Loading...
HomeMy WebLinkAbout4764 Resolution - WSDOT Interlocal Detour AgreementResolution – WSDOT Haul Road/Detour ILA - 1 Version 1.9.26 RESOLUTION NO. 4764 A RESOLUTION OF THE CITY OF PASCO, WASHINGTON, AUTHORIZING THE CITY MANAGER TO EXECUTE AN AGENCY HAUL ROAD/DETOUR AGREEMENT BETWEEN WASHINGTON STATE DEPARTMENT OF TRANSPORTATION (WSDOT) AND THE CITY OF PASCO. WHEREAS, WSDOT is administering a project at US 395/Kartchner Street interchange northbound ramp terminal; and WHEREAS, the project includes construction of a new roundabout at the existing intersection of Kartchner Street and Commercial Avenue, which is currently a two-way stop controlled intersection; and WHEREAS, the footprint of the project is entirely within WSDOT jurisdiction; and WHEREAS, construction of the project requires a temporary detour of traffic to provide access to the local businesses in this vicinity; and WHEREAS, the proposed detour utilizes segments of City streets, including Capitol Avenue, Hillsboro Street, Commercial Avenue, and Kartchner Street; and WHEREAS, WSDOT shall be responsible only for the maintenance and repairs of city’s roads specifically attributable to the project use and those will be restored to their Baseline Condition, which is established prior to starting the project construction; and WHEREAS, the City Council of the City of Pasco, Washington, has after due consideration, determined that it is in the best interest of the City of Pasco to enter into the Agency Haul Road/Detour Agreement. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO, WASHINGTON: That the City Council of the City of Pasco approves the terms and conditions of the Agency Haul Road/Detour Agreement between WSDOT and the City of Pasco; a copy of which is attached hereto and incorporated herein by reference as Exhibit 1; and Be It Further Resolved, that the City Manager of the City of Pasco, Washington, is hereby authorized, empowered, and directed to sign and execute said Agreement on behalf of the City of Pasco. Be It Further Resolved, that this Resolution shall take effect immediately. Resolution – WSDOT Haul Road/Detour ILA - 2 Version 1.9.26 PASSED by the City Council of the City of Pasco, Washington, on this 20th day of July, 2026. Charles Grimm Mayor ATTEST: APPROVED AS TO FORM: _____________________________ ___________________________ Gabriela Sanchez Ogden Murphy Wallace, PLLC City Clerk City Attorney Agency Haul Road/Detour Agreement Agency and Address Agreement Number State Route Number Control Section Number Section / Location Region Intended Use (Haul Road or Detour Road) Vehicle Restrictions Description of Roads or Streets This Agreement is between the Washington State Department of Transportation (WSDOT) and the above-named governmental entity (Agency) hereinafter referred to individually as the Party and collectively as the Parties. Recitals 1. WSDOT is planning the construction or improvement of a section of state highway as shown above; 2. WSDOT plans to use the Agency roads or streets described above and as further detailed in red on the attached Exhibit “A” for detour routes or for hauling purposes during construction of the project, and 3. It is anticipated that use of the Agency’s roads or streets for such purposes will result in the need for additional maintenance work on the roads or streets, the cost of which should be borne by WSDOT. Now Therefore, pursuant to chapter RCW 47.28.140 and in consideration of the terms, conditions, and performances contained herein, the recitals as stated above which are incorporated and made a part hereof, and any Exhibits attached hereto, it is mutually agreed as follows: 1. PURPOSE 1.1 The Agency hereby agrees to WSDOT’s use of the roads or streets covered by this Agreement subject to the conditions contained herein. 1.2 Immediately prior to the beginning of WSDOT’s use of the roads or streets, the Parties shall make a joint condition inspection. WSDOT shall prepare a “Memorandum” of the existing condition of said roads or streets, attached hereto as Exhibit B. The Memorandum shall include a statement of the extent and frequency of routine maintenance operations normally carried out by the Agency, shall contain an explanation of any repair or maintenance required prior to WSDOT’s use, and may include photographs showing condition of the existing roadway. The Memorandum shall establish the “Baseline Condition” of the roads or streets that are the subject of this Agreement. 1.3 In the event that the Memorandum establishes the need for the repair or maintenance of the roads or streets prior to WSDOT’s use, the Parties shall prepare an addendum to the Memorandum that provides a detailed description of work to be performed and division of responsibilities for performance of the work. Any repair or maintenance of the roads and streets prior to WSDOT’s use shall be documented in the addendum to the Memorandum. 1.4 The Agency agrees not to restrict the legal size, weight, or speed of vehicles using the roads or streets covered by this Agreement except as stated above under Vehicle Restrictions. DOT Form 224-014 Revised 09/2023 Page 1 of 4 City of Pasco 525 N. 3rd Avenue Pasco, WA 99301 HR5-1004 US 395 1101 US 395/Kartchner Street interchange northbound ramp terminal at milepost 23.69 South Central Region Detour Road N/A The work proposed under this Agreement is to provide access to the local businesses on North Commercial Ave. through the use of Kartchner St., North Capitol Ave., East Hillsboro St., and North Commercial Ave. 1.5 It is expressly understood that WSDOT shall be responsible only for the maintenance and repairs of the Local $JHQF\¶VURDGVRUVWUHHWVVSHFL¿FDOO\DWWULEXWDEOHWRWKHSURMHFWXVH8SRQFRPSOHWLRQRIXVHRIWKHURDGVRU streets covered by this Agreement the Parties will conduct a joint inspection to identify any damage to the roads or streets occasioned by WSDOT’s use thereof. The Baseline Condition as established in the Memorandum, and any addendum thereto, will be used for purposes of comparison. The Parties shall document the need for repair or maintenance of the roads or streets based on WSDOT’s use and shall determine the cost of the required maintenance and repair to restore the roads or streets to the Baseline Condition. 1.6 WSDOT shall reimburse the Agency for the actual direct and related indirect costs of the required maintenance and repairs to restore the roads or streets to the Baseline Condition or WSDOT shall complete the repair to the satisfaction of the Agency. 1.7 When indicated by a check mark in the box the Agency is a county, WSDOT and the Agency acknowledge that WKHWHUPVRIWKLV$JUHHPHQWVDWLV¿HVWKHUHTXLUHPHQWVRI:$& 2. PERIOD OF PERFORMANCE Subject to its other provisions, the period of performance of this Agreement shall commence on and be completed on unless terminated sooner as provided in this Agreement or extended through a properly executed amendment. 3. LEGAL RELATIONS  ,WLVXQGHUVWRRGDQGDJUHHGWKDWWKLV$JUHHPHQWLVVROHO\IRUWKHEHQH¿WRIWKH3DUWLHVKHUHWRDQGJLYHVQRULJKWWR any other Party. No joint venture or partnership is formed as a result of this Agreement. 3.2 The Parties shall be deemed independent contractors for all purposes, and the employees of the Parties or any of their contractors, subcontractors, consultants, and the employees thereof, shall not in any manner be deemed to be employees of the other Party. 4. INDEMNIFICATION 4.1 To the extent allowable under law, each Party to this Agreement will protect, defend, indemnify, and save harmless WKHRWKHU3DUW\LWVRႈFHUVRႈFLDOVHPSOR\HHVDQGDJHQWVZKLOHDFWLQJZLWKLQWKHVFRSHRIWKHLUHPSOR\PHQWDV such, from any and all costs, claims, judgments, and/or awards of damages (both to persons and property), arising out of, or in any way resulting from, each Party’s negligent acts or omissions with respect to the provisions of this Agreement. Neither Party will be required to indemnify, defend, or save harmless the other Party if the claim, suit, or action for injuries, death, or damages (both to persons and property) is caused by the sole negligence of the other 3DUW\:KHUHVXFKFODLPVVXLWVRUDFWLRQVUHVXOWIURPWKHFRQFXUUHQWQHJOLJHQFHRIWKH3DUWLHVWKHLUDJHQWVRႈFLDOV or employees, and/or involve those actions covered by RCW 4.24.115, the indemnity provisions provided herein ZLOOEHYDOLGDQGHQIRUFHDEOHRQO\WRWKHH[WHQWRIWKHQHJOLJHQFHRIWKHLQGHPQLI\LQJ3DUW\LWVDJHQWVRႈFLDOVRU employees. 4.2 The Parties agree that their obligations under this section extend to any claim, demand, and/or cause of action EURXJKWE\RURQEHKDOIRIDQ\RIWKHLURႈFHUVRႈFLDOVHPSOR\HHVRUDJHQWV)RUWKLVSXUSRVHRQO\WKH3DUWLHVE\ mutual negotiation, hereby waive, with respect to each other only, any immunity that would otherwise be available against such claims under the Industrial Insurance provisions of Title 51 RCW.  7KLVLQGHPQL¿FDWLRQDQGZDLYHUZLOOVXUYLYHWKHWHUPLQDWLRQRIWKLV$JUHHPHQW 5. DISPUTE RESOLUTION 5.1 The Parties shall work collaboratively to resolve disputes and issues arising out of, or related to, this Agreement. Disagreements shall be resolved promptly and at the lowest level of hierarchy. To this end, following the dispute UHVROXWLRQSURFHVVVKRZQEHORZVKDOOEHDSUHUHTXLVLWHWRWKH¿OLQJRIOLWLJDWLRQ  7KH3DUWLHVGHVLJQDWHGUHSUHVHQWDWLYHVVKDOOXVHWKHLUEHVWHႇRUWVWRUHVROYHGLVSXWHVDQGLVVXHVDULVLQJRXW of or related to this Agreement. The representatives shall communicate regularly to discuss the status of the WDVNVWREHSHUIRUPHGKHUHXQGHU7KHUHSUHVHQWDWLYHVVKDOOFRRSHUDWHLQSURYLGLQJVWDႇVXSSRUWWRIDFLOLWDWH the performance of this Agreement and the resolution of any disputes or issues arising during the term of this Agreement. DOT Form 224-014 Revised 09/2023 Page 2 of 4 August 3rd, 2026 October 31st, 2026 5.1.2. A Party’s representative shall notify the other Party in writing, with email being acceptable, of any dispute or issue that they believe may require formal resolution. The representatives shall meet within five (5) working days of receiving the written notice and attempt to resolve the dispute. 5.1.3. In the event the representatives cannot resolve the dispute or issue, the Agency Public Works Director and WSDOT’s Region Administrator, or their respective designees, shall meet and engage in good faith negotiations to resolve the dispute. 5.1.4. In the event the Agency and WSDOT cannot resolve the dispute or issue, the Agency and WSDOT shall each appoint a member to a Dispute Board. These two members shall then select a third member not affiliated with either Party. The three-member board shall conduct a dispute resolution hearing that shall be informal and unrecorded. All expenses for the third member of the Dispute Board shall be shared equally by both Parties; however, each Party shall be responsible for its own costs and fees. 6. RECORDS AND AUDIT All records related to the Work performed under this Agreement shall be held and kept available for inspection and audit for a period of six (6) years from the date of termination of this Agreement or any final payment authorized under this Agreement, whichever is later. Each Party shall have full access to and right to examine said records, during normal business hours and as often as it deems necessary. In the event of litigation or claim arising from the performance of this Agreement, the Agency and WSDOT agree to maintain the records and accounts until such litigation, appeal or claims are finally resolved. This section shall survive the termination of this Agreement. 7. TERMINATION 7.1 This Agreement may be terminated, without penalty or further liability as follows: 7.1.1 Termination for Convenience This Agreement may be terminated for convenience by WSDOT at any time. The notice of intent to terminate for convenience shall be issued in writing no less than thirty (30) working days in advance of termination. WSDOT shall not be liable to the Agency for any direct, indirect, or consequential damages arising solely from termination of this Agreement. 7.1.2 Termination for Cause This Agreement may be terminated for cause by either Party if the other Party does not fulfill in a timely and proper manner its obligations under this Agreement, or if the other Party violates any of the terms and conditions of this Agreement. The notice of intent to terminate for cause shall be issued by a Party in writing and the other Party shall have the opportunity to correct the violation or failure within fifteen (15) working days of the date of the notice. If the failure or violation is not corrected within the time allowed, this Agreement will automatically terminate. 7.1.3 Termination for Withdrawal of Authority This Agreement may be terminated by WSDOT in the event that WSDOT’s authority to perform any of its duties is withdrawn, reduced, or limited in any way after the commencement of this Agreement. The notice of intent to terminate for withdrawal of authority shall be issued by WSDOT in writing no less than seven (7) calendar days in advance of termination. No penalty shall accrue to WSDOT in the event termination under this section is exercised. This section shall not be construed to permit WSDOT to terminate this Agreement in order to acquire similar services from a third-party. 7.1.4 Termination for Non-Allocation of Funds This Agreement may be terminated by either Party if insufficient funds are allocated or appropriated to the Party to continue its performance of this Agreement in any future period. The notice of intent to terminate for non-allocation of funds shall be issued in writing no less than seven (7) calendar days in advance of termination. 7.2 Any termination of this Agreement shall not prejudice any rights or obligations accrued to the Parties prior to termination. 8. GENERAL 8.1 Assurances. The Parties agree that all activity pursuant to this Agreement shall be in accordance with all applicable federal, State, and local laws, rules, and regulations as they currently exist or as amended. DOT Form 224-014 Revised 09/2023 Page 3 of 4 8.2 Interpretation. This Agreement shall be interpreted in accordance with the laws of the state of Washington. The titles to paragraphs and sections of this Agreement are for convenience only and shall have no effect on the construction or interpretation of any part hereof. 8.3 Amendments. This Agreement may be amended only by the mutual written agreement of the Parties executed by personnel authorized to bind each of the Parties. 8.4 Waiver. A failure by a Party to exercise its rights under this Agreement shall not preclude that Party from the subsequent exercise of such rights and shall not constitute a waiver of any other rights under this Agreement unless stated to be such in writing and signed by an authorized representative of the waiving Party and attached to the original Agreement. 8.5 All Writings Contained Herein. This Agreement contains all of the terms and conditions agreed upon by the Parties. No other understandings, oral or otherwise, regarding the subject matter of this Agreement shall be deemed to exist or to bind the Parties. 8.6 Venue. The Venue of any action brought under this Agreement involving WSDOT shall be in Superior Court for County, State of Washington. 8.7 Severability. If any term or condition of this Agreement is held invalid, such invalidity shall not affect the validity of the other terms or conditions of this Agreement. 8.8 Authority to Bind. The signatories to this Agreement represent that they have the authority to bind their respective organizations to this Agreement. 9. COUNTERPARTS This Agreement may be executed in counterparts or in duplicate originals. Each counterpart or each duplicate shall be deemed an original copy of this Agreement signed by each Party, for all purposes. Electronic signatures or signatures transmitted via email in portable document format (“PDF”) may be used in place of original signatures on this Agreement. Each Party intends to be bound by its electronic or PDF signature on this Agreement and is aware that the other Party is relying on its electronic or PDF signature. In Witness Whereof, the parties hereto have executed this Agreement as of the party’s date signed last below. AGENCY By: Printed: Title: Date: WASHINGTON STATE DEPARTMENT OF TRANSPORTATION By: Printed: Title: Date: DOT Form 224-014 Revised 09/2023 Page 4 of 4 W. Brian White, P.E. South Central Region Administrator Thurston HR5-1004 Exhibit A Sheet 1 of 2 AGREEMENT HR5-1004 CITY OF PASCO EXHIBIT “A” SPECIFICATIONS AND DETAILS The work proposed under this Agreement includes a detour to maintain access to local businesses through the use of Kartchner St., North Capitol Ave., East Hillsboro St., and North Commercial Ave. during the US 395/Kartchner St. I/C – Northbound ramp Terminal Improvements Project in the City of Pasco in Franklin County, Washington. Short Term Detour Route Details Portions of the intersection of Kartchner St. and the US 395 northbound ramp terminal will be closed, depending on the phase of construction, limiting specific movements and requiring motorists to follow the posted detour to access local businesses. The detour will consist of the use of Kartchner St. between the US 395 northbound ramp terminal and North Capitol Ave, the use of North Capitol Ave. between Kartchner St. and East Hillsboro St., the use of East Hillsboro St. between North Capitol Ave. and North Commercial Ave., and the use of North Commercial Ave. between East Hillsboro St. and Kartchner St. In accordance with Section 1.6 of the Agreement, pavement repairs will be made by WSDOT’s contractor once usage of the detour route has ceased and will be completed by the end of the contract. The City of Pasco will not seek reimbursement for repairs. Duration and Time Frame: 24 hours a day for approximately 15 days between July 2026 and September 2026. Notification: WSDOT will notify the City’s representative 10 days prior to implementation of the detour. City of Pasco Representative: Andrey Avetisyan 525 N. 3rd Avenue 2nd Floor Pasco, WA 99301 Office: 509-544-4131 avetisyana@pasco-wa.gov WSDOT Representative: Andres Mendoza, P.E. Construction Project Engineer 1655 Fowler Street Richland, WA 99352 Office: 509-222-2440 Andres.Mendoza@wsdot.wa.gov Exhibit 'A' Page 1 of 2 HR5-1004 DETOUR PLAN 28 28 B. WHITE NB RAMP TERMINAL IMPROVEMENTS KARTCHNER ST I/C US 395 A. MENDOZA DU1 26Y002 U. VARGAS U. VARGAS P. COOPER C O M M E R CI A L R A I N I E R A V E A V E J A S O N C A P I T O L A V E KARTCHNER ST HILLSBORO ST COMMERCIAL AVE CLOSED US 395 KARTCHNER ST I/C- DETOUR PLAN 395 A V E LEVEL TYPE 3 BARRICADE TEMPORARY SIGN LOCATION DETOUR ROUTE "PAVEMENT REPAIR EXCAVATION INC HAUL" AND "HMA FOR PAVEMENT REPAIR". BY THIS DETOUR ROUTE SHALL BE REPAIRED BY BID ITEMS 4. AS APPROVED BY THE PROJECT ENGINEER, DAMAGES TO THE ROADWAY CAUSED 3. THE DETOUR PLAN SHALL BE USED IN CONJUNCTION WITH CLASS A SIGN PLAN. 2. COVER SIGNS WHEN NOT ON USE. 1. ALL SIGNS ARE BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED. NOTES: CLOSED ROAD RO D CLOSED LOCAL TRAFFIC ONLY NOT TO SCALE HILLSBORO ST FILE NAME TIME DATE PLOTTED BY DESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM. REVISION DATE BY LOCATION NO.CONTRACT NO. JOB NUMBER NO. REGION STATE FED. AID PROJ. NO. WASH PLAN REF NO BilslaB 22-Jun-2026 2:13:18 PM XL6976_PS_DT_Sheet_AD01.dgn 10 SHEET OF SHEETS p w : / / p r o j e c t s t o r e . w s d o t . w a . g o v : W S D O T / D o c u m e n t s / S o u t h C e n t r a l / _ P r o j e c t s / 3 9 5 / 0 . 3 6 _ K a r t c h n e r S t - N B R a m p _ C O N N E C T / D e s i g n / _ C A D D / S h e e t s / 4 2 0 - D e t o u r P l a n / A D 0 1 / X L 6 9 7 6 _ P S _ D T _ S h e e t _ A D 0 1 . d g n c : \ u s e r s \ b i l s l a b \ p w _ w s d o t \ d 0 9 9 1 0 6 9 \ X L 6 9 7 6 _ P S _ D T _ S h e e t _ A D 0 1 . d g n W SD O T STAMP BOX STAMP BOX AD1- NOTE ADDED 6/22/2026 ZCB DETOUR DETOUR DETOUR DETOUR DETOUR DETOUR M4-9R 30" 24" 48" 30" R11-2 (B/W) M4-9 30" 24" M4-9R 30" 24" 60" 30" R11-3A (B/W) M4-9L 30" 24" M4-9L 30" 24" M4-9L 30" 24" (R/B/W) R3-2 24" 24" Exhibit 'A' Page 2 of 2 HR5-1004 HR5-1004 Exhibit B Page 1 of 2 AGREEMENT HR5-1004 EXHIBIT “B” JOINT INSPECTION MEMORANDUM This Memorandum is to document the baseline conditions of the Agency road(s) to be utilized as part of the detour. Project: US 395 Kartchner St. I/C NB Ramp Terminal Improvements Agency Road(s): Kartchner St., N. Capitol Ave., E. Hillsboro St., N. Commercial Ave. Date of Inspection(s): 5/28/2026 Existing Conditions (circle condition and identify any areas needing attention): Pavement Condition (including shoulders): Excellent Good Acceptable Cracking Pavement Condition Notes: N Capitol Ave: all paving joints are showing early signs of cracking. Southbound lane has a longitudinal crack about 3’ from fogline on wheelpath. E Hillsboro St: lots of alligator cracking and a few blowouts. N Commercial Ave: looks to be the same condition as N Capitol Ave, maybe a bit better (not as many joints). Kartchner St: has concrete lanes and acceptable asphalt shoulders adjacent to curb and gutter. See pictures. Striping Condition (circle condition and identify any areas needing attention): Excellent Good Acceptable Worn Striping Condition Notes: N Capitol Ave: striping is acceptable E Hillsboro St: has one non-existent stop bar WB at N Commercial Ave. No striping other than that. N Commercial Ave: stripping is worn but, visible mostly. Kartchner St: stripping is worn but, visible mostly. Signage Condition (circle condition and identify any areas needing attention): HR5-1004 Exhibit 'B' Page 1 of 2 HR5-1004 Exhibit B Page 2 of 2 Excellent Good Acceptable Damaged Signage Condition Notes: Street signs are all in and visible. Repairs: Repairs to be completed prior to detour implementation including but not limited to delineation, pavement repair, and clearing of obstructions (List below or indicate N/A): 1. Pasco has no plans of work until the fall, which will be crack sealing. 2. Pasco has requested that we Grind and Pave E Hillsboro St., and Crack Seal Kartchner, N Capitol Ave and, N Commercial Ave. prior to implementing the detour. WSDOT cannot commit to this request due to the limited funds of the project and the detoured traffic is associated with local traffic movements, not re-routing of highway traffic on the local road. WSDOT will repair all pavement that has deteriorated as a result of the extra vehicles on the detour route. WSDOT will work with the city on determining these areas following the usage of the detour. 3. 4. Routine Maintenance: Routine maintenance will be completed by WSDOT or its contractor in accordance with standard maintenance practices throughout the use of the detour. HR5-1004 Exhibit 'B' Page 2 of 2