Loading...
HomeMy WebLinkAbout4804 Ordinance - Amending PMC Chapter 3.35 Related to Water Sewer Utilities Rates Connectino Fees MaxOrdinance – Amending PMC for Water & Sewer Connection Fees - 1 {DPK4915-7476-8777;1/13206.000014/} ORDINANCE NO. 4804 AN ORDINANCE OF THE CITY OF PASCO, WASHINGTON, AMENDING AND REPEALING SECTIONS OF PASCO MUNICIPAL CODE IN CHAPTER 3.35 FEE SUMMARY AND AMENDING AND REPEALING SECTIONS IN TITLE 13 WATER AND SEWERS TO ADJUST RATES AND CONNECTION FEES FOR CITY WATER AND SEWER UTILITIES. (MAXIMUM ALLOWED CONNECTION CHARGE) WHEREAS, Pasco Municipal Code (PMC) Chapter 3.35 Fee Summary and Title 13 Water and Sewers contains numerous charges including, but not limited to, Water and Sewer Utilities billing monthly base fees and connections fees; and WHEREAS, studies of the rates, charges, and fees of utility systems are generally conducted on periodic intervals to ensure they provide adequate revenue for the utilities, and to ensure the rates, charges, and fees are, and continue to be, in conformance with state law; and WHEREAS, the City contracted with Financial Consulting Solutions Group (FCS Group) to evaluate and provide a recommendation to the City concerning water and sewer monthly rates and connection fees; and WHEREAS, at the October 6, 2025, City Council Regular Meeting, the FCS Group presented the Water and Sewer Rate Study to the Council recommending revisions to the City's water and sewer monthly rates and connection fees; and WHEREAS, at the November 10, 2025, City Council Workshop Meeting, the Council directed staff to adopt increases as recommended by the FCS Group. WHEREAS, in the event the City is awarded $80 million or more in low interest loans in support of water infrastructure construction, rates will be reevaluated and adjusted as deemed appropriate to reflect such awards prior to the 4-year period established in this ordinance. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF PASCO, WASHINGTON DO ORDAIN AS FOLLOWS: Section 1. Water Utility PMC Section 3.35.160 Water utility effective January 1,2022 is hereby amended and shall read as follows: 3.35.160 Water utility effective January 1, 2022 through February 28, 2026. Fee/Charge Reference 2021 2022 2023 2024 2025 2026 Ordinance – Amending PMC for Water & Sewer Connection Fees - 2 {DPK4915-7476-8777;1/13206.000014/} Inside city: Consumption – per 100 cubic feet: Residential/com mercial $0.88 $0.94 $1.00 $1.07 $1.12 $1.18 13.20.050 Bulk – per 1,000 gallons $1.45 $1.54 $1.64 $1.75 $1.84 $1.93 13.20.080 Residential – single- family base fees: 3/4 and 5/8 inch – per month $20.55 $21.89 $23.31 $24.83 $26.07 $27.37 13.20.020 1 inch – per month $30.81 $32.82 $34.95 $37.22 $39.08 $41.03 13.20.020 Senior reduced/low income: 3/4 and 5/8 inch – per month $6.83 $7.27 $7.74 $8.24 $8.65 $9.08 3.65.150 1 inch – per month $10.30 $10.97 $11.68 $12.44 $13.06 $13.71 3.65.150 Commercial – base fees: 3/4 inch – per month $28.97 $30.85 $32.86 $35.00 $36.75 $38.59 13.20.030 1 inch – per month $42.37 $45.12 $48.05 $51.17 $53.73 $56.42 13.20.030 Ordinance – Amending PMC for Water & Sewer Connection Fees - 3 {DPK4915-7476-8777;1/13206.000014/} 1-1/2 inch – per month $81.60 $86.90 $92.55 $98.57 $103.50 $108.68 13.20.030 2 inch – per month $130.86 $139.37 $148.43 $158.08 $165.98 $174.28 13.20.030 3 inch – per month $178.74 $190.36 $202.73 $215.91 $226.71 $238.05 13.20.030 4 inch – per month $257.54 $274.28 $292.11 $311.10 $326.66 $342.99 13.20.030 6 inch – per month $402.01 $428.14 $455.97 $485.61 $509.89 $535.38 13.20.030 8 inch – per month $557.10 $593.31 $631.88 $672.95 $706.60 $741.93 13.20.030 10 inch – per month $967.36 $1,015.73 $1,066.52 13.20.030 Fee/Charge Reference Outside City; effective 11/1/02: Consumption – per 100 cubic feet: Residential/commercial 90% surcharge 13.20.090 Bulk – per 1,000 gallons 90% surcharge 13.20.090 Residential – single-family base fees: 3/4 and 5/8 inch – per month 90% surcharge 13.20.090 1 inch – per month 90% surcharge 13.20.090 Senior reduced/low income 90% surcharge 13.20.090 Ordinance – Amending PMC for Water & Sewer Connection Fees - 4 {DPK4915-7476-8777;1/13206.000014/} Commercial – base fees: All sizes 90% surcharge 13.20.090 Fee/Charge Reference Fire hydrants: Meter rental: Refundable deposit Not to exceed 110% of Cost, as determined by the Director of Finance 13.20.080 Nonrefundable removal fee $30.00 13.20.080 Monthly base rental fee $62.00 Late payment and not returning meter after 48 hrs. (per day) $50.00 Hydrant rental – outside corporate limits, per year $20.00 13.20.070 Charges for water meters and services: Meter and service costs equal to average cost to City based on prior year 13.45.010 Move meter for owner Cost + 15% 13.30.060 Change meter size Cost + 15% 13.30.050 Water system capital expansion/replacement charges Ordinance – Amending PMC for Water & Sewer Connection Fees - 5 {DPK4915-7476-8777;1/13206.000014/} Inside City limits: 3/4-inch meter $360.00 13.25.010 1-inch meter $601.00 13.25.010 1-1/2-inch meter $1,198 13.25.010 2-inch meter $1,918 13.25.010 3-inch meter $3,599 13.25.010 4-inch meter $5,999 13.25.010 6-inch meter $11,995 13.25.010 8-inch meter $19,192 13.25.010 10-inch meter $27,591 13.25.010 Outside City limits: 3/4 – 10-inch meter 90% surcharge 13.25.020 Front footage (per foot): Residential: In and out City limits $20.00 13.45.020 Commercial: In and out City limits $25.00 13.45.020 Square Footage (per sq. ft.): Residential: In and out City limits $0.0388 13.45.020 Ordinance – Amending PMC for Water & Sewer Connection Fees - 6 {DPK4915-7476-8777;1/13206.000014/} Commercial: In and out City limits $0.0426 13.45.020 Water rights acquisition fee – per acre foot $4,150.00 13.45.060(2) 21.05.120(2) Base water rights acquisition fee – per residential unit ($4,150.00 per acre foot x potable use factor .30) $1,245.00 13.15.030(1) Potable water irrigation fee (no irrigation water available) Equal to 50% of the area of the lot or parcel to be served expressed in acres or portion of acres x 3.5 acre feet of water x $4,150.00 (per acre foot) 13.15.030(1) Water rights transfer fee $1,000.00 13.15.030(5) Section 2. PMC Section 3.35.160 Water utility effective January 1, 2022 is hereby replaced as of March 1, 2026 and shall read as follows: Fee/Charge Reference 2026 2027 2028 2029 Inside city: Consumption – per 100 cubic feet: Residential/com mercial $1.35 $1.63 $1.97 $2.16 13.20.050 Bulk – per 1,000 gallons $2.22 $2.68 $3.24 $3.55 13.20.080 Ordinance – Amending PMC for Water & Sewer Connection Fees - 7 {DPK4915-7476-8777;1/13206.000014/} Residential – single- family base fees: 3/4 and 5/8 inch – per month $31.48 $38.01 $45.90 $50.26 13.20.020 1 inch – per month $47.19 $56.98 $68.80 $75.34 13.20.020 Senior reduced/low income: 3/4 and 5/8 inch – per month $10.44 $12.61 $15.23 $16.68 3.65.150 1 inch – per month $15.77 $19.04 $22.99 $25.18 3.65.150 Commercial – base fees: 3/4 inch – per month $44.38 $53.58 $64.70 $70.85 13.20.030 1 inch – per month $64.88 $78.34 $94.60 $103.53 13.20.030 1-1/2 inch – per month $124.98 $150.91 $182.22 $199.53 13.20.030 2 inch – per month $200.42 $242.01 $292.22 $319.99 13.20.030 3 inch – per month $273.75 $330.56 $399.15 $437.07 13.20.030 4 inch – per month $394.44 $476.29 $575.12 $629.75 13.20.030 Ordinance – Amending PMC for Water & Sewer Connection Fees - 8 {DPK4915-7476-8777;1/13206.000014/} 6 inch – per month $615.69 $743.45 $897.71 $983.00 13.20.030 8 inch – per month $853.22 $1,030.26 $1,244.04 $1,362.23 13.20.030 10 inch – per month $1226.49 $1480.99 $1,788.30 $1958.19 13.20.030 Fee/Charge Reference Fire hydrants: Meter rental: Refundable deposit Not to exceed 110% of Cost, as determined by the Director of Finance 13.20.080 Nonrefundable removal fee $30.00 13.20.080 Monthly base rental fee $62.00 Late payment and not returning meter after 48 hrs. (per day) $50.00 Hydrant rental – outside corporate limits, per year $20.00 13.20.070 Charges for water meters and services: Meter and service costs equal to average cost to City based on prior year 13.45.010 Move meter for owner Cost + 15% 13.30.060 Ordinance – Amending PMC for Water & Sewer Connection Fees - 9 {DPK4915-7476-8777;1/13206.000014/} Change meter size Cost + 15% 13.30.050 Water system capital expansion/replacement charges effective through December 31, 2026 Inside City limits: 3/4-inch meter $360.00 13.25.010 1-inch meter $601.00 13.25.010 1-1/2-inch meter $1,198 13.25.010 2-inch meter $1,918 13.25.010 3-inch meter $3,599 13.25.010 4-inch meter $5,999 13.25.010 6-inch meter $11,995 13.25.010 8-inch meter $19,192 13.25.010 10-inch meter $27,591 13.25.010 Outside City limits: 3/4 – 10-inch meter 90% surcharge 13.25.020 Front footage (per foot): Residential: In and out City limits $20.00 13.45.020 Commercial: Ordinance – Amending PMC for Water & Sewer Connection Fees - 10 {DPK4915-7476-8777;1/13206.000014/} In and out City limits $25.00 13.45.020 Square Footage (per sq. ft.): Residential: In and out City limits $0.0388 13.45.020 Commercial: In and out City limits $0.0426 13.45.020 Water system capital expansion/replacement charges effective January 1, 2027 Inside City limits: 3/4-inch meter $6,148 13.25.010 1-inch meter $10,267 13.25.010 1-1/2-inch meter $20,472 13.25.010 2-inch meter $32,767 13.25.010 3-inch meter $65,596 13.25.010 4-inch meter $100,392 13.25.010 6-inch meter $204,902 13.25.010 8-inch meter $327,856 13.25.010 10-inch meter $471,323 13.25.010 Water rights acquisition fee – per acre foot $4,150.00 13.45.060(2) 21.05.120(2) Ordinance – Amending PMC for Water & Sewer Connection Fees - 11 {DPK4915-7476-8777;1/13206.000014/} Base water rights acquisition fee – per residential unit ($4,150.00 per acre foot x potable use factor .30) $1,245.00 13.15.030(1) Potable water irrigation fee (no irrigation water available) Equal to 50% of the area of the lot or parcel to be served expressed in acres or portion of acres x 3.5 acre feet of water x $4,150.00 (per acre foot) 13.15.030(1) Water rights transfer fee $1,000.00 13.15.030(5) Section 3. PMC Section 3.35.170 Sewer Utility is hereby amended and shall read as follows: 3.35.170 Sewer utility effective January 1, 2022 through February 28, 2026. Fee/Charge Reference 2021 2022 2023 2024 2025 2026 Inside city: Consumption – per 100 cubic feet over 1,000 cubic feet: Residential none Commercial $1.85 $1.85 $1.85 $1.92 $2.00 $2.08 13.50.030 Hotel/motel $1.85 $1.85 $1.85 $1.92 $2.00 $2.08 13.50.020 Ordinance – Amending PMC for Water & Sewer Connection Fees - 12 {DPK4915-7476-8777;1/13206.000014/} Residential: Single-family one unit – per month $35.38 $35.38 $35.38 $36.80 $38.27 $39.80 Senior reduced/low income – per month $11.84 $11.84 $11.84 $12.31 $12.80 $13.31 3.65.150 Multifamily 1 – 4 units – per month $35.38 $35.38 $35.38 $36.80 $38.27 $39.80 13.50.010 Multifamily 5+ units – per month $28.53 $28.53 $28.53 $29.67 $30.86 $32.09 13.50.010 Commercial – base fee – per month $47.57 $47.57 $47.57 $49.47 $51.45 $53.51 13.50.030 Hotel/motel – base fee per unit/per month $7.50 $7.50 $7.50 $7.80 $8.11 $8.43 13.50.020 Outside City: Consumption – per 100 cubic feet over 1,000 cubic feet: Residential none Commercial 50% surcharge 13.50.070 Hotel/motel 50% surcharge 13.50.070 Residential: Single-family one unit – per month 50% surcharge 13.50.070 Ordinance – Amending PMC for Water & Sewer Connection Fees - 13 {DPK4915-7476-8777;1/13206.000014/} Senior reduced/low income – per month 50% surcharge 13.50.070 Multifamily 1 – 4 units – per month 50% surcharge 13.50.070 Multifamily 5+ units – per month 50% surcharge 13.50.070 Commercial – base fee – per month 50% surcharge 13.50.070 Hotel/motel – base fee per unit/per month 50% surcharge 13.50.070 Fee/Charge Reference 2016 2017 2018 Sewer stub-out connection fee $4,000.00 13.60.030 Fee/Charge Reference Capital expansion: Residential: Inside City – Homes (per unit) $1,288.00 13.60.010 Inside City – Hotel/motel (per unit) $524.00 13.60.010 Outside City – Homes (per unit) 50% surcharge 13.60.020 Ordinance – Amending PMC for Water & Sewer Connection Fees - 14 {DPK4915-7476-8777;1/13206.000014/} Commercial: Inside City: 3/4-inch meter $1,288.00 13.60.010 1-inch meter $1.936.00 13.60.010 1-1/2-inch meter $4.517.00 13.60.010 2-inch meter $7,097.00 13.60.010 3-inch meter $13,550.00 13.60.010 4-inch meter $21,291.00 13.60.010 6-inch meter $43,226.00 13.60.010 8-inch meter $69,032.00 13.60.010 10-inch meter $98,927.00 13.60.010 Outside City 3/4 – 10-inch meter 50% surcharge 13.60.020 Fee/Charge Reference Front footage (per foot): Residential: Ordinance – Amending PMC for Water & Sewer Connection Fees - 15 {DPK4915-7476-8777;1/13206.000014/} In and out City limits $25.00 13.65.020 Commercial: In and out City limits $25.00 13.65.020 Square footage (per sq. ft.) Residential: In and out City limits $0.0468 13.65.020 Commercial: In and out City limits $0.0468 13.65.020 Section 4. PMC Section 3.35.170 Sewer Utility is hereby replaced as of March 1, 2026 and shall read as follows: 3.35.170 Sewer utility Fee/Charge Reference 2026 2027 2028 2029 Inside city: Consumption – per 100 cubic feet over 1,000 cubic feet: Residential none Ordinance – Amending PMC for Water & Sewer Connection Fees - 16 {DPK4915-7476-8777;1/13206.000014/} Commercial $2.16 $2.33 $2.52 $2.72 13.50.030 Hotel/motel $2.16 $2.33 $2.52 $2.72 13.50.020 Residential: Single-family one unit – per month $41.33 $44.4 $48.21 $52.07 Senior reduced/low income – per month $13.82 $14.93 $16.12 $17.41 3.65.150 Multifamily 1 – 4 units – per month $41.33 $44.64 $48.21 $52.07 13.50.010 Multifamily 5+ units – per month $33.33 $36.00 $38.87 $41.98 13.50.010 Commercial – base fee – per month $55.57 $60.01 $64.81 $70.00 13.50.030 Hotel/motel – base fee per unit/per month $8.76 $9.46 $10.22 $11.03 13.50.020 Fee/Charge Reference Sewer stub-out connection fee $4,000.00 13.60.030 Fee/Charge Reference Sewer Capital expansion charges effective through December 31, 2026 Residential: Ordinance – Amending PMC for Water & Sewer Connection Fees - 17 {DPK4915-7476-8777;1/13206.000014/} Inside City – Homes (per unit) $1,288.00 13.60.010 Inside City – Hotel/motel (per unit) $524.00 13.60.010 Outside City – Homes (per unit) 50% surcharge 13.60.020 Commercial: Inside City: 3/4-inch meter $1,288.00 13.60.010 1-inch meter $1.936.00 13.60.010 1-1/2-inch meter $4.517.00 13.60.010 2-inch meter $7,097.00 13.60.010 3-inch meter $13,550.00 13.60.010 4-inch meter $21,291.00 13.60.010 6-inch meter $43,226.00 13.60.010 8-inch meter $69,032.00 13.60.010 10-inch meter $98,927.00 13.60.010 Ordinance – Amending PMC for Water & Sewer Connection Fees - 18 {DPK4915-7476-8777;1/13206.000014/} Outside City 3/4 – 10-inch meter 50% surcharge 13.60.020 Fee/Charge Reference Front footage (per foot): Residential: In and out City limits $25.00 13.65.020 Commercial: In and out City limits $25.00 13.65.020 Square footage (per sq. ft.) Residential: In and out City limits $0.0468 13.65.020 Commercial: In and out City limits $0.0468 13.65.020 Sewer capital expansion charges effective January 1, 2027 Residential Homes (per unit) $4,354 13.60.010 Ordinance – Amending PMC for Water & Sewer Connection Fees - 19 {DPK4915-7476-8777;1/13206.000014/} Commercial Per ERU $4,354 13.60.010 and 13.60.020 Section 5. PMC Section 13.05.090 Payment of Capital Expansion/Replacement Charges- Commencement of Utility Billing is hereby amended and shall read as follows: 13.05.090 Payment of capital expansion/replacement charges – Commencement of utility billing. Capital Expansion/Replacement Charges – Eligibility and Utility Billing Commencement Water and sewer system capital expansion/replacement charges set forth respectively in PMC 13.25.010 and 13.60.010 shall not be accepted by the City unless the premises to be served are developed with an existing structure permitted for occupancy, or are in the process of development with a residential or commercial building as evidenced by a valid building permit. Acceptance of any such application shall cause the regular monthly utility billing established in this title to commence. Water and sewer system capital expansion and replacement charges, as set forth in PMC 13.25.010 and PMC 13.60.010, shall not be accepted by the City unless the premises to be served contain an existing structure permitted for occupancy, or are actively under development with a residential or commercial building, as evidenced by a valid building permit or utility permit. Acceptance of such charges shall cause regular monthly utility billing, as established in this title, to commence. Section 6. PMC Section 13.05.095 Capital Expansion/Replacement Charges- Calculation of Payment Timing is hereby added and shall read as follows: 13.05.095 Capital Expansion/Replacement Charges – Calculation and Payment Timing Water and sewer system capital expansion/replacement charges shall be calculated by the City pursuant to PMC Chapter 3.35 and shall be paid at permit issuance. Such charges shall not be calculated, paid, or collected prior to or at the time of permit application or submittal. For purposes of this section, “permit” means the applicable building permit or utility permit associated with the connection. Section 7. PMC Section 13.25.010 Water System Capital Expansion/Replacement Charges is hereby amended and shall read as follows: 13.25.010 Water system capital expansion/replacement charges. At the time of application for the installation of a customer service account within the City limits, a A fee as set forth in PMC Chapter 3.35 PMC and PMC 13.05.095, for each of the Ordinance – Amending PMC for Water & Sewer Connection Fees - 20 {DPK4915-7476-8777;1/13206.000014/} following categories shall be paid to the City in all cases where the installation of a service line is required for the initiation of service: ¾-inch meter 1-inch meter 1 1/2-inch meter 2-inch meter 3-inch meter 4-inch meter 6-inch meter 8-inch meter 10-inch meter Existing [Ord. 3654 § 1, 2004; Ord. 3608 § 12, 2003; Ord. 2961 § 4, 1993; Ord. 2307 § 9, 1981; Code 1970 § 13.22.010.] Section 8. PMC Section 13.25.020 Water System Capital Expansion Replacement Charges Outside the City Limits is here by amended and shall read as follows: 13.25.020 Water system capital expansion/replacement charges outside the City limits. At the time of application for the installation of a customer service account located outside the City limits, a A water system capital expansion/replacement fee shall be paid to the City in all cases where the installation of a service line is required for the initiation of service. The water system capital expansion/replacement charges for water service outside the City limits shall be as set forth in PMC Chapter 3.35 PMC and PMC 13.05.095, for the following categories: ¾-inch meter 1-inch meter 1 1/2-inch meter 2-inch meter 3-inch meter 4-inch meter 6-inch meter 8-inch meter Ordinance – Amending PMC for Water & Sewer Connection Fees - 21 {DPK4915-7476-8777;1/13206.000014/} 10-inch meter [Ord. 3654 § 1, 2004; Ord. 3608 § 13, 2003; Ord. 2961 § 5, 1993; Code 1970 § 13.22.020.] Section 9. PMC Section 13.45.010 New Service Lines Inside City is hereby amended and shall read as follows: 13.45.010 New service lines inside city. For each water connection there shall be a charge for the service and water meter, paid in accordance with PMC 13.05.095, in an amount equal to the average cost to the City of the service connection and installation, including the water meter covering both parts and labor. The average cost to the City shall be determined annually by the City Finance Director based upon the average cost to the City of such service connections and installations in the previous calendar year. A deposit sufficient to cover actual cost for meters shall be made in advance. That portion of the deposit, if any, in excess of average shall be refunded upon completion of the installation. In addition to the above charges, when it becomes necessary to open a paved street and replace pavement, a fee as set forth in PMC Chapter 3.35 PMC shall be charged. In those areas where it is not possible to determine asphalt patch quantities in advance, they will be computed from field measurements after completion of the work and will be billed to the applicant or deducted from the deposit. [Ord. 3608 § 17, 2003; Ord. 2997 § 1, 1994; Ord. 2961 § 6, 1993; Ord. 1784 § 1, 1976; Ord. 1759 § 1, 1976; Ord. 962 Art. IX, § 121, 1959; Code 1970 § 13.36.010; Code 1954 § 4-3.190.] Section 10. PMC Section 13.45.020, Connection to Existing Lines is hereby repealed. Section 11. PMC Section 13.45.040 Extension of Lines – Installation by Requesting Party is hereby amended and shall read as follows: 13.45.040 Extension of lines – Installation by requesting party. When an extension of the City system is required and such is requested of and agreed to by the City, and it is further agreed that the requesting party will extend the line(s), the requesting party shall install the line extension at their sole cost and expense, subject to the remaining provisions of this section. (1)The front footage charge under PMC 13.45.020 shall be waived for connection to the newly installed line by the party to the parcel(s) of property owned by the installing party. (1)(2) The installing party when connecting his or her parcel(s) of property to the extension shall pay square footage Water system capital expansion/replacement Ordinance – Amending PMC for Water & Sewer Connection Fees - 22 {DPK4915-7476-8777;1/13206.000014/} charges, in accordance with PMC Chapter 3.35 and PMC 13.05.095, for the parcels(s) of the property served as provided under PMC 13.45.0240, except that, if the extension passes by one or more parcels of property under other ownership already connected to an existing line, there shall be a deduction in the amount of front footage and square footage charges previously paid for such parcels(s) of property at the time of their connection. In some cases the deduction may be sufficient to result in a cash payment from the City to the party making the extension. (2)(3) The City may enter into developer reimbursement agreement as provided in Chapter 14.25 PMC. [Ord. 4156, 2014; Ord. 3608 § 19, 2003; Ord. 2961 § 9, 1993; Code 1970 § 13.36.040.] Section 12. PMC Section 13.60.10 Sewer System Capital Expansion/Replacement Charges is hereby amended and shall read as follows: 13.60.010 Sewer system capital expansion/replacement charges. At the time of application fFor the connection to the public sewer inside the City limits, a sewer system capital expansion/replacement fee, as set forth in PMC Chapter 3.35 PMC and PMC 13.05.095, shall be paid to the City for the following: Dwelling units: A residential single unit property shall be assigned one ERU per unit as a sewer connection charge. A residential multiple unit property shall be assigned 0.75 ERU per unit. Hotel/motel units Commercial – The sanitary sewer system capital expansion/replacement charges, as set forth in PMC Chapter 3.35 PMC, shall be based on Equivalent Residential Unit. A nonresidential property shall have a calculated ERU pursuant to the flow calculation, but in no case shall the ERU be less than 0.75 ERU for any connection. The City shall make a determination of the number of ERUs applicable to the property, based on flow rate via fixture count, water meter size, or other industry standard method. The flow rate shall then determine the number of ERUs. For purposes of this determination, an ERU for service shall consist of a projected usage of 249 gallons per day of sewage flow. The Public Works director is authorized to adjust the sewer connection charge on a case-by-case basis based on the flow calculation, the specific characteristics of the development and/or principles of fairness. size of water service , unless special conditions apply. In which for each of the following: ¾-inch meter 1-inch meter 1½-inch meter Ordinance – Amending PMC for Water & Sewer Connection Fees - 23 {DPK4915-7476-8777;1/13206.000014/} 2-inch meter 3-inch meter 4-inch meter 6-inch meter 8-inch meter [Ord. 3654 § 1, 2004; Ord. 3608 § 25, 2003; Ord. 3047 § 4, 1994; Ord. 2307 § 10, 1981; Code 1970 § 13.42.010.] Section 13. PMC Section 13.60.20 Sewer System Capital Expansion/Replacement System Fee Outside the City Limits is hereby amended and shall read as follows: 13.60.020 Sewer system capital expansion/replacement system fee outside the City limits. The fees established by the preceding section shall be applicable to sewer service outside the City limits with the addition of a surcharge, as set forth in Chapter PMC 3.35 PMC and PMC 13.05.095. [Ord. 3608 § 26, 2003; Ord. 2307 § 11, 1981; Code 1970 § 13.42.020.] Section 14. PMC Section 13.60.030 Sewer Stub-Out Connection Fee is hereby amended and shall read as follows: In addition to sewer connection permit fees required by this chapter, there is imposed upon the owners of property applying to connect to the City sanitary sewer system, a sewer stub-out connection fee in an amount, as set forth in PMC Chapter 3.35 PMC, for connection to any sanitary sewer stub-out installed and paid for by the City, and funded by the capital improvement fund. This charge shall not apply to sewer stub-outs whose construction has been funded by a local improvement district to which the property is subject, stub-outs constructed by the owner or its predecessor in interest when no prior existing stub-out exists. If no sewer stub-out is available for connection, the property owner, upon the approval of the Director of Public Works, may install a sewer stub-out from an existing sewer line for a building connection, except from this fee. [Ord. 3608 § 27, 2003; Ord. 3195 § 1, 1996; Code 1970 § 13.42.025.] Section 15. PMC Chapter 13.65 Sewer Extensions is hereby repealed. Section 16. PMC Section 13.70.120 Permit Required is hereby amended and shall read as follows: Ordinance – Amending PMC for Water & Sewer Connection Fees - 24 {DPK4915-7476-8777;1/13206.000014/} No unauthorized person shall uncover, make any connections with or opening into, use, alter, or disturb any public sewer or appurtenance thereof without first obtaining a written permit from the Director and paying the fees and charges in accordance with PMC 13.05.95 and PMC Chapter 3.35 PMC. All connections shall meet the requirements of this chapter. [Ord. 3702 § 2, 2004; Code 1970 § 13A.52.110.] Section 17. PMC Section 13.70.130 Classification of Permit-Fees is hereby amended and shall read as follows: (1) There shall be two classes of building sewer and side sewer permits: (a) For residential and commercial service. (b) For service to establishments producing industrial wastes. (2) In either case, the owner or his agent shall make application on a special form furnished by the City. The permit and inspection fee shall be paid to the City, in accordance with PMC 13.05.095, at the time the application is filed. Any street cuts are required to be pursuant to permit as provided in PMC 12.24.070. [Ord. 3702 § 2, 2004; Code 1970 § 13A.52.120.] Section 18. Severability. If any section, subsection, sentence, clause, phrase or word of this ordinance should be held to the invalid or unconstitutional by a court of competent jurisdiction, such invalidity or unconstitutionality thereof shall not affect the validity or constitutionality of any other section, subsection, sentence, clause phrase or word of this ordinance. Section 19. Corrections. Upon approval by the city attorney, the city clerk or the code reviser are authorized to make necessary corrections to this ordinance, including scrivener’s errors or clerical mistakes; reference to other local, state, or federal laws, rules, or regulations; or numbering or referencing of ordinances or their sections and subsections. Section 20. Effective Date. This ordinance shall take full force and effect five (5) days after approval, passage and publication as required by law. Ordinance – Amending PMC for Water & Sewer Connection Fees - 25 {DPK4915-7476-8777;1/13206.000014/} PASSED by the City Council of the City of Pasco, Washington, on this 20th day of January, 2026. APPROVED AS TO FORM: ___________________________ Ogden Murphy Wallace, PLLC City Attorneys _____________________________ Charles Grimm Mayor ATTEST: _____________________________ Krystle Shanks, CMC Deputy City Clerk Published: January 25, 2026