor with Variable-Speed Drive 16 16 1 HR HR LS $525.00 $325.00 $125,000 $8,400.00 $5,200.00 $125,000.00 Furnish and Install Discharge Piping Operate Test Pump 500 30 LF HR $85.00 $240.00 $42,500.00 $7,200.00 Well Disinfection 1 LS $500.00 $500.00 Well Head Com letion 1 LS $350.00 $350.00 Well House 1 LS $37,000.00 $37,000.00 Electrical, Instrumentation, and Controls 1 LS 38,450.00 38,450.00 Water Quality Analysis 1 I LS 1 $1,500.001 $1,500.00 Subtotal $350,030 Construction Contingency (20 percent[) $70,000 Sales Tax (8.6 percent) $36,125 Construction Subtotal $456,160 Administrative, Legal, and Engineering Costs (35 percent) $159,660 Notes Rounded Estimated Project Cost $616,000 1. Construction contingency is higher to account for uncertainty in well construction, aquifer characteristics, and hydraulic conditions. 13- 1444.407 D -5 Irrigation System Master Plan December 2013 Appendix D: Project Cost Estimates City of Pasco 01.. o*e 13 \1444 - Paz- wuerresomar mdyW07 PIa,Prepm nUm9B m system master PYntnPPe CWt PP ad -Mim wet annwms a Murray, Smith &Associates, W. Engineers /Planners Tacoma, Washington AGENDA REPORT NO. 15 FOR: City Council Date: 06/05/2014 TO: Gary Crutchfi anager FROM: Ahmad Qayo i, Public Works Director Workshop Mtg.: 06/09/2014 Regular Mtg.: 06/16/2014 SUBJECT: Six -Year Transportation Improvement Plan 2015 - 2020 I. REFERENCE(S): 1. Six -Year Transportation Improvement Plan 2015 — 2020 - Proposed Plan 2. Six -Year Transportation Improvement Plan 2015 — 2020 - Resolution 3. Six -Year Transportation Improvement Plan 2015 — 2020 - Map H. ACTION REQUESTED OF COUNCIL /STAFF RECOMMENDATIONS: 06/09: Discussion 06/16: Conduct Public Hearing 06/16: MOTION: I move to approve Resolution No. thereby adopting the City's Six -Year Transportation Improvement Plan for 2015 -2020. III. FISCAL IMPACT: None IV. HISTORY AND BRIEF FACTS: A) Each year, all Cities and Counties in the State are required to adopt an updated Six -Year Transportation Improvement Plan specifically for federal and state funded projects. For the City of Pasco, this plan has consisted of all projects including the annual overlays, street widening, and signal projects which are within the City limits. Larger projects such as the Lewis Street Overpass also have been shown. B) The proposed six -year program represents those projects that are anticipated to be needed within six years. Several projects will need to be coordinated with utility projects which could change the actual timing of the projects. Although this process of adopting a six -year plan is a state requirement, the Council will again review the projects in the annual Six -Year C.I.P. process and the budgeting process. While the worksheets presented by staff include a potential funding source, many of the projects listed will be dependent upon available funding. In addition, staff will be pursuing available grants from the various funding programs. Staff recommends the plan be presented at a public hearing on June 16, 2014, and that Council adopt the plan by resolution. 4(d) W Lei O � o � N � 1 � � p O p N � W C!3 C� p rte. QI i � O � U r U �O 0 � o � N 0 kr) � O I�1 � O •TT� ^^y Vl a z 1 O V a 4•+ O y U z b ro a a b y a ro Q a 0 ro 9 r a a a a o v o C o v OOOa�Uv a nvC7�i wUv� 000 o7Q�i� �I�I�INI� 66I6e I�sI�nI�sI &S IU9I66IGe IESI'.SIEn IEoqIGosIGO I�i�s ■ I�I�sIGl)I�I�I I's I-,�I�I� w 0 v o Grob Z i .*O bA 5%u ro b O q U o c o v r Z ro U ° w u z Ln 3 CJ w Uro U �O b 'd b m V5 U W ro ro > a C7 ro w ro q G o UTCA�Q����aoZQo�. °� U`�QOaOu CdobQ.� roW a��wc4CaA �y��Q° > ° Afw o v > N o q ��HQxav3o�oW a a 00od¢�H ¢�g000cnga0.lN �:000al.��N.°i nl °w �b0 n W itl 0 .0 .Q Q •� N 00 > N � 0 0 0 0 0 �+ O ti U U U U U O a _� dd O q O O O 0 p : a Qp�j ; O ol O O 7 Vl . > 24;� CO CO O N 'drD Q O N R O O > ' > > 3 > 0 4 p V-O w 0 v o Grob Z i .*O bA 5%u ro b O q U o c o v r Z ro U ° w u z Ln 3 CJ w Uro U �O b 'd b m V5 U W ro ro > a C7 ro w ro q G o UTCA�Q����aoZQo�. °� U`�QOaOu CdobQ.� roW a��wc4CaA �y��Q° > ° Afw o v > N o q ��HQxav3o�oW a a 00od¢�H ¢�g000cnga0.lN �:000al.��N.°i nl b � N w Q a Q w w w ro c r° ro Cn > > Y 77.: -,Z U � l O�maww'�� 0 O.aUv Q pe) O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O n O O O O O O O O O O O O O O O O O O OO .r O O ct 1p O O O N nj O O N M O N .-. 69 69 69 69 69 69 fH 69 69 69 69 69 69 69 69 69 69 69 > N y W o C G C G Y 'O O H rn y y v, M YO O O O O 77 C O O O O O �" Y v v o U a W s> VI 4V Y 'yam Vi N a s a 0 Q 0' o .0 a a a .a a �0 > m =3°� as = >x O _O O O .� N Q� O O O_ y ti Q O J, e� Cd ro w O p _O _O c� V] 'b > i Q CYi-. H (V 7 >> i% J W rte% N U z z w o H U Q � z W F v � O oZ H o ^ Qn O �3 zQ C c ° Cl) w j q tf w j Q 0. C x Q .Q N cn U x ro O C coE �LpCLn tl,, W U N .D , , O Q a > n a C6 U O (A O [ U ¢ �d Q °� C, x R 0.x CA 3 O r3 O ��C 7 ❑a C �°N a°ca '�O N N b 3 O O N O N : N N Q I Q C2 0.i >" N N G cn r7 N Q Q RESOLUTION NO. A RESOLUTION adopting the revised and extended Comprehensive Street, Storm Drain and Bridge Programs for the City of Pasco. WHEREAS, RCW 35.77.010 provides for annual revision and extension of the Comprehensive Street Program of each city and town, after public hearing thereon; and WHEREAS, it is now time to revise and extend the Comprehensive Street, Storm Drain and Bridge Programs; and NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO, That the City Council of the City of Pasco hereby adopts the revision and extension of the Comprehensive Street, Storm Drain and Bridge Programs for the ensuing six years as attached hereto and labeled "Six -Year Transportation Improvement Plan 2015 - 2020" incorporated by this reference as though fully set forth herein; and Be It Further Resolved, that the Comprehensive Street, Storm Drain and Bridge Programs shall be filed with the Benton - Franklin Regional Council and the State of Washington. PASSED by the City Council of the City of Pasco this 16th Day of June, 2014. Matt Watkins Mayor ATTEST: Debra L. Clark City Clerk APPROVED AS TO FORM: Leland B. Ken City Attorney r T+n �a law .r ' IL.— Illluul.r -� • L w m .gym 1111 a ■ ■ ■■r� - .-- X111111.. ■um •••••• i -.a.'il E l• MMAJI 11111111 ��� \ ,\` 11 ■Pill ■��i�_� � ; ,� _ = II PAM ll��il % /ANi11i � ��11:i 11 :l F� ♦Til1�1Y111un1.- ;illl IE "1111YIIfli.;� ��t'��'i I!��Il�lr \�i■ �` _ SHE ��■■ .■� �,. � - nom, � ff� ,' 11 ■ Ilse �V1 �1�111� IYII��E p 111 Ills Liles qL un eeeeeeeeeea AGENDA REPORT FOR: City Council TO: Gary Crutchfie anager Rick Terway, Admin & Community Services FROM: Dunyele Mason, Financial Services Manager SUBJECT: Billing & Collection Processes I. REFERENCE(S): H. Il. 100 V 1. Billing & Collection Processes - Proposed Ordinance June 2, 2014 Workshop Mtg.: 6/9/14 Regular Mtg.: 6/16/14 ACTION REQUESTED OF COUNCLUSTAFF RECOMMENDATIONS: 6/9: Discussion 6/16: MOTION: I move to adopt Ordinance No. , amending Pasco Municipal Code Title 3 establishing various fees, defining acceptance of credit cards and establishing procedures for miscellaneous billing and, further, authorize publication by summary only. FISCAL IMPACT: HISTORY AND FACTS BRIEF: A) The city bills for various types of services. The utility billing and collection rules are listed in Title 3 Chapter 200. Rent billing and collections processes are covered by individual contract. LID and cemetery billings and collections are covered by ordinance. Other types of services' (e.g. ambulance, abatements, inspections, false alarm response, etc.) billing and collection processes are not currently specified in the Pasco Municipal Code. Licenses, permits and impact fees are prepaid rather than a billed service and are therefore specifically excluded from this discussion. B) The city currently accepts credit cards for utility bills, cemetery bills, golf course activities and recreation activities. The attached ordinance would expand this acceptance to other billed services such as ambulance, fence replacement, back flow devices, engineering inspection, etc. It would continue to prohibit the use of credit cards to pay for non - billed charges such as permits, taxes, licenses, etc. DISCUSSION: A) Establish consistent due dates and collections fees for all billed services. Except as specified by contract or specific ordinance (e.g. rents, LIDS, etc.) billing and collection processes will be consistent with the utility billing and collection processes: Due when billed, $10 penalty at 28 days, $10 collection fee at 38 days, a $10 Pre - Collect collection agency notice at 45 days and turned over to outside collection agency at 75 days (5% collection agency fee). B) Expand credit card acceptance to include the remaining billed services. The use of credit cards for billed services is a way keep customer loan activities in the private sector. Examples of billed services are services for ambulance, cemetery, backflow devices, code enforcement, fence replacement, engineering inspections, false alarms, etc. Payment by credit card allows the customer to pay debts to the city in full, and immediately, when billed. The customer can then pay their debt to the credit card company (private lender) by setting the monthly payments at whatever they can afford. This is a cost effective alternative to the city establishing installment payment plans. I C) Formalize current policy of accepting credit cards for Recreational programs. Keeping the city out of the lending business is one reason to accept credit cards; the other is to promote certain activities or programs. The attached ordinance puts into code the current practice of promoting recreational (including golf course) activities by accepting credit cards and by waiving associated debit/credit card processing fees. D) Formalize current policy to disallow credit card (but allow debit card) use for prepaid (non - billed) charges. The processing fees for credit cards are higher than they are for debit cards because credit cards are paid over time and are a form of lending. Debit cards generally carry a lower processing cost because they transfer payment immediately and therefore are just to cover the one time transaction processing cost. Permitting, licensing and B &O tax processing activities are carried out primarily by the business sector and are normal business activities. The city does accept debit cards to provide business customers payment convenience. Unlike individuals that incur sudden, large bills (such as for Cemetery and Ambulance services), businesses typically have access to other types of credit (e.g. bank line of credit) that do not require the city to incur any financing costs. The code change maintains current practice for taxes, licenses and permit payments. E) Establish guidelines for installment billings: Installment plans should only be used for individuals and be short-term; an installment plan should not be authorized merely as a mechanism for customer convenience. All installment payment plans should be in writing in a form prescribed by the city and signed by both the customer and the Finance Manager. Installment payment plans would be available as follows: 1. For debts owed by individuals only. Installment plans are not available for debts owed by corporations, partnerships, businesses or other entity or associations; and 2. For debts as defined in 3.300.010 (which include such services as ambulance, cemetery, backfiow devices, fencing replacement, etc.); and 3. All installment payment plans must provide for payment in full within twelve months of the original bill date. Monthly payments are to be a minimum of $100. In cases of financial hardship, the applicant may request and the Finance Manager is authorized to set a reduced monthly payment of not less than $50 per month. Any installment plan should include a loan origination fee equal to the greater of 3% the amount owed or $10 and a per installment billing fee of $5. F) Existing agreements. Agreements entered into prior to the effective date would remain in place until paid in full or default (missed payment) occurs. If default occurs then the entire remaining amount becomes immediately due and payable. ORDINANCE NO. AN ORDINANCE of the City of Pasco, Washington, amending Title 3 "Revenue and Finance" establishing various fees, defining acceptance of credit cards and establishing procedures for miscellaneous billing. WHEREAS, the City provides a variety of services whereby the customer is billed for services rendered; and WHEREAS, some of those billing and collection processes are not currently included in municipal code; and WHEREAS, unifying billing and collection processes will provide a more efficient means of administering those systems and provide a more convenient and equitable system for the City's customers; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF PASCO, WASHINGTON, DO ORDAIN AS FOLLOWS: Section 1. That the following subsections of the Pasco Municipal Code 3.200.140 pertaining to utility payments shall be repealed: Section 2. That Section 3.200.140 entitled "MISCELLANEOUS UTILITY CHARGES" of the Pasco Municipal Code, shall be and hereby is amended to read as follows: J) There shall be a charge as set forth in Chanter 3.07 of this code to be known as the "Utility Lien Search Fee" for providing a legally binding utility pay-off estimate pursuant to RCW 60.80.020. Section 3. That Chapter 3.112 RETURNED CHECKS the Pasco Municipal Code, shall be and hereby is amended to read as follows: CHAPTER 3.112 MWRNED CHECKS AND ELECTRONIC PAYMENTS Sections: 3.112.010 PENALTY E-E RETURNED PAYMENT PENALTY — IMPOSITION 3.112.020 nvr.re r� T� CASH ONLY— AUTHORITY 3.112.030 RETURNED PAYMENT PENALTY NOTICE 3.112.040 MISCELLANEOUS PAYMENT PROCESSING CHARGES 3.112.050 DEBIT /CREDIT CARD ACCEPTANCE 3.112.010 PE- � RETURNED PAYMENT PENALTY — IMPOSITION. Any person, corporation, business or partnership or other entity or association, issuing a bank check, of draft or electronic form of payment including, but not limited to debit cards and credit cards to the City of Pasco, or any of its departments, shall be assessed by the City Finance Department a penalty fee known as the "Returned Payment Fee" as set forth in the fee provisions of this code, if the pa}nnent bank eheek or d,44--is returned to the City unpaid or otherwise not processed when presented the aeeaunt e f 1 payer-i,. 3.112.020 PENALTY Y FEE CASH ONLY — AUTHORITY. The City Finance Department and any other City Department is authorized not to accept the bank check or draft of a person, corporation, business, partnership, or other entity or association assessed the penalty fee set out in Section 3.1120.010 until the penalty fee has been paid along with the amount of the underlying bank check or draft by cash, cashier's check or money order. 3.112.030 NOTICE. Notice of the penalty fee imposed by Section 3.112.010 and the authority imposed by Section 3.112.020 shall be posted in a place or places that is open to the view of the general public at-- 1 where payments are accepted from members of the public Additionally, notice of the penalty shall be included on all billing invoices. 3.112.040 MISCELLANEOUS PAYMENT PROCESSING CHARGES. There shall be a charge as set forth in Chapter 3.07 of this code the following charges: A) "Debit Card Convenience Fee (Counter)" for payments made by debit card and processed at the utility payment counter and the "Debit /Credit Card Convenience Fee (Web)" for payments made by debit /credit card and processed via the on -line web payment system B) "On -line Processing Assistance Fee" for payments made over the phone that utiliz p e office .personnel to process the transaction via the on -line or phone Payment system 3.112.050 DEBIT /CREDIT CARD ACCEPTANCE. Credit cards will be accg ted as payment for all billed charges related Payment processing charges and all charges incurred at the Sun Willows Golf Course City View Cemetery and through the Recreation Division Credit cards will not be accepted for permits licenses taxes and other fees where payment is required before service, license or Permit is provided Debit cards are accepted for all fees Permits and licenses whether billed or not Section 4. That Section 3.07.150 entitled "Utilities - Billing" of the Pasco Municipal Code, shall be and hereby is amended to read as follows: 3.07.150 UTILITIES — BILLING 3 Fee /Charge Reference A) Application Fee 1) Service to new connection $15.00 13.16.010 2) Service to existing connection $15.00 3.200.140 (A) B) Utility Deposit Water Consumption Factor $75.00 3.200.040 C) Disconnect Collection Weeess Fee $50.00 3.200.140(0) D) Field Service 1) Field Service Fee $15.00 3.200.140(D) 2) After Hours Fee $75.00 3.200.140(E) 3) After Hours Fee /Collection $25.00 3.200.140(F) E) Unauthorized Reconnect Penalty $50.00 3.200.110 F) Late Pay penalty $10.00 3.200.140(B) G) Phei =e Celleetig = Fr-apeqg Collection $10.00 3.200.140(B) Notification Fee H4 Debit Card Geavenietiee V4-50 3.200.14O(� Fee, -eulitef) &1 -.-50 Phone Opefator-Asstat-�[4e S3.0 (� 14} Phone Ne n ssist n 7*n -r &2-.W Utility Lien Search Fe $30.0 0 3.200.140 (J) 1?}i) Meter test (accuracy test of meter) $60.00 13.24.030 Fire Line - per month $8.00 13.28.060 #)K) Meter repair $100.00 plus 13.24.100 time /material 9}L) Sewer tap and inspection (In/ Out City) $75.00 13.52.140 P4M) Water tap application fee (each) $150.00 3 Section 5. That Section 3.07.090 entitled "MISCELLANEOUS" of the Pasco Municipal Code, shall be and hereby is amended to read as follows: A) Photocopy Fees — per copy B) Returned Cheeps Payment Fee Fj Utilitp/ -Lien Seareh Fee Fee /Charge $ 0.15 $25.00 C) Debit Card Convenience Fee (Counter( $38,00 0.50 D) Debit/Credit Card Convenience Fee (Web) $ 1.50 E) Phone Operator Assist Payment Fee 3.00 F) Phone No Assist Payment Fee $ 2.00 G) Late Pay Penalty $10.00 H) Phone & Collection Fee $10.00 I) Pre - Collection Fee $10.00 J) Collection Turnover Fee (charges penalties & fees) 5% K) Installment Plan Origination Fee ($10 min) 3% L) Installment Plan Monthly Bill Fee $ 5.00 Reference Admin Order 42 3.112.010 Cftl 3.112.040 A) 3.112.040 A) 3.112.040 B) 3.112.040 B) 3.300.050 A) 3.300.050 B) 3.300.050 C) 3.300.050 D) 3.300.070 D) 3.300.070 D) Section 6. That Section 3.200.080 entitled "DELINQUENCY" of the Pasco Municipal Code, shall be and hereby is amended to read as follows: 3.200.080 DELINQUENCY. A) All utility charges shall be due immediately upon billing and become delinquent if not paid in full twenty days after the date of billing. Late fees, penalty fees and collections fees are considered delinquent when assessed. B) Notice of delinquency shall be sent on the subsequent monthly bill informing the customer that a late pay penalty fee has been added and if payment for all delinquent charges is not received by the date, time and location listed on the notice, additional fees will be incurred and water service may be stopped without further notice. A copy of the delinquent bill will also be sent to the owner for all delinquent tenant accounts. Delinquent charges €eFw4ieh- paynww has not be reeei a that are not paid by ten days past the subsequent monthly bill date shall be sent a phone notification to the customer's designated local phone number on file stating the date and time by which payment must be received in order to be excluded from the disconnect collection process. Delinquent charges s - ° hieh r°', +e ' ' that are not paid by twelve days past the subsequent monthly bill date shall be subject to disconnection of water service until payrrient has been a f all delinquent charges are paid unless the manager and the customer establish a written and signed payment arrangement to provide for payment of all charges billed and expected to be billed by the last payment date of the arrangement. Payment arrangements are not automatic and are to be based on a written policy established by the City Manager and administered by the manager. Failure to adhere to the written arrangement will result in additional fees as specified in Chapter 3.07 and disconnection of water service without further notice. If an account is processed through the disconnect collection process for two consecutive months or any three times within the last twelve months, the manager may require payment for all current as well as delinquent charges be received prior to reconnecting water service. 4 C) A separate delinquent notice, in addition to the notice pursuant to paragraph (B) shall be delivered to the service location of multi - family and commercial properties at least seven days prior to scheduled disconnection of service to provide tenants the opportunity to contact the landlord or to arrange payment prior to the disconnection of service. Section 7. That a new Chapter 3.300 entitled "Miscellaneous Billing Management" of the Pasco Municipal Code, shall be and hereby is created and shall read as follows: Chanter 3.300 MISCELLANEOUS BILLING MANAGEMENT Sections: 3.300.010 DEFINITIONS 3.200.020 FAILURE TO RECEIVE MAIL - CHANGE IN ADDRESS OR OWNERSHIP 3.300.030 ORDER OF PAYMENT 3.300.040 BILLING 3.300.050 DELINQUENCY 3.300.060 AMBULANCE INSURANCE COVERAGE 3.300.070 CEMETERY SERVICES 3.300.080 INSTALLMENT PAYMENTS 3.300.090 BACKBILLS- PREPAYMENT REQUIRED 3.300.100 HEARING AND APPEAL. 3.300.010 DEFINITIONS. For the purpose of this Chapter, certain terms or words shall be interpreted or defined as follows. Except as defined in this section all words in this title shall carry the customary meanings. Words used in the present tense include the future and the future includes the present and the plural includes the singular and the singular includes the plural. This chapter specifically excludes debts and services covered by Chapter 3.200 Utility Billing Management, or is set out by specific contract (e.g. rents), or is set out by specific ordinance or resolution (e.g. Local Improvement District debt). If contracts are silent as to payment terms or conditions, then this chapter shall apply. A) "Manager" means the Finance Manager, and his or her designee. B) "Office business hours" means Monday through Friday from 8:00 a.m. to 5:00 p.m. excluding holidays where city offices are closed. C) "Office nonbusiness hours" means any days and hours not included in office business hours. D) "Paid" means payment that has been received, processed and posted to the customer's account. E) "Billing office" means the Finance Division office inside City Hall, which is located at 525 N P Ave Pasco, WA. It specifically excludes the drop box located at City Hall or any other location. 3.300.020 FAILURE TO RECEIVE MAIL - CHANGE IN ADDRESS OR OWNERSHIP. Failure to receive mail shall not be recognized as a valid excuse for failure to pay bills when due. Change in ownership of property and change in mailing address must be made in writing to the Finance Department. All bills and notices, including delinquency and collection notices shall be sent to the customer's billing address provided the City. 3.300.030 ORDER OF PAYMENT. Payments received shall be applied against outstanding charges in the following order: Interest and finance charges, late and penalty fees, collection charges, then charges in the order listed on the invoice. Overpayments may be applied to other invoices for the same customer. If no other outstanding invoices exist then the overpayment shall be refunded. Refunds will be issued within two weeks of the receipt of the overpayment 3.300.040 BILLING. All charges shall be due immediately upon billing and become delinquent if not paid in full to the billing office during office hours within twenty -eight days of the original bill date. Late fees, penalty fees and collections fees are considered delinquent when assessed. Bills shall include notice of availability of an installment payment plan when applicable and the process for the customer to request such a payment plan. 3.300.050 DELINQUENCY. Delinquent bills shall be processed as follows: A) Invoices that are not paid in full within twenty -eight days will incur a penalty known as a "Late Payment Penalty" in an amount as set forth in Chapter 3.07. A delinquent notice indicating the amount of the invoice and penalty will be mailed. The notice shall also include the timeline for the additional of future collection fees as outlined below (at thirty -eight days and forty -five days) as well as the process for the customer to dispute charges or request a payment plan (if applicable). B) Bills not paid in full within thirty -eight days from the original bill date will incur a collection fee known as "Phone & Collection Fee" in an amount as set forth in Chapter 3.07. The customer will be called at the phone number provided by the customer to the city Finance Department. If no phone number is provided the city, at a minimum, will check the local phone book to try and locate a phone number. The collection fee applies irrespective of the phone call outcome. C) Bills not paid in full within forty -five days of the original bill date will be flagged to turn over to an outside collection agency for follow up. A "Pre- Collect" notice will be sent informing the customer they have 30 days to either pay in full (including penalties and collection charges) or dispute the charges or their account will be turned over to an outside collection agency and that an additional collection fee has been added. Customers will also be notified that once the bill (including penalties and collections charges) has been turned over collection then their right to dispute charges becomes forfeit and the account will not be withdrawn from the outside collection process once it is turned over. A collection fee known as "Pre - Collection Fee" in an amount as set forth in Chapter 3.07 will be added. D) Bills (including penalties and collections charges) not paid in full within seventy - five days of the original bill date and which are not in dispute and which are not covered by an installment payment plan will be turned over to an outside collection agency. Accounts turned over to an outside collection agency incur an additional collection fee by the city known as the "Collection Turnover Fee" at the time of transfer as set forth in Chapter 3.07 and will incur interest charges at the maximum rate allowed by state law starting with the date of transfer. 3.300.060 AMBULANCE INSURANCE COVERAGE. The responsibility for payment of ambulance and medical service charges remains with the patient (or patient's family if a minor). In the case of ambulance charges, if the customer assigns the right to collect payment from an insurance company and provides all information and approvals when requested, the city will bill the insurance company directly. Once the insurance company has paid, then the rol remaining amount will be billed to the customer per 3.300.040. If the insurance company has not paid within sixty days, then the full amount will be billed to the customer per 3.300.040. The customer may request an installment payment plan per 3.300.060. If insurance proceeds are later received by the city then the overpayment will be refunded to the customer. 3.300.070 CEMETERY SERVICES. All cemetery goods and services must be paid for either at the time of sale, or before burial, provided, however upon acceptance of application for time payment, the account may be paid over time as follows. Fifty percent of the invoice must be paid prior to burial; the remaining amount exceeding $1,500 must be paid within sixty days. The last $1,500 must be paid in no longer than twelve months from the original invoice date. 3.300.080 INSTALLMENT PAYMENT PLANS. Per 3.112.040 credit cards are accepted for all billed debts. The city is considered the lender of last resort when there are no savings or other credit avenues available. An installment plan is not authorized merely as a mechanism for customer convenience. All installment payment plans must be in writing in a form prescribed by the city and signed by both the customer and the manager. Installment payment plans are available as follows: A) For debts owed by individuals only. Installment plans are not available for debts owed by corporations, partnerships, businesses or other entity or associations. B) For debts as defined in 3.300.010. C) All installment payment plans must provide for payment in full within no later than twelve months of the original bill date with $100 per month as the recommended minimum payment. An applicant may request a financial hardship waiver from the manager who is authorized to set a lower monthly payment. Such lower payment shall be no less than $50 per month. D) There shall be a charge known as the "Installment Plan Origination Fee" as well as a flat rate, per installment, processing fee known as the "Installment Processing Fee ". Both amounts are set forth in Chapter 3.07. 3.300.090 BACK BILLS - PREPAYMENT REQUIRED. An applicant who is liable to the City for unpaid, past due charges may be required to pre -pay for future services. Service may be denied to any person or persons who use any deceptive, unlawful, or misleading means or device whatsoever to avoid or minimize the payment for services or other charges owed. 3.300.100 HEARING AND APPEAL. Any person aggrieved by the assessment of any charge, fee, or penalty, may, within ten (10) days of receipt of the City's billing to which they are objecting, in writing, upon a form provided by the City, request an informal administrative hearing before the manager. The manager hearing this dispute shall be authorized to correct any errors to the customer's billing. The appeal hearing shall be scheduled by the manager at City Hall and conducted during regular business hours within seven (7) business days of receipt of the appeal. A written decision shall be delivered to the customer at the address designated on the appeal within ten (10) days of the hearing. Section 8. This Ordinance shall take effect September 1, 2014. 7 PASSED by the City Council of the City of Pasco at a regular meeting the 16th day of June 2014. Matt Watkins, Mayor ATTEST: Debra L. Clark, City Clerk APPROVED AS TO FORM: Leland B. Kerr, City Attorney FOR: City Council TO: Gary Crutchf Rick Terway, AGENDA REPORT & Community Services FROM: Dunyele Mason, Financial Services Manager SUBJECT: Local Government Investment Pool I. REFERENCE(S): H. H. IV VA May 23, 2014 Workshop Mtg.: 6/9/14 Regular Mtg.: 6/16/14 1. Local Government Investment Pool — Proposed Resolution 2. Local Government Investment Pool — Prospectus 3. Local Government Investment Pool — Transaction Authorization Form ACTION REQUESTED OF COUNCIL /STAFF RECOMMENDATIONS: 6/9: Discussion 6/16: MOTION: I move to adopt Resolution No. , naming Dunyele Mason as the "authorized individual" to authorize all amendments, changes or alterations to the Local Government Investment Pool Transaction Authorization Form and to acknowledge the terms and conditions of participation as outlined in the prospectus. FISCAL IMPACT: HISTORY AND FACTS BRIEF: A) The city utilizes the investment expertise of the State Treasurer's office and invests its excess cash into the Local Government Investment Pool (LGIP). In an effort to provide more clarity regarding how the LGIP operates and as a result of recently amended state WACs the LGIP has created and distributed a prospectus. B) As a condition of continued participation in the LGIP, the State Treasurer is requiring each investor to provide a copy of a Resolution that acknowledges the governing body has read, received and understands the prospectus as well as specifically designates, by name, the "authorized individual" that is authorized to create all amendments, changes and alterations to the Transaction Authorization Form (which controls who is allowed to move money and to designate which bank accounts money comes in and out of). Changes to the "authorized individual" must be made by a new resolution. DISCUSSION: C) The state is requesting a person's name rather than title to be specifically named by Resolution as the "authorized individual." As the Financial Services Manager is already bonded, staff recommends that Dunyele Mason be so named. 4(f) RESOLUTION NO. A RESOLUTION AUTHORIZING INVESTMENT OF MONIES IN THE LOCAL GOVERNMENT INVESTMENT POOL. WHEREAS, pursuant to Chapter 294, Laws of 1986, the Legislature created a trust fund to be known as the Public Funds Investment Account [commonly referred to as the Local Government Investment Pool (LGIP)] for the contribution and withdrawal of money by an authorized governmental entity for purposes of investment by the Office of the State Treasurer; and WHEREAS, from time to time it may be advantageous to the authorized governmental entity, the City of Pasco, the "governmental entity," to contribute funds available for investment in the LGIP; and WHEREAS, the investment strategy for the LGIP is set forth in its policies and procedures; and WHEREAS, any contributions or withdrawals to or from the LGIP made on behalf of the governmental entity shall be first duly authorized by the Pasco City Council, the "governing body" or any designee of the governing body pursuant to this resolution or a subsequent resolution; and WHEREAS the governmental entity will cause to be filed a certified copy of said resolution with the Office of the State Treasurer; and WHEREAS the governing body and any designee appointed by the governing body with authority to contribute or withdraw funds of the governmental entity has received and read a copy of the prospectus and understands the risks and limitations of investing in the LGIP; and WHEREAS, the governing body attests by the signature of its members that it is duly authorized and empowered to enter into this agreement, to direct the contribution or withdrawal of governmental entity monies, and to delegate certain authority to make adjustments to the incorporated transactional forms, to the individuals designated herein. NOW THEREFORE, BE IT RESOLVED that the governing body does hereby authorize the contribution and withdrawal of governmental entity monies in the LGIP in the manner prescribed by law, rule, and prospectus. BE IT FURTHER RESOLVED that the governing body has approved the Local Government Investment Pool Transaction Authorization Form (Form) as completed by Dunyele Mason and incorporates said form into this resolution by reference and does hereby attest to its accuracy. BE IT FURTHER RESOLVED that the governmental entity designates Dunyele Mason, Finance Manager, as the "authorized individual" to authorize all amendments, changes, or alterations to the Form or any other documentation including the designation of other individuals to make contributions and withdrawals on behalf of the governmental entity. BE IT FURTHER RESOLVED that this delegation ends upon the written notice, by any method set forth in the prospectus, of the governing body that the authorized individual has been terminated or that his or her delegation has been revoked. The Office of the State Treasurer will rely solely on the governing body to provide notice of such revocation and is entitled to rely on the authorized individual's instructions until such time as said notice has been provided. BE IT FURTHER RESOLVED that the Form as incorporated into this resolution or hereafter amended by delegated authority, or any other documentation signed or otherwise approved by the authorized individual shall remain in effect after revocation of the authorized individual's delegated authority, except to the extent that the authorized individual whose delegation has been terminated shall not be permitted to make further withdrawals or contributions to the LGIP on behalf of the governmental entity. No amendments, changes, or alterations shall be made to the Form or any other documentation until the entity passes a new resolution naming a new authorized individual; and BE IT FURTHER RESOLVED that the governing body acknowledges that it has received, read, and understood the prospectus as provided by the Office of the State Treasurer. In addition, the governing body agrees that a copy of the prospectus will be provided to any person delegated or otherwise authorized to make contributions or withdrawals into or out of the LGIP and that said individuals will be required to read the prospectus prior to making any withdrawals or contributions or any further withdrawals or contributions if authorizations are already in place. 2014. PASSED by the City Council of the City of Pasco, Washington, this 16th day of June, SIGNED in authentication of its passage this _ day of , 2014. Matt Watkins, Mayor ATTEST: Debra Clark, City Clerk Leland B. Kerr, City Attorney LOCAL GOVERNMENT INVESTMENT POOL Prospectus January 2014 James L. McIntire Washington State Treasurer Contents The LGIP 3 -4 wLei oovernment investment Pool —Money Market Fund 4 -9 Ill. Mdridgement 9 -10 I. The LGIP The Local Government Investment Pool (the "LGIP ") is an investment pool of public funds placed in the custody of the Office of the Washington State Treasurer (the "State Treasurer ") for investment and reinvestment as defined by RCW 43.250.020. The purpose of the LGIP is to allow eligible governmental entities to participate with the state in the investment of surplus public funds, in a manner that optimizes liquidity and return on such funds. In establishing the LGIP, the legislature recognized that not all eligible governmental entities are able to maximize the return on their temporary surplus funds, and therefore it provided a mechanism whereby they may, at their option, utilize the resources of the State Treasurer to maximize the potential of their surplus funds while ensuring the liquidity of those funds. The State Treasurer has established a sub -pool within the LGIP whose shares are offered by means of this Prospectus: The LGIP -Money Market Fund (the "LGIP -MMF" or the "Fund "). The State Treasurer has the authority to establish additional sub -pools in the future. The Fund offered in this Prospectus seeks to provide current income by investing in high - quality, short term money market instruments. These standards are specific to the Fund, as illustrated in the following table. The LGIP -MMF offers daily contributions and withdrawals. FUND SNAPSHOT The table below provides a summary comparison of the Fund's investment types and sensitivity to interest rate risk. This current snapshot can be expected to vary over time. LGIP -Money Market Fund Current Investments (as of November 1, 2013) Fees and Expenses Cash Bank Deposits US Treasury bills Repurchase agreements US Government aeencv 60 days Administrative Fee. The State Treasurer charges pool participants a fee representing administration and recovery costs associated with the operation of the Fund. The administrative fee accrues daily from pool participants' earnings prior to the earnings being posted to their account. The administrative fee will be paid monthly. In the event that there are no earnings, the administrative fee will be deducted from principal. The chart below illustrates the operating expenses of the LGIP -MMF for past years, expressed in basis points as a percentage of fund assets. Local Government Investment Pool -MMF Operating Expenses by Fiscal Year (in Basis Points) 2006 2007 2008 2009 2010 2011 2012 2013 Total Operating Expenses 1.12 0.96 0.84 a88 0.64 a81 0.68 0.87 (1 basis point = 0.01 %) Because most of the expenses of the LGIP -MMF are fixed costs, the fee (expressed as a percentage of fund assets) will be affected by: (i) the amount of operating expenses; and (ii) the assets of the LGIP -MMF. The table below shows how the fee (expressed as a percentage of fund assets) would change as the fund assets change, assuming an annual fund operating expenses amount of $800,000. Fund Assets $6.0 bn $8.0 bn $10.0 bn Total Operating Expenses (in Basis Points) 1.33 1.0 .80 Portfolio Turnover: The Fund does not pay a commission or fee when it buys or sells securities (or "turns over" its portfolio). However, debt securities often trade with a bid /ask spread. Consequently, a higher portfolio turnover rate may generate higher transaction costs that could affect the Fund's performance. II. Local Government Investment Pool - Money Market Fund Investment Objective The LGIP -MMF will seek to effectively maximize the yield while maintaining liquidity and a stable share price of $1. Principal Investment Strategies The LGIP -MMF will seek to invest primarily in high - quality, short term money market instruments. Typically, at least 55% of the Fund's assets will be invested in US government securities and repurchase agreements collateralized by those securities. The LGIP -MMF means a sub -pool of the LGIP whose investments will primarily be money market instruments. The LGIP -MMF will only invest in eligible investments permitted by state law. The LGIP -MMF will not be an SEC - registered money market fund and will not be required to follow SEC Rule 2a -7. Investments of the LGIP -MMF will conform to the LGIP Investment Policy, the most recent version of which will be posted on the LGIP website and will be available upon request. Principal Risks of Investing in the LGIP -Money Market Fund Counterporty Credit Risk. A party to a transaction involving the Fund may fail to meet its obligations. This could cause the Fund to lose the benefit of the transaction or prevent the Fund from selling or buying other securities to implement its investment strategies. Interest Rate Risk. The LGIP -MMF's income may decline when interest rates fall. Because the Fund's income is based on short -term interest rates, which can fluctuate significantly over short periods, income risk is expected to be high. In addition, interest rate increases can cause the price of a debt security to decrease and even lead to a loss of principal. 4 Liquidity Risk. Liquidity risk is the risk that the Fund will experience significant net withdrawals of Fund shares at a time when it cannot find willing buyers for its portfolio securities or can only sell its portfolio securities at a material loss. Management Risk. Poor security selection or an ineffective investment strategy could cause the LGIP -MMF to underperform relevant benchmarks or other funds with a similar investment objective. Issuer Risk. The LGIP -MMF is subject to the risk that debt issuers and other counterparties may not honor their obligations. Changes in an issuer's credit rating (e.g., a rating downgrade) or the market's perception of an issuer's creditworthiness could also affect the value of the Fund's investment in that issuer. The degree of credit risk depends on both the financial condition of the issuer and the terms of the obligation. Also, a decline in the credit quality of an issuer can cause the price of a money market security to decrease. Securities Lending Risk and Reverse Repurchase Agreement Risk. The LGIP -MMF may engage in securities lending or in reverse repurchase agreements. Securities lending and reverse repurchase agreements involve the risk that the Fund may lose money because the borrower of the Fund's securities fails to return the securities in a timely manner or at all or the Fund's lending agent defaults on its obligations to indemnify the Fund, or such obligations prove unenforceable. The Fund could also lose money in the event of a decline in the value of the collateral provided for loaned securities or a decline in the value of any investments made with cash collateral. Risks Associated with use of Amortized Cost. The use of amortized cost valuation means that the LGIP -MMF's share price may vary from its market value NAV per share. In the unlikely event that the State Treasurer were to determine that the extent of the deviation between the Fund's amortized cost per share and its market -based NAV per share may result in material dilution or other unfair results to shareholders, the State Treasurer may cause the Fund to take such action as it deems appropriate to eliminate or reduce to the extent practicable such dilution or unfair results. An investment in the LGIP -MMF is not a bank deposit and is not insured or guaranteed by the Federal Deposit Insurance Corporation or any other government agency. Although the Fund seeks to preserve the value of investments at $1 per share, pool participants could lose money by investing in the LGIP -MMF. There is no assurance that the LGIP -MMF will achieve its investment objective. Performance The following information is intended to address the risks of investing in the LGIP -MMF. The information illustrates changes in the performance of the LGIP -MMF's shares from year to year. Returns are based on past results and are not an indication of future performance. Updated performance information may be obtained on our website at www.tre. wa.gov or by calling the LGIP toll -free at 800- 331 -3284. Fiscal Year -by -Year Returns: Net Yield Local Government Investment Pool 6.00% 5.21% 5.00% 414 %� ;. 4.04% 4.00% 3.00% 2.13% 2.00% i.46% 1:05% -ter 1.00% y! n Mlo 0.22% 0.14% 0.00% -1.00% -2.00% -3.00% , . .., .. 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Local Government Investment Pool -Money Market Fund Average Accrued Net Yield 1 Year 3 years 5 year 10.vears 0.17% 0.19% .52% 1.94% Transactions: LGIP -MMF General Information The minimum transaction size (contributions or withdrawals) for the LGIP -MMF will be five thousand dollars. The State Treasurer may, in its sole discretion, allow for transactions of less than five thousand dollars. Valuing Shares The LGIP -MMF will be operated using a net asset value (NAV) calculation based on the amortized cost of all securities held such that the securities will be valued at their acquisition cost, plus accrued income, amortized daily. The Fund's NAV will be the value of a single share. NAV will normally be calculated as of the close of business of the NYSE, usually 4:00 p.m. Eastern time. If the NYSE is closed on a particular day, the Fund will be priced on the next day the NYSE is open. 5 NAV will not be calculated and the Fund will not process contributions and withdrawals submitted on days when the Fund is not open for business. The time at which shares are priced and until which contributions and withdrawals are accepted is specified below and may be changed as permitted by the State Treasurer. To the extent that the LGIP -MMF's assets are traded in other markets on days when the Fund is not open for business, the value of the Fund's assets may be affected on those days. In addition, trading in some of the Fund's assets may not occur on days when the Fund is open for business. Transaction Limitation The State Treasurer reserves the right at its sole discretion to set a minimum and /or maximum transaction amount from the LGIP -MMF and to limit the number of transactions, whether contribution, withdrawal, or transfer permitted in a day or any other given period of time. The State Treasurer also reserves the right at its sole discretion to reject any proposed contribution, and in particular to reject any proposed contribution made by a pool participant engaged in behavior deemed by the State Treasurer to be abusive of the LGIP -MMF. A pool participant may transfer funds from one LGIP -MMF account to another subject to the same time and contribution limits as set forth in WAC 210.10.060. Contributions Pool participants may make contributions to the LGIP -MMF on any business day. All contributions will be effected by electronic funds transfer to the account of the LGIP -MMF designated by the State Treasurer. It is the responsibility of each pool participant to pay any bank charges associated with such electronic transfers to the State Treasurer. Failure to wire funds by a pool participant after notification to the State Treasurer of an intended transfer will result in penalties. Penalties for failure to timely wire will be assessed to the account of the pool participant responsible. Notice. To ensure same day credit, a pool participant must inform the State Treasurer of any contribution over one million dollars no later than 9 a.m. on the same day the contribution is made. Contributions for one million dollars or less can be requested at any time prior to 10 a.m. on the day of contribution. For all other contributions over one million dollars that are requested prior to 10 a.m., a pool participant may receive same day credit at the sole discretion of the State Treasurer. Contributions that receive same day credit will count, for earnings rate purposes, as of the day in which the contribution was made. Contributions for which no notice is received prior to 10:00 a.m. will be credited as of the following business day. Notice of contributions may be given by calling the Local Government Investment Pool (800- 331 -3284) OR by logging onto State Treasurer's Treasury Management System ( "TMS "). Please refer to the LGIP -MMF Operations Manual for specific instructions regarding contributions to the LGIP -MMF. Direct deposits from the State of Washington will be credited on the same business day. Pricing. Contribution requests received in good order will receive the NAV per unit of the LGIP -MMF next determined after the order is accepted by the State Treasurer on that contribution date. Withdrawals Pool participants may withdraw funds from the LGIP -MMF on any business day. Each pool participant shall file with the State Treasurer a letter designating the financial institution at which funds withdrawn from the LGIP -MMF shall be deposited (the "Letter "). This Letter shall contain the name of the financial institution, the location of the financial institution, the account name, and the account number to which funds will be deposited. This Letter shall be signed by local officials authorized to receive and disburse funds, as described in WAC 210 -10 -020. 7 Disbursements from the LGIP -MMF will be effected by electronic funds transfer. Failure by the State Treasurer to wire funds to a pool participant after proper notification to the State Treasurer to disburse funds to a pool participant may result in a bank overdraft in the pool participant's bank account. The State Treasurer will reimburse a pool participant for such bank overdraft penalties charged to the pool participant's bank account. Notice. In order to withdraw funds from the LGIP -MMF, a pool participant must notify the State Treasurer of any withdrawal over one million dollars no later than 9 a.m. on the same day the withdrawal is made. Withdrawals for one million dollars or less can be requested at any time prior to 10 a.m. on the day of withdrawal. For all other withdrawals from the LGIP -MMF over one million dollars that are requested prior to 10 a.m., a pool participant may receive such withdrawal on the same day it is requested at the sole discretion of the State Treasurer. No earnings will be credited on the date of withdrawal for the amounts withdrawn. Notice of withdrawals may be given by calling the Local Government Investment Pool (800- 331 -3284) OR by logging on to TMS. Please refer to the LGIP -MMF Operations Manual for specific instructions regarding withdrawals from the Fund. Pricing. Withdrawal requests with respect to the LGIP -MMF received in good order will receive the NAV per unit of the LGIP -MMF next determined after the order is accepted by the State Treasurer on that withdrawal date. Suspension of Withdrawals. If the State Treasurer has determined that the deviation between the Fund's amortized cost price per share and the current net asset value per share calculated using available market quotations (or an appropriate substitute that reflects current market conditions) may result in material dilution or other unfair results, the State Treasurer may, if it has determined irrevocably to liquidate the Fund, suspend withdrawals and payments of withdrawal proceeds in order to facilitate the permanent termination of the Fund in an orderly manner. The State Treasurer will distribute proceeds in liquidation as soon as practicable, subject to the possibility that certain assets may be illiquid, and subject to subsequent distribution, and the possibility that the State Treasurer may need to hold back a reserve to pay expenses. The State Treasurer also may suspend redemptions if the New York Stock Exchange suspends trading or closes, if US bond markets are closed, or if the Securities and Exchange Commission declares an emergency. If any of these events were to occur, it would likely result in a delay in the pool participants' redemption proceeds. The State Treasurer will notify pool participants within five business days of making a determination to suspend withdrawals and /or irrevocably liquidate the fund and the reason for such action. Earnings and Distribution LGIP -MMF Daily Factor The LGIP -MMF daily factor is a net earnings figure that is calculated daily using the investment income earned (excluding realized gains or losses) each day, assuming daily amortization and /or accretion of income of all fixed income securities held by the Fund, less the administrative fee. The daily factor is reported on an annualized 7 -day basis, using the daily factors from the previous 7 calendar days. The reporting of a 7 -day annualized yield based solely on investment income which excludes realized gains or losses is an industry standard practice that allows for the fair comparison of funds that seek to maintain a constant NAV of $1.00. LGIP -MMF Actual Yield Factor The LGIP -MMF actual yield factor is a net daily earnings figure that is calculated using the total net earnings including realized gains and losses occurring each day, less the administrative fee. 8 Dividends The LGIP -MMF's dividends include any net realized capital gains or losses, as well as any other capital changes other than investment income, and are declared daily and distributed monthly. Distribution The total net earnings of the LGIP -MMF will be declared daily and paid monthly to each pool participant's account in which the income was earned on a per -share basis. These funds will remain in the pool and earn additional interest unless withdrawn and sent to the pool participant's designated bank account as specified on the Authorization Form. Interest earned will be distributed monthly on the first business day of the following month. Monthly Statements and Reporting On the first business day of every calendar month, each pool participant will be sent a monthly statement which includes the pool participant's beginning balance, contributions, withdrawals, transfers, administrative charges, earnings rate, earnings, and ending balance for the preceding calendar month. Also included with the statement will be the monthly enclosure. This report will contain information regarding the maturity structure of the portfolio and balances broken down by security type. Ill. Management The State Treasurer is the manager of the LGIP -MMF and has overall responsibility for the general management and administration of the Fund. The State Treasurer has the authority to offer additional sub -pools within the LGIP at such times as the State Treasurer deems appropriate in its sole discretion. Administrator and Transfer Agent. The State Treasurer will serve as the administrator and transfer agent for the Fund. Custodian. A custodian for the Fund will be appointed in accordance with the terms of the LGIP Investment Policy. IV. Miscellaneous Limitation of Liability All persons extending credit to, contracting with or having any claim against the Fund offered in this Prospectus shall look only to the assets of the Fund that such person extended credit to, contracted with or has a claim against, and none of (i) the State Treasurer, (ii) any subsequent sub -pool, (iii) any pool participant, Livj the LGIP, or (vl the State Treasurer's officers, employees or agents (whether past, present or future), shall be liable therefor. The determination of the State Treasurer that assets, debts, liabilities, obligations, or expenses are allocable to the Fund shall be binding on all pool participants and on any person extending credit to or contracting with or having any claim against the LGIP or the Fund offered in this Prospectus. There is a remote risk that a court may not enforce these limitation of liability provisions. 9 Amendments This Prospectus and the attached Investment Policy may be amended from time to time. Pool participants shall receive notice of changes to the Prospectus and the Investment Policy. The amended and restated documents will be posted on the State Treasurer website: www.tre.wa.gov. Should the State Treasurer deem appropriate to offer additional sub -pools within the LGIP, said sub -pools will be offered by means of an amendment to this prospectus. LGIP -MMF Contact Information Internet: www.tre.wa.eov Treasury Management System /TMS Phone: 1- 800 - 331 -3284 (within Washington State) Mail: Office of the State Treasurer Local Government Investment Pool PO Box 40200 Olympia, Washington 98504 FAX: 360-902-9044 10 LOCAL GOVERNMENT INVESTMENT POOL TRANSACTION AUTHORIZATION FORM Please fill out this form completely, including any existing information, as this form will rtepl ace the previous form. Name of Entity: City of Pasco Mailing Address: PO Box 293 Pasco WA 99301 Fax Number: 509 -544 -3082 E -mail Contact: masond @ pasco - wa.gov Do you wish to have your monthly LGIP statements faxed to the number listed above? Please note — if you choose to receive statements via fax, you will not receive another copy via U.S. mail. ❑✓ YES, please fax statements El No, please send statements via U.S. mail Bank account where funds will be wired when a withdrawal is requested. (Note: Funds will not be transferred to any account other than that listed). Bank Name: US Bank Branch Location: Pasco Bank Routing Number: 125000105 Account Number: 153501454992 Account Name: General - TDs Persons authorized to make deposits and withdrawals for the entitv listed above. Name Title Signature Telephone Number Dunyele Mason Finance Manager / Y� 509 - 544 -3065 Stan Strebel Deputy City Manager E-mail Ad 509- 543 -5760 Richard Terway ACS Director / D 509 - 543 -5775 By sieftature below. I cartifv I am authorized to represent the mstitution/a encv for the purpose of this transaetion_ Any changes to these instructions must be submitted in writing to the Office of the State Treasurer. Please mail this form to the address listed below: OFFICE OF THE STATE TREASURER LOCAL GOVERNMENT INVESTMENT POOL PO Box 40200 OLYMPIA, WA 98504 -0200 FAx: (360) 902-9044 Date Received: Fund Number: (for LGIP use only) State of Washington ) County of SS. Signed or attested before me by Dated this _ day of 20_. SEAL OR STAMP Signature of Notary Typed or printed name of Notary Notary Public in and for the State of Wash. My appointment expires: Finance Manager 6/16/14 AuthodZed SY nature tae e Dunyele Mason masond @pasco - wa.gov 509 - 544 -3065 (Print Authorimd Signature) E-mail Ad (Telephone number) Any changes to these instructions must be submitted in writing to the Office of the State Treasurer. Please mail this form to the address listed below: OFFICE OF THE STATE TREASURER LOCAL GOVERNMENT INVESTMENT POOL PO Box 40200 OLYMPIA, WA 98504 -0200 FAx: (360) 902-9044 Date Received: Fund Number: (for LGIP use only) State of Washington ) County of SS. Signed or attested before me by Dated this _ day of 20_. SEAL OR STAMP Signature of Notary Typed or printed name of Notary Notary Public in and for the State of Wash. My appointment expires: