Loading...
HomeMy WebLinkAbout4713 Resolution - PBS Engineering - Amendment 6 to PSA Broadmoor TIF Design Resolution - Amend 6 to PSA with PBS for Broadmoor TIF - 1 SCRIVENER’S ERROR Resolution Number was corrected from 3713 to 4713 - See correction highlighted in yellow RESOLUTION NO. 4713 A RESOLUTION OF THE CITY OF PASCO, WASHINGTON, APPROVES AUTHORIZING THE CITY MANAGER TO EXECUTE AMENDMENT NO. 6 TO THE PROFESSIONAL SERVICES AGREEMENT WITH PBS ENGINEERING & ENVIRONMENTAL, INC., AN APEX COMPANY FOR THE BROADMOOR TAX INCREMENTAL FINANCING (TIF) DESIGN PROJECT. WHEREAS, the City of Pasco (City) and PBS Engineering & Environmental, Inc. (PBS), entered into a Professional Services Agreement (PSA) on August 1, 2022, to provide engineering services with respect to the Broadmoor Tax Increment Funding (TIF) project; and WHEREAS, this project is funded through tax increment financing funds and will follow local procedures for right-or-way acquisition, design, advertisement, environmental permitting, and bidding; and WHEREAS, the City and PBS entered into Amendment No. 1 to the PSA on December 5, 2022, for additional professional design engineering services: and WHEREAS, the City and PBS entered into Amendment No. 2 to the PSA on March 25, 2024, to add professional design engineering services for a traffic signal; and WHEREAS, the City and PBS entered into Amendment No. 3 to the PSA to provide additional professional design engineering services generally supporting the final designs for Road 108 and Sandifur Parkway and add additional time of performance; and WHEREAS, the City and PBS entered into Amendment No. 4 to the PSA on March 19, 2025, to add professional design engineering services and additional time of performance; and WHEREAS, the City and PBS entered into Amendment No. 5 to the PSA on December 29, 2025, to add additional time of performance; and WHEREAS, the City and PBS desire to enter into Amendment No. 6 to the PSA to provide additional professional design engineering services generally supporting the final designs for Road 103 and further described in detail in Exhibit A; and WHEREAS, the City Council of the City of Pasco, Washington, has after due consideration, determined that it is in the best interest of the City of Pasco to enter into Amendment No. 6 with PBS Engineering & Environmental, Inc., an APEX Company. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO, WASHINGTON: That the City Council of the City of Pasco approves the terms and conditions of Amendment 6 between the City of Pasco and PBS Engineering & Environmental, Inc., an APEX Company as attached hereto and incorporated herein as Exhibit A, and Be It Further Resolved, that the City Manager of the City of Pasco, Washington, is hereby authorized, empowered, and directed to execute said Amendment on behalf of the City of Pasco. Be It Further Resolved, that this resolution shall take effect immediately. PASSED by the City Council of the City of Pasco, Washington, on this 16th day of March, 2026. Charles Grimm Mayor ATTEST: APPROVED AS TO FORM: _____________________________ ___________________________ Krystle Shanks Ogden Murphy Wallace, PLLC Deputy City Clerk City Attorney PBS Engineering & Environmental, Inc, an APEX Company - Amendment No. 6 Broadmoor TIF Design Services – Project No. 22377 Version 08.15.2025 Page 1 AMENDMENT NUMBER 6 to PROFESSIONAL SERVICES AGREEMENT Broadmoor TIF Design Services PROJECT: 22-377 AGREEMENT NO. 22-025 WHEREAS, the City and PBS Engineering & Environmental, Inc., an APEX Company entered into a Professional Services Agreement on 8/1/2022 to provide design engineering services with respect to the Broadmoor Tax Incremental Financing (TIF) project. WHEREAS, the City and PBS Engineering & Environmental, Inc., an APEX Company entered into Amendment No. 1 to provide additional professional design engineering services, on 12/5/2022; WHEREAS, the City and PBS Engineering & Environmental, Inc., an APEX Company entered into Amendment No. 2 to provide additional professional design engineering services and add additional time of performance on 3/25/2024; WHEREAS, the City and PBS Engineering & Environmental, Inc., an APEX Company entered into Amendment No. 3 to provide additional professional design engineering on 6/25/2024; WHEREAS, the City and PBS Engineering & Environmental, Inc., an APEX Company entered into an Amendment No. 4 to provide additional professional design engineering and add additional time of performance on 3/19/2025; WHEREAS, the City and PBS Engineering & Environmental, Inc., an APEX Company entered into an Amendment No. 5 to provide additional professional design engineering and add additional time of performance on 12/29/2025; NOW, THEREFORE, this agreement is amended to allow PBS Engineering & Environmental, Inc., an APEX Company to provide additional professional design engineering and add additional time of performance services as described in Exhibit A. 1. Scope of Work: See Exhibit A. 2. Fee: The compensation for the work is based on a Time and Materials Basis not to exceed the amount of $395,703.00 for a total authorization amount of $2,575,059.00. See Exhibit B. 3. Time of performance: No Change. The services shall be complete for the project on or before 12/31/2026. DATED THIS DAY______________________________. [date of execution] CITY OF PASCO, WASHINGTON PBS ENGINEERING & ENVIRONMENTAL AN APEX COMPANY Harold L. Stewart II – City Manager Jason Mattox, PE – Vice President RESOLUTION -EXHIBIT A Apex Companies, LLC CITY OF PASCO, WASHINGTON Scope of Work Broadmoor TIF Amendment 6 – Harris Road Realignment (Road 103) City of Pasco Project # XXXXXX INTRODUCTION Apex Companies LLC (PBS) and its Consultant team have been selected by the City of Pasco (City) to perform traffic and design engineering, land surveying, geotechnical engineering, and right-of-way (ROW) acquisition services for the Broadmoor Tax Increment Financing (TIF) projects. This project is funded through tax increment financing funds and will follow local procedures for ROW acquisition, design, advertisement, environmental permitting, and bidding. The project team currently includes: • Kittelson & Associates, Inc. (KAI)―Signal Design • EPIC Land Solutions (EPIC)―ROW Acquisition • DKS Associates – Traffic modeling PROJECT BACKGROUND The Broadmoor TIF project was originally planned to be delivered through several amendments. See below for a breakdown of the contracting to date. Base Contract: Broadmoor TIF - 30% Plans This contract consisted of: • Survey. • Geotechnical investigations. • Coordinate preferred ultimate roadway sections. • Develop all TIF-related roadway segments to 30% design. • Evaluate potential project phasing opportunities. • Determine the amount of improvements that can feasibly be designed for the first construction package. • Determine ultimate ROW widths throughout the 30% design process. This will be done in collaboration between the City Public Works Engineering, City Planning, and the Broadmoor developer. This phase of design took substantially longer than initially anticipated as there was significant coordination and collaboration with the Broadmoor Subarea Plan. This work was performed within the budget associated with the contract. RESOLUTION -EXHIBIT AEXHIBIT A City of Pasco Broadmoor TIF—Harris Road Realignment (Road 103) – Amendment 6 February 2026 Page 2 of 17 Apex Companies, LLC Broadmoor TIF—Final Design Projects 1 and 2 (Amendment 1) This contract consisted of the following. Project 1 • Rough site grading of Road 108 from Harris Road to Sandifur Parkway and Sandifur Parkway from Road 108 to Broadmoor Boulevard. • Storm sewer, water, irrigation, and sewer infrastructure along Road 108 and Sandifur Parkway for advertisement mid-December. Although there were several changes to the location of the utilities due to changes in anticipated future tenants and/or retailers leaving the conversation and the needs of interested developers, this project was completed as anticipated. Project 2 • Broadmoor Boulevard widening, Interstate 182 to Burns Road • Sandifur Parkway from Road 105 to the east Throughout the development of this project, there were several modifications to the work performed. Due to urgent safety and capacity needs along the corridor, the scope for the signal at Buckingham Drive was shifted north to provide a signal at Burns Road and Broadmoor Boulevard, and the project was broken out into two projects: one for the signal at Sandifur Parkway and one for the signal at Burns Road. As these projects progressed, it was determined that the signal at Buckingham Drive was essential to minimize impacts to the traveling community (from both a desire to minimize inconvenience of construction and from a network safety and mobility standpoint). This resulted in the addition of a third signal to the contract, and the need for Amendment 2 (see below). Addition of Signal (Amendment 2) This amendment added funds to the project for the addition of a signal at Buckingham Drive to the scope. Addition of Signal (Amendment 3) Project 3 is anticipated to include final design for Road 108 and Sandifur Parkway from the intersection of Road 108 east to the Project 2 limits. Work will include a roundabout at the intersection of Road 108 and Sandifur Parkway, a signal at the intersection of Road 105 and Sandifur Parkway, and another signal at the intersection of Road 103 and Sandifur Parkway. DKS Traffic Support (Amendment 4) Amendment 4 added DKS to the project team for Traffic Modeling support. Time Extension (Amendment 5) Amendment 5 extended the duration of the contract to 12/31/2026. HARRIS ROAD REALIGNMENT (AMENDMENT 6, CURRENT AMENDMENT) PROJECT DESCRIPTION Amendment 6 is for the design of Road 103 From Sandifur Pkwy to Harris Road (approximately 0.3 miles). Work will include a traffic circle at the intersection of Road 103 and Harris Road, coordination with adjacent developer RESOLUTION -EXHIBIT A City of Pasco Broadmoor TIF—Harris Road Realignment (Road 103) – Amendment 6 February 2026 Page 3 of 17 Apex Companies, LLC to develop cohesive design that accommodates both development with City transportation needs, design of underground City utilities, and coordination with franchise utility companies. OVERALL PROJECT ASSUMPTIONS • Apex Companies, LLC, by and through its wholly owned subsidiary PBS Engineering and Environmental LLC (Apex), will prepare submittal items listed in this Scope of Work. • Traffic modeling will be performed by DKS Associates (DKS). • A SEPA checklist will be required for this project. If additional cultural resources evaluations are needed, City will contract directly with appropriate consultant. • A wildlife survey has already been completed for the project area • Landscape is not included in this amendment • Full field survey work is not included in this amendment. However, four days of verification survey are assumed to be needed to verify earthwork and tie in locations/elevations. • All property dedication work will be provided by the adjacent developer/s • If a signal is warranted, it will be designed by the developer SCOPE OF WORK Task 1. Project Management and Administration Apex shall oversee project tasks and coordinate with City representatives to manage the scope, schedule, and budget for the design engineering phase. The current phase of the project is budgeted for an eight-month design schedule. Subtask 1.1. Contract Administration, Invoicing, and Progress Reports • Prepare and submit monthly invoices. Each invoice will include: the date period covered by the invoice; the number of hours worked during the billing period with billing rates shown; expenses and associated markups; the total cost for labor and expenses for the billing period; subconsultants fees including markups for the billing period; and a total amount summarizing labor, expenses, and subconsultant fees. • Prepare a Contract Summary Report to accompany the monthly invoices. The Contract Summary Report will list each invoice, as well as the current invoice, with an itemized summary of invoice numbers, dates, and amounts billed for labor, expenses, and subconsultants as well as total amounts for each invoice. The Contract Summary Report will also list the total amount billed to date, the total amount remaining under the contract, and the contract expiration date. • Maintain required contract documentation. Provide copies of project files and records to the City for audits and public information requests. Final documents shall be provided in electronic format as requested. Deliverables • Monthly invoices, Contract Summary Reports, and Project Status Reports • Project documentation, upon request RESOLUTION -EXHIBIT A City of Pasco Broadmoor TIF—Harris Road Realignment (Road 103) – Amendment 6 February 2026 Page 4 of 17 Apex Companies, LLC Subtask 1.2. Meetings This item includes the coordination and meetings necessary to successfully complete the project. • Up to 32 weekly phone meetings with City staff. • Up to 8 internal Apex design team coordination meetings. • Meet with City staff after the review of the 30%, 60%, 90%, and final plan submittals. These meetings will be attended instead of the monthly meetings during this deliverable window. Deliverables • Meeting agendas and meeting summaries • Design Submittal Comment Review and Response Log Subtask 1.3. Management, Coordination, and Direction • The Consultant shall provide management, coordination, and direction to the Project team in order to complete the project on time and within budget. The City fosters a partnership approach of all stakeholders in the Project. The Consultant shall integrate this strategy into the overall management approach. • The Consultant shall establish a quality management program and designate responsibility for review of technical work and other deliverable products. • Prepare and maintain a project design schedule. The schedule shall identify Consultant tasks and items provided by the City and other consultants. The schedule shall be updated as circumstances require or as requested by the City (assumes one update). • The Consultant shall prepare and submit an activities list and schedule to the City following the Notice to Proceed. The schedule shall show appropriate milestones for the Project, including intermediate and final submittal dates for design documents and key decision points. • The Consultant shall coordinate Consultant tasks and activities with the City. Deliverables • Project schedule and schedule updates • Summary notes of coordination efforts • Quality Assurance and Quality Control (QA/QC) Program Deliverables • Coordination meeting agendas and meeting summaries Subtask 1.4. Broadmoor Development Support No change with this amendment Task 2. Surveying Subtask 2.1. Surveying and Base Map Completed as a part of the original contract for 30% design. Additional field survey work is not included in this amendment, as it is assumed that the previously constructed projects were per plans. RESOLUTION -EXHIBIT A City of Pasco Broadmoor TIF—Harris Road Realignment (Road 103) – Amendment 6 February 2026 Page 5 of 17 Apex Companies, LLC Subtask 2.2. Right-of-Way Support Completed as part of Amendment 1. Subtask 2.3. Road 103 - Survey Support Verification of drone survey Perform surface verification survey along the route of Road 103. This will be done by surveying cross section about every 50-ft from the eastern limits of the project to the western limits of the project, and by providing field survey for project tie in locations with existing roadways. This will be done once the city is ready to move towards advertisement of the project to validate earthwork quantities. Deliverables • AutoCAD C3D Surface for validation of drone surface Task 3. Geotechnical Engineering Subtask 3.1. Geotechnical Engineering No work with this amendment Subtask 3.2. Project 3 Signal Geotechnical Services No work with this amendment Task 4. Traffic Engineering (Kittelson) Subtask 4.1. Contract Administration, Invoicing, and Progress Reports • Prepare and submit monthly invoices with progress reports. Each invoice will include: the date period covered by the invoice; the number of hours worked during the billing period with billing rates shown; expenses; the total cost for labor; and expenses for the billing period. • Maintain required contract documentation. Provide copies of project files and records to the City for audits and public information requests. Final documents shall be provided in electronic format as requested. Deliverables • Monthly invoices and Project Status Reports • Project documentation, upon request Subtask 4.2. Meetings (Kittelson) This item includes the coordination and meetings necessary to successfully complete the project. • Preparation for and attendance at a two-hour project kickoff meeting over Microsoft Teams with City staff, including up to three Kittelson staff. • Up to 50 weekly phone meetings with Apex staff (1 hour in length). • Preparation for and attendance project coordination meeting (up to three) with City staff including and up to three Kittelson staff. • Meet (three times) with City staff after the review of the 60%, 90%, and final plan submittals. These meetings will be attended instead of the monthly meetings these months. RESOLUTION -EXHIBIT A City of Pasco Broadmoor TIF—Harris Road Realignment (Road 103) – Amendment 6 February 2026 Page 6 of 17 Apex Companies, LLC Subtask 4.8. Project 3 Preliminary Roundabout Review (Kittelson) No work with this amendment Subtask 4.9. Project 3 60% Design (PS&E) (Kittelson) No work with this amendment Subtask 4.10. Project 3 90% Design (PS&E) (Kittelson) No work with this amendment Subtask 4.11. Project 3 Final Design (PS&E) (Kittelson) No work with this amendment Subtask 4.12. Project 3 QA/QC (Kittelson) No work with this amendment Subtask 4.13. Advertisement and Bidding Support (Kittelson) No work with this amendment Subtask 4.14. Road 103 - 60% Design (PS&E) (Kittelson) The Consultant will address review comments on the 30% plans and develop construction documents to the 60% design stage. These documents will consist of plans, a bid item list, and an opinion of probable construction cost. The Consultant will develop construction documents to the 60% design stage. These documents will consist of plans, a bid item list, and an opinion of probable construction cost. The 60% plans shall include: • Signing and striping plans and details • Illumination plans and details Tasks include: 1. Calculate quantities and prepare a 60% engineer’s estimate of construction costs for the plans above. 2. Submit a 60% plan set and cost estimate for review. Deliverables • 60% plans and cost estimates (PDF versions) Subtask 4.15. Road 103 - 90% Design (PS&E) (Kittelson) The Consultant will address review comments from the 60% plans and develop construction documents to the 90% design stage. These documents will consist of plans, specifications, a bid item list, an opinion of probable construction cost, and an anticipated construction schedule. The 90% plan set shall include the following sheets: • Signing and striping plans and details RESOLUTION -EXHIBIT A City of Pasco Broadmoor TIF—Harris Road Realignment (Road 103) – Amendment 6 February 2026 Page 7 of 17 Apex Companies, LLC • Illumination plans and details Tasks include: 1. Address 60% City review comments regarding the plans and estimate. 2. Update and compute quantities and prepare an engineer’s estimate of construction costs shown on the plans. Identify which bid items will require special provisions. 3. Prepare 90% Level Project Specifications including current WSDOT amendments, General Special Provisions (GSPs), and special provisions necessary for this project. 4. Submit a 90% plan set, specifications, and a cost estimate for review. Deliverables • 90% plans, specifications, and cost estimates (PDF of the plan set, specifications, and cost estimate) Subtask 4.16. Road 103 - Final Design (PS&E) (Kittelson) The consultant will address review comments from the 90% plans and develop construction documents for the final design submittal. These documents will consist of plans, specifications, a bid item list, and an opinion of probable construction cost. Address the 90% comments. Final design phase plan set shall include: • Signing and striping plans and details • Illumination plans and details Tasks include: 1. Address 90% City review comments regarding the plans, specifications, and estimate. 2. Prepare final special provisions as needed for nonstandard items shown on the plans and compile the project specifications. 3. Update and compute quantities and prepare an engineer’s estimate of construction costs. 4. Submit 100% plans, special provisions, and estimate for review. Deliverables • Final plans, special provisions, and estimate (PDF) Subtask 4.17. Road 103 - QA/QC (Kittelson) The Consultant will provide QA/QC for design work in accordance with the Consultant’s Quality Management Plan (QMP). The Consultant will provide senior-level design and construction personnel to review plan submittals and provide technical support. Subtask 4.18. Advertisement and Bidding Support (Kittelson) The Consultant will provide bidding support services, consisting of coordination with the project team, preparing responses to bidder questions, and the preparation of addendums. RESOLUTION -EXHIBIT A City of Pasco Broadmoor TIF—Harris Road Realignment (Road 103) – Amendment 6 February 2026 Page 8 of 17 Apex Companies, LLC Task 5. Environmental Review and Documentation This work has been completed by the City under the Broadmoor EIS process. Task 6. Design Engineering The Consultant will advance the design from the 30% plans during the current phase of the project. The Consultant team will be responsible for providing design engineering services for the deliverables outlined below for the following submittals: • Preliminary 30% Submittal: Completed • Project 1―90% Design (PS&E): Completed • Project 1―Final Design (PS&E): Completed • Project 2―60% Design (Plans and Estimate): Completed • Project 2―90% Design (PS&E): Completed • Project 2―Final Design (PS&E): Completed • QA/QC Project 1 and 2: Completed • Project 3―60% Design (Plans and Estimate): Completed • Project 3―90% Design (PS&E): Completed • Project 3―Final Design (PS&E): Completed • Road 103―30% Strip map • Road 103―60% Design (Plans and Estimate) • Road 103―90% Design (PS&E) • Road 103―Final Design (PS&E) • Road 103 QA/QC Subtask 6.1. 30% Design (Preliminary) Completed as part of the original contract for 30% design. Subtask 6.2. Project 1 - 90% Design (PS&E) Completed as part of Amendment 1. Subtask 6.3. Project 1 - Final Design (PS&E) Completed as part of Amendment 1. Subtask 6.4 . Project 2 - 60% Design (PS&E) Completed as part of Amendment 1. Subtask 6.5. Project 2 - 90% Design (PS&E) Completed as part of Amendment 1. Subtask 6.6. Project 2 - Final Design (PS&E) Completed as part of Amendment 1. Subtask 6.7. QA/QC Completed as part of Amendment 1. Subtask 6.8. Project 3 - 60% Design (Plans and Estimate) Completed as part of Amendment 3. RESOLUTION -EXHIBIT A City of Pasco Broadmoor TIF—Harris Road Realignment (Road 103) – Amendment 6 February 2026 Page 9 of 17 Apex Companies, LLC Subtask 6.9. Project 3 - 90% Design (PS&E) Completed as part of Amendment 3. Subtask 6.10. Project 3 - Final Design (PS&E) Completed as part of Amendment 3. Subtask 6.11. Project 3 - QA/QC Completed as part of Amendment 3. Subtask 6.12. Road 103 - 30% Design (Plans and Estimate) The consultant will develop the project to a 30% level of design based on the work performed to date and the Broadmoor Subarea Plan. This will be used to facilitate coordination with the adjacent developers. Design tasks include the following: • Compute quantities and prepare an engineer’s estimate of construction costs. • Submit 30% Strip Map for review. • Meeting with City staff after review of the 30% Strip Map The 30% strip map shall include the following: • Anticipated project planimetric information • Preliminary roadway profile • Preliminary project footprint Deliverables • 30% Strip map and opinion of probable construction costs in PDF format • Draft Stormwater Calculations and Memo of Assumptions Subtask 6.13. Road 103 - 60% Design (Plans and Estimate) The consultant will develop construction documents to the 60% design stage. These documents will consist of plans, format, and an opinion of probable construction cost. Design tasks include the following: • Compute quantities and prepare an engineer’s estimate of construction costs. • Submit 60% plans for review. • Meet with City staff after review of the 60% plans. • City and Franchise utility coordination for new City utilities and relocations of franchise utilities into JUT The 60% plan set shall include the following: • Cover sheet (1) • Civil legend sheet (1) • Typical sections (2) • Miscellaneous details (2) • Traffic control plans (2) • Site prep and demolition plans (2) RESOLUTION -EXHIBIT A City of Pasco Broadmoor TIF—Harris Road Realignment (Road 103) – Amendment 6 February 2026 Page 10 of 17 Apex Companies, LLC • Erosion control and grading plans (2) • Erosion control notes detail sheets (1) • Roadway and stormwater plan over profile sheets (5) • Utility plan over profile sheets (Sewer, Water, Irrigation City utilities) (5) • JUT plan over profile sheets (4) • Traffic Circle layout sheet (1) • Signing plans and details (see Task 5) • Striping plans and details (see Task 5) • Illumination plans and details (see Task 5) Deliverables • 60% construction plans and opinion of probable construction costs in PDF format • Draft Stormwater Calculations and Memo of Assumptions • SEPA Checklist Subtask 6.14. Road 103 - 90% Design (PS&E) The consultant will address review comments from the 60% plans and develop construction documents to the 90% design stage. These documents will consist of plans, contract specifications in WSDOT format, and an opinion of probable construction cost. Design tasks include the following: • Update street design based on comments from 60% plans. • Compute quantities and prepare an engineer’s estimate of construction costs. • Submit 90% plan review set for review. • Meet with City staff after review of the 90% plans. • Project specifications • City and Franchise utility coordination for new City utilities and relocations of franchise utilities into JUT The 90% plan set shall include the following: • Cover sheet (1) • Civil legend sheet (1) • Typical sections (2) • Miscellaneous details (2) • Traffic control plans (2) • Site prep and demolition plans (2) • Erosion control and grading plans (2) • Erosion control notes detail sheets (1) • Roadway and stormwater plan over profile sheets (5) • Utility plan over profile sheets (Sewer, Water, Irrigation City utilities) (5) • JUT plan over profile sheets (4) • Traffic Circle layout sheet (1) • Traffic circle Grading sheet (1) • Americans with Disabilities Act (ADA) grading sheets (8) • Signing plans and details (see Task 5) RESOLUTION -EXHIBIT A City of Pasco Broadmoor TIF—Harris Road Realignment (Road 103) – Amendment 6 February 2026 Page 11 of 17 Apex Companies, LLC • Striping plans and details (see Task 5) • Illumination plans and details (see Task 5) • Standard details (10) Deliverables • 90% construction plans, specifications, and opinion of probable construction costs (final) in PDF format • Final Stormwater Report and Calculations Subtask 6.15. Road 103 - Final Design (PS&E) The Consultant will address review comments from the 90% plans and develop construction documents to the final design stage. These documents will consist of plans, contract specifications in WSDOT format, and an opinion of probable construction cost. Design tasks include the following: • Update street design based on comments from 90% plans. • Compute quantities and prepare an engineer’s estimate of construction costs. • Submit a draft final plan set for review. • Meet with City staff after review of the draft final plans. • Address draft final plan comments from the City and submit final PS&E for construction. • City and Franchise utility coordination for new City utilities and relocations of franchise utilities into JUT The final plan set shall include the following: • Cover sheet (1) • Civil legend sheet (1) • Typical sections (2) • Miscellaneous details (2) • Traffic control plans (2) • Site prep and demolition plans (2) • Erosion control and grading plans (2) • Erosion control notes detail sheets (1) • Roadway and stormwater plan over profile sheets (5) • Utility plan over profile sheets (City utilities) (5) • JUT plan over profile sheets (4) • Traffic Circle layout sheet (1) • Traffic circle Grading sheet (1) • Americans with Disabilities Act (ADA) grading sheets (8) • Signing plans and details (see Task 5) • Striping plans and details (see Task 5) • Illumination plans and details (see Task 5) • Standard details (10) Deliverables • Construction plans, specifications, and opinion of probable construction costs (final) in PDF format • Commercial Service request assistance RESOLUTION -EXHIBIT A City of Pasco Broadmoor TIF—Harris Road Realignment (Road 103) – Amendment 6 February 2026 Page 12 of 17 Apex Companies, LLC • Bidding support (Response to bidder questions and issuing addendum) Assumptions • The City will compile all bid document packages. • Up to 10 bidder questions and 2 addendums will be issued in the bidding phase. Subtask 6.16. Road 103 - QA/QC The Consultant will provide QA/QC for design work in accordance with the Consultant’s QA/QC Program. The Consultant will provide senior-level design and construction personnel to review plan submittals and provide technical support. Task 7. Utility Coordination Subtask 7.1. Preliminary Utility Coordination Completed as part of the original contract for 30% design. Subtask 7.2. Utility Meetings Completed as part of Amendment 1. Subtask 7.3. Conflict Identification, Analysis and Recommended Resolution Completed as part of Amendment 1. Subtask 7.4. Conflict Notification and Utility Relocations Completed as part of Amendment 1. Task 8. Public Involvement To be included in a future Amendment if requested. Task 9. Right-of-Way Subtask 9.1. Right-of-Way Acquisition Completed in a previous Amendment. Task 10. Construction Management Subtask 10.1. Construction Support Completed as part of Amendment 3. Subtask 10.4. Road 103 Construction Support Subtask 10.1 – Construction Support The Consultant will provide construction management support as requested by the City. Work is anticipated to include some or all of the following. As the actual level of support is unknown 200 hours of Apex support and 24 hours of Kittleson support have been budgeted to support the City on a requested basis. Preconstruction and Kickoff Meetings 1) Apex will attend the preconstruction conference (PreCon). Apex will attend and take meeting notes. Assumptions: RESOLUTION -EXHIBIT A City of Pasco Broadmoor TIF—Harris Road Realignment (Road 103) – Amendment 6 February 2026 Page 13 of 17 Apex Companies, LLC 1) Coordination and pre-construction meetings will be attended by the Apex construction services engineer and design engineer as requested. Utility Coordination Consultant will support the coordination of project timelines, design modifications, and relocations with utility companies to minimize impacts to the project schedule (assumes four utility coordination meetings) Assumptions: • JUT will be coordinated by the contractor for utility relocations. • Apex will Coordinate designs for protection of existing utilities during construction. Deliverables: • Review and comment on utility relocation plans. QA/QC Construction Surveying As requested, Apex will provide quality assurance / quality control (QA/QC) construction survey for the project when asked for by the City and the following is a list of items, but not limited to: 1) Project control perpetuation 2) Structural survey 3) Joint Utility Trench (every 50’) 4) Curb line 5) Roadway grading 6) ADA compliance 7) Utility structures Assumptions: 1) 48 hours’ notice is required prior to each request. On-Site Meetings As requested, Apex will attend on-site project progress and utility coordination meetings. Other specific pre- work meetings may include the following (based on need during construction or City or Contractor request): traffic control/staging, construction surveying, HMA paving, and striping. Apex will take meeting notes for each meeting attended. Generally, PBS’ Construction Engineer or Project Assistant, Apex Inspector, and Contractor will attend. Progress meetings will be used to promote effective communication between the City, PBS, Contractor, and other project stakeholders. Deliverables: 1) Construction meeting notes provided to the City. Material Submittals As requested, Apex will assist the City in the review of material submittals (Manufacturer’s Certificates of Compliance, Certificates of Material Origin, cut sheets, Qualified Product List sheets, etc.), construction sequence schedules, shop drawings, and other items required from the Contractor to ensure compliance with contract requirements. RESOLUTION -EXHIBIT A City of Pasco Broadmoor TIF—Harris Road Realignment (Road 103) – Amendment 6 February 2026 Page 14 of 17 Apex Companies, LLC Apex may review the following submittals, including but not limited to: material-specific submittals, HMA and concrete mix designs, illumination materials, landscape items, and others required by construction contract specifications. Deliverables: 1) Record of materials (based on information provided to APEX) 2) Copies of approved material submittals. 3) Copies of written communications with the Contractor. Response to Questions and Change Orders Apex will assist the City in response to requests for information (RFI) and response for clarifications (RFC) by the Contractor and provide supplemental information as needed to maintain the progress of the work. If field adjustments are required, as a result of a change in conditions or a desired change by the City, Apex will prepare necessary change order documents and plan revisions for approval by City staff.. PBS’ duties will include the following: 1) Assisting the City with addressing construction questions and Request for Information (RFI) from the Contractor. 2) Assisting the City with processing Request for Clarification (RFC) from the Contractor. 3) Assisting the City with preparing field directives and change orders and provide these to the City for approval and issuance to the Contractor. Exclusions: Approval of change order paperwork to Contractor. Deliverables: 1) Copies of RFIs to the City staff 2) Copies of RFCs to the City staff 3) Plan sheets for design changes Site Visits PBS’ Construction Engineer will perform site visits as necessitated by concerns or issues arising from construction, or when requested by the City. As-Builts Apex will assist and support the Final Plans that will be revised to conform to construction record drawings from information supplied by the Contractor, and as reviewed by the City Construction Management team. The As- builts will be submitted to the City both a PDF and an electronic data format consistent with CoP GIS requirements. PBS’ duties may include the following: 1) Apex will assist in the review Construction Record Drawings provided by the Contractor. 2) Apex will assist in the collection of As-Built Survey information for underground utilities (storm sewer, sanitary sewer) and above ground water features (meters and hydrants). 3) Apex will assist in the submittal of draft As-Built Drawings for City review. RESOLUTION -EXHIBIT A City of Pasco Broadmoor TIF—Harris Road Realignment (Road 103) – Amendment 6 February 2026 Page 15 of 17 Apex Companies, LLC 4) Apex will assist in the revision of the As-Built drawings based on City comments and submit final As-Built drawings for approval. Deliverables: 1) Reviewed Construction Record Drawings. Task 11. DKS Traffic Support Subtask 11.1. Signal Timing Coordination Completed as part of Amendment 4. Subtask 11.2. Traffic Design & Construction Support Completed as part of Amendment 4. Subtask 11.3. Signal Timing Analysis and Coordination Plans DKS will develop weekday AM, PM, and Midday traffic volumes estimates for 2026 for the following signalized intersections: • Broadmoor / Burns • Broadmoor / Buckingham • Broadmoor / Pedestrian Signal at Delta School • Broadmoor / Sandifur • Road 103 / Sandifur • Road 105 / Sandifur DKS will incorporate the three estimated volume sets into the Synchro 12 software to develop AM, PM, and non-peak hour coordination plans. As commercial development along Broadmoor Boulevard is still limited, no weekend or holiday specific coordination plans will be developed at this time. DKS will provide the City with spreadsheets of the coordination plan timing inputs (offsets, splits, Max2 times if necessary), along with a short memorandum describing the desired operations at the intersections. Deliverables: • Short memorandum (5 pages or less) describing the intended signal operations at each of the six intersections. • Signal Timing inputs for the following intersections, provided in spreadsheet format o Broadmoor / Buckingham o Broadmoor / Pedestrian Signal at Delta School o Road 103 / Sandifur o Road 105 / Sandifur • AM, PM, and Off-Peak Coordination Timing inputs for the following intersections, provided in spreadsheet format RESOLUTION -EXHIBIT A City of Pasco Broadmoor TIF—Harris Road Realignment (Road 103) – Amendment 6 February 2026 Page 16 of 17 Apex Companies, LLC o Broadmoor / Burns o Broadmoor / Buckingham o Broadmoor / Pedestrian Signal at Delta School o Broadmoor / Sandifur o Road 103 / Sandifur o Road 105 / Sandifur Assumptions: Weekend timing will follow the off-peak coordination plan. No new traffic counts will be collected for this task as the analysis volumes will be derived from a combination of prior counts and Citywide Travel Demand Model data. Traffic analysis will be conducted in Synchro. Subtask 11.4. Road 103 - Signal Timing Implementation Support DKS will send one staff person to Pasco to support the implementation of the new coordinated signal timing plans. In collaboration with the signal vendor, the contractor, and the City signals technician, DKS will observe signal operations of the new plan over two days. DKS will review operational findings after the first day and will suggest timing adjustments (if needed) for implementation and observation on the second day. The signal vendor shall provide direct signal timing inputs to the controllers. Deliverables: • Two-days of in-person observation of the signal timing implementation, and as needed revisions to the signal coordination plans based on these observations. Assumptions: The signal vendor will be in the field alongside DKS during the timing implementation and will be responsible for inputting the timings into the controllers. The coordination implementation of five of the signals (except for the pedestrian signal at Delta High School) will occur during the DKS field support. DKS only assumes one in-person, two-day implementation trip to Pasco to support this task. Subtask 11.5. Road 103 – Traffic Analysis DKS will update the citywide travel demand model to reflect the latest land use assumptions for lots 4, 5, 6, 10, 11, 12, 13, 29, and 30. DKS will then analyze the mid (10-year) and long-term (20-year) traffic operations on Road 103, both at Sandifur Pkwy and at Harris Road. The traffic analysis will be performed in Synchro/SimTraffic and will include queuing analysis to size the turn bays on Road 103. The analysis will include AM, PM, and weekend peak hours. Deliverables: • Short memorandum summarizing traffic analysis findings and design recommendations for Road 103 RESOLUTION -EXHIBIT A City of Pasco Broadmoor TIF—Harris Road Realignment (Road 103) – Amendment 6 February 2026 Page 17 of 17 Apex Companies, LLC • Coordination meeting (in-person) with City of Pasco public works and CED staff to discuss land use assumptions for the areas directly impacting Road 103 Assumptions: Attendance at one in-person meetings coordination meeting is assumed along with the associated travel expenses. All traffic analysis will be focused primarily on the AM, PM, and weekend peak hours and will incorporate previously collected traffic counts provided by the City. Subtask 11.6. Traffic Design & Construction Support DKS will perform the following services up to the agreed upon task fee upon request by the City of Pasco to support the Road 103 TIF project through construction: • Traffic Design review of signal, signing, and striping plans during the Road 103 PS&E • Traffic Design review of Road 103 amendments and RFI responses during construction of the Broadmoor Area TIF projects Deliverables: • Red-lined comments on PS&E sheets and documents for Road 103 RESOLUTION -EXHIBIT A TOTAL TOTAL TOTAL TOTAL TOTAL ORIGIONAL TOTAL PBS Traffic Traffic ROW SUB AMENDMENT #5 BUDGET AMENDMENT #4 BUDGET AMENDMENT #3 BUDGET AMENDMENT #2 BUDGET AMENDMENT #1 BUDGET CONTRACT BUDGET Task and Description Engineer VII Engineer VI Engineer V Engineer II Sr. Scientist/Plan ner II Survey VI Survey Crew (2 Person) Admin II Expense TOTAL Kittelson DKS EPIC TOTAL AMOUNT AMOUNT AMOUNT AMOUNT AMOUNT AMOUNT TASK 1 - PROJECT MANAGEMENT AND ADMINISTRATION 0.00 39,665.00 0.00 0.00 0.00 0.00 39,665.00 179,755.00 0.00 78,040.00 41,622.00 339,082.00 Subtask 1.1 - Contract Administration, Invoicing, and Progress Reports 9.00 16.00 3,885.00 0.00 0.00 0.00 0.00 3,885.00 8,250.00 $0.00 $1,000.00 2,560.00 $15,695.00 Subtask 1.2 - Meetings 40.00 8.00 8.00 8.00 16,180.00 0.00 0.00 0.00 0.00 16,180.00 44,625.00 $0.00 $34,290.00 16,202.00 $111,297.00 Subtask 1.3 - Management, Coordination and Direction 80.00 19,600.00 0.00 0.00 0.00 0.00 19,600.00 27,000.00 $0.00 $42,750.00 22,860.00 $112,210.00 Subtask 1.4 – Broadmoor Development Support 0.00 0.00 0.00 0.00 0.00 0.00 99,880.00 $0.00 $0.00 0.00 $99,880.00 TASK 2 - SURVEY 0.00 10,240.00 0.00 0.00 0.00 0.00 10,240.00 3,500.00 0.00 16,216.00 42,580.00 72,536.00 Subtask 2.1: Surveying and Base Map 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $0.00 42,580.00 $42,580.00 Subtask 2.2 - Right-of-Way Support 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $16,216.00 0.00 $16,216.00 Subtask 2.3 – Project 3 Right-of-Way Support 0.00 0.00 0.00 0.00 0.00 0.00 3,500.00 $0.00 $0.00 0.00 $3,500.00 Subtask 2.3 – Road 103- Survey Support 16.00 32.00 10,240.00 0.00 0.00 0.00 0.00 10,240.00 0.00 $0.00 $0.00 0.00 $10,240.00 TASK 3: GEOTECHNICAL ENGINEERING 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22,880.00 0.00 0.00 34,340.00 57,220.00 Subtask 3.1 Geotechnical Engineering 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $0.00 34,340.00 $34,340.00 Subtask 3.2 – Project 3 Signal Geotechnical Services 0.00 0.00 0.00 0.00 0.00 0.00 22,880.00 $0.00 $0.00 0.00 $22,880.00 TASK 4: TRAFFIC ENGINEERING (KITTELSON PROJECT 2)0.00 0.00 60,720.00 0.00 0.00 60,720.00 60,720.00 222,908.00 0.00 162,135.00 0.00 445,763.00 Subtask 4.1 - Contract Administration, Invoicing, and Progress Reports 0.00 2,822.00 0.00 0.00 2,822.00 2,822.00 4,362.00 $0.00 $1,906.00 0.00 $9,090.00 Subtask 4.2 - Meetings 0.00 8,805.00 0.00 0.00 8,805.00 8,805.00 25,477.00 $0.00 $7,902.00 0.00 $42,184.00 Subtask 4.3 - Site Visit 0.00 4,831.00 0.00 0.00 4,831.00 4,831.00 0.00 $0.00 $11,075.00 0.00 $15,906.00 Subtask 4.4 – 60% Design (PS&E)0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $54,024.00 0.00 $54,024.00 Subtask 4.5 – 90% Design (PS&E)0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $33,237.00 0.00 $33,237.00 Subtask 4.6 – Final Design (PS&E)0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $17,730.00 0.00 $17,730.00 Subtask 4.7 - QA/QC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $36,261.00 0.00 $36,261.00 Subtask 4.8 – Project 3 Preliminary Roundabout Review 0.00 0.00 0.00 0.00 0.00 0.00 5,335.00 $0.00 $0.00 0.00 $5,335.00 Subtask 4.9 – Project 3 60% Design (PS&E)0.00 0.00 0.00 0.00 0.00 0.00 75,750.00 $0.00 $0.00 0.00 $75,750.00 Subtask 4.10 –Project 3 90% Design (PS&E)0.00 0.00 0.00 0.00 0.00 0.00 50,658.00 $0.00 $0.00 0.00 $50,658.00 Subtask 4.11 – Project 3 Final Design (PS&E)0.00 0.00 0.00 0.00 0.00 0.00 29,308.00 $0.00 $0.00 0.00 $29,308.00 Subtask 4.12 – Project 3 QA/QC 0.00 0.00 0.00 0.00 0.00 0.00 29,110.00 $0.00 $0.00 0.00 $29,110.00 Subtask 4.13 – Advertisement and Bidding Support 0.00 0.00 0.00 0.00 0.00 0.00 2,908.00 $0.00 $0.00 0.00 $2,908.00 Subtask 4.14. Road 103 60% Design (PS&E) (Kittelson)0.00 11,525.00 0.00 0.00 11,525.00 11,525.00 0.00 $0.00 $0.00 0.00 $11,525.00 Subtask 4.15. Road 103 90% Design (PS&E) (Kittelson)0.00 15,493.00 0.00 0.00 15,493.00 15,493.00 0.00 $0.00 $0.00 0.00 $15,493.00 Subtask 4.16. Road 103 Final Design (PS&E) (Kittelson)0.00 8,612.00 0.00 0.00 8,612.00 8,612.00 0.00 $0.00 $0.00 0.00 $8,612.00 Subtask 4.17. Road 103 QA/QC (Kittelson)0.00 7,020.00 0.00 0.00 7,020.00 7,020.00 0.00 $0.00 $0.00 0.00 $7,020.00 Subtask 4.18. Advertisement and Bidding Support (Kittelson)0.00 1,612.00 0.00 0.00 1,612.00 1,612.00 0.00 $0.00 $0.00 0.00 $1,612.00 TASK 5: ENVIRONMENTAL REVIEW AND DOCUMENTATION 0.00 $0.00 TASK 6: DESIGN ENGINEERING 196,200.00 0.00 0.00 0.00 0.00 196,200.00 349,280.00 30,000.00 627,220.00 112,710.00 1,315,410.00 Subtask 6.1: 30 Percent Design (Preliminary)0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $0.00 112,710.00 $112,710.00 Subtask 6.2 – Project 1 - 90 Percent Design (PS&E)0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $52,620.00 0.00 $52,620.00 Subtask 6.3 – Project 1 - Final Design (PS&E)0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $55,500.00 0.00 $55,500.00 Subtask 6.4 – Project 2 – 60% Design (Plans and Estimate)0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $153,540.00 0.00 $153,540.00 Subtask 6.5 – Project 2 – 90% Design (PS&E)0.00 0.00 0.00 0.00 0.00 0.00 0.00 $25,000.00 $153,540.00 0.00 $178,540.00 Subtask 6.6 – Project 2 – Final Design (PS&E)0.00 0.00 0.00 0.00 0.00 0.00 0.00 $5,000.00 $145,620.00 0.00 $150,620.00 Subtask 6.7 - QA/QC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $66,400.00 0.00 $66,400.00 Subtask 6.8 – Project 3 – 60% Design (Plans and Estimate)0.00 0.00 0.00 0.00 0.00 0.00 95,900.00 $0.00 $0.00 0.00 $95,900.00 Subtask 6.9 – Project 3 – 90% Design (PS&E)0.00 0.00 0.00 0.00 0.00 0.00 170,000.00 $0.00 $0.00 0.00 $170,000.00 Subtask 6.10 – Project 3 – Final Design (PS&E)0.00 0.00 0.00 0.00 0.00 0.00 45,280.00 $0.00 $0.00 0.00 $45,280.00 Subtask 6.11 – Project 3 - QA/QC 0.00 0.00 0.00 0.00 0.00 0.00 38,100.00 $0.00 $0.00 0.00 $38,100.00 Subtask 6.12. Road 103—30% Design (Plans and Estimate)16.00 16.00 20.00 80.00 24,140.00 0.00 0.00 0.00 0.00 24,140.00 0.00 $0.00 $0.00 0.00 $24,140.00 Subtask 6.13. Road 103—60% Design (Plans and Estimate)16.00 32.00 110.00 220.00 8.00 68,490.00 0.00 0.00 0.00 0.00 68,490.00 0.00 $0.00 $0.00 0.00 $68,490.00 Subtask 6.14. Road 103 —90% Design (PS&E)16.00 32.00 90.00 160.00 54,110.00 0.00 0.00 0.00 0.00 54,110.00 0.00 $0.00 $0.00 0.00 $54,110.00 Subtask 6.15. Road 103—Final Design (PS&E)16.00 24.00 48.00 80.00 31,360.00 0.00 0.00 0.00 0.00 31,360.00 0.00 $0.00 $0.00 0.00 $31,360.00 Subtask 6.16. Road 103—QA/QC 20.00 60.00 18,100.00 0.00 0.00 0.00 0.00 18,100.00 0.00 $0.00 $0.00 0.00 $18,100.00 TASK 7: UTILITY COORDINATION 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50,384.00 31,420.00 81,804.00 Subtask 7.1 Utility Coordination 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 31,420.00 $31,420.00 Subtask 7.2 - Utility Meetings 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $12,264.00 0.00 $12,264.00 Subtask 7.3 - Conflict Identification, Analysis and Recommended Resolution 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19,060.00 0.00 $19,060.00 Subtask 7.4 -Conflict Notification and Utility Relocations 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19,060.00 0.00 $19,060.00 TASK 8: PUBLIC INVOLVEMENT 0.00 $0.00 TASK 9: RIGHT OF WAY 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23,666.00 0.00 23,666.00 Subtask 9.1 – Right of Way Acquisition 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23,666.00 0.00 $23,666.00 TASK 10: CONSTRUCTION MANAGEMENT 38,000.00 3,968.00 0.00 0.00 3,968.00 41,968.00 100,700.00 0.00 0.00 0.00 142,668.00 Subtask 10.1 – Construction Support 0.00 0.00 0.00 0.00 0.00 0.00 100,700.00 $0.00 $0.00 0.00 $100,700.00 Subtask 10.4 – Construction Support 40.00 20.00 40.00 100.00 38,000.00 3,968.00 0.00 0.00 3,968.00 41,968.00 $0.00 $0.00 0.00 $41,968.00 Task 11. DKS Traffic Support 0.00 0.00 46,910.00 0.00 46,910.00 46,910.00 0.00 0.00 0.00 0.00 46,910.00 Subtask 11.1. Signal Timing Coordination 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $0.00 0.00 $0.00 Subtask 11.2. Traffic Design & Construction Support 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $0.00 0.00 $0.00 Subtask 11.3 Signal Timing Analysis and Coordination Plans 0.00 0.00 17,445.00 0.00 17,445.00 17,445.00 0.00 $0.00 $0.00 0.00 $17,445.00 Subtask 11.4. Road 103 - Signal Timing Implementation Support 0.00 0.00 9,465.00 0.00 9,465.00 9,465.00 0.00 $0.00 $0.00 0.00 $9,465.00 Subtask 11.5. Road 103 – Traffic Analysis 0.00 0.00 15,085.00 0.00 15,085.00 15,085.00 0.00 $0.00 $0.00 0.00 $15,085.00 Subtask 11.6. Traffic Design & Construction Support 0.00 0.00 4,915.00 0.00 4,915.00 4,915.00 0.00 $0.00 $0.00 0.00 $4,915.00 Management Reserve 0.00 0.00 0.00 0.00 0.00 50,000.00 0.00 0.00 0.00 50,000.00 Management Reserve 0.00 0.00 0.00 0.00 50,000.00 $0.00 $0.00 0.00 $50,000.00 Reimbursable Expenses 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 $0.00 Copies 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 $0.00 Expenses 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 $0.00 Travel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 $0.00 0.00 TOTAL HOURS 253.00 192.00 316.00 648.00 8.00 16.00 32.00 16.00 MAX HOURLY RATES 245.00 220.00 195.00 160.00 110.00 190.00 225.00 105.00 TOTAL DOLLARS 61,985.00$ 42,240.00$ 61,620.00$ 103,680.00$ 880.00$ 3,040.00$ 7,200.00$ 1,680.00$ -$ 284,105.00$ 64,688.00$ 46,910.00$ -$ 111,598.00$ 395,703.00$ $0.00 929,023.00$ 30,000.00$ 957,661.00$ 262,672.00$ 2,575,059.00$ Broadmoor TIF – Road 103 SUBCONSULTANTS RESOLUTION -EXHIBIT A EXHIBIT B