HomeMy WebLinkAbout4044 Ordinance ORDINANCE NO.
AN ORDINANCE amending the Comprehensive Plan to include the Pasco School
District Capital Facilities Plan.
WHEREAS, the Pasco City Council did on September 2, 2008 adopt by
Ordinance No. 3866 a Comprehensive Plan for the City; and,
WHEREAS, the Comprehensive Plan was intended to be a guide for
development and may be reviewed annually; and,
WHEREAS, the Planning Commission conducted a series of public hearings
beginning on October 18, 2010 and ending on January 25, 2012; and,
WHEREAS, following the January 25, 2012 hearing the Planning Commission
recommended the City Council amended the Comprehensive Plan by adopting by
reference the 2011-2017 Pasco School District Capital Facilities Plan; and,
WHEREAS, the City Council finds the Planning Commission's recommendation
will aid the City in anticipating orderly and coordinated development within the city;
NOW,THEREFORE,
THE CITY COUNCIL OF THE CITY OF PASCO DO ORDAIN AS
FOLLOWS:
Section 1. Ordinance No. 3866 adopting the Comprehensive Plan is hereby
amended to include the 2011-2017 Pasco School District Capital Facilities Plan by
reference as indicated in Exhibit "1" attached hereto.
Section 3. This ordinance shall be in full force and effect after passage and
publication as required by law.
PASSED by the City Council of the City of Pasco this 21"day of February, 2012.
Matt Watkins, Mayor
ATTEST: APPROVED AS TO FORM:
a 0:21t 010/ —s-
r
Debra L. Clark, City Clerk Leland B. Kerr, City Attorney
EXHIBIT 1
PASCO SCHOOL DISTRICT NO. 1
CAPITAL FACILITIES PLAN
2011 - 2017
BOARD OF DIRECTORS
Sherry Lancon, President
William Leggett, Vice President
Jeffery Dong, Member
Ruben Peralta, Member
Ryan Brault, Member
SUPERINTENDENT
Saundra L. Hill
ASSISTANT SUPERINTENDENT OF OPERATIONS
John Morgan
Adopted by the Pasco School Board
December 13, 2011
Pasco School District Capital Facilities Plan
Page 1 of 21
November 2011
SECTION 1
INTRODUCTION
A. Purpose of the Capital Facilities Plan
Washington land use and environmental laws include schools in the category of
public facilities and services for which cities and counties must plan. When new
development places demands on schools, cities, counties and developers must
ensure school facilities are adequate to accommodate the additional demands.
School districts adopt capital facilities plans to assist counties and cities to address
legal requirements to ensure adequate school facilities will exist to serve new
development. The capital facility plans identify school facilities that are necessary
to meet the educational needs of the growing student populations.
The Pasco School District has prepared this Capital Facilities Plan (the "CFP") to
provide the community, Franklin County, the City of Pasco and the developers
information regarding the District's facilities and forecast needs for the next six
years (2011-2017).
In accordance with capital facilities planning under the Growth Management Act,
this CFP contains the following elements:
• The District's standard of service or educational program standards which
is based on program year, class size by grade span, number of
classrooms, types of facilities and other factors identified by the District.
• An inventory of existing capital facilities owned by the District, showing
the locations and capacities of the facilities, based on the District's
standard of service.
• Future enrollment forecasts for elementary, middle, and high schools.
• A forecast of the future needs for capital facilities and school sites based
on the District's enrollment projections.
• The proposed capacities of expanded or new capital facilities over the
next six years based on the inventory of existing facilities and the
standard of service.
• The cost for needed facilities and the plan for financing capital facilities
within projected funding capacities.
• A school impact fee calculation identifying the amount single-family and
multi-family developers should pay to mitigate the impacts new
construction of single-family and multi-family homes has on the District.
Pasco School District Capital Facilities Plan
Page 2 of 21
November 2011
B. Overview of the Pasco School District
The Pasco School District serves students in the City of Pasco and in
unincorporated Franklin County. The Pasco community is experiencing accelerated
growth and has experienced significant growth for the past fifteen years. Pasco is
near six other school districts: North Franklin, Star, Columbia, Finley, Kennewick,
and Richland.
The District serves over 15,600 students. The District currently has one (1) early
learning center, seven (7) elementary schools serving K-5, four (4) elementary
schools serving grades 1-5, three (3) middle schools serving grades 6-8, two (2)
high schools serving grades 9-12 and one alternative middle/high school serving
grades 6-12. The District also has 171 portable classrooms that provide capacity
for 4,275 students.
The most significant issues facing the District in terms of providing classroom
capacity to accommodate existing and projected demands follow.
• K-12 facility needs have been projected for the short and long term.
Presently, the elementary and middle schools are housing students in
excess of capacity.
• Providing the educational programs that are either required by the state
and federal government, or that are desired by the public for quality
education, requires additional facility space, For example, to provide for
the visual and performing arts programs the District must find additional
facility space that can accommodate music instruction without
interrupting general education classrooms.
• The District is expected to experience significant growth in Franklin
County. Over 2000 residential lots have been previously approved by
the City of Pasco without school capacity mitigation remain vacant and
the market continues to consume them at the rate of over 400 per year.
Developers continue to approach the City for additional new residential
development, which is subject to SEPA mitigation. This continued
growth is of concern in light of the overcrowding and inadequate
capacity at the existing schools.
• The District must obtain a super majority vote (60% yes votes) to secure
the funds that are necessary to build new schools. The most recent
bond to address current needs failed with just a 48% yes vote.
• Assessed property values in Franklin County are relatively low, which
limits the district's bonding capacity and increases the tax burden on
district patrons. Pasco's per pupil AV in 2009-10 was $311,000 placing
Pasco 271St out of the 295 districts, the largest district in the bottom 25.
The majority of this assessed value is in residential property with a
Pasco School District Capital Facilities Plan
Page 3 of 21
November 2011
serious lack of commercial and industrial value. This makes it more
difficult to obtain the voters' approval on bond measures.
• There is a shortage of large parcels that are suitable as school sites and
as growth continues to occur there will be fewer suitable sites to acquire
at prices the District's taxpayers will support in the locations where the
largest growth is occurring.
• The prolonged and significant growth in the District has resulted in
enrollment that significantly exceeds capacity in the school facilities.
The District, out of necessity, must look at less desirable methods of
providing education such as Multi Track Year Round Education, double
shifting and other solutions that create a subpar learning environment.
The District also has to increase the number of students that are served
in portables beyond generally acceptable levels that strain and exhaust
the school's infrastructure or lease and renovate facilities never intended
for serving children as schools. These approaches to providing more
capacity to serve students may be implemented on a short term and
temporary basis until measures can be taken to permanently increase
capacity in the schools.
SECTION 2
DISTRICT EDUCATIONAL PROGRAM STANDARDS
School facility and student capacity needs are dictated by the types and amounts of
space required to accommodate the District's adopted educational program. The
role that quality education plays in growing a strong local economy is vital. In order
to accomplish the community value of having a strong local economy, schools must
have quality facilities. These facilities serve as the supporting space for developing
the whole child within a community to prepare them for a competitive global
economy.
The educational program standards which typically drive needs for educational
space for students include grade configuration, optimum facility size, class size,
educational program offerings, supplemental program offerings, specialty spaces,
classroom utilization and scheduling requirements. On October 11, 2011, the Pasco
School Board voted to adjust the elementary schools' configuration from a K-5
model to a K-6 model in order to serve the enrollment growth at a reduced per pupil
cost to Pasco taxpayers. This shift delays the need for a middle school but
increases the need for additional elementary schools. The per pupil cost for
elementary schools is significantly less than the cost for a middle school.
While the District is exploring and may implement Multi Track Year Round
Education, double shifting, changes to service area boundaries, increased use of
portables and/or use of leased facilities, these measures are temporary. They are
not the preferred or permanent standard of service.
Pasco School District Capital Facilities Plan
Page 4 of 21
November 2011
In addition to student population, other factors such as collective bargaining
agreements, government mandates, and community expectations affect classroom
space requirements. Space is necessary for regular classrooms, the fine and
performing arts, physical education, special education, Highly Capable, English as
a Second Language (ESL), technological applications, computer labs, preschool
and daycare programs, and other specialized programs. Space must be provided
for common areas such as media centers, gyms, cafeterias, kitchens, and
auditoriums. Space is needed for groups of students and employees to work
together. These programs can have a significant impact on the available student
capacity within school facilities. Further, the community expects all spaces to be
well utilized during the school day and available after the school day for public use.
A. District Educational Program Standards:
Core program includes the following:
• Core classroom space for all curriculum areas which includes space for group
learning, direct instruction, and individual student work to meet the rigors set
forth in state standards.
• Science classroom space that supports advanced coursework (including water,
sinks, gas, fume hoods, and safety equipment). Students must achieve rigorous
state-mandated science standards. This requires specialty space that is not met
by adding portables. High school and middle school science lab space is a high
priority.
• Physical education space is needed for students to meet rigorous health and
fitness standards. This includes covered areas, fields, gymnasiums, and other
multi-use spaces.
• Technological competency is expected for all students. Space must be
allocated for technological equipment and applications in classrooms and
specialty spaces. Space must also be provided for state assessments required
to be administered to every student on a computer. Square footage for this
equipment and its infrastructure is not calculated in current state allowances, yet
must be provided.
• Art, music, and theatre arts spaces are critical to the core program for students.
Spaces are necessary to adequately meet the rigorous standards of these state
required programs and programs that are local priorities. The visual and
performing arts programs for students are a high priority for the Pasco
community and adequate space needs to be provided.
• Library/media services (research, technology, collaboration) and space must be
provided for students to achieve the rigors in the core program. In an
information-driven environment, student access to information through
appropriately sized library/media spaces is essential.
• Extra-curricular activities need adequate space in order to safely support
program activities.
Special programs are essential to meet the needs of special populations.
Pasco School District Capital Facilities Plan
Page 5 of 21
November 2011
• Special Education services are delivered at each of the schools within the
District. Program standards and services vary based on the disabling conditions
of the students and their Individual Education Plans (IEP). Implementing each
student's IEP requires large and small specialty spaces, which the District must
provide. Program standards change as a result of various external or internal
influences. External influences include changing federal mandates, funding
changes, and the introduction of new technological applications which meet the
needs of students. Internal influences include modifications to the program
year, class size, grade configurations, and facility changes. For example, some
students require significant equipment from wheel chairs to specialized
equipment for toileting. Others need room specially designed and equipped for
security.
• Special populations receive special support. Specialty space is essential to
delivery of this support. Federal and state programs, including Title 1/LAP
Reading and Math and Highly Capable, provide limited funding and do not
legally allow for the expense of adding facilities to support them.
• Early childhood programs for special needs students are legally mandated,
essential educational programs to develop early childhood literacy skills and are
vital to the community. These programs require specialty space which is not
funded by the state.
• Supplementary services in core academic areas (tutoring, on-line learning) and
providing multiple pathways to prepare students for a broader range of post-
secondary learning opportunities require additional spaces that have not been
calculated in current state square footage allowance formulas.
Support services are often overlooked services and are essential to a quality
educational program.
• Food delivery, storage, preparation, and service require spaces that are
specially designed and equipped also need specific attention. As student
populations increase, adequately calculating space needs for this core service is
crucial to the overall planning of the facility. Adequacy in planning for this space
has significant impacts on the overall learning environment for students if not
done appropriately.
• Transportation support centers are required to handle growing transportation
needs.
• Maintenance and administrative support facilities must also be considered and
are often overlooked as core support services.
• Space for legally-mandated records retention must also be provided.
• State-approved secured space must be provided for high stakes state
assessment materials.
B. Elementary Educational Program Standards
The District educational program standards, which directly affect school capacity,
include:
• Class sizes for grades K-1 are targeted not to exceed 25 students per class.
• Class sizes for grades 2-6 are targeted not to exceed 29 students per class.
Pasco School District Capital Facilities Plan
Page 6 of 21
November 2011
• Music, which includes both strings and band instruction along with general
music, will be provided in separate classrooms.
• Physical education instruction must be provided in a full size area.
• Some special education services are provided in a self-contained classroom for
some children, while others need highly specialized services. This means that
some special education classes have much smaller class sizes than general
education classes, based on the individual needs of the students.
• Title I and LAP programs may require specialized areas.
• All elementary schools will have a library/media resource center, which includes
space for a technology lab.
• A sufficient number of computer labs will be available and must be provided for
state-mandated testing for all students.
• A specialized science lab for grades 4-6 will be available.
C. Middle and High School Program Standards
The District education program's standards, which directly affect middle school and
high school capacity include:
• Class sizes for 6th grade are not to exceed 29 students per class.
• Class sizes for grades 7-8 are not to exceed 32 students per class or 155
students per day.
• Class sizes for high school grades 9-12 are not to exceed 32 students or 155
students per day.
• The middle and high school classroom utilization standard is set at a factor of
85% (based on a regular school day) due to the need to provide planning and
teaming periods.
• Special education services are provided in a self-contained classroom for some
children, while others need highly specialized spaces.
• Students will also be provided other programs in classrooms or specialty
classrooms, such as computer labs, individual and large group study rooms,
practice labs and production rooms.
• Each school will have an adequate Library/Media Center.
• Career and Technical Education requires specialized spaces suited to the
curriculum.
SECTION 3
CAPITAL FACILITIES INVENTORY
The facilities inventory serves to establish a baseline for determining the facilities
necessary to accommodate future demand (student enrollment) at acceptable
levels of service. This section provides an inventory of capital facilities owned and
operated by the District including schools, portables, undeveloped land and support
facilities. School facility capacity was inventoried based on the space required to
accommodate the District's educational program standards. The capacity does not
include temporary capacity that may be provided through alternative delivery
methods, like Multi Track Year Round Education, double shifting, excessive use of
portables or use of leased facilities.
Pasco School District Capital Facilities Plan
Page 7 of 21
November 2011
A. Schools
The District currently maintains one (1) early learning center, seven (7) elementary
schools serving K-5, four (4) elementary schools serving grades 1-5, three (3)
middle schools serving grades 6-8, two (2) high schools serving grades 9-12. The
District also operates an alternative program for middle and high school students in
portable facilities. Based on the October 11, 2011 action of the Pasco School
Board, the elementary configuration will be changed to include sixth grade, if
necessary, for the purposes of reducing the cost of new school construction for
Pasco taxpayers.
School capacity is based on the number of teaching stations within each building
and the space requirements of the District's current educational programs, This
capacity calculation is used to establish the District's baseline capacity, and to
determine future capacity needs based on projected student enrollment. The
District believes educational programs are best delivered in brick and mortar
facilities. However, the prolonged and significant rate of growth, and the state
funding policy of not providing state match until there are unhoused students,
requires use of portables.
In light of this, the District plans to house some elementary, middle and high school
population permanently in portables. The number of portables counted as
permanent capacity varies by building and is calculated based upon the reasonable
maximum each building's infrastructure can accommodate to provide all the
components of an adequate educational program, which include the ability to meet
health and fitness requirements, to feed students, to provide for adequate music,
band and orchestra instruction, to host the minimal amount of parent and family
programs, to provide for safety in the pickup and drop off of students as well as
provide classroom space. The portable classrooms housing more students than the
amount determined maximally reasonable for each school are deemed to provide
temporary capacity and are not included in the district's permanent capacity
calculations. The school capacity inventory is summarized in Tables 1, 2, and 3.
Pasco School District Capital Facilities Plan
Page 8 of 21
November 2011
Table 1 — Elementary School Brick and Mortar Inventory
Early Learning Location Yr Built/ Acres Bldg Area Teaching Brick &
Center Remodel sq ft Stations* Mortar
Ca acit
Captain Gray (K)** 1102 N. 10t Ave 1986 8.6 47,478 22 484
Elementary Schools
K-5
Edwin Markham 4031 Elm Rd 1962/1984 12 34,898 13 312
James McGee 4601 N Horizon Dr 1981 14 44,774 20 480
Mark Twain 1801 Road 40 1953/1999 15 52,725 18 432
Maya An elou 6001 Road 84 2004 13 59,630 27 648
Ruth Livingston 2515 Road 84 1977 14 44,717 20 480
Whittier 616 N Wehe Ave 1998 16 46,845 19 456
Vir i ie Robinson 125 S Wehe Ave 2005 13 59,630 24 576
Elementary Schools
1-5
Emerson 1616 W Octave St 1997 8.6 46,845 22 528
Longfellow 301 N 10' Ave 1989 6 44,325 20 480
Robert Frost 1915 N 22 Id Ave 1997 10.6 46,845 20 480
Rowena Chess 715 N 24 1h Ave 2000 11 49,360 23 552
TOTAL 1 578,072 j 248 1 5,908
Table 2 — Middle School Brick and Mortar Inventory
Middle Schools Location Yr Built/ Acres Bldg Area Teaching Brick &
(6-8) Remodel sq ft Stations* Mortar
Ca acit ***
Ellen Ochoa 1801 E Sheppard St 2002 36 115,029 30 637
McLoughlin 2803 Road 88 1982 30 133,161 37 787
Stevens 1120 N 22 nd Ave 1960/1984/ 12.7 91,934 28 595
2005
TOTAL 1 340,124 95 2,019
Table 3— High School Brick and Mortar Inventory
High Schools Location Yr Built/ Acres Bldg Area Teaching Brick &
(9-12) Remodel sq ft Stations* Mortar
Ca acit ***
Pasco High School 1108 N 1 01h Avenue 1953/1972/ 34 255,992 86 1,827
1993/2005
Chiawana HS 8125 W. Argent 2009 80 337,703 102 2,167
New Horizons 3110 Argent Road All inventory in portables
TOTAL 1 593,695 1 188 3,994
Pasco School District Capital Facilities Plan
Page 9 of 21
November 2011
* The elementary capacity was calculated on 24 students to each teaching station using the state's
calculation of number of teaching stations per school, realizing some teaching stations serve
substantially fewer and others substantially more than 24. Rooms such as music rooms, special
education rooms, LAP rooms, library, computer labs and science rooms, advanced placement rooms,
and similar rooms that are used for special programs have been included in the number of teaching
stations reported above. However, there are 35 teaching stations that are used to deliver special
programs in the elementary schools, which cannot be used to serve the standard class size of 25 to 29
students. There are 29 teaching stations that are used to deliver special programs in the middle
schools, which cannot be used to serve the standard class size of 29 to 32 students. There are 9
teaching stations that are used to deliver special programs in the high schools, which cannot be used to
serve the standard class size of 32 students. The number of teaching stations in this chart excludes
portables.
**Captain Gray Early Learning Center was calculated using 22 students per teaching station.
*** Permanent capacity for secondary schools is calculated by multiplying the number of teaching
stations times the students per classroom defined in the educational standards, times the 85%
efficiency factor. The efficiency factor recognizes the time teaching stations are not used due to
circumstances such as teacher planning periods.
B. Portables
Portables are used to house students until growth slows to a more manageable
level and until funding can be secured to construct permanent facilities. Because of
the prolonged and significant rate of growth in the District, students may be
permanently served in portables. To the extent the District is unable to
accommodate enrollment in brick and mortar facilities and the limited number of
permanent portables, additional portables may be used to provide temporary
capacity. The inventory of portables identifies the facilities that are used as regular
teaching stations, special programs and other educational purposes. Also noted is
the number of portables that are providing permanent capacity.
Table 4— Portables Inventory
School Portable School Portable
Classrooms Classrooms
Elementary Elementary
Edwin Markham 3 Robert Frost 5
Emerson 1 Vir ie Robinson 6
James McGee** 14 Rowena Chess 5
Long fellow 4 Ruth Livingston 13
Mark Twain 8 Whittier 9
Maya Angelou 6 Captain Gray 6
Total Elem 80*
*To serve approximately 1517 of the enrolled elementary students in
portables, 63 of the 80 portable classrooms provide permanent capacity.
Portable classrooms that are needed to serve more than the 1517 students
are considered temporary housing.
** McGee has one double portable (2 classrooms) that are not full size
classrooms and are not suitable for general education classes, thus limiting
their use.
Pasco School District Capital Facilities Plan
Page 10 of 21
November 2011
School Portable School Portable
Classrooms I Classrooms
Middle High
Ellen Ochoa 8 Pasco High 25
McLoughlin 26 New Horizons 16
Stevens 14 Total High 41***
Total Middle 48**
** To serve approximately 575 of the enrolled middle school students in
portables, 20 of the 48 portable classrooms provide permanent capacity.
Portables that are needed to serve the remaining enrolled middle school
students are temporary capacity.
***All the portable classrooms currently at the high schools are deemed to
provide permanent capacity.
C. Support Facilities
In addition to schools, the District owns and operates facilities that provide
operational support functions to the schools. An inventory of these facilities is
provided in Table 5.
Table 5 -Support Facility Inventory
Facility Location Building Area —sq ft
Booth Bldg / District Office 1215 W Lewis Street 55,000
Building 210 / M & 0 3412 W Stearman Avenue 28,000
D. Land Inventory
Table 6 — Unimproved Parcels Owned by the District
Parcel Location Area—Acres Notes
Roads 48/52 21.93 Acres Potential elem or ELC site
Fre 's Addition/Block 18 1.88 acres
N California St. .32 acres
Rd 60/Sandifur 8 acres Elementary site
Rd 52/Powerline 41 acres Middle School site
N California/Spokane St 6.25 acres Adjacent to Whittier
Henry St. between 22/24 1.9 acres Adjacent to Stevens
Pasco School District Capital Facilities Plan
Page 11 of 21
November 2011
SECTION 4
STUDENT ENROLLMENT PROJECTIONS
A. Projected Student Enrollment
The District's enrollment projections are based on an estimate by the Office of the
Superintendent of Public Instruction (OSPI). OSPI estimates future enrollment for
all Washington State school districts. OSPI uses a modified cohort survival
methodology to forecast future enrollment. This methodology estimates how many
students in one year will attend the next grade the following year by looking at
historical data. The methodology also forecast how many new kindergarten
students will enroll based on the number of live births in the county and historical
averages for the number of children that enter kindergarten relative to the number
of live births. The enrollment forecast is more accurate in the earlier years and less
accurate in later years. The adjusted forecast is released annually in November.
TABLE 7 - ENROLLMENT FORECAST WITH K-5 CONFIGURATION
Grade 2011 2012 2013 2014 2015 2016 2017
K 1,408 1,471 1,534 1,597 1,660 1,723 1,788
1 1,428 1,485 1,552 1,618 1,685 1,751 1,817
2 1,371 1,470 1,528 1,597 1,665 1,734 1,802
3 1,385 1,407 1,508 1,568 1,638 1,708 1,779
4 1,235 1,423 1,445 1,549 El, 11 1,683 1,755
5 1,298 1,252 1,442 1,465 70 1,633 1,706
Total Elem 8,125 8,508 9,009 9,394 9,829 10,232 10,647
7,971*
6 1 1,186 1,317 1,270 1,463 1,486 1,593 1,657
7 1,189 1,212 1,346 1,298 1,495 1,518 F1,627
8 1,189 1,210 1,233 1,370 1,321 1,521 1,544
Total Mid 3,564 3,739 3,849 4,131 4,302 4,632 4,829
3,498*
9 1,520 1,697 1,727 1,760 1,965 1,886 2,172
10 1,013 1,063 1,187 1,208 1,231 1,368 11313
11 865 838 879 982 999 1,108 1,131
12 757 787 762 800 894 909 926
Total High 4,155 4,385 4,555 4,750 5,089 5,181 5,542
4,164*
TOTAL 15,844 16,632 17,413 18,275 19,220 20,045 21,017
15,633-
Reflects the actual student enrollment for October 1, 2011. The updated OSPI forecast will
not be available until the end of November 2011.
Pasco School District Capital Facilities Plan
Page 12 of 21
November 2011
The Multi Track Year Round Task Force recommended that sixth grade become a part of the
elementary schools, thereby decreasing a need for middle school space and increasing the
need for elementary schools which saves the taxpayers the higher cost of building a new
middle school. The board approved the configuration change on October 11, 2011. The
projections using the new configuration follow in Table 8,
TABLE 8- ENROLLMENT FORECAST WITH K-6 CONFIGURATION
Grade 2011 2012 2013 2014 2015 2016 2017
K 1,408 1,471 1,534 1,597 1,660 1,723 1.,788
1 1,428 1,485 1,552 1,618 1,685 1,751 1,817
2 1,371 1,470 1,528 1,597 1,665 1,734 1,802
3 1,385 1,407 1,508 1,568 1,638 1,708 1,779
4 1,235 1,423 1,445 1,549 1,611 1,683 1,755
5 1,298 1,252 1,442 1,465 1,570 1,633 1,706
6 1,186 1,317 1,270 1,463 1,486 1,593 1,657
Tota 1 9,311 9,825 10,279 10,857 11,316 11,825 12,36-4
Elem 9,147*
7 1,189 1,212 1,346 1,298 1,495 1,518 1,627
8 1,189 1,210 1,233 1,370 1,321 1,521 1,544
Total 2,378 2,422 2,579 2,668 2,816 3,039 3,171
Mid 2,322*
9 1,520 1,697 1,727 1,760 1,965 1,886 2,172
10 1,013 1,063 1,187 1,208 1,231 1,368 1,313
11 865 838 879 982 999 1,108 1,131
12 757 787 762 800 894 909 926
Total 4,155 4,385 4,555 4,750 5,089 5,271 5,542
High 4,164*
TOTAL 15,844 16,632 17,413 1 -1-8,275 1 19,220 20,045 21,017
15,633*
* Reflects the actual student enrollment for October 1, 2011. The updated OSPI forecast
will not be available until the end of November 2011.
SECTION 5
CAPITAL FACILITIES NEEDS
A. Facility Needs
Facility needs are derived by subtracting existing capacity from the existing and
forecast enrollment. The District's current capacity, its educational programs,
standard of service and enrollment forecast are used to determine its facility needs.
Existing needs are derived by subtracting the current capacity from the students
that are currently enrolled. The six year needs equal the forecast enrollment in
Pasco School District Capital Facilities Plan
Page 13 of 21
November 2011
2017 minus the existing capacity, or the current needs plus the needs to serve
increased student enrollment attributed to growth.
As shown in Table 9 below, by 2017 in a K-6 elementary configuration, the district
needs to add capacity to serve 4879 elementary school students, 221 middle
school students and 749 high school students.
Table 9 — Enrollment, Capacity and Needs
Needs
Current Current 2017 Remaining Needs
Brick & Permanent Total 2017 Projected after Remaining
Facilities Mortar Portable Current Projected Facility Phase 2 after
Capacity Capacity Capacity* Enrollment Needs Brick & Phase 2
Mortar Portables
Additions
Elementary 5,908 1,517 7,425 12,304 4,879 1,279 559
(K-6)
Middle (7-8) 2,019 575 2,594 3,171 577 577 577
High (9-12) 3,994 799 4,793 5,542 749 0 0
Totals 11,921 2,891 14,811 21,017 6,205 1856 1,136**
* Current capacity equals capacity in the brick and mortar facilities reflected in the inventory of
facilities, plus permanent portable capacity, to the maximum extent possible yet able to maintain an
optimal educational environment within each school's infrastructure limitations.
**Capacity to house the projected remaining 1,136 unhoused students is not included in either Phase
one or two to account for what may be an overestimate by OSPI of Pasco's growth by 2017. Because
this document must be updated every two years, the enrollment projections will be updated based on
real enrollment numbers.
To serve the projected 21,017 students in,2017, the District needs to restructure its
grade configuration to become K-6 elementary schools and 7-8 middle schools. This
postpones the need to construct another middle school for about six years but
creates the need to construct five schools serving elementary students, which could
be four 750-student elementary schools and one 600 student early learning center
serving half day kindergarteners. It must also add portables at the elementary
schools and add capacity at the high school level.
The District's current permanent facility needs are for 1722 K-6 elementary students
(Current K-6 enrollment at 9147 minus permanent capacity of 7425). Reconfiguring
the grade levels provides for adequate middle school capacity by using both brick
and mortar and permanent portable capacity at reasonable maximum levels until at
Pasco School District Capital Facilities Plan
Page 14 of 21
November 2011
least 2016. This was calculated using the October 2011 state count of students who
are actually enrolled and attending Pasco Schools then subtracting the total
capacity.
B. Planned Improvements
To serve the forecast growth, the District will construct needed facilities in
phases. In the first phase, the District will construct two 750-student elementary
schools, one early learning center and add portables. An early learning center is
recommended for two reasons. First, since it would be designed for kindergarten
needs, the cost per square foot is less. Second, an early learning center allows
for the whole school to focus solely on the needs of the young learner and
provides an enriched educational experience. The District will also make facility
improvements needed to maintain current facilities adequately to serve existing
students.
While the Phase 1 improvements are being constructed, the District will start
working on financing and plans to construct two additional 750-student
elementary schools, add capacity at the high schools and add additional portable
classrooms at the new elementary schools as needed. The additional capacity
and costs for the planned improvements is shown in Table 10.
Table 10—Added Facility Capacity and Costs
Needed Facility Improvements Additional Capacity Total Cost
PHASE 1
New Elementary School#13 750' $23,827,071
New Elementary School#14 750 $27,044,006
New Early Learning Center 600** $20,717,573
Facility Site Needs 0 $5,100,000
Structural Needs 0 $525,000
HVAC Needs 0 $1,500,000
Energy Efficiencies 0 $700,000
144 Elem***
Portables 150 HS $1,350,000
300
Total Costs $80,763,650
PHASE 2
New Elementary School #15 750 $27,044,006**
New Elementary School#16 750 $27,044,006
CHS Expansion 600**** $5,600,000***
Portables 576 Elem*** $2,700,000
Total $62,388,012
Pasco School District Capital Facilities Plan
Page 15 of 21
November 2011
* This amount is less than the other elementary schools because the district
already owns the land and has already completed much of the architectural and
engineering work in preparation for construction. The cost for schools in future
phases is a conservative estimate using the cost to construct the Phase 1
schools and reflects the estimates based on the prevailing wage and green
building laws. The cost for inflation has not been included. It will be captured
when this CFP is updated.
**The Early Learning Center would serve 600 full time students, meaning that it
could serve up to 1200 half day kindergarteners.
***To serve the remaining forecast K-6 growth, the District would need to add 54
more portable classrooms. However, it is estimated that space will exist on the
elementary campuses to only add 30 portable classrooms, totaling 110 portable
classrooms. The 30 new classrooms can serve another 720 students for a total
of 2,237 K-6 students served in portables all of which are permanent. Of the 110
portable classrooms, 93 classrooms would be considered permanent capacity
after Phases one and two. The remaining portable classrooms, or 17 of the 110
portable classrooms, will provide temporary interim capacity and are not counted
as permanent capacity. After adding portables to the maximum amount
possible, 559 K-6 students will remain unhoused after Phase two. (See Table 11
for details.) About six portables will need to be added at the high school level to
serve about 150 more students as permanent capacity. School impact fees may
be used to pay for the cost of portables.
****The cost to add capacity for 600 high school students is conservative and is
based on an estimate of$232 per sq ft (10% more than the original construction
of$211) for about 1,000 square feet per classroom for 24 classrooms (includes
allowance for halls and stairwells). (The cost of per square foot in western
Washington ranges from $289-$312.) Chiawana was originally designed to add
the additional classrooms to the wings of the school to absorb future growth.
The 24 classrooms will house about 600 additional students. Therefore, about
six portable classrooms will need to be added to house the remaining 149
students in the projection and are scheduled in Phase 1.
Shown in Table 11 is the analysis of the amount of current permanent K-6 portable
capacity and an estimate for the future. No set percentage is possible due to the
individual characteristics and limitations of each school and site. The district has
analyzed each site to determine the maximum enrollment possible yet maintain a
quality educational program and all of its components.
Table 11 —Analysis of K-6 Permanent and Temporary Portable Capacity
Maximum Unhoused
Reasonable Max- #Portable Temporary Total Remaining
Enroll Enroll for B/M B/M=#st in Classrooms Port Portable Unhoused
Optimal capacity perm as perm Classrooms Classrooms Students
Quality portables
2011 7,971 7,425 5,908 1,517 63 17 80
2017 After Phase 1 12,304 9,669 8,008 *144 69 17 86
2017AfterPhase 2 12,304 11,745 9,508 *576 93 17 110 559
* Portable capacity at unbuilt schools sites are estimates of 6 classrooms per new school.
Pasco School District Capital Facilities Plan
Page 16 of 21
November 2011
*The permanent capacity attributed to portable classrooms at those schools that are not yet built is
only an estimate and subject to change once sites are secured and designs are finalized.
In 2017, the OSPI enrollment forecast projects that the District will be serving 21,017
students. Table 12 shows the current capacity, the added capacity for the planned
improvements, the total capacity when the planned improvements are complete, and the
forecast enrollment. As shown in Table 12, when all the planned improvements are
constructed the District will have permanent capacity to serve 11 ,745 out of the 21,017
projected students. Capacity to house the projected remaining 780 unhoused students is not
included in either Phase one or two to account for what may be an overestimate by OSPI of
Pasco's growth by 2017. Because this document must be updated every two years, the
enrollment projections will be updated based on real enrollment numbers.
Table 12- Planned Capacity and Forecast Enrollment in a K-6 Configuration
2017
2017 Increased 2017 Increased Total Facility
2017 Total Facility Capacity
Facilities Projected Current Projected Capacity Needs Capacity after Needs
Facility from
Enrollment Capacity* Y after phase 2 phases 1 Phases 1
Needs Phase 1 Phase 1 and 2
and 2
Elementary (K-6) 12,304 7425 4,879 2,244* 2,635 2076* 11,745 559
Middle (7-8) 3171 2,594 577 0 577 0 2,594 577
High (9-12) 5,542 4,793 749 150 599 600 5,543 (1)
Totals 21,017 14,811 5,849 2,394 3,811 2,676 19,882 1,136
*Includes brick and mortar schools and portables.
Table 13 - Planned Capacity and Forecast Enrollment
Added Total Planned Remaining
Facility Current Capacity Capacity Forecast Projected
Capacity* Enrollment Unhoused
Students
Elements K-6) 7,425 4,320 11,745 12,304 559
Middle (7-8) 2,594 0 2,594 3,171 577
High (9-12) 4,793 750 5,543 5,542 (1)
TOTAL 14,811 5,070 19,882 21,017 1,136
Pasco School District Capital Facilities Plan
Page 17 of 21
November 2011
"Total planned capacity in Phase 1 includes six portable classrooms at the elementary level, all of
which are considered permanent capacity. After Phase 2 construction, 24 more portable classrooms
will be considered permanent capacity. The 6 portable classrooms for the high school are also
considered permanent capacity.
The District's ability to fund the planned improvements that will add capacity is dependent
upon the passage of bond elections at a 60% supermajority and capital construction funds
from the state.
Numbers for permanent portable classroom capacity for schools not yet constructed are only
estimates and may change based on site selection and layout.
SECTION 6
CAPITAL FACILITIES FINANCING PLAN
A. Planned Improvements
Planned improvements in Phase 1 include the construction of two elementary schools
and one early learning center, the addition of six portable classrooms at the high
school level and another six portable classrooms at the elementary level. The District
also needs to acquire school sites and must make a variety of improvements that are
needed at existing facilities. When the planned Phase 1 improvements are constructed
there will be permanent capacity for 9,669 students.
B. Financing for Planned Improvements
1. General Obligation Bonds
Bonds are typically used to fund construction of new schools and other capital
improvement projects. Bonds are then retired through collection of property taxes.
The District must pass a bond election with a 60% majority since it is the primary
source of funding for the capital improvements listed in this plan.
2. State Capital Construction Funds
State Capital Construction funds come from the Common School Construction Fund
("the fund"). Bonds are sold on behalf of the Fund, and then retired from revenues
accruing predominantly from the sale of timber from the common school lands. If these
sources are insufficient, the Legislature can appropriate funds or the State Board of
Education can change the standards. School districts may qualify for state match
funds for specific capital projects based on a prioritization system. Based on the
District's assessed valuation per student, the formula in the state regulations and the
significant number of unhoused students (calculated by the State's definition), the
District is currently eligible for state match funds for new schools at a factor of
approximately 86% within the state's calculation formula only if local voters approve the
funds for the local portion of the projects.
3, Impactor Mitigation Fees
Impact or mitigation fees are a means of supplementing traditional funding sources for
construction of public facilities needed to accommodate new development. School
impact fees or SEPA mitigation fees are generally collected by the permitting agency at
Pasco School District Capital Facilities Plan
Page 18 of 21
November 2011
the time plats are approved or building permits are issued. Improvements that do not
add capacity and that are constructed to existing schools to serve existing enrollment,
are not included in impact fee or mitigation fee calculations. The existing needs and
deficiencies are excluded from the cost that is attributed to growth because impact and
mitigation fees cannot be used to remedy existing deficiencies.
C. Six-Year Financing Plan
Table 14 demonstrates how the District intends to fund new construction and
improvements to school facilities in the first phase of the Capital Facility Plan. A similar
financing plan will be prepared for improvements that are planned for Phase 2 once the
improvements in Phase 1 are under construction. The financing components include a
bond issue, state match funds, and impact fees. Projects or portions of projects which
remedy existing deficiencies are not appropriate for impact fees. Thus, fees collected
from new developers will not be used to finance projects or portions of projects which
remedy existing deficiencies.
Table 14- Capital Facilities Financing Plan Phase 1
Added Unsecured Funds
Project Capacity Cost Bonds State Match* Impact Fees**
New Elementary School#13 750 $23,827,071*** $9,757,686 $13,169,385 $900,000
New Elementary School#14 750 $27,044,006 $11,647,044 $14,496,962 $900,000
New Early Learning Center 600 $20,717,573 $9,612,446 $10,655,127 $450,000
Facility Sites 0 $5,100,000 $5,100,000 $0 $0
Existing Facility Improvements 0 $2,725,000 $2,725,000 $0 $0
Portables 300 $1,350,000 $0 $0 $1,350,000
TOTAL 2400 $80,763,650 $38,842,176 $38,321,474 $3,600,000
-This number is an estimate of state match and is subject to verification by OSPI.
** This number is an estimate that assumes housing development will occur at a rate similar to what
has been experienced the past six years and impact fees in the amount of at least $4,683.34 will be
collected from builders for every new housing unit.
***This amount is less than other similar elementary schools because the district already owns the
land and has already completed much of the architectural and engineering work in preparation for
construction.
SECTION 7
SCHOOL IMPACT OR MITIGATION FEES
The Growth Management Act (GMA) authorizes jurisdictions to collect impact fees to
supplement funding of additional public facilities needed to accommodate new
development. The State Environmental Policy Act requires mitigation of impacts that new
development has on schools and the State Subdivision Act requires there be adequate
provision for schools prior to approving subdivisions. Impact fees or mitigation fees
address these legal requirements. They cannot be used for the operation, maintenance,
Pasco School District Capital Facilities Plan
Page 19 of 21
November 2011
repair, alteration, or replacement of existing capital facilities used to meet existing service
demands.
A. Fee Calculations
Franklin County and the City of Pasco have not adopted a school impact fee
ordinance. However, the District's Capital Facility Plan addresses the forecast growth
for which the City and County must plan, and it identifies the need to collect fees to
address a portion of the cost the District will incur to build facilities to serve growth.
The fees have been calculated using a standard school impact fee formula that is
authorized by the Growth Management Act and adopted in Washington counties and
cities. The fees, calculated as shown in attached Appendix A, are based on the
District's cost per dwelling unit to construct new elementary and middle schools to add
capacity to serve new development. Construction costs do not include that portion of
the total cost to build new schools that is being incurred to serve unhoused students (to
remedy existing deficiencies). Credits have been applied in calculating the fees to
account for future state match funds the District could receive and projected future
property taxes that will be paid by the owner of the dwelling unit. The fees have been
discounted by 25% to minimize the impacts the fees may have on new development
and ensure new development is not paying more than its fair share.
B. District's Proposed Fees
The District requests collection of school impact fees in the amounts of:
Single Family: $4,683.34
Multi-Family: $4,525.86
Pasco School District Capital Facilities Plan
Page 20 of 21
November 2011