Loading...
HomeMy WebLinkAbout2733 Resolution RESOLUTION NO. Q23 -3 A RESOLUTION approving preliminary plat for Oak Estates. WHEREAS, RCW 58.17 enables the City to uniformly administer the process of subdividing property for the overall welfare of the community; and, WHEREAS, owners and developers of property situated in the southwest quarter of Section 21, Township 9 North, Range 29 East, W.M. have requested approval of a preliminary plat; and, WHEREAS, the Planning Commission has reviewed said preliminary plat which is named Oak Estates; and WHEREAS, following a public hearing, the Planning Commission found the proposed plat promoted the general welfare of the community and recommended said preliminary plat be approved with conditions; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO: That the preliminary plat for Oak Estates located in the southwest quarter of Section 21, Township 9 North, Range 29 East W.M., is hereby approved with the following conditions: 1) At the time lots are developed all abutting roads and utilities shall be developed to City standards. This includes but is not limited to water, irrigation and sewer lines, curb, gutter, streets and storm water retention. Sidewalks must be installed no later than the time each lot is developed with a house. 2) The sewer system must provide gravity flow sewer to each lot within the preliminary plat. 3) The developer shall be responsible for all costs associated with construction inspection service expenses incurred by the City of Pasco Engineering Department. 4) The developer shall insure active and ongoing dust and litter abatement activities occur during the construction of the subdivision and construction of the houses thereon. 5) The final plat shall contain 10-foot utility easements parallel all streets. 6) The final plat shall contain the following Franklin County Public Utility District statement: "The individual or company making improvements on R a lot or lots of this plat is responsible for providing and installing all trench, conduit, primary vaults, secondary junction boxes, and backfill for the PUD's primary and secondary distribution system in accordance with PUD specifications; said individual or company will make full advance payment of line extension fees and will provide all necessary utility easements prior to PUD construction and/or connection of any electrical service to or within the plat." 7) The final plat shall contain the following utility easement statement: "An easement is hereby reserved over, under and upon the front 10 feet of all lots adjacent to all streets for the installation, construction, renewing, operating and maintaining natural gas, electric, telephone and TV cable." I 8) The developer/builder shall pay the City a "traffic mitigation fee" of $150 per lot upon issuance of building permits for homes. These funds shall be placed in a fund and used to finance signalization and other improvements necessary to mitigate traffic impacts in the City. 9) All engineering designs for infrastructure and final plat drawings shall utilize the published City of Pasco Vertical Control Datum. 10) No building permits shall be issued for any lots in the plat until all infrastructure improvements are completed to the satisfaction of the Engineering Department. 11) An additional 5-foot sewer easement shall be provided across the front of lot 4 for sewer service to existing lots at the end of Road 70. P ssed by the it_y Council of the City of Pasco this 3rd day of March, 2003. Michael Garrison, Mayor ATTEST: APPR AS TO FORM: 4 Catherine Se man, Deputy City Clerk Leland B. Kerr, City Attorney