HomeMy WebLinkAbout04242008 Port of Pasco Sewage Lift Station Easement Agreement After recording return to:
Dan F. Hultgrenn
P. O. Box 2368
Pasco, WA 99302
Grantor: Port of Pasco
Grantee: City of Pasco
Brief Legal: Section 18, Township 9 North, Range 30
East, W.M., Franklin County
Full legal on page 2
SEWAGE LIFT STATION EASEMENT AGREEMENT
between
CITY OF PASCO
and
PORT OF PASCO
By this Local Cooperative Agreement ("Transfer Agreement") entered into
this 14 day of A ar- - 2008, the City of Pasco, Washington,
a municipal corporation hereinafter referred to as "City', and Port of Pasco, a
municipal corporation, hereinafter referred to as "Port", enter into the following
agreement.
WHEREAS, the Port constructed a sanitary sewage lift station for airport
operations and for use by its tenants situated on Port properties (the "Lift Station"),
and
WHEREAS, the City routinely operates and maintains lift stations across
the city, has a vested interest in its use for area sewage collection, and will
assume responsibility for the operation and maintenance of the lift station pursuant
to this Transfer Agreement, and
WHEREAS, the City will need an easement over certain Port property in
order to maintain, operate, repair and replace the Lift Station and for pipes leading
from the Lift Station to the city sewer system.
SEWAGE LIFT STATION EASEMENT AGREEMENT- 1
b:\Port of Pasco\Airport\'l'erminal\Sewage Lift Easement Agreement 2-29-08.city rev.doc
NOW, THEREFORE, the parties agree as follows:
Section 1. The Port, for and in consideration of the mutual covenants and
conditions set forth below, grants and conveys to the City, its successors and
assigns, an easement over the lands described in Section 2.
Section 2. The easement shall be over and across the following described
real property ("Easement Area"), also generally indicated on Exhibit A:
A parcel of land situated in the Southwest quarter of the Southwest quarter
of Section 18, Township 9 North, Range 30 East, W.M., Franklin County,
Washington, described as follows:
Beginning at the Southwest corner of said Southwest quarter; thence North
89°56'02" East along the South line of said Southwest quarter, a distance of
500.02 feet and being the True Point of Beginning; thence North 04°14'16"
East, a distance of 99.33 feet; thence South 85°30'26" East, a distance of
65.01 feet; thence South 04°29'34" West, a distance of 94.18 feet to a point
on said South line; thence South 89°56'02" West, along said South line, a
distance of 64.77 feet to the True Point of Beginning, EXCEPT any portion
lying within Argent Road right-of-way.
Section 3. The Easement Area shall be used for maintenance, operation,
repair and replacement of the Lift Station, and sewer lines to and from the Lift
Station, ingress and egress to the Lift Station, parking and landscaping.
Section 4. The City hereby acknowledges that the Port has designed and
installed a new sewage lift station and sewer collection line which meets City
standards and has been inspected and accepted by the Public Works
Department..
Section 5. The Lift Station shall be owned, operated, and maintained by
the City. The Port shall have no ownership interest and no obligation to maintain,
repair, or replace the Lift Station.
Section 6. The City will allow and accept sewage flow from the aircraft
deicing collection system. The City will also allow and accept sewage flow
meeting the conditions of the Pasco Municipal Code from other Port property east
of Varney Lane and north or Argent Road, approximately 83 acres, as indicated on
Exhibit B. Furthermore, the City acknowledges and agrees that there shall be no
sewer square footage charged for Port properties utilizing the Lift Station in
SEWAGE LIFT STATION EASEMENT AGREEMENT- 2
D:\Port of Pasco\Airport\Terminal\Sewage Lift Easement Agreement 2-29-08.city rev.doc
recognition of the Port's construction of the Lift Station and allowing it to be utilized
by properties other than the properties owned by the Port.
Section 7. The City acknowledges and agrees that no sewer front footage
charges or stub-out connection fee for Port property using the Lift Station will be
charged if the Port installs a sewer main or hookups to the lift station, being
consistent with City policy since the Port is responsible for constructing the
infrastructure.
Section 8. The City and the Port agree that only sewer system fees will
apply to Port properties utilizing the Lift Station and that sewer system fees will be
based on each water meter installed.
Section 9. This Agreement shall be construed and enforced in
accordance with, and the validity and performance hereof shall be governed by the
laws of the State of Washington. Venue of any suit between the parties arising out
of the Agreement shall be the Superior Court for the County of Franklin, State of
Washington.
Section 10. This Agreement may be changed, modified, or amended only
upon written agreement executed by the parties.
Section 11. Each party shall defend, indemnify, and hold the other
harmless from any claims, causes of action, or judgment arising from, or as a
direct result of the negligent or intentional acts of its agents, employees or officers.
Section 12. This Agreement contains all the terms and conditions agreed
upon by the parties. All items incorporated by reference are attached. No other
understanding, verbal or otherwise, in regard to the subject matter of this
Agreement, shall be deemed to exist or to bind any of the parties.
Dated this 2 day of , 2008.
CITY OF ASCO P ZPAS-
fftn,r-, (�Lov��
Joyce tl Mayor James T. Klindworth, Preside
ATTES ATTESTS
Ct�)J
Debra L. Clark, City C1 rk William G. Clark, Vice President
SEWAGE LIFT STATION EASEMENT AGREEMENT- 3
DAPort of Pasco\Airport\Terminal\Sewage lift Easement Agreement 2-29-08.city rev.doc
APPROV S TO FORM:
Leland Kerr, City Attorney Dan F. H Itgr n , Port Counsel
STATE OF WASHINGTON)
) ss.
County of Franklin )
On this c�� day of r, 2008, before me, the undersigned, a
Notary Public in and for the Se of Washington, duly commissioned and sworn,
personally appeared JAMES T. KLINDWORTH and WILLIAM G. CLARK to me
known to be the President and Vice President of the Board of Commissioners of
the Port of Pasco, the municipal corporation that executed the foregoing
instrument, and acknowledged the said instrument to be the free and voluntary act
and deed of said municipal corporation, for the uses and purposes therein
mentioned, and on oath stated that they were authorized to execute the said
instrument.
Witness my hand and official seal hereto affixed the day and year first
above written.
KEt �i Printed Na e: �—
Notary Public in and fo the
State of Washington, residing
NOTARYN:*= at
PUBLIC _ My commission expires: 11 - k U 9
OF WA.SV\N
!1!
SEWAGE LIFT STATION EASEMENT AGREEMENT- 4
b:\Port of Pasco\Airport\TcrrnmahSewage Lift Easement Agreement 2-29-08.city rev.doc
STATE OF WASHINGTON
County of Franklin
On this 2_[ _day of , 2008, before me, the undersigned, a
Notary Public in and for the State A Washington, duly commissioned and sworn,
personally appeared JOYCE OLSON, to me know to be the Mayor of Pasco, the
municipal corporation that executed the foregoing instrument, and acknowledged the said
instrument to be the free and voluntary act and deed of said municipal corporation, for the
uses and purposes therein mentioned, and on oath stated that she was authorized to
execute the said instrument.
Witness my hand official sal hereto affixed the day and year first above written.
Printed Name: Q F'-1- l ����t�+�����'s�►
]Notary Public in and forte
� v �,U't� RFS•. �
State of Washington, residing
At Qct SCb
My commission expires: �?
�� •'•.AUG •• ,5�'��
'`',elf sl!i 14 0 ���
" 1
RSI CONTROL
5/8° REBAR W1 TN CAP —
EDGE ELEV=408.01' S85°30'26'E
F
Z
N 6
O C}
PH
°^ ru m
v m
❑Q J PHONE z o
ti
CURB
1 N89°56'02'E S89°56'02'W
VECJC❑R 50002' 64.77'
�f
a'
x PROPERTY CORNER
L7 ter' Gv�$ ARGENT ROAD CVR STRATT❑N
L I
1
I
I �
k
L
l '
1
*1%6,6
anv +lioz r,
do=%do .t.
XN
•e
; i
1
r.
,.
r#ryw •
JOft
„G !
elf •��: ��" . � � ,r,.
4-J
i[rl� � frt � .. �'. ' i •
4{s