Loading...
HomeMy WebLinkAbout2651 Resolution RESOLUTION NO J A RESOLUTION approving a preliminary plat for Green Hill Addition. WHEREAS, RCW 58.17 enables the City to uniformly administer the process of subdividing property for the overall welfare of the community; and, WHEREAS, owners and developers of property situated in the southwest quarter of Section 28, Township 9 North, Range 30 East, W.M. have requested approval of a preliminary plat; and, WHEREAS, the Planning Commission has reviewed said preliminary plat which is named Green Hill Addition; and WHEREAS, following a public hearing, the Planning Commission found the proposed plat promoted the general welfare of the community and recommended said preliminary plat be approved with conditions; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO: That the preliminary plat for Green Hill Addition located in the southeast quarter of Section 28, Township 9 North, Range 30 East W.M., is hereby approved with the following conditions: 1) At the time lots are developed all abutting roads and utilities shall be developed to City standards. This includes but is not limited to water, irrigation and sewer lines, curb, gutter, and streets, street lighting, and storm water retention and the handicapped sections of all sidewalks at street radii. Sidewalks must be installed no later than the time each lot is developed with a house. The handicapped sections of the sidewalks must be completed with the street and curb improvements prior to final plat approval. 2) The City will not accept a sewer system design, which does not provide gravity flow sewer service to each lot within the preliminary plat. 3) The developer shall be responsible for all costs associated with construction inspection service expenses incurred by the City of Pasco Engineering Department. 4) The developer shall insure active and ongoing dust abatement activities occur during the construction of the subdivision and construction of the houses thereon. 5) The final plat shall contain 10-foot utility easements parallel all streets. 6) All final plats shall contain the following Franklin County Public Utility District statement: "The individual or company making improvements on a lot or lots of this plat is responsible for providing and installing all trench, conduit, primary vaults, secondary junction boxes, and backfill for the PUD's primary and secondary distribution system in accordance with PUD specifications; said individual or company will make full advance payment of line extension fees and will provide all necessary utility easements prior to PUD construction and/or connection of any electrical service to or within the plat." 7) All final plats shall contain the following utility easement statement: "An easement is hereby reserved over, under and upon the front 10 feet of all lots adjacent to all streets for the installation, construction, renewing, operating and maintaining natural gas, electric, telephone and TV cable." 8) The developer/builder shall pay the City a "traffic mitigation fee" of $65 per lot upon issuance of building permits for homes. These funds shall be placed in a fund and used to finance signalization and other improvements necessary to mitigate traffic impacts in the City. 9) The tract of ground located between the proposed plat and "A" Street must be included in the plat. 10) All homes shall be placed on the lots with the front doors and porches oriented to the streets. Homes placed lengthwise on the lots shall be of the front loading design. Passed by the City Council of the City of Pasco this 4th day of March, 2002. Michael Garrison, Mayor ATTEST: APPROVED AS TO FORM: Catherine Seaman, Leland B. Kerr, City Attorney Deputy City Clerk