HomeMy WebLinkAbout4687 Resolution - Change Order No. 4 Sandifur Broadmoor Project Resolution - Change Order No. 4 with Tapani, Inc- 1 RESOLUTION NO. 4687 A RESOLUTION OF THE CITY OF PASCO, WASHINGTON, AUTHORIZING THE CITY MANAGER TO SIGN AND EXECUTE CHANGE ORDER NO. 4 WITH TAPANI, INC. FOR THE SANDIFUR PKWY/ BROADMOOR INTERSECTION IMPROVEMENTS PROJECT. WHEREAS, the City of Pasco (City) and Tapani, Inc. (Tapani) entered into a Construction Contract on January 27, 2025, for construction of the Sandifur Pkwy/ Broadmoor Intersection Improvements Project; and WHEREAS, previously approved Change Order No. 1 was under the authority provided to the Interim City Manager; and WHEREAS, previously approved Change Order No. 2 was under the authority provided to the Public Works Director; and WHEREAS, previously approved Change Order No. 3 was under the authority provided to the Public Works Director; and WHEREAS, proposed Change Order No. 4 is issued to provide a pedestrian hybrid beacon (PHB) or High-Intensity Activated Crosswalk (HAWK) for a new crossing along Broadmoor Blvd near Delta High School. This provides a safe crossing for users between the Sandifur Pkwy and Broadmoor Blvd traffic signal and a new Buckingham Drive and Broadmoor Blvd traffic signal; and WHEREAS, the $245,159.30 amount of Change Order No. 4 added to the cumulative sum of previously approved Change Orders exceeds the City Manager’s authority, and thus determined to obtain Council approval; and WHEREAS, the City Council of the City of Pasco, Washington, has, after due consideration, determined that it is in the best interest of the City to enter Change Order No. 4 with Tapani, Inc. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO, WASHINGTON: That the City Council of the City of Pasco approves the terms and conditions of Change Order No. 4 between the City of Pasco and Tapani, Inc. as attached hereto and incorporated herein as Exhibit A. Be It Further Resolved, that the that the City Manager of the City of Pasco, Washington, is hereby authorized, empowered, and directed to execute said Change Order No. 4 on behalf of the City of Pasco. Resolution - Change Order No. 4 with Tapani, Inc- 2 Be It Further Resolved, that this Resolution shall take effect immediately. PASSED by the City Council of the City of Pasco, Washington, on this 1st day of December, 2025. _____________________________ David Milne Mayor ATTEST: APPROVED AS TO FORM: _____________________________ ___________________________ Debra Barham, MMC Kerr Ferguson Law, PLLC City Clerk City Attorneys Project No:24 600 Sandifur Pkwy/Broadmoor Intersection Improvements Contractor: Description of Change:HAWK System Detail as Appropriate:To provide a safe crossing for Delta High School with the Broadmoor Blvd improvements the City had planned for the rectangular rapid flashing beacon (RRFB). After reviewing the corridor and discussing with the designer the city decided a pedestrian hybrid beacon (PHB) or HAWK system would be the preferred option for safety and future proofing the crosswalk. This change adds the materials and labor to install the HAWK system. However, some RRFB parts were order during this coordination and cannot be returned. These parts will be given to the City at no additional cost. Contract Bid Amount (Schedule A - Non-Taxed):4,109,227.50$ Contract Bid Amount (Schedule B - Taxed):163,080.00$ SALES TAX @ 8.9%:14,514.12$ Total:4,286,821.62$ Subtotal Subtotal **Sales tax @ 8.9% *Sales tax @ 8.9% Total Total Total Change Orders To Date 343,826.17$ *SCHEDULE A = NO TAX **Inclusive of CO1 (Sched B)--(taxed)New Contract Amount YES NO APPROVED: CONTRACTOR Date Date APPROVED: Date Date APPROVED: Date DatePUBLIC WORKS DIRECTOR CITY MANAGER CONSTRUCTION INSPECTOR APPROVED: PROJECT MANAGER ENGINEERING MANAGER APPROVED: AGREED TO AND ACCEPTED: 98,666.87$ 245,159.30$ 4,630,647.79$ IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER Contract Time Prior to this Change Order…………………………..200 Modification to Contract Time by this Change Order………………0 Revised Total Contract Time…………………………………………200 It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously executed Contract Documents shall apply to this Change Order. PREVIOUS CHANGE ORDER CURRENT CHANGE ORDER 97,698.95$ 245,159.30$ 967.92$ -$ Tapani, Inc. CITY OF PASCO PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO. 4 Schedule A (Non-Taxed) Project Title: $4,665,882.74 $ 132,933.90 $ 133,901.82 $379,061.12 RESOLUTION - EXHIBIT A Date:10/28/2025 Project Name:Sandifur Contract #24600 Job #252503 C.O. #8 C.O. Title:Hawk System Hours Rate Hours Rate Foreman 10 61.46$ 92.19$ HRS 614.60$ Pipelayer 10 52.14$ 78.21$ HRS 521.40$ Pipelayer 10 52.14$ 78.21$ HRS 521.40$ Labor Sub Total 1,657.40$ Labor Overhead & Profit 15%248.61$ Labor Total 1,906.01$ Units Rate Unit Total 10 29.30$ HRS 293.00$ Equipment Sub Total 293.00$ Equipment Overhead & Profit 15%43.95$ Equipment Total 336.95$ Unit Rate Quantity Unit Total -$ -$ -$ -$ -$ Material Sub Total -$ Material Overhead & Profit 15%-$ Material Total -$ Unit Rate Quantity Unit Total 203,906.03$ 1 LS 203,906.03$ 3,347.35$ 1 LS 3,347.35$ -$ -$ Sub Contractors Sub Total 207,253.38$ Subcontractor Overhead & Profit 15%31,088.01$ Subcontractor Total 238,341.39$ Unit Rate Quantity Unit Total -$ -$ -$ Other Sub Total -$ Other Overhead & Profit 15%-$ Stipulations Other Total -$ Sub Total 240,584.35$ Accepted by:General Liability Insurance 0.4016%966.19$ Bond 1.5%3,608.77$ Date:Total Amount 245,159.30$ This Change increases the time to complete the project by: Day(s) Equipment # - Description 5040118 - Crew Truck Force Account / Change Order Worksheet Description This ROM is for the Hawk System that the City requested. This covers all time, materials, and labor to install the HAWK System on Broadmoor. Material Description LABOR EQUIPMENT MATERIAL OTHER Straight Time This proposal is based on the usual cost elements such as labor, material, and normal markups and does not include all costs for additional changes in the sequence of work, delays, disruptions, rescheduling, extended overhead, overtime (unless specified), acceleration, and/or impact costs; and the right is expressly reserved to make claim for any and all (if any) of these related items prior to final completion of this contract. Please consider this language official "notice" as defined in subcontract and/or main contract. Overtime Class Name/Description Unit Total SUBCONTRACTORS Subcontractor Description Silverline Quoted Hawk System Vac Truck for Poles Corporate Office PO Box 1900 Battle Ground, WA 98604 360.687.1148 RESOLUTION - EXHIBIT A Change Proposal Request (CPR) Page 1 of 2 Project Information Change Proposal Request Project #1-25008 Contract #1-25008-001 Title Sandifur Pwky Broadmoor Blvd Intersection Improvements CPR #1-25008-002 Address Sandifur Pwky & Broadmoor Blvd.Issue Date 15-Sep-2025 Subject City, State, Zip Pasco, WA 99301 Country USA HAWK System Prime Contract Company Owner Contact Todd Pluff Contact Steve Ingram Company Silverline Electric LLC Company Tapani Inc:Sandifur Broadmoor 1-25008 Address 4121 West Clearwater Avenue Address Sandifur Pwky and Broadmoor Blvd City, State, Zip Kennewick, WA 99336 City, State, Zip Pasco, WA 99301 Country United States Country United States Phone (509) 544-8840 Phone Fax Fax Description of the proposed change: Upgrade RRFB system in front of Highschool to a HAWK system Net Amount of this Proposed Change:$203,906.03 The Contract time due to this Change Proposal Request is to be determined at a later date. This document, when fully executed as accepted, shall constitute authorization to proceed with the work described herein. Submitted By Response:￿ Accept ￿ Do Not Accept Silverline Electric LLC Tapani Inc:Sandifur Broadmoor 1-25008 Company Company __________________________________________________________________________________________________________________ By Date By Date RESOLUTION - EXHIBIT A Change Proposal Request (CPR) Page 2 of 2 Proposed Items Item #Item Description Quantity Unit Unit Price Subtotal 1 Labor 129 EA 133.10 17,169.90 2 Western Systems Hawk system package 1 LS 93,964.10 93,964.10 3 Hawk System Poles & Service equipment 1 LS 63,460.83 63,460.83 4 Concrete form materials 1 LS 4,203.54 4,203.54 5 General material 1 LS 22,117.66 22,117.66 6 Equipment rental 1 LS 2,990.00 2,990.00 Subtotal = $203,906.03 Tax = $0.00 Total = $203,906.03 RESOLUTION - EXHIBIT A RESOLUTION - EXHIBIT A 11 5 + 0 0 11 6 + 0 0 3.8"89.8"2.4" 8'-0" 7. 1 3 " 10 " 6. 8 7 " 2' - 0 " BORDER R=1.38" TH=0.75" IN=0.5"Panel Style: neon xwalk.ssi M.U.T.C.D.: 2009 Edition DESIGNED: CHECKED: Full Size Sheet Format Is 22x34; If Printed Size Is Not 22x34, Then This Sheet Format Has Been Modified & Indicated Drawing Scale Is Not Accurate. Know what's below. before you dig.Call R 21035845 J AMEST A U N B RADY K R A U P P STA T E O F WASHIN G T O N R EGISTE R E DP R O F E SSIONA L E N G I N E ER SHEET ID SHEET OF BR O A D M O O R A R E A T I F - B R O A D M O O R P E D C R O S S I N G P R O J E C T A S I T E L O C A T E D I N T H E C I T Y O F P A S C O , W A S H I N G T O N BID SET 66084.002 AUGUST 2025 JBK SHEET ID SHEET OF 83103.1 8/28/25 BR O A D M O O R B L V D 0 10510 Scale: 1" = 10' LEGEND CALLOUTS RED/FLASH RED YELLOW/FLASH YELLOW HEAD NO. 21, 22, 61, 62 HEAD NO. 48, 49 88, 89 SIGNAL DISPLAYS X X Construction note callout. See construction notes on this sheet. Illumination note callout. See Illumination Plans. Interconnect note callout. See Illumination Plans. Wiring note callout. See wiring notes, Sheet TS10. Traffic signal pole. See traffic signal standard for details, Sheet TS11. X 1. All Traffic Control Devices Shall Conform To The Latest Edition Of The Manual On Uniform Traffic Control Devices (MUTCD) And WSDOT Standards. 2. Information On This Sheet Is Accurate For Traffic Signal Improvements Only. 3. The Locations Of The Pole Foundations Shall Be Staked In The Field For Approval By City Inspector Staff Prior To Installation. 4. Locations Of Existing Underground Structures And Utilities Are Approximate Only. It Is Not The Intent Of These Plans To Show The Exact Location Of Underground Equipment. It Is The Responsibility Of The Contractor To Verify The Locations Of All Existing Utilities With The Respective Owners. Existing Utilities Damaged By The Contractor Shall Be Repaired At The Contractor's Expense. Call Dig Line 48 Hours Prior To Excavation To Request Underground Utility Locations. 5. Top of Foundation Elevations Provided Represent Approximate Finished Ground Surface Elevations. Top Of Foundation Elevations For All Poles Are To Be Field Verified By The Contractor Based On The Actual Finished Ground Elevations Prior To Installation Of The Pole Foundations. 6. The Conduit And Junction Box Layout Shown Is Schematic. The Contractor Shall Maintain Appropriate Clearance Between Adjacent Utilities And Minimize Impacts To Adjacent Infrastructure To The Extent Possible. 7. Ground The Signal And Illumination System In Accordance With The Current Edition Of The National Electric Code (NEC). 8. All New Conduit Installed Shall Include 1-#12 "Locate Wire". Insulate All Locate Wires From All Metallic Items. 9. Use HDPE Or Rigid Steel Under Roadway And Driveways And Schedule 80 PVC For All Other Conduits. 10. Contractor To Pothole At All Proposed Foundation Locations Prior To Construction And Submission Of Shop Drawings And Notify Engineer Of Any Discrepancies. 11. Arrows Shown Are Schematic Only And Not To Be Installed As Part Of The Signal Plan. GENERAL NOTES Construct foundation and install Type II signal standard complete with signal displays, terminal cabinet. See plan reference No. IS-13 and Signal Standard Detail Chart, sheet TS11 for additional information. 1 2 3 Construct Foundation And Install Type PS Pole With Type D Mounted Pedestrian Signal Head And APS Pushbutton. See Sheet STD16 For WSDOT Standard Plan J-20.16 For Pedestrian Signal Standard. See Plan Reference No. IS-13 And Signal Standard Detail Chart, Sheet TS11 For Additional Information. 4 6 8 CONSTRUCTION NOTES Vehicle Signal Display Conduit & Wiring Controller Cabinet Service Cabinet Pedestrian signal display Type 2 Junction Box Type 8 Junction Box Traffic Sign Crosswalk Sign F i l e n a m e : H: \ 2 7 \ 2 7 7 9 9 - B r o a d m o o r A r e a T I F P r o j e c t s \ d e s i g n ( B r o a d m o o r ) \ _ C D \ C D - B R O A D M O O R - P H B S I G N A L - 2 7 7 9 9 . d w g L a y o u t T a b : 10 3 . 1 U s e r : Jo h n H e n r i k s e n C A D P l o t D a t e / T i m e : 8/ 2 8 / 2 0 2 5 1 1 : 2 7 : 0 0 A M BR O A D M O O R B L V D P E D E S T R I A N H Y B R I D B E A C O N S I G N A L P L A N JBK AXR SHEET ID SHEET OF TS09 5 7 Prop. ROW Install Type 2 Junction Box See Sheet STD17 For WSDOT Standard Plan J-40.10 For Junction Box Details. Install Type 8 Junction Box. See Sheet STD18 For WSDOT Standard Plan J-40.30 For Junction Box Details. Connect to Power Source. Coordinate Work with Big Bend Electric Cooperative (Zach Underhill, 509-659-1700*2190, Zunderhill@BBEC.org) (Mitchell Myers, 509-659-1700*2130, Mmyers@BBEC.org) Construct New Multi-Cabinet Foundation. Install New Type P PLUS NEMA TS2-1 Traffic Signal Cabinet. Install New Econolite Cobalt 2100 Traffic Signal Controller with Cobalt Software. See Sheet STD14 For WSDOT Standard Plan J-10.10 For Signal Cabinet Layout Details. Install New Vehicle Signal Display Using Type M Mount. See Sheet STD18 and STD19 For WSDOT Standard Plan J-75.20 For Mounting Details. Install New 120V/240V Service Cabinet Type D Foundation Per WSDOT Standard Plan J-10.21. 11 32 42 5 2 6 2 2 1 3 4 5 6 7 8 8 9 Install New Aluminum "CROSSWALK-STOP ON RED" Sign on Mast Arm. R10-23, 24"x30". 9 9 10 Install New Aluminum "CROSSWALK" Sign on Mast Arm. WSDOT W11A-301, 96"x24", per WSDOT Standard Plan G-30.10 sheet STD 14. 10 10 62 61 2221 8 8 49 48 88 89 11 Install New Aluminum "STOP HERE ON RED" Sign on Mast Arm, WSDOT R10-6, 24"x36", per WSDOT Standard Plan G-24.50 sheet STD 06. 11 11 12 Install ITS pull box with standard duty lid per WSDOT Standard Plan J-90.10 on sheet STD12.Ex. Easement IL IL IL IL 4 12 ITS ITS 12.25' Prop. ROW Ex. ROW PEDESTRIAN MOVEMENT Ø1 Ø2 Ø3 Ø4 Ø8 Ø7 Ø6 Ø5 PHASE DIAGRAM PROTECTED VEHICLE MOVEMENT RED/FLASH RED IL ITS IL ITS RESOLUTION - EXHIBIT A DESIGNED: CHECKED: Full Size Sheet Format Is 22x34; If Printed Size Is Not 22x34, Then This Sheet Format Has Been Modified & Indicated Drawing Scale Is Not Accurate. Know what's below. before you dig.Call R 21035845 J AMEST A U N B RADY K R A U P P STA T E O F WASHIN G T O N R EGISTE R E DP R O F E SSIONA L E N G I N E ER SHEET ID SHEET OF BR O A D M O O R A R E A T I F - B R O A D M O O R P E D C R O S S I N G P R O J E C T A S I T E L O C A T E D I N T H E C I T Y O F P A S C O , W A S H I N G T O N BID SET 66084.002 AUGUST 2025 JBK SHEET ID SHEET OF 83103.2 8/28/25 F i l e n a m e : H: \ 2 7 \ 2 7 7 9 9 - B r o a d m o o r A r e a T I F P r o j e c t s \ d e s i g n ( B r o a d m o o r ) \ _ C D \ C D - B R O A D M O O R - P H B S I G N A L - 2 7 7 9 9 . d w g L a y o u t T a b : 10 3 . 2 U s e r : Jo h n H e n r i k s e n C A D P l o t D a t e / T i m e : 8/ 2 8 / 2 0 2 5 1 1 : 2 7 : 0 4 A M BR O A D M O O R B L V D P E D E S T R I A N H Y B R I D B E A C O N W I R I N G D I A G R A M JBK AXR SHEET ID SHEET OF TS10 5C 743 W B O G R 48 742 741 TB2O R G B W 5C 22 622 621 623 624 626 TO POWER SOURCE 5C TB1 O R G B Y W R 5C 62 O R G B W 61 662 661 663 664 666 5C 783W B O R G 88 781 782 662 661 663 664 666 XY SERVICE CABINET SIGNAL CONTROLLER JUNCTION BOXTERMINAL BLOCK WIRING NOTE POLE NOTE LEGEND O R G B W 5C 21 622 621 623 624 626 R O W G B Ø2 R O W G B Ø4 R O W G B Ø6 R O W G B Ø8 21 , 2 2 61 , 6 2 VEHICLE DISPLAY 721 723 722 R G O W B Ø2 48 , 4 9 741 743 742 R G O W B Ø4 761 763 762 R G O W B Ø6 88 , 8 9 781 783 782 R G O W B Ø8 PEDESTRIAN DISPLAY 724 725 O B Ø2 48 , 4 9 PEDESTRIAN BUTTON 724 725 O B Ø4 724 725 O B Ø6 88 , 8 9 724 725 O B Ø8 621 623 622 624 626 641 643 642 644 646 661 663 662 664 666 681 683 682 684 686 5A1 5A3 5A2 BL Y O BARE Ø2 , Ø 5 A EMERGENCY VEHICLE DETECTOR GRD BL Y O BARE Ø4 , Ø 7 B GRD 5C1 5C3 5C2 BL Y O BARE Ø6 , Ø 1 C GRD 5D1 5D3 5D2 BL Y O BARE Ø8 , Ø 3 D GRD 5B2 5B3 5B1 5A4 5A5 B W A PREEMPTION INDICATION Ø2 , Ø 5 5B4 5B5 B W B 5C4 5C5 B W C 5D4 5D5 B W D Ø4 , Ø 7 Ø6 , Ø 1 Ø8 , Ø 3 VD C VD C VD C VD C TB 3 VIDEO CAMERA DETECTION TB 2 TB 1 TB 4 TB 3 TB 2 TB 1 TB 4 TB 3 TB 4 TB 1 TB 2 TB 3 TB 2 TB 1 TB 4 TB 3 TB 4 TB 1 TB 2 TB 3 TB 4 TB 1 TB 2 TERMINAL CODING CONNECT TO DETECTOR COMMON BUS CONTROL SIDE TERMINAL CONNECTION CONNECT TO NEUTRAL BUS SPARE CONTROLLER TERMINALS R O B G BL 671 673 672 674 675 676 677 W W TB 4 R O B G BL 611 613 612 614 615 616 617 W W TB 1 Ø1 R O B G BL 631 633 632 634 635 636 637 W W TB 2 Ø3 R O B G BL 651 653 652 654 655 656 657 W W TB 3 Ø5 Ø7 Type 8 Junction Box 5C 743W B O R G 49 741 742 74 4 74 5 B W 2C S 48 5C 783 W B O G R 89 782 781 2 2 1 4 5 2 1 3 6 1 3 2 5 4 6 78 4 78 5 B W 2C S 88 74 4 74 5 B W 2C S 49 R Y R R R R Y R R Y ITS Pull Box 1 Type 2 Junction Box 78 4 78 5 B W 2C S 89 4 4 CONDUIT Type 8 Junction Box 7 7 Type 2 Junction Box RESOLUTION - EXHIBIT A DESIGNED: CHECKED: Full Size Sheet Format Is 22x34; If Printed Size Is Not 22x34, Then This Sheet Format Has Been Modified & Indicated Drawing Scale Is Not Accurate. Know what's below. before you dig.Call R 21035845 J AMEST A U N B RADY K R A U P P STA T E O F WASHIN G T O N R EGISTE R E DP R O F E SSIONA L E N G I N E ER SHEET ID SHEET OF BR O A D M O O R A R E A T I F - B R O A D M O O R P E D C R O S S I N G P R O J E C T A S I T E L O C A T E D I N T H E C I T Y O F P A S C O , W A S H I N G T O N BID SET 66084.002 AUGUST 2025 JBK SHEET ID SHEET OF 83103.3 8/28/25 F i l e n a m e : H: \ 2 7 \ 2 7 7 9 9 - B r o a d m o o r A r e a T I F P r o j e c t s \ d e s i g n ( B r o a d m o o r ) \ _ C D \ C D - B R O A D M O O R - P H B S I G N A L - 2 7 7 9 9 . d w g L a y o u t T a b : 10 3 . 3 U s e r : Jo h n H e n r i k s e n C A D P l o t D a t e / T i m e : 8/ 2 8 / 2 0 2 5 1 1 : 2 7 : 0 8 A M BR O A D M O O R B L V D P E D E S T R I A N H Y B R I D B E A C O N P O L E S C H E D U L E JBK AXR SHEET ID SHEET OF TS11 FILE NAME TIME DATE DESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM.REVISION DATE BY SHEET OF SHEETS Washington State Department of Transportation P.E. STAMP BOX P.E. STAMP BOX DATE DATE LOCATION NO.CONTRACT NO. JOB NUMBER REGION NO. STATE FED.AID PROJ.NO. WASH10PLOTTED BY PLAN REF NO Plot 1 SIGNAL STANDARD DETAIL CHART***3 3 3 40'45'50' MIN.MAX. 4 SECTION 12" 5 SECTION 12" 17.5' 17.0' 17.0' 19.2' 18.0' 17.5' 20.9' 19.7' 18.5' 22.0' 20.8' 19.6' 16.5' 16.5' 16.5' SIGNAL DISPLAY VERTICAL CLEARANCE TO ROADWAY 53' - 180' MEASURED FROM BOTTOM OF SIGNAL HEAD HOUSING TO ROADWAY ALL LEGEND 90° 90 ° E1 90° 0°180° 270° E2 E1 R O A D W A Y LOCATION STATION ANCHOR BOLT PLATE h i i 85 ° E E FF G G H H I I H H I I A2 A1 12 ' - 0 " 8' - 0 " 6' - 6 " a b c a e gg j j i B9 B10 B11 h i CURB OR EDGE OF SHOULDER LIMITS OF VERTICAL CLEARANCE a b a b d a b B1 B2 B3 B4 B5 B6 B7 ROADWAY TYPE II, III & SD SIGNAL STANDARD D D C f NOTES 6 5 4 4 5 NOTE: E2 ELEVATION IS TO TOP OF FOUNDATION 10' 12' 8' 6' 14' 16' 19.8 O F F S E T L I N E POLE ORIENTATION LINE (E1 ATTACHMENT POINT) 26.4 39.6 52.8 46.2 1 2 1 2 1 2 2 1 2 1 2 2 2 2 OR` ` ` ` SIGN b c e 3.0 FT 3.0 FT N/A N/A N/A 3.0 FT 7.5 SQ. FT. 36.0 SQ. FT. 15.0 SQ. FT. HEIGHT WIDTH AREA 3 3 1' - 0" MIN. TO 2' - 6" MAX. FROM POLE CENTERLINE TO SIGN EDGE 33.0 FOR POST MOUNTED SIGNS THERE SHALL BE 2' - 0" MIN. FROM THE FACE OF THE CURB OR THE EDGE OF THE SHOULDER TO THE EDGE OF THE SIGN ALL HANDHOLES AT 180^ FROM E1 HORIZONTAL DISTANCE FROM STOP LINE 3 SECTION 12" 5 SECTION CLUSTER 12" MEASURE ATTACHMENT POINT ANGLES CLOCKWISE FROM POLE ORIENTATION LINE (E1 ATTACHMENT POINT) TO THE ATTACHMENT POINT LOCATION POLE ORIENTATION ANGLE (P.O.A.) DEGREES CLOCKWISE FROM OFFSET LINE TO POLE ORIENTATION LINE (E1 ATTACHMENT POINT) TYPE E MOUNTS SHALL BE USED FOR PEDESTRIAN DISPLAYS ON TYPE II OR III SIGNAL STANDARDS, WITH THE FOLLOWING EXCEPTION: PEDESTRIAN DISPLAYS MOUNTED ON OCTAGONAL (8 SIDED) SIGNAL STANDARDS AT AN ANGLE OTHER THAN A 45 DEGREE INCREMENT SHALL USE A TYPE A MOUNT FOR TWO PEDESTRIAN DISPLAYS, OR A TYPE B MOUNT FOR A SINGLE PEDESTRIAN DISPLAY. POLE ORIENTATION AND ATTACHMENT POINT DETAIL 3 3 GGgg I III g g 8' - 0 " 8' - 0 " 10 ' - 0 " iii a 6 6 63' - 6" MEASURED FROM SIDEWALK SURFACE TO CENTER OF PEDESTRIAN PUSH BUTTON SIGNAL STANDARD NO. APPROVED DRAWING NO. FABRICATION DATE EXAMPLE SIGNAL STANDARD IDENTIFICATION TAG DETAIL SRXXX, MP XXX.XX MANUFACTURER APPROVED DWG. XXXXXX STD. NO. XX STATE ROUTE AND MILE POST NO. FAB. X/XX/XXXX STD. NO. 02 SR97, MP 069.09 MANUFACTURER APPROVED DWG. AB12345 FAB. 6/14/2002 MOUNTING COUPLING INSTALLED AT OFFSET DISTANCE INDICATED IN CHART. FOR TYPE N MOUNTS ONLY, DRILL 1" DIA. HOLE IN MAST ARM AND INSTALL PLASTIC SPLIT BUSHING FOR CABLE ENTRANCE. FIELD INSTALLED. SIGN SIZES SHALL NOT EXCEED THE MAXIMUM VALUES LISTED HERE: ELEVATION IS TO TOP OF FOUNDATION. FIELD VERIFY ELEVATION PRIOR TO ORDERING SIGNAL STANDARDS. IS-13 1 1 ALTERNATE 23 STD. No.STREET NAME STATION FIELD LOCATION OFFSET LT.RT.ELEV.P.O.A. POLE TYPE A1 A2 B1 B2 B4 B5 B6 C D E1 E2 F G1 G2 H I1 I2 POLE ATTACHMENT POINT ANGLES (deg.)FOUNDATION DEPTH (FT) ALTERNATE 1 3' SQ.3' RD.4' RD.3' RD.4' RD. REMARKSSIGNAL MAST ARM DATA B7 B8 B9 B10B3 SOIL BEARING PRESSURE (PSF) MOUNTING HEIGHT (FT) B11 B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 FOUNDATION DESIGN XYZ (FT ) LUMINAIRE ARM (FT) TYPE PPB PPB POST TYPE PS PED. HEAD STANDARD TYPE I VEHICLE HEAD STANDARD ATTACHMENT POINT LUMINAIRE MAST ARM X Y Z (ft ) MAST ARM LENGTH X Y Z (ft ) STANDARD TYPE STANDARD PLAN REFERENCES POLE FOUNDATION ELECTRICAL PPB FIXED BREAKAWAY PPB PS I II, III, SD N/A J-20.10 J-20.15 J-21.15 J-20.16 J-20.10 J-20.15 J-21.10 J-21.10 J-26.10, J-26.15 CURBSTANDARD J- 2 0 . 1 1 N/A J-20.10 J-20.15 J-20.20 J-21.20 N/A a.VEHICLE DISPLAY f.LUMINAIRE b.MAST ARM MTD. SIGN g.PEDESTRIAN DISPLAY c.STREET NAME SIGN h.TERMINAL CABINET d.PRE-EMPT DETECTOR i.APS PPB-M e.POST MTD. SIGN j. HANDHOLE PLACEMENT SHALL BE 2' - 0" MIN. FROM FACE OF CURB OR EDGE OF SHOULDER; 3' - 0" MIN. FROM FACE OF GUARDRAIL; 4' - 0" MIN. FROM CONC. BARRIER TYPE 2 (MEASURED FROM A POINT WHERE THE BARRIER BASE MEETS THE SHOULDER SURFACE (TOE). MEASUREMENT TAKEN FROM TRAFFIC SIDE OF BARRIER; TO FACE OF POLE) 7 DMS OR VMS IS NOT ALLOWED ON THESE POLES. TAG NOTES: CORROSION RESISTANT METAL TAG SECURED WITH (2) 0.125" RIVETS AS FOLLOWS: - POLE SHAFT - LOCATED WITHIN 6" ABOVE HAND HOLE (TYPE II & III). - SIGNAL AND LUMINAIRE MAST ARM (TYPE II & III) - LOCATED WITHIN 6" OF THE LUMINAIRE ARM AND THE POLE SHAFT CONNECTION POINT (TYPE III). TEXT SHALL BE A MINIMUM OF 3/16" HIGH, STAMPED OR EMBOSSED. OFFSETS (FT) (Z) (POLE TO ATTACHMENT POINT)WINDLOAD AREAS (FT ) (X)(Y)2 3 CALCULATED POLE XYZ (FT ) CALCULATED POLE XYZ (FT ) IS THE SUM OF THE TOTAL XYZ (FT ) FOR THE SIGNAL ARM AND THE XYZ (FT ) FOR THE LUMINAIRE ARM (IF PRESENT). x 1 2 3 4 5 6 BROADMOOR BLVD 115+37.5 34.5' x II II PS PS 19 22.5 10.5 5.00 10.3 10.3 18016.0 602 k B8 2 900 1000 10'10'8'8'8' x PS PS BROADMOOR BLVD 115+49.3 40.0' BROADMOOR BLVD 115+43.5 34.5' BROADMOOR BLVD 115+53.0 3.0' BROADMOOR BLVD 115+29.0 3.0' BROADMOOR BLVD 115+38.5 39.2' x x x x 0 16.5 28.0 16.022.0 5.0 6.5 10.3 10.35.0 18016.0 797 700 1000 10'10'8'8'8' 19 270 90 90 270 90 270 270 90 RESOLUTION - EXHIBIT A QUOTATION Bid Item #53; Permanent Signing (RRFB) Qty Description 4 Control Cabinet (SC315-G) Solar, Natural Finish Carmanah Part # 84539 4 Battery 35AH Carmanah Part #88055 4 50 Watt Solar Panel Carmanah Part #74387 4 Top of Pole Mount, 3.5-4.5” OD Round, For 50, 80, & 170-Watt Solar Panels Carmanah Part # 89334 4 Solar Panel Harness, MC4 to Spade Terminals, 8’ Carmanah Part # 84584 4 Lightbar with Confirmation Lights (Includes Universal Mounting Bracket) (Black) Carmanah Part #87668 4 Harness, 16FT, Terminal Block to Light Bar, RRFB, SC315, TPE Carmanah Part #78225 4 Pushbutton Polara iNX Audible, 9X12 Sign & Mount, Black Carmanah Part #89068 4 Harness, 16FT, Polara iNX Button, G-Series Carmanah Part #84507 4 Sign (Children Walking Symbol) 36” x 36” Fluorescent Yellow Green 3M DG3 Series 4083 (S1-1) with Windbeam NW Safety Supply Part # S1-1/36YGDG3, WINDBEAM-S1-1 36 2 Sign (Arrow) 24” X 12” 3M DG3 4083 Fluorescent Yellow Green 3M DG3 Series 4083 Left Down Arrow with Windbeam NW Safety Supply Part # W16-7PL/24YGDG3, WINDBEAM-24X12 2 Sign (Arrow) 24” X 12” 3M DG3 4083 Fluorescent Yellow Green 3M DG3 Series 4083 Right Down Arrow with Windbeam NW Safety Supply Part # W16-7PR/24YGDG3, WINDBEAM-24X12 RESOLUTION - EXHIBIT A