Loading...
HomeMy WebLinkAbout3393 Resolution • RESOLUTION NO. 3313 A RESOLUTION of the City of Pasco, Washington, providing for the replacement of nonconforming subdivision estate fences. WHEREAS, the City has previously approved "Surewood" estate fences as subdivision estate fences for subdivisions backing on arterial streets with the expectation of providing a durable, attractive, and graffiti resistance corridor; and WHEREAS, since the installation of such fences, the materials have experienced rapid deterioration, resulting in the slats being easily broken or removed with very light impact; and WHEREAS, the materials have proven not be graffiti resistant but, rather, susceptible to stains and discoloration; and WHEREAS, the "Surewood" product is no longer in production, and no longer available for replacement, resulting in a mismatch of colors, texture, and size defeating the goal of an attractive, consistent neighborhood and impairing the values of the homes and properties within that neighborhood; and WHEREAS, several subdivisions within the City have utilized the "Surewood" product as an estate fence resulting in various degrees of damage and deterioration requiring it replacement; and WHEREAS, by plat conditions, the owner of the adjacent properties bear the responsibility for the repair, maintenance and replacement of those fences; and WHEREAS, it is recognized by the City Council that in addition to the private benefit, the fences also represent the public interest in maintaining the aesthetic attractiveness of the City's subdivisions and the value of its homes, replacement of the defective fences needs to be conducted in a reasonable and orderly fashion; and WHEREAS, the City has determined that replacement of these fences should be done on a neighborhood basis over time commensurate with the deterioration and damage evidencing that the fences have exceeded their useful life as a result of their defective condition;NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF PASCO, WASHINGTON, DO RESOLVE AS FOLLOWS: Section 1. The "Surewood" fencing materials as previously used as components in the subdivision estate fence has proven to be defective for its intended purpose, and is prohibited from use as an estate fence. All existing"Surewood" fences are nonconforming. Section 2. "Surewood"estate fences are present in the following neighborhoods: A. Loviisa Farms/Montgomery Estates Subdivisions including: along Road 100, Chapel Hill Blvd., and Road 84. B. Columbia Place Subdivision including: along Sandifur Blvd. and Road 84. Section 3. All "Surewood" fence materials (slats) shall be replaced with those complying with the standards established by PMC 26.32.090, as amended by Ordinance No. . Section 4. The reasonable time for the replacement of the nonconforming "Surewood" fences shall occur by the following date(s) as specified: A. Loviisa Farms/Montgomery Estates Subdivisions—May 1, 2013. B. Columbia Place Subdivision—May 1, 2014. Section 5. To encourage and assist in the prompt transition to conform with the existing standard, in an orderly fashion, as funds may be available to the City, and in relation to the remaining useful life of the nonconforming materials, the City shall, upon application of a qualified home owner, provide for the labor and services for the disposal of the nonconforming fence material, and the installation of the new conforming fence material, at its sole expense during the periods below. The property owner will be responsible for material costs of the conforming materials at the actual cost of such materials at the best volume price obtainable by the City. The City will bill the property owner for the material costs with the property owner having the option to pay in twelve (12) equal monthly installments included with the property owner's utility bill. Section 6. To be eligible for the City's participation outlined above: A. Property owners within the Loviisa Farms/Montgomery Estates Subdivisions must apply on or before July 1, 2012. B. Property owners within the Columbia Place Subdivision must apply on or before July 1, 2013. After each of the dates identified above, the property owners of the respective subdivisions shall be responsible for their full costs of the fence replacement, and the full responsibility to have such replacement completed before the deadline specified in Section 4, above. Any noncomplying fencing material from and after such date may be subject to code enforcement and plat covenant compliance proceedings. ASSED by the City Council of the City of Pasco, Washington, as its regular meeting dated this f� day of April, 2012. iff,,Z,18 ---- Matt Watkins, Mayor A EST: I APP AS TO FORM:.4.________--------1. aQ.Q,c: ,Debra L. Clark, City Cler Leland B. Kerr, City Attorney Replacement of Nonconforming Subdivision Estate Fences Page 2