Loading...
HomeMy WebLinkAboutSP 2026-002 - decisionCITY OF PASCO LAND USE BEARING EXAMINER IN TIIE MATTER OF ) FINDINGS OF FACT, CONCLUSIONS OF LAW, AND SP 202 2 ) DECISION AND SeminM Building ) CONIIIITIONS OF APPROVAL THIS MATTER having come on for hearing in front of the City of Pasco Heariaag E sarrainer on March 11, 2026, the Hearing Examiner having taken evidence hereby submits the follow✓icag Ffi'�Ldin s of Fact, Conclusions of Law, Decision and Conditions of Approval as follows: 1. Proponent: Strizhnk's Haven Ranch LLC, 105609 E Miser Pkwy., Kennewick, WA 99338 2. Applicant: Scott Robinson, 31500 Gcape St. Suite 3-200, Lake Elsinore, CA 92532-9702 3. Request: Special Permit fm- the coaastraaction of an approximately 2,700 sq.ft. Latter-day Saints church seminary building on a lot in k-uture Mavens Place subdivision. 4. Timeline: 4.1. February 18, 2026 Applications Submitted. 4.2. December 25, 2026 Application Deemed Complete. 4.3. February 25, 2026 Notice of Public Hem•ing udr SP2026-002 scheduled for March 11, 2026, was posted on the City of Pasco websko, published iH fhe Tai-City Heazid Newspaper, and mailed to properties within 300 feet of the proposal. 4.4. March 4, 2026 Public Heaa•in- Staff Report Published. 4.5. An open record public hearing was held, aver legal notice, on March 11, 2026. 5. BACHG-ROUND, 5.1. 1?57op2v= y- sc:°3peim : 5.1.1.Abbreviated Legal: THAT PARCEL OF LAID LOCATED IN A PORTION OF THAT CERTAif PARCEL OF LAND ND CO-1\1VE I- E i , AS PARCEL C BY DEED RECORDED t1INDEP1 AUDl !OR'S F I L E, N Ul , BZ11, , 03G`129 P-E-C0R D S Off' FRAt�1NL][� CT COIJN71 WAS104GTON, LOCATED IN A PO> a�l'1101`,] OF S)E 'i) 01"J 3, ��✓�JII�TS17[1[P 9 11®l��ll Il, RANGE 29 EAST. 5.1.2.Ceneral Location: An unaddressed parcol ruortla of Bur%aas Rd. and east of Road 60. (Parcel#114330043), Pasco, VVA99301 5.1.3.Property Size: 40.85 acres (1,770,6000.99 Square, Feet). The building'vvili be built on a 15,025 sc1. rt. lot to be subdivided as part of the Ravens Place subdivisions. 5.2. Access: The site is currently accessed from Road 60 and Bums Road to the south, after the division the site will be accessed by Bulldog Ln to the east. SP 2026-002 Seminary Building Page 1 of 5 5.3. Utilities: Municipal water is available in Road 60 to the southwest; municipal sewer is available to the north crossing to the north of the property. The site will be served with both municipal water and sewer after the Ravens Place subdivision has finished final plat. 5.4. Land Use and Zoning: The property is zoned R-1 (Low Density Residential) and R-3 (Medium Density Residential) and is currently undeveloped. Surrounding properties are zoned and developed as follows: 5.4.1.North: R-1 Low Density Residential 5.4.2.East: R-1 Low Density Residential 5.4.3.South: R-1 Low Density Residential, R-3 Medium Density Residential 5.4.4.West: R-1 Low Density Residential 5.5. COMPREHENSIVE PLAN: The Comprehensive Plan designates the location as "Low Density Residential" and "Medium Density Residential". Both Low Density Residential and Medium Density Residential are described as being for a variety of residential housing. The appropriate zoning districts in both Low Density Residential and Medium Density Residential designations are R-S-20; R-S-12; R-S-1; R-1; R-1-A; R-1-A2; R-2; R-3; R-4; and RP. The residential zoning of this property allows unclassified use via a special permit. 5.6. Environmental Determination: The Special Permit is exempt from SEPA due to the project meeting exemption requirements of WAC 197-11-800(6)(b). 5.7. Site: The specific area of the project is currently bare ground. The site as a is an agricultural field that is in the process of being developed into a residential subdivision. After the subdivision the lot where the seminary building will be constructed will be 15.025 sq. ft. 5.8. History: The site was annexed on January 17, 2022, with Ordinance #4574. The zoning was established through ZD2021-003 as both R-1 and R-3. Before Annexation the site was the location of a center pivot irrigated field. Since annexation the site has started the process of subdivision through the City of Pasco. The preliminary plat for the Ravens Place subdivision was approved by the Hearing Examiner on November 21, 2024. After which Lots 370 and 371 were combined in a minor plat amendment to create Lot 1 on April 22, 2025. Phases 1 and 2 of the Ravens Place subdivision are, at the time of this report, undergoing Final Plat review by the City of Pasco. This Special Permit will be conditioned to ensure that only the future Lot 1 of the Ravens Place subdivision will be developed as a religious seminary building. The final plat for the Ravens Place subdivision, was submitted on December 18th of 2025 and is currently under review by the City of Pasco. Appearing and testifying on behalf of the Applicant was George Stecker, 122 Warren Acres Road, Yakima, Washington. 6.1. Mr. Stecker testified that he was an agent authorized to appear and speak on behalf of the property owner and Applicant. 6.2. Mr. Stecker indicated that he had reviewed the Staff Report prior to the hearing; agreed with the factual representations set forth within the staff report; and did not object to the proposed Conditions of Approval. 6.3. Mr. Stecker testified that the proposed seminary will offer classes to students from a nearby high school campus, held during the school day, when students would otherwise have a "home room" period at the high school. The seminary will be built to have a residential appearance, with plans SP 2026-002 Seminary Building Page 2 of 5 for only three (3) parking spaces. Access to the seminary will be primarily pedestrian —students walking from the high school to the seminary, and vice versa. 6.4. Mr. Stecker testified that he agreed with likening the seminary to a high school, as a characterization of its use. 7. No member of the public testified at the hearing. 8. The entire planning file of record was admitted into the hearing record. 9. The proposed Latter-day Saints seminary building is a place of religious education. Religious education commonly includes academic and skills training elements. The proposed seminary will provide a supplement to the education offered students at the nearby high school. The proposed seminary, therefore, is an unclassified use under PMC 25.200.020(1) which may be considered for a Special Permit. 10. PMC 25.200.080 FINDINGS: 10.1. The proposal IS in accordance with the goals, policies, objectives, maps and/or narrative text of the Comprehensive Plan. In particular, the proposal supports the following policies found within the Comprehensive Plan: 10.1.1. Policy CF-2 A: Encourage growth in geographic areas where services and utilities can be extended in an orderly, progressive, and efficient manner. 10.1.2. Policy LU-2 A: Maintain sufficient land designated to accommodate residential, commercial, industrial, educational, public facility, and open -space uses proximate to appropriate transportation and utility infrastructure. 10.1.3. Policy L U-3-B: Support existing and design future recreational, educational, and cultural facilities and services through the Capital Facilities Plan; dedication of land through the concurrency management process,- and coordination with service providers. 10.2. The proposal will NOT adversely affect public infrastructure. Access to the site is not currently developed, but the site will be accessed from Bulldog Ln, a future street in the Ravens Place subdivision. Utilities will be installed during the construction of civil improvements of the Ravens Place subdivision. Utilities will be available to the site and have been designed and constructed to accommodate current uses. The proposed use will not increase the need for infrastructure improvements and is unlikely to adversely impact the existing infrastructure. 10.3. The proposal WILL be constructed, maintained and operated to be in harmony with the existing or intended character of the general vicinity. The properties in the general vicinity are a mixture of public and residential uses, with Sageview High School to the west across road 60. While the site is currently an agricultural field, phases 1 and 2 of the Ravens Place subdivision are currently being reviewed for completeness. The applicant states "Maintenance of the building and property will be a scheduled activity, currently contracted with maintenance professionals". When constructed, the seminary building will be maintained and operated in harmony with the intended character of the general vicinity. The majority of students visiting the seminary are expected to arrive by pedestrian travel. Pedestrian and any vehicular traffic to/from the seminary is not expected to be greater in nature than the residential traffic planned for the Ravens Place subdivision. The submitted site plans appear to be in harmony with the intended character of the general vicinity, but will be conditioned to meet screening standards, parking requirements, and setbacks. The applicant states that the building will reflect the design and nature of the nearby residences, and planning staff agreed that the development, as conditioned, will be in harmony with the intended character of the general vicinity. SP 2026-002 Seminary Building Page 3 of 5 10.4. The location and height of proposed structures and the site design will NOT discourage the development of permitted uses on property in the general vicinity or impair the value thereof. The proposed new seminary building will be subject to the Pasco Municipal Code. The proposed structure is approximately 2700 sq. ft. and appears to be a single story in height. These dimensions would not discourage development on adjacent properties. The applicant states "the design height and exterior appearance of the proposed building will be very similar to the adjoining residential properties." This design choice will not discourage the development of permitted uses on surrounding properties. The proposed use, as conditioned, will not discourage development of permitted uses on property in the general vicinity or impair their value as the building will meet Pasco Municipal Code Standards. 10.5. The operations in connection with the proposal will NOT be more objectionable to nearby properties by reason of noise, fumes, vibrations, dust, traffic, or flashing lights than would be the operation of any permitted uses within the district. The R-1 and R-3 zones allow for a multitude of residential uses, accessory, and conditional uses. After construction, the noise, fumes, dust, and flashing lights should not be any greater than anticipated in a residential zone as the proposed use does not generate any of these irritating factors. Traffic to the development will mainly consist of foot traffic and be during normal school hours, and is unlikely to be higher than normal for a residential zone. This foot traffic will be crossing from the adjacent Sageview Highschool to the seminary building for religious instruction. The applicant states that the seminary building will house one classroom. This size of structure is unlikely to generate foot traffic that would be more objectionable than other permitted uses in a residential zone. The development of a religious seminary building is unlikely to be objectionable to nearby properties, as conditioned. 10.6. The proposal will NOT endanger the public health or safety if located and developed where proposed, or in any way will become a nuisance to uses permitted in the district. The proposal states an anticipated crosswalk will be established across road 60, aligned with Red Tail Dr, this crosswalk will serve as the main access for students to the proposed seminary building. The crosswalk will serve as the preferred route between Sageview Highschool and the proposed development. The City of Pasco Transportation Systems Master Plan (TSMP), Table 10 Functional Classifications of New Roadways, recommends that Road 60 north of Burns Rd be classified as a collector. Based on the recommendation of the TSMP, it is appropriate to place conditions on this permit to ensure the safety of pedestrians crossing road 60. The proposal is required to adhere to the PMC including provisions such as the outdoor lighting and noise ordinances. If there were to be violations to these codes, then code cases may be initiated and remediating steps undertaken. Additionally, the use shall be subject to periodic reviews for compliance with conditions imposed under the special permit. 11. The City of Pasco Hearing Examiner considered all evidence within the record in rendering this decision. 12. Any Conclusion of Law that is more correctly a Finding of Fact is hereby incorporated as such by this reference. H. CONCLUSIONS OF LAW 1. The Hearing Examiner has been granted the authority to render this decision 2. As conditioned, this project is consistent with the Pasco Comprehensive Plan and Pasco Municipal Code. SP 2026-002 Seminary Building Page 4 of 5 3. Any Finding of Fact that is more correctly a Conclusion of Law is hereby incorporated as such by this reference. III. DECISION Based on the above Findings of Fact and Conclusions of Law, SP 2026-002 is hereby APPROVED subject to the following Condition of Approval. IV. CONDITIONS OF APPROVAL 1. The special permit shall apply to Parcel # 114330043, and when subdivided will apply to Lot 1 of the Ravens Place subdivision and any subdivision thereof. 2. All lighting shall be directed downward and shielded in such a way that no light from the development encroaches onto another property. 3. The applicant shall install a crosswalk across Road 60 with Rapid Flashing Beacons. 4. All signage on the property shall be in conformance with PMC Title 17, particularly those provisions applicable to residentially zoned property. 5. Parking for the seminary building shall meet standards in PMC 25.185. 6. All landscaping shall meet standards in PMC 25.180, including parking lot landscaping. 7. The development shall meet all required building setbacks within PMC 25.22. 8. The site plan shall be developed in substantial conformity to the Special Use Permit application, site plan and any building plans submitted. 9. Any modification or change in the nature, character or intensity of the use may require additional review and/or Special Use Permits. 10. Applicant shall adhere to all Federal, State and City zoning, building, fire, and safety codes. Dated this 2-6 day of March, 2026 CITY OF PASCO HEARING EXAMINER PRO TEM (a/y D. Eyestone Absent a timely appeal, this Decision is final' ' See Ch. 36.70C RCW (establishing a 21 day appeal period to superior court, and setting forth necessary review contents, along with filing and service requirements). SP 2026-002 Seminary Building Page 5 of 5