Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
4780 Resolution_Amending_2027-2032_TIP
Resolution 4780 – 2027 – 2032 TIP Amendment - 1 Revision: 1.9.26 RESOLUTION NO. 4780 A RESOLUTION OF THE CITY OF PASCO, WASHINGTON, – REVISING THE 2027-2032 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM FOR THE CITY OF PASCO FOR THE PURPOSE OF GUIDING THE DEVELOPMENT, DESIGN, AND CONSTRUCTION OF LOCAL AND REGIONAL TRANSPORTATION IMPROVEMENTS. WHEREAS, RCW 35.77.010 requires that each city and town adopt annually, following a public hearing, a Six-Year Transportation Improvement Program detailing projected needs for street construction; and WHEREAS, the Pasco City Council adopted the 2027-2032 Transportation Improvement Program on June 15, 2026, following a public hearing; and WHEREAS, the Pasco City Council held a public hearing on September 8, 2026, to consider amending the 2027-2032 Six-Year Transportation Improvement Program; and WHEREAS, the amended Six-Year Transportation Improvement Program is consistent with the Comprehensive Plan, supports the health, safety, and welfare of the residents of Pasco, and will benefit the public; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO, WASHINGTON: That the City of Pasco’s Six-Year Transportation Improvement Program for 2027-2032 is hereby amended to include the projects shown attached hereto as Exhibit A.. Be It Further Resolved, that this Resolution shall take effect immediately. PASSED by the City Council of the City of Pasco, Washington, on this 8th day of September, 2026. Charles Grimm Mayor ATTEST: APPROVED AS TO FORM: _____________________________ ___________________________ Gabriela Sanchez Ogden Murphy Wallace, PLLC City Clerk City Attorney Revised 2027-2032 Transportation Improvement Program FINAL 08/18/2026 Final 06/09/2026 Column1 Project Title Road Name Begin/End Termini PE ROW CONST Total Ranked Funding Type Prior Year 2027 Year 2028 Year 2029 Year 2030 Year 2031 Year 2032 REMAINDER 6 year- plan PROJECTS 1 Lewis Street Underpass Demolition Lewis Street 1st Ave to Tacoma Ave 500,000$ 3,000,000$ 3,500,000$ 1 Secured Grant/Loan 500,000$ 3,000,000$ 3,000,000 2 SRTS Argent Rd/Rd 88 & Sandifur Pkwy/Rd 90 Pedestrian Crossings Argent Road Road 88 197,008$ 982,048$ 1,179,056$ 1 Secured Grant 500,000$ 679,056$ 679,056 3 Rd 40 E Extension Road 40 East 'A' Street/ East Lewis Place 80,000$ 380,000$ 1,468,000$ 1,928,000$ 1 Local Funds 460,000$ 1,468,000$ 1,468,000 4 Ainsworth Ave Pavement Preservation Ainsworth Ave Oregon Ave/10th ave 440,000$ 250,000$ 1,442,000$ 2,132,000$ 1 Secured Grant/Local Funds 590,000$ 1,542,000$ 1,542,000 5 Lewis Street Pavement Preservation Lewis Street US12/27th Ave 650,000$ 250,000$ 5,500,000$ 6,400,000$ 1 Secured Grant/Local Funds 800,000$ 5,600,000$ 5,600,000 6 Sylvester St Overpass Pedestrian/Bicycle Access Sylvester Street US 395 Overpass 1,000,000$ 6,000,000$ 7,000,000$ 1 Secured Grant/Planned Grant 1,000,000$ 6,000,000$ 6,000,000 7 Sandifur Pkwy/Rd 76 Intersection Safety Enhancements Sandifur Parkway Road 76 371,000$ 1,660,000$ 2,031,000$ 1 Secured Grant/Private contributions 371,000$ 1,660,000$ 1,660,000 8 Citywide Injury Minimization and Speed Management Implementation Multiple Locations Multiple 100,000$ 650,000$ 750,000$ 1 Secured Grant 100,000$ 650,000$ 650,000 9 Clark St Improvements Clark Street 10th St/2nd St 350,000$ 1,450,000$ 1,800,000$ 1 Secured Grant 100,000$ 250,000$ 1,450,000$ 1,700,000 10 South Rd 68 Pavement Preservation Court St I-182 350,000$ 350,000$ 1,500,000$ 2,200,000$ 1 Secured Grant/Local Funds 700,000$ 1,500,000$ 2,200,000 11 Road 44 FCID Canal Crossing Road 44 FCID Canal (North of Argent PI)300,000$ 1,300,000$ 1,600,000$ 1 Secured Grant/Local Funds 50,000$ 250,000$ 1,300,000$ 1,550,000 12 Harris Rd Realignment Rd 103 Sandifur Pkwy 400,000$ 3,600,000$ 4,000,000$ 1 Local Funds (Tax Incremental Finanacing and TIF)400,000$ 3,600,000$ 3,600,000 13 Buckingham Dr Extension (Broadmoor Blvd to Rd 103)Buckingham Dr Broadmoor Blvd/Rd 103 300,000$ 1,600,000$ 1,900,000$ 1 Local Funds (Tax Incremental Finanacing)100,000$ 800,000$ 1,000,000$ 1,800,000 14 Buckingham Dr Extension (Rd 103 to Rd 105)Buckingham Dr Rd 103/Rd 105 300,000$ 1,800,000$ 2,100,000$ 1 Local Funds (Tax Incremental Finanacing)100,000$ 800,000$ 1,200,000$ 2,000,000 15 Road 103 Extension (Sandifur Pkwy to Buckingham Dr)Road 103 Sandifur Pkwy/Buckingham Dr 300,000$ 2,400,000$ 2,700,000$ 1 Local Funds (Tax Incremental Finanacing)100,000$ 1,000,000$ 1,600,000$ 2,600,000 16 Road 105 Extension (Sandifur Pkwy to Buckingham Dr)Road 105 Sandifur Pkwy/Buckingham Dr 300,000$ 2,100,000$ 2,400,000$ 1 Local Funds (Tax Incremental Finanacing)100,000$ 900,000$ 1,400,000$ 2,300,000 17 Rd 76 Overpass Road 76 Chapel Hill/Burden Blvd 2,800,000$ 2,110,000$ 28,100,000$ 33,010,000$ 2 Grants /Private Contributions/Local Funds 100,000$ 1,200,000$ 1,800,000$ 1,910,000$ 8,000,000$ 12,000,000$ 8,100,000$ 33,010,000 18 Burden Blvd/Rd 60 Intersection Improvements Burden Road Road 60 360,000$ 1,810,000$ 2,170,000$ 2 Local Funds (TIF Impact)360,000$ 1,810,000$ 2,170,000 19 Burns Rd/Rd 68 Intersection Improvements Burns Road Rd 68 550,000$ 370,000$ 2,750,000$ 3,670,000$ 2 Planned Grant/Local Funds 550,000$ 370,000$ 2,750,000$ 3,670,000 20 Burns Rd Extension - Missing link Burns Road Road 68/Rio Grande Lane 600,000$ 1,250,000$ 4,150,000$ 6,000,000$ 2 Local Funds/Private contributions 300,000$ 1,000,000$ 4,700,000$ 6,000,000 21 South 4th Ave (Festival Street Improvements)S 4th Avenue Lewis Street / Columbia Street 290,000$ 790,000$ 1,080,000$ 2 Planned Grant 290,000$ 790,000$ 1,080,000 22 Systemic Pedestrian Crossing Improvements Multiple Locations Multiple Locations 280,000$ 1,502,000$ 1,782,000$ 2 Planned Grant/Local Funds 100,000$ 180,000$ 1,502,000$ 1,782,000 23 City Wide Traffic Signal Improvements (Phase 3)Multiple Locations Multiple Locations 300,000$ 2,877,500$ 3,177,500$ 2 Planned Grant 300,000$ 2,877,500$ 3,177,500 24 E Lewis St/Heritage Blvd Intersection Improvements E Lewis Street Heritage Blvd 400,000$ 2,000,000$ 2,400,000$ 2 Local Funds/Private Contributions/Planned Grant 400,000$ 1,500,000$ 500,000$ 2,400,000 25 Systemic Access Management Safety Improvements Multiple Locations Multiple Locations 150,000$ 650,000$ 800,000$ 2 Planned Grant/Local Funds 150,000$ 650,000$ 800,000 26 Systemic Low-Cost Countermeasures at Stop-Controlled Intersections Multiple Locations Multiple Locations 200,000$ 550,000$ 750,000$ 2 Planned Grant/Local Funds 200,000$ 550,000$ 750,000 27 Court & Rd 100 Intersection Improvements Court St Rd 100 500,000$ 1,000,000$ 4,500,000$ 6,000,000$ 2 Local Funds 500,000$ 1,000,000$ 4,500,000$ 6,000,000 28 Court Street/Road 60 Intersection Improvements Court St Rd 60 450,000$ 2,500,000$ 2,950,000$ 2 Planned Grant 450,000$ 2,500,000$ 2,950,000 29 Sandifur Pkwy/Convention Dr Intersection Improvements Sandifur Parkway Convention Dr 410,000$ 1,900,000$ 2,310,000$ 2 Local Funds/Private contributions 410,000$ 1,900,000$ 2,310,000 30 Sandifur Pkwy/Rd 84 Intersection Improvements Sandifur Parkway Road 84 350,000$ 1,900,000$ 2,250,000$ 2 Planned Grant/TIF (Impact)350,000$ 1,900,000$ 2,250,000 31 Sacajawea Heritage Trail Levee Lowering Sacajawea Heritage Trail Road 54/Road 72 250,000$ 3,000,000$ 3,250,000$ 2 Planned Grant 250,000$ 1,500,000$ 1,500,000$ 3,250,000 32 I-182/Broadmoor Blvd I/C Multiuse Pathway/Bridge Broadmoor Boulevard I-182 1,500,000$ 8,000,000$ 9,500,000$ 3 Planned Grant/Local Funds 500,000$ 1,000,000$ 4,000,000$ 4,000,000$ 9,500,000 33 Safe Routes to School Project TBD TBD 300,000$ 1,000,000$ 1,300,000$ 3 Planned Grant 300,000$ 1,000,000$ 1,300,000 34 Columbia St Improvements Columbia Street 10th St/2nd St 390,000$ 1,190,000$ 1,580,000$ 3 Planned Grant 390,000$ 1,190,000$ 1,580,000 35 Burden Rd/Rd 44 Intersection Improvements Burden Road Road 44 360,000$ 1,810,000$ 2,170,000$ 3 Local funds (TIF Impact)360,000$ 1,810,000$ 2,170,000 36 Rd 40 East Pathway Road 40 East Sacajawea Park/East Lewis Place 440,000$ 690,000$ 840,000$ 1,970,000$ 3 Planned Grant 540,000$ 590,000$ 840,000$ 1,970,000 37 Rainier Ave/Kartchner St Intersection Improvements Rainier Ave Kartchner 400,000$ 2,000,000$ 2,400,000$ 3 Local Funds/Private contributions 200,000$ 200,000$ 1,500,000$ 500,000$ 2,400,000 38 Court St Improvements- Ped/Bike Court Street Road 96/Harris Road 1,480,000$ 5,800,000$ 7,280,000$ 3 Planned Grant 180,000$ 1,340,000$ 3,456,000$ 2,304,000$ 7,280,000 39 W Lewis St/N 14th Ave Intersection Improvements W Lewis St 14th Ave 400,000$ 150,000$ 2,200,000$ 2,750,000$ 3 Planned Grant/Local Funds 400,000$ 150,000$ 2,200,000$ 2,750,000 40 Wrigley Dr/Rd 76 Intersection Improvements (Rd 76 Improvements)Road 76 Wrigley Dr 350,000$ 2,150,000$ 2,500,000$ 3 Local Funds/TIF (Impact)350,000$ 2,150,000$ 2,500,000 41 N 4th Ave Pavement Preservation (I-182 to County Line)I-182 County Line (Glade Rd)150,000$ 1,600,000$ 1,750,000$ 3 Planned Grant/Local Match 150,000$ 1,600,000$ 1,750,000 42 Argent Rd Widening (Phase 4) Argent Road Road 36/Road 44 1,180,000$ 4,720,000$ 5,900,000$ 4 Planned Grant/Local Funds 1,180,000$ 2,360,000$ 2,360,000$ 5,900,000 43 Franklin County Irrigation District Canal Bicycle/Pedestrian Pathway N/A Road 100/Road 76 300,000$ 500,000$ 2,000,000$ 2,800,000$ 4 Planned Grant 300,000$ 500,000$ 2,000,000$ 2,800,000 44 Rd 100 Widening Road 100 Court St/Chapel Hill Blvd 825,000$ 750,000$ 7,000,000$ 8,575,000$ 4 Planned Grant 625,000$ 950,000$ 7,000,000$ 8,575,000 45 Shoreline Rd Realignment Shoreline Road Court/Burns Road 500,000$ 2,500,000$ 7,500,000$ 10,500,000$ 4 Planned Grant 250,000$ 2,000,000$ 1,000,000$ 7,250,000$ 3,250,000 46 Burns Rd Extension to Glade Rd Burns Road "Road 44"/N Glade Road 4,800,000$ 4,000,000$ 19,200,000$ 28,000,000$ 4 Planned Grant 2,400,000$ 3,400,000$ 3,000,000$ 19,200,000$ 8,800,000 47 4th Ave Pavement Preservation (Lewis St to I-182)Lewis Street I-182 300,000$ 150,000$ 2,550,000$ 3,000,000$ 5 Planned Grant 150,000$ 300,000$ 2,550,000$ 3,000,000 48 Systemic Roadway Lighting Upgrades Multiple Locations Multiple Locations 150,000$ 100,000$ 400,000$ 650,000$ 5 Planned Grant/Local Funds 150,000$ 100,000$ 400,000$ 650,000 49 Burden Rd/Madison Ave Intersection Improvements Burden Road Madison Ave 360,000$ 1,810,000$ 2,170,000$ 5 Local funds (TIF Impact)360,000$ 1,810,000$ 2,170,000 50 Court St Safety Improvements Court Street Road 40/Road 68 110,000$ 340,000$ 450,000$ 5 Planned Grant 110,000$ 340,000$ 450,000 51 James St Improvements James Street Oregon Ave/Frontier Lp 250,000$ 1,600,000$ 1,850,000$ 5 Local Funds 250,000$ 1,600,000$ 1,850,000 52 Harris Rd / Crescent Rd Overpass Harris Road Harris Road/Crescent Rd 4,000,000$ 5,000,000$ 45,000,000$ 54,000,000$ 5 Planned grant /Private contributions/local funds 1,000,000$ 3,000,000$ 50,000,000$ 4,000,000 53 Lewis Street Corridor Improvements (Phase 1)Lewis Street 2nd Ave/ 5th Ave 880,000$ 4,800,000$ 5,680,000$ 5 Planned Grant/Local 530,000$ 450,000$ 780,000$ 3,920,000$ 1,230,000 54 Lewis Street Corridor Improvements (Phase 2)Lewis Street 5th Ave/10th Ave 640,000$ 4,460,000$ 5,100,000$ 5 Planned Grant 300,000$ 4,800,000$ 300,000 55 Court St Safety Improvements (Phase 2)Court Street Road 68/Road 96 680,000$ 680,000$ 5,100,000$ 6,460,000$ 5 Planned Grant/Local Funds 680,000$ 680,000$ 5,100,000$ 1,360,000 56 I-182/Broadmoor Blvd I/C Improvements - Westbound Broadmoor Boulevard I-182 750,000$ 8,000,000$ 8,750,000$ 5 Planned Grant/Local Match 750,000$ 8,000,000$ 750,000 PROGRAMS 188,233,556 57 Annual Pavement Preservation Multiple Locations Multiple Locations -$ 1 Local funds 701,000$ 715,500$ 737,000$ 759,200$ 782,000$ 805,500$ 4,500,200$ 58 Ped/Bike Gap Program Multiple Locations Multiple Locations -$ 2 Local funds 105,000$ 110,250$ 115,763$ 121,551$ 127,628$ 580,191$ 59 Neighborhood Traffic Calming Program Multiple Locations Multiple Locations -$ 2 Local funds 110,250$ 115,763$ 121,551$ 127,628$ 134,010$ 609,201$ PLANS AND STUDIES 5,689,592$ 60 Traffic Analysis for US 12 US 12 A /Tank Farm Road/SR 124 3,060,000$ 3,060,000$ 1 Planned Grant 1,530,000$ 1,530,000$ 3,060,000$ 61 Bicycle & Pedestrian Master Plan Update 300,000$ 300,000$ 3 Local Funds 300,000$ 300,000$ 62 ADA Sidewalk Transition Plan Update 300,000$ 300,000$ 3 Local Funds 300,000$ 300,000$ 63 Interchange Feasibility Study on I-182 I-182 Multiple Existing Interchanges 450,000$ 450,000$ 3 Local Funds 200,000$ 250,000$ 64 Rd 68/Taylor Flats Rd Intersection Study Road 68 Taylor Flats Rd/Columbia River 350,000$ 350,000$ 4 Local Funds 350,000$ 350,000$ 4,010,000 296,764,556$ 34,690,056$ 25,698,250$ 25,785,013$ 31,081,513$ 41,587,179$ 39,541,138$ 197,933,148