HomeMy WebLinkAbout2719 Resolution RESOLUTION NO. 2719
A RESOLUTION approving a preliminary plat for Wilson
Meadows.
WHEREAS, RCW 58.17 enables the City to uniformly administer the
process of subdividing property for the overall welfare of the community; and,
WHEREAS, owners and developers of property situated in the northeast
quarter of Section 18, Township 9 North, Range 29 East, W.M. have requested
approval of a preliminary plat; and,
WHEREAS, the Planning Commission has reviewed said preliminary plat
which is named Wilson Meadows; and
WHEREAS, following a public hearing, the Planning Commission found
the proposed plat promoted the general welfare of the community and
recommended said preliminary plat be approved with conditions; NOW
THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO:
That the preliminary plat for Wilson Meadows located in the northeast
quarter of Section 18, Township 9 North, Range 29 East W.M., is hereby
approved with the following conditions:
1) At the time lots are developed all abutting roads and utilities shall be
developed to City standards. This includes but is not limited to water, irrigation
and sewer lines, streets and storm water retention. Sidewalks must be
installed no later than the time each lot is developed with a house. Curb and
gutter shall be a requirement for development of the plat.
2) The developer shall acquire dedicate and improve the eastern half of
Road 108 from the north line of Court Street to the north line of lot 1.
3) All engineering designs for infrastructure and final plat drawings shall
utilize the published City of Pasco Vertical Control Datum.
4) The developer shall be responsible for all costs associated with
construction inspection service expenses incurred by the City of Pasco
Engineering Department.
5) The developer shall insure active and ongoing dust and litter abatement
activities occur during the construction of the subdivision and construction of
the houses thereon. The developer shall also be responsible for erosion control
to prevent soil erosion into the Columbia River.
6) The final plat(s) shall contain 10-foot utility easements parallel to all
streets.
7) The developer shall extend a sewer line from Oak Street to the north
between lots 8 and 9 and provide a 10-foot easement on each lot for the sewer
line.
8) The developer shall install a properly designed irrigation system with stubs
to all lots in the subdivision for future irrigation needs. The irrigation lines
shall run in easements as directed by the Franklin County Irrigation District.
9) The developer/builder shall pay the City a "traffic mitigation fee" of $150
per lot upon issuance of building permits for homes. Fees collected shall be
placed in a fund and used to finance signalization and other improvements
necessary to mitigate traffic impacts on the circulation system within the I-182
corridor.
10) All engineering designs for infrastructure and final plat drawings shall
utilize the published City of Pasco Vertical Control Datum.
11) Argent Place shall be renamed to be consistent with the street naming
policy.
12) Sewer lines in Road 108 and Road 105 shall be sized for future flow from
the north.
13) The water line in Road 105 shall be sized to accommodate development
to the north of the plat.
PASSED by the City Council of the City of Pasco at a regular meeting this
6' day of January, 2003.
ichael L. G son, Mayor
ATTEST: APPROVED AS TO FORM:
a ^
Webster U. Jackso ,.__ ty Clerk Leland B. Kerr, City Attorney