STORMWATER MAINTENANCE AGREEMENT FOR
___________________
THIS STORMWATER MAINTENANCE AGREEMENT (this “Agreement”) is made and entered into
this ____ day of __________, 20___, by and between the City of Pasco, Washington, a Municipal
Corporation (hereinafter referred to as the “City”), and _____________, (hereinafter referred to
as the “Developer”). The Developer is seeking to develop all or a portion of Parcel No.
______________ and in consideration thereof the parties mutually agree and covenant the
following:
1. Each storm water facility (catch basin) shall have an inlet protection per BMP C220
outlined in the most current version of the Stormwater Management Manual for
Eastern Washington.
2. The Developer will provide all monitoring, maintenance practices and procedures, as
well as any financial obligations relating to the storm drain system. Failure to provide
adequate maintenance, which may result in the failure of any storm drain system, is the
complete responsibility of the Developer.
3. All storm drain systems (catch basins, abutting roadways, etc.) will be cleaned and
inspected by the Developer on a regular maintenance schedule, not to exceed 1 month
between inspections and cleaning. A maintenance and cleaning schedule is to be
submitted to the City Engineer or designee affecting these storm drain systems prior to
construction of these facilities.
4. The Developer will inspect all BMP’s within 24 hours of any discharge to facilities (i.e.
rain event, snow melt, fugitive construction water discharge, etc.).
5. All storm drain systems are to be kept operational by the Developer at all times until
accepted by the City Engineer or designee.
6. Failure to maintain or keep operational at all times any storm drain system, which would
result in intervention by the City, will result in all costs incurred, including private
property damage, to be levied against the owner/developer at a rate not to exceed
125% percent of costs incurred.
7. Failure of any storm drain facility, as determined by the City Engineer or designee, will
result in the replacement of each facility as well as complete repairs to the Right-of-Way
by the owner/developer as directed by the City Engineer or designee. This may include
replacement of curb, gutter and sidewalk as well as repaving of adjoining street side
(centerline to curb) from intersection to intersection. This policy will start at the
beginning of construction of the storm drain facilities and remain in effect until the
expiration of the one year warranty period for said facilities.
8. All lots that contribute to or affect the performance of any given storm drain facility, as
determined by the City Engineer or designee, must be landscaped with approved and
accepted landscaping prior to that particular storm drain facility receiving final
inspection & acceptance. The City Engineer or designee shall determine actual areas
that may affect a storm drain facility.
9. Prior to acceptance of any storm drain system, all facilities within the system must be
cleaned by the Developer. The City Engineer or designee will then inspect each facility.
Flooding tests or internal camera inspection may also be required at the developer’s
expense. Once each facility passes inspection and is accepted by the City Engineer or
designee the one year warranty period for those accepted storm drain systems will
begin.
10. In the event ownership of any property located within the confines of this agreement is
passed to another person(s) or entity, excluding certificate of occupancy through the
developer to individual lots, this agreement shall also then transfer to said person(s) or
entity and remain in full force until all conditions have been substantially met to the
satisfaction of the City Engineer or designee.