HomeMy WebLinkAbout3124 Resolution RESOLUTION NO. t 2�q
A RESOLUTION approving a planned density development preliminary plat for Three
Rivers Crossing Division II.
WHEREAS, RCW 58.17 enables the City to uniformly administer the process of
subdividing property for the overall welfare of the community; and,
WHEREAS, owners and developers of property situated in southwest quarter of
Section 10, Township 9 North, Range 29 East, W.M. have requested approval of a preliminary
plat; and,
WHEREAS, the Planning Commission has reviewed said preliminary plat which is
named Three Rivers Crossing Division Il; and
WHEREAS, following a public hearing, the Planning Commission found the
proposed plat promoted the general welfare of the community and recommended said
preliminary plat be approved with conditions; NOW THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO:
That the preliminary plat for Three Rivers Crossing Division II located in the North half of
Section 10, Township 9 North, Range 29 East, W.M., is hereby approved with the following
conditions:
1) At the time lots are developed, all abutting roads and utilities shall be developed to
City standards as approved by the City Engineer. This includes, but is not limited to,
water, irrigation and sewer lines, streets, street lights, and storm water retention.
Sidewalks must be installed no later than the time each lot is developed with a house.
The handicapped accessible pedestrian ramps must be completed with the street and
curb improvements prior to final plat approval. All existing and proposed utilities
must be installed underground by the developer at the developer's expense.
2) All intersections will require setback lines for appropriate sight distances. No fences,
utility vaults or pedestals, or other obstructions will be allowed in this area.
3) The developer/builder shall pay the City a "traffic mitigation fee" per the Municipal
Code.
4) The developer shall install a common Estate type fence/wall 6 feet in height along the
rear line of all lots abutting Road 60, Power Line Road and Convention Drive. Said
wall must match the existing block wall in Phase 5 of Three Rivers Crossing. The
City may make repairs or replace the fencing as needed. Property owners adjoining
said fence/wall shall be responsible for payment of all costs associated with
maintenance and upkeep of the fencing/wall. These fencing/wall requirements shall
be noted clearly on the face of the final plat(s).
5) The developer shall be responsible for all costs associated with construction
inspection and plan review service expenses incurred by the City of Pasco
Engineering Department.
6) The developer will be required to provide a deposit to the City of Pasco to allow the
City of Pasco to hire a surveying company to perform topographic surveys of the
constructed utilities including manhole lids and flow line elevations, location of sewer
stubs, water valves, water meters, irrigation valves, irrigation services, storm water
catch basins, street lights, fire hydrants, monuments and other pertinent information
deemed necessary, to the satisfaction of the City of Pasco. The developers will be
required to provide as-built drawings for the remainder of the improvements. The
City of Pasco contracted surveyor will be given an electronic copy of the design
drawings to then insert their findings from the topographic survey.
7) The developer shall ensure active and ongoing dust and litter abatement activities
occur during the construction of the subdivision and construction of the houses
thereon.
S) The final plat shall contain 10 to 15 foot utility easements parallel to all streets as
required by utility providers.
9) All engineering designs for infrastructure and final plat drawings shall utilize the
published City of Pasco Vertical Control Datum. Said datum shall be identified on
the drawings for each submittal.
10) The final plat shall contain the following Franklin County Public Utility District
statement: "The individual or company making improvements on a lot or lots of this
plat is responsible for providing and installing all trench, conduit, primary vaults,
secondary junction boxes, and backfill for the PUD's primary and secondary
distribution system in accordance with PUD specifications; said individual or
company will make full advance payment of line extension fees and will provide all
necessary utility easements prior to PUD construction and/or connection of any
electrical service to or within the plat."
11) All corner lots and other lots that present difficulties for the placement of yard fencing
shall be identified by lot number in the notes on the face of the final plat(s).
12) All storm water must be disposed of through means approved by the City of Pasco.
All methods utilized to capture and dispose of storm water must be in accordance
with current City Codes and Standard Specifications, and applicable Washington
State Law.
13) The developer shall be responsible for installing landscaping in the unimproved right-
of-way on Road 60, Convention Drive, and Power Line Road. This landscaping will
consist of lawn and Spring Snow Crab apple trees or approved equal. The trees shall
be spaced at 50-foot intervals. No trees will be planted within 25 feet of a street light.
The landscaping must include an irrigation system. All landscape plans shall be
reviewed and approved by the Engineering and Community and Administrative
Services Departments prior to installation.
14) Lots abutting Road 60, Convention Drive and Power Line Road shall not have direct
access to those streets. Access shall be prohibited by means of deed restrictions or
statements on the face of the final plat(s).
15) The developer/builder shall pay the City a "common area maintenance fee" of$375
per lot upon issuance of building permits for homes. These funds shall be placed in a
fund and used to for the maintenance of the landscaping along Convention Drive,
Power Line Road and Road 60. The City shall accept maintenance responsibility for
the landscaping abutting said streets at such time as all maintenance fees for all lots in
each division abutting said streets have been paid.
16) Irrigation mainlines must be installed throughout the entire proposed plat of a size
sufficient to service each and every currently proposed/future lot pursuant to PMC
26.04.116. Additional mainlines, as directed by the City Engineer may be required to
be installed. The developer must install a properly designed irrigation system with
stubs to all lots in the subdivision for future irrigation needs. All easements/rights of
way necessary to convey an irrigation system to and through the proposed plat must
be conveyed to the City of Pasco. The irrigation lines shall run in easements/rights of
way as directed by the City Engineer. In addition to the subdivision improvements, a
16 inch irrigation mainline must be installed along with the street improvements for
Power Line Road, a 12 inch mainline must be installed in conjunction with the street
improvement for Convention Drive and a 10 inch mainline must be installed in
conjunction with the-street improvements for Road 60.
17) The assignment of water rights associated with this land is a requirement for
subdivision approval. If no water rights are available to transfer to the City the
property owner/developer must pay a water right fee of$1,500 per acre in lieu thereof.
The Public Works Director may waive the fee if the developer mixes a soil additive in
the ground that provides 30% retention of irrigation water.
18) All streets are to be developed to City Standards and/or as directed by the City
Engineer. Street grades for all arterial and collector roads shall not exceed 6 percent.
Interior local access street grades shall not exceed 10 percent. All intersections will
require setback lines for appropriate sight distances. No fences, utility vaults or
pedestals, or other obstructions will be allowed in this area. Approaches to
intersecting interior streets shall not exceed 2 percent and any street intersecting an
arterial or collector street shall be zero (0) percent coming out of the toe of the
arterial/collector street slope. All temporary streets will be required to have a paved
turn around (2 inch pavement on 4 inches of rock base) at the end of the street to the
satisfaction of the City Engineer.
19) Convention Drive must be completed in conjunction with the first phase of
development. Convention Drive must have 40 feet of right of way dedicated on the
developer's property to accommodate a future right of way of 80 feet. Additional right
of way on adjoining property will be required to accommodate the 4 feet of paving
required to the west of the centerline of Convention Drive. The curve radius for the
right of way at the intersection of Convention drive with Power Line Road must be 55
feet. Convention Drive must be built to a 28 feet pavement width (24 feet on the
developers property and 4 feet west of the centerline of Convention Drive on the
adjoining property) to accommodate a future width of 48 feet. The pavement section
for Convention Drive must be a 4 inch asphalt layer placed on a 2 inch top course
rock with an 8 inch base course rock. The developer must construct curb, gutter and a
5 feet wide sidewalk along the east side of convention drive as part of the roadway
improvements. All required fire hydrants and street lighting must be installed by the
developer along the east side of Convention Drive. The developer must also install a
12 inch irrigation main line in Convention Drive in conjunction with the roadway
improvements. The location and material for the pipe will be as directed by the City
Engineer.
20) Power Line Road must be completed with each phase of development abutting said
street. Power Line Road must have 40 feet of right of way dedicated on the
developer's property to accommodate a future right of way of 80 feet. Additional right
of way on adjoining property will be required to accommodate the 4 feet of paving
required to the north of the future centerline of Power Line Road. (City Staff will
assist the developer in obtaining the additional right-of-way.) The curve radius for the
right of way at all intersections with Power Line Road must be 45 feet with the
exception of the intersections with Convention Drive and Road 60 which must be 55
feet. Power Line Road must be built to a 28 feet pavement width (24 feet on the
developers property and 4 feet north of the future centerline of Power Line Road on
the adjoining property. In the event the 4 feet of right-of-way can not be obtained the
road may be permitted to be shifted south 4 feet.) to accommodate a future pavement
width of 48 feet. The pavement section for Power Line Road must consist of a 4 inch
pavement layer place on a 2 inch top course with an 8 inch base course. The
developer must install curb, gutter and a 5 feet wide sidewalk along the south side of
Power Line Road as part of the roadway improvements. All required fire hydrants
and street lighting must be installed by the developer along the south side of Power
Line Road. The developer must also install a 16 inch irrigation main line in Power
Line Road as part of the roadway improvements. The location and material for the
pipe will be as directed by the City Engineer.
21) Road 60 must be completed with each phase of development abutting said street.
Road 60 must have a 40 feet right of way dedicated on the developer's property to
accommodate a future right of way of 80 feet. Additional right of way on adjoining
property will be required to accommodate the 4 feet of paving required to the east of
the future centerline of Road 60. The curve radius for the right of way for all streets
intersecting Road 60 must be 35 feet, except the intersection with Power Line Road
which must be 55 feet. The pavement width must be 28 feet (24 feet on the
developer's property and 4 feet east of the future centerline of Road 60 on the
adjoining property) for a total future pavement width of 48 feet. The paving section
must consist of a 4 inch asphalt layer placed on a 2 inch top course with an 8 inch
base course. The developer must install curb, gutter and a 5 feet wide sidewalk and
all appurtenant handicapped sections on the west side of Road 60 along with the street
improvements. All required fire hydrants and street lighting must be installed along
with the street improvements. The developer must also install a 10 inch irrigation
main line in Road 60 in conjunction with the roadway improvements. The location
and material for the pipe will be as directed by the City Engineer. At the time of
development of any phase abutting Road 60, if the Pasco School District has not
developed its property abutting said road, the developer will be responsible to extend
the above roadway improvements south to Sandifur Parkway, including the
intersection thereof. The City will work with the developer to establish a late comers
agreement for the street improvements in the event the School District has not
developed Road 60 at the time the developer completes any phase of the plat adjacent
Rd 60.
22) All water lines must be extended through the length of each proposed plat. All water
lines will be required to be looped with the existing City of Pasco water system. A
deposit is required for the removal of any temporary loops installed by the developer.
The deposit must include the cost of removing the temporary piping, replacing
damaged curb, gutter and sidewalk, and a curb to curb replacement of all pavement
for at least 10 feet on both sides of the temporary line that was removed. No water
valves or meter boxes are to be located in any easements or walkways.
23) Any existing irrigation pipe from the previous farming activities on the site,
regardless of size, type or location, must be removed at the owner/developers
expense. Existing pipe must be removed prior to the development of the phase in
which it is located and must be removed to the satisfaction of the City of Pasco.
24) Any and all utilities must be located as directed by the City Engineer. This shall
include but not be limited to gas, phone, power, cable and all other utilities located
within or adjoining this preliminary plat. Any existing utilities that present
difficulties shall be relocated at the developer's expense, pursuant to the City
Engineer's direction. All utility plans, including the above mentioned, are required to
be submitted to the City of Pasco prior to subdivision approval.
25) The final plat(s) must contain the following statement. "Irrigation service lines are
currently available to lots within this plat; however, water for the irrigation system
may not currently be available. The City of Pasco is constructing its irrigation
infrastructure on an ongoing basis. The use of the system will become available as
time and resources permit the expansion and connection of new systems to the
existing irrigation supply". This statement must appear on all pages of said final
plat(s).
26) Street lighting must be as directed by the City Engineer. Residential street lights are
typically installed every 300 feet and collector/arterial street lights are installed every
150 feet.
27) Prior to the City of Pasco accepting construction plans for review for any phase of
development the developer must enter into a Storm Water Maintenance Agreement
with the City. The developer will be responsible to obtain the signatures of all parties
required on the agreement and to have the agreement recorded with the Franklin
County Auditor. The original signed and recorded copy of the agreement must be
presented to the City of Pasco at the first intake meeting for construction plans for
each phase of development.
28) The developer will be required to conform to all conditions set forth in the Storm
Water Maintenance Agreement including, but not limited to, regular cleaning and
maintenance of all streets, gutters, catch basins and catch basin protection systems.
Cleaning shall occur on a regular basis to ensure that no excess build up of sand,
trash, grass clippings, weeds or other debris occurs in any portion of the streets,
gutters, or storm water collection facilities.. Cleaning and upkeep of the streets,
gutters, and storm water collection facilities must be to the satisfaction of the City
Engineer. The developer will be responsible to operate and maintain the storm drain
system in accordance with the Storm Water Maintenance Agreement for a period of
up to 5 years from the date of final plat approval for each phase or until the system is
accepted by the City of Pasco. The City of Pasco's acceptance of construction plans
for subsequent phases of the subdivision will be contingent on the developer
satisfying all requirements of the Storm Water Maintenance Agreement.
29) The developer will be required to comply with the City of Pasco Civil Plan Review
process. A copy of the requirements for the civil plan review process is available
from the City of Pasco Engineering Department.
Passed by the City Council of the City of Pasco this 1 st day of December, 2008.
Mayor rro
N.crewaB in s
A ST: APPRO S TO FORM:
Sandy L. nworthy, Leland B. Kerr, City Attorney