HomeMy WebLinkAbout2025.08.11 Council Workshop Packet AGENDA City Council Workshop Meeting 7:00 PM - Monday, August 11, 2025 Pasco City Hall, Council Chambers & Microsoft Teams Webinar Page 1. MEETING INSTRUCTIONS for REMOTE ACCESS - Individuals, who would like to provide public comment remotely, may continue to do so by filling out the online form via the City’s website (www.pasco-wa.gov/publiccomment) to obtain access information to comment. Requests to comment in meetings must be received by 4:00 p.m. on the day of this workshop. The Pasco City Council Workshops are broadcast live on PSC-TV Channel 191 on Charter/Spectrum Cable in Pasco and Richland and streamed at www.pasco-wa.gov/psctvlive and on the City’s Facebook page at www.facebook.com/cityofPasco. To listen to the meeting via phone, call 1-332-249-0718 and use access code 855 605 385#. Audio equipment available for the hearing impaired; contact the Clerk for assistance. Servicio de intéprete puede estar disponible con aviso. Por favor avisa la Secretaria Municipal dos dias antes para garantizar la disponiblidad. (Spanish language interpreter service may be provided upon request. Please provide two business day's notice to the City Clerk to ensure availability.) 2. CALL TO ORDER 3. ROLL CALL (a) Pledge of Allegiance 4. VERBAL REPORTS FROM COUNCILMEMBERS 5. ITEMS FOR DISCUSSION WITH OPPORTUNITY FOR PUBLIC COMMENT – the public may comment on each topic scheduled for discussion, up to 2 minutes per person with a total of 8 minutes per item. If Page 1 of 63 opposing sides wish to speak, then both sides receive an equal amount of time to speak or up to 4 minutes each side. 3 - 5 (a) Carryover Funds for Capital Projects from 2023-2024 Biennium (5 minute staff presentation) 6 - 61 (b) 2 Resolutions - Change Order No. 11 Process Water Reuse Facility Phase 2 Construction Contract with Tapani & RH2 Engineering PSA Amendment 7 (5 minute staff presentation) 6. MISCELLANEOUS COUNCIL DISCUSSION 7. EXECUTIVE SESSION 8. ADJOURNMENT 9. ADDITIONAL NOTES 62 - 63 (a) Adopted Council Goals (Reference Only) (b) This meeting is broadcast live on PSC-TV Channel 191 on Charter/Spectrum Cable in Pasco and Richland and streamed at www.pasco-wa.gov/psctvlive. Audio equipment available for the hearing impaired; contact the City Clerk for assistance. Servicio de intérprete puede estar disponible con aviso. Por favor avisa la Secretaria Municipal dos días antes para garantizar la disponibilidad. (Spanish language interpreter service may be provided upon request. Please provide two business day's notice to the City Clerk to ensure availability.) Page 2 of 63 AGENDA REPORT FOR: City Council August 6, 2025 TO: Dave Zabell, Interim City Manager City Council Workshop Meeting: 8/11/25 FROM: Griselda Garcia, Interim Director Finance SUBJECT: Carryover Funds for Capital Projects from 2023-2024 Biennium (5 minute staff presentation) I. ATTACHMENT(S): Capital Projects with Proposed Budgets II. ACTION REQUESTED OF COUNCIL / STAFF RECOMMENDATIONS: Discussion III. FISCAL IMPACT: Various Funds - $65,644,749 IV. HISTORY AND FACTS BRIEF: Budget carry forward/carryover for capital projects is a business standard adopted by a majority of organizations. This process accommodates project schedules crossing budget periods and schedule delays. Prior to 2021 the City of Pasco had not adopted such a process, resulting in staff expending significant time to make estimates for the year during the budgeting process and resulting in inaccurate budget authorizations when such basis of estimates changed. During 2021-2022 Biennial Budget preparation, staff recommended a change in the budgeting process to allow for the carryover budgeting for capital projects. Operational budgets will continue to be authorized during the biennial budgeting process and any changes to the budget will be brought to Council as such needs are identified. The carryover process has been in practice since its implementation in 2021. Staff uses a project accounting module in the financial system that allows for the tracking of the project budgets in a more effective and centralized manner. Page 3 of 63 V. DISCUSSION: Staff has prepared a carryover budget adjustment request to Council, which is attached. The carryover requests are calculated with not just an authorized budget at the time of its approval, but new information provided by various departments. Staff has reduced the budget where necessary and appropriate; however, any request to increase budget will be routed to Council as such needs are identified. The total value of capital project expenses is $41.2M; however, due to governmental accounting standards and internal funding sources, $24.7M is reflected as an expense in the fund that is funding the project. Of the $41.2M of project budget requested for carryover, $30.7M is funded through existing bond funds for capital project purposes and $1.8M is funded by grants. Further, $227K related to equipment replacement capital is a result of timing as the vehicles were ordered in 2024 but received in 2025 due to unforeseen supply chain delays. As a result, budget authorization is needed for the 2025-2026 biennium. The attached report will provide further details on individual projects. Page 4 of 63 CIP Category Project Requested Carryover into 2025 - 2026 Budget Funding Source Parks & Rec Specialty Kitchen 126,800 ARPA Parks & Rec Softball Complex Updates 170,100 Capital Improvement Fund - REET Parks & Rec Road 80/84 Park 424,100 Park Development Fund Parks & Rec Road 80/84 Park 100,000 Unsecured Grant Parks & Rec Cemetery Estate Fence/Wall 350,000 General Fund Parks & Rec City Hall Remodel/Updates (Fire panel, paint, elevators, HVAC) 800,000 2023 Bond xfer from General Fund Parks & Rec City Hall Refurb Phase 2 (recreation and planning) 160,000 General Fund Parks & Rec Gesa Stadium MLB Required Improvements 160,200 Stadium Fund Parks & Rec Multimodal Door Replacement 70,000 Multimodal Fund Parks & Rec Mobile Stage 131,200 General Fund 2,492,400 Buildings & Facilities Police HQ Generator 119,867 General Fund Building & Facilities Kennel Purchases - Animal Control Facility 566,500 2023 Bond xfer from General Fund Building & Facilities Kennel Purchases - Animal Control Facility 44,100 DSNCOR Building & Facilities Kennel Purchases - Animal Control Facility 44,100 DNSCOK 774,567 Roadway Court St /Rd 68 Intersection Improvements 159,000 GSFEDDOT Roadway Court St /Rd 68 Intersection Improvements 881,800 TIB Roadway Broadmoor Tax Incr Fin Project 579,000 TIF Bond xfer from General Fund Roadwork Road 108 Sandifur Parkway Extension 14,689,000 TIF Bond xfer from General Fund Roadwork Burns Rd/Broadmoor Blvd Intersection Improvements 886,000 TIF Bond xfer from General Fund Roadwork Sandifur Pkwy/Broadmoor Blvd Intersection Improvements 5,500,000 TIF Bond xfer from General Fund Roadwork Sylvester Street Safety Improvements 478,000 GSFEDDOT Roadwork Sylvester Street Safety Improvements 97,700 GSWADOT Roadwork Oregon Avenue Overlay 15,000 GSFEDDOT 23,285,500 Water Transmission Main - WPWTP to Zone 3 1,236,800 Water Rates Water WP WTP Expansion (Phase 2) 151,700 Water Expansion Restricted Cash Water Broadmoor Burns Intersection 22,500 2023 Bonds - TIF Area Water Sandifur Pkwy/Broadmoor Intersection 85,000 2023 Bonds - TIF Area Water Sandifur Pkwy Road 108 extension 327,700 2023 Bonds - TIF Area Water Water line work at Sylvester Street Storm Project 22 396 250,000 2023 Bonds - TIF Area Water Permanganate Dosing at Butterfield WTP 19,640 2023 Bonds - TIF Area Water Reservoir Storage Tank Zone 3 4,973,475 Water Expansion Restricted Cash Irrigation Irrigation System Expansion 1,110,000 2023 Bonds Irrigation Broadmoor Burns Intersection Improvements 148,000 2023 Bonds - TIF Area Irrigation Sandifur Parkway/Broadmoor Intersection 92,000 2023 Bonds - TIF Area Irrigation Sandifur Parkway Road 108 Extension 217,000 2023 Bonds - TIF Area Sewer Sandifur Parkway/Broadmoor Intersection 3,900 Sewer Expansion Restricted Cash Sewer Sandifur Parkway Road 108 Extension 129,000 Sewer Expansion Restricted Cash Sewer East UGA Expansion Sewer 160,000 2025 Bond PWRF PWRF Irrigation System - Farm Upgrades 4,851,500 2023 Bonds Stormwater Schlagel Park 362,000 2023 Bonds Stormwater Sylvester Stormwater 250,000 Stormwater rates 14,390,215 Equip Replc-Govt. Parks Tractors - Ordered 2024, but received/paid in 2025 72,000 Existing fund balance via contributions Equip Replc-Utilities Stormdrain Vehicle - Ordered 2024, but received/paid in 2025 97,600 Existing fund balance via contributions Equip Replc-Utilities Court Vehicle - Ordered 2024, but received/paid in 2025 57,700 Existing fund balance via contributions 227,300 41,169,982 Total Buildings & Facilities Total Equipment Replacement Grand Total Roadway Total Roadway Utilities Total Utilities Equipment Replacement Carryovers Parks & Rec Total Parks & Rec Buildings & Facilities Page 5 of 63 AGENDA REPORT FOR: City Council August 6, 2025 TO: Dave Zabell, Interim City Manager City Council Workshop Meeting: 8/11/25 FROM: Maria Serra, Director Public Works SUBJECT: 2 Resolutions - Change Order No. 11 Process Water Reuse Facility Phase 2 Construction Contract with Tapani & RH2 Engineering PSA Amendment 7 (5 minute staff presentation) I. ATTACHMENT(S): Resolution - PWRF Phase 2 Change Order No. 11 Exhibit A - Change Order No. 11 Resolution - PSA Amendment No. 7 RH2 - PWRF Improvements (Winter Storage) PSA (#21-039) - Amendment No. 7 Exhibit A - Amend No. 7 PWFR PH2 Presentation II. ACTION REQUESTED OF COUNCIL / STAFF RECOMMENDATIONS: Discussion III. FISCAL IMPACT: This project is funded 100% by a Department of Ecology Clean Water State Revolving Fund (CWSRF) low-interest loan. This report includes two items, with total fiscal impact of $323,385.01. They are as follows: a. Proposed Construction Contract Change Order No. 11 with Tapani, Inc. for PWRF Phase 2 $85,531.01 Engineer's Construction Estimate $45,488,837.00 Awarded Construction Contract Amount $31,588,246.92 Previously Approved Change Orders No. 1-10 $1,431,338.81 Proposed Change Order No. 11 $85,531.01 New Contract Amount $33,105,116.74 Page 6 of 63 b. Proposed Amendment No. 7 to Professional Services Agreement (PSA) with RH2 for PWRF Phase 2: $237,854.00 Summary: Original PSA $422,542.00 Amendment No. 1 $267,625.00 Amendment No. 2 $9,038.00 Amendment No. 3 $111,584.00 Amendment No. 4 $1,364,811.00 Amendment No. 5 $1,357,001.00 Amendment No. 6 $0.00 Proposed Amendment No. 7 $237,854.00 New PSA Total $3,770,455.00 IV. HISTORY AND FACTS BRIEF: Storage 2 Phase (PWRF) Winter Reuse Water Process The Facility Improvements project began with the City of Pasco entering into a Professional Services Agreement (PSA) with RH2 Engineering, Inc. in August 2021 to design 200 million gallons of winter storage ponds. The scope later expanded to over 300 million gallons to accommodate existing processors' future growth, prompting multiple contract amendments for environmental permitting, land acquisition, agencies. regulatory state and federal coordination and with Amendments 1 through 6 addressed needs ranging from NEPA compliance to dam safety requirements, and extended construction support through 2025. The project is being fully funded through a State Revolving Fund (SRF) low- interest loan administered by the Washington State Department of Ecology and authorized under Resolution No. 4425. As a Designated Equivalency Project (DEP), it is subject to federal requirements for labor documentation, reporting, and complexity project to of adding verification, payroll contractor layers oversight and coordination. The construction contract was awarded to Tapani, Inc. on September 11, 2023, with work now approximately 98% complete. Change Order No. 11 with Tapani, conditions during discovered field to proposed is Inc address construction. This includes removal of 620 feet of abandoned PVC pipe, added corrosion protection features, a new lift station control panel for integration with existing installations power for conduit and the at components facility communication to control gates. These changes improve system functionality and durability while aligning with Ecology’s regulatory requirements. The total cost of Change Order No. 11 is $85,531.01 (including tax), tracked on a Time and Materials (T&M) basis. The proposed Amendment No. 7 to RH2 Professional services agreement Page 7 of 63 includes additional construction administration, onsite inspections, and expanded coordination responsibilities to ensure regulatory compliance. It also provides additional operations drilling and for support engineering well coordination with Burnham accommodating the PRRC startup timeline. With Amendment 7 is proposed as not to exceed $237,854.00. Prior amendments to the PSA (1 through 6) addressed various evolving project needs. These included added environmental permitting for land acquisition (Amendment 1), preparation of an Environmental Site Assessment required by the US Bureau of Reclamation (Amendment 2), additional permitting to comply with federal funding and NEPA requirements for an expanded disposal site (Amendment 3), and engineering services to address Dam Safety regulations and coordination with other ongoing construction phases (Amendment 4). Amendments 5 and 6 provided for extended construction support services, contract 6 Amendment with regulatory and administration, compliance, extending RH2's services through the end of 2025 without a change in scope or cost. Both the proposed amendment and change order can be accommodated within the existing project budget. V. DISCUSSION: City Staff has reviewed and negotiated these items. Staff recommends approval of CO No. 11 to the construction contract with Tapani, Inc. in the amount of $85,531.01 for the PWRF - Phase 2 Winter Storage Improvements project. City Staff recommends approval of Amendment No. 7 to the PSA with RH2 Engineering for the PWRF Pretreatment Improvements Phase 2 project in the amount of $237,854.00. Page 8 of 63 Resolution – PWRF PH 2 Project CO No. 11 - 1 RESOLUTION NO. ______ A RESOLUTION OF THE CITY OF PASCO, WASHINGTON, AUTHORIZING THE INTERIM CITY MANAGER TO EXECUTE CHANGE ORDER NO. 11 WITH TAPANI, INC., FOR THE PROCESS WATER REUSE FACILITY PHASE 2 WINTER STORAGE IMPROVEMENTS PROJECT. WHEREAS, the City of Pasco (City) and Tapani, Inc., entered into a Construction Contract on September 11, 2023, for construction of the Process Water Reuse Facility (PWRF) Phase 2 Improvements; and WHEREAS, previously approved Change Orders No. 1, 4, 7, 8 and 10 were under the authority provided to the City Manager and Public Works Director; and WHEREAS, previously approved Change Orders No. 2, 3, 5, 6 and 9 were under the authority provided to the City Manager via Council adoption of Resolution Nos. 4433, 4441, 4493, 4561, and 4598 respectively; and WHEREAS, the $85,531.01 amount of Change Order No. 11 added to the cumulative sum of previously approved Change Orders exceeds the City Manager’s authority, and thus determined to obtain Council approval; and WHEREAS, the City Council of the City of Pasco, Washington, has after due consideration, determined that it is in the best interest of the City to enter into Change Order (CO) No. 11 with Tapani, Inc. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO, WASHINGTON: That the City Council of the City of Pasco approves the terms and conditions of CO No. 11 between the City of Pasco and Tapani, Inc., as attached hereto and incorporated herein as Exhibit A. Be It Further Resolved, that the Interim City Manager of the City of Pasco, Washington is hereby authorized to execute said CO No. 11 on behalf of the City of Pasco. Be It Further Resolved, that this Resolution shall take effect immediately. Page 9 of 63 Resolution – PWRF PH 2 Project CO No. 11 - 2 PASSED by the City Council of the City of Pasco, Washington, on this ___ day of _____, 2025. _____________________________ Pete Serrano Mayor ATTEST: APPROVED AS TO FORM: _____________________________ ___________________________ Debra Barham, CMC Kerr Ferguson Law, PLLC City Clerk City Attorneys Page 10 of 63 Page 11 of 63 Page 12 of 63 Date:1/15/2025 Project Name:PWRF Phase 2 Contract # Job #242001 C.O. #CPR TBD Description: Pipe Removal in 123 MG Lagoon Embankment. Hours Rate Hours Rate Foreman 6 77.60$ 116.41$ HRS 465.63$ Backhoe (45,000 Gw & Under) 8 75.74$ 113.61$ HRS 605.92$ Backhoe (45,000 Gw To 110,000 Gw) 6 76.09$ 114.14$ HRS 456.56$ Loader Operator (front-end & Overhead, 4 Yds. Incl. 8 Yds.) 7 76.09$ 114.14$ HRS 532.65$ Pipelayer 12 67.35$ 101.03$ HRS 808.25$ Labor Sub Total 2,869.01$ Labor Overhead & Profit 15%430.35$ Sick Leave 0%-$ Labor Total 3,299.36$ Equipment #Equipment Description Units Rate Unit Total 5040187 Crew Truck 6 47.37$ HRS 284.22$ 1101149 Caterpillar 303.5E2 CR Excavator 8 62.49$ HRS 499.92$ 1145181 Caterpillar 349F Excavator 6 242.78$ HRS 1,456.68$ 1530055 Caterpillar 938M Loader 7 78.16$ HRS 547.12$ Equipment Sub Total 2,787.94$ Equipment Overhead & Profit 15%418.19$ Equipment Total 3,206.13$ Unit Rate Quantity Unit Total -$ -$ -$ -$ -$ Material Sub Total -$ Material Overhead & Profit 15%-$ Material Total -$ Unit Rate Quantity Unit Total -$ -$ -$ -$ Sub Contractors Sub Total -$ Subcontractor Overhead & Profit 15%-$ Subcontractor Total -$ Unit Rate Quantity Unit Total 1,500.00$ 1 LS 1,500.00$ -$ -$ -$ Other Sub Total 1,500.00$ Other Overhead & Profit 15%225.00$ Stipulations Other Total 1,725.00$ Sub Total 8,230.49$ Accepted by:General Liability Insurance 0.0000%-$ Bond 0.0% -$ Date:Total Amount 8,230.49$ This Change increases the time to complete the project by: Day(s) This proposal is based on the usual cost elements such as labor, material, and normal markups and does not include all costs for additional changes in the sequence of work, delays, disruptions, rescheduling, extended overhead, overtime (unless specified), acceleration, and/or impact costs; and the right is expressly reserved to make claim for any and all (if any) of these related items prior to final completion of this contract. Please consider this language official "notice" as defined in subcontract and/or main contract. OTHER Description Disposal Cost - Average Rolloff Cost, No Invoice Yet MATERIAL Material Description SUBCONTRACTORS Subcontractor Description Total EQUIPMENT Class Name/Description Straight Time Overtime Unit Force Account/ Change Order Worksheet This force account covers the removal of 620' of 6" PVC in the acnhor trench of the 123 MG lagoon. LABOR Corporate Office PO Box 1900 Battle Ground, WA 98604 360.687.1148 Page 13 of 63 Page 14 of 63 Page 15 of 63 Page 16 of 63 Page 17 of 63 Page 18 of 63 Page 19 of 63 Page 20 of 63 Page 21 of 63 Page 22 of 63 Pa g e 2 3 o f 6 3 KC P JM C Ap r 2 4 , 2 0 2 5 Ap r 2 5 , 2 0 2 5 CI T Y O F P A S C O 21 - 0 2 3 6 PW R F 2 - D - S T R P 1 . D W G SHOWN S03 119 170 DWG NO.: DA T E DE S C R I P T I O N RE V I S I O N S BY RE V I E W EN G I N E E R : SA V E D A T E : RE V I E W E D : PL O T D A T E : CL I E N T : FI L E N A M E : SHEET NO.: JO B N O . : NO . 0"1"2" DRAWING IS FULL SCALE WHEN BAR MEASURES 2" SCALE: EF F L U E N T S P L I T T E R B O X CI T Y O F P A S C O PW R F P H A S E 2 : W I N T E R S T O R A G E OBLIQUE SECTION A A CL CL CL A CL 549.50' TOP OF FOUNDATION PLAN VIEW KC P JM C Ap r 2 4 , 2 0 2 5 Ap r 2 5 , 2 0 2 5 CI T Y O F P A S C O 21 - 0 2 3 6 PW R F 2 - D - S T R P 1 . D W G SHOWN S03 119 170 556.00' FINAL GRADE 1'-0" TYP. FULL PERIMETER 8'-6" 25'-0"8'-0" 4'-6" 7'-0" 4'-6" 6" TYP. FULL PERIMETER 16'-0" 7'-0" 36'-0" 1'-0" 6" 1-1 2" 3"3"10"10"10" OPENING + 6" 12" 2"6 12 2-1 2" 2-1 2" 1" 1" WEIR BLADE DETAILS 501 3'-0", TYP. 8'-0" TYP. 1'-0", TYP. 557.49' TOP OF WALL 562.00' TOP OF WALL 550.00' I.E. 550.50' I.E. (TYP OF 2) 557.70' WEIR 3A 8'-6" CL 501 CL VERTICAL BAR DETAIL 1 1 MIN LAP CO N T CO N T 48" #5 #5 #5 6"6" 1 CL6'-0" 504 505 4'-10", MIN. 502 503 301 3 3 SEE DWG NO. C111 FOR STRUCTURE CORNER POINTS 551.50' I.E. 316 SS WEIR BLADE, 1/4" THICK 1/8" 301 302 302 1 06 / 0 9 / 2 0 2 3 AD D E N D U M N O . 1 TB C KR S 10 09 / 2 8 / 2 0 2 3 CO N F O R M E D F O R C O N S T R U C T I O N EA R KR S 3'-6" 1 34 04 / 2 5 / 2 0 2 5 CH A N G E P R O P O S A L R E Q U E S T N O . 3 3 . 1 TB C KR S 4'-0" 502 INLET OUTLET, TYP. OF 3 GALV. STEEL GRATING 19-W-4 WITH 2-1/2" X 3/16" BEARING BARS (WEIGHS 17.2 PSF), 9'-0" SPANNING E-W DIRECTION, TYP. 30" SLIDE GATE, TYP. OF 2 WEIR BLADE, TYP. 30" SLIPMETER BEAM TO CONCRETE WALL CONNECTION, TYP. 6" CRUSHED SURFACING BASE COURSE. COMPACT TO FIRM AND UNYIELDING CONDITION. 1" HOLES, TYP. REMOVE BURRS 5 8" x 8" ANCHOR BOLT 5 8" CUT WASHERS 1" AIR VENT PIPE #5 @ 12" O.C., E.F., E.W., TYP. ALL WALLS U.N.O. 6" AIR VENT, TYP OF 3 CONNECTION TO ESB W8x24 GRATING SUPPORT BEAM, TYP. W8x24 GRATING SUPPORT BEAM, TYP. W8x24 GRATING SUPPORT BEAM, TYP. TOP OF FOUNDATION SLAB STD HOOKADD'L O.F. VERTS PER VERTICAL REBAR DETAIL 1 FOR NORTH AND SOUTH EXTERIOR WALLS, TYP. LADDER ACCESS, TYP. GUARDRAIL, CENTER OF WALL, TYP. TOP OF INTERIOR WALL LOWERED FOR GRATING TO RUN ACROSS TOP OF WALL, TYP. #5 @ 12" O.C., T&B LONGITUDINAL BARS VAPOR BARRIER CONNECTION TO ESB PIPE PENETRATION, TYP. EMBANKMENT FILL, 8" MAX LIFTS COMPACTED TO 95% MAX DRY DENSITY #5 @ 12" O.C., TYP. TRANSVERSE BARS #5 @ 6" O.C., BOT TRANSVERSE BARS FLOW WEIR CREST 1/8" CHAMFER ON SIDES AND CREST OF WEIR PLATE 4" WIDE NUMBERED FIBERGLASS STAFF GAUGE, CRAIN OR EQUAL, TYP. OF 2 WALL OPENING RST, TYP. CONCRETE CORNER RST, TYP. CONCRETE INTERSECTION RST, TYP. GRATING SUPPORT BEAM NOTCH GRATING AS NECESSARY TO ACOMODATE SINGLE ANODE INSTALLATION. NOTCHED AREA TO INCLUDE BANDING OF SAME MATERIAL AS GRATING, TYP. OF 4 5 8" THREADED EPOXY ANCHOR BOLT. PLACE 6" FROM OUTER EDGE, TYP. OF 4 ANODE JUNCTION BOX, MOUNT TO RAILING, TYP. OF 2 ANODE TYP. OF 8 ANODE , TYP. OF 81 1 1 4" 1" Pa g e 2 4 o f 6 3 TB C JM C Ap r 2 5 , 2 0 2 5 Ap r 2 5 , 2 0 2 5 CI T Y O F P A S C O 21 - 0 2 3 6 PW R F 2 - D - S T R P 7 . D W G SHOWN S06 122 170 DWG NO.: DA T E DE S C R I P T I O N RE V I S I O N S BY RE V I E W EN G I N E E R : SA V E D A T E : RE V I E W E D : PL O T D A T E : CL I E N T : FI L E N A M E : SHEET NO.: JO B N O . : NO . 0"1"2" DRAWING IS FULL SCALE WHEN BAR MEASURES 2" SCALE: LA G O O N O U T L E T S T R U C T U R E CI T Y O F P A S C O PW R F P H A S E 2 : W I N T E R S T O R A G E LAGOON OUTLET STRUCTURE PLAN LAGOON OUTLET STRUCTURE SECTION A A A CL 556.00' TOP OF WALL INTAKE ELEVATIONS & DIMENSIONS POND SLIPMETER OR SLIDE GATE? PIPE INVERT ELEVATION FINISHED FLOOR A B C D E WALL CONNECTION DETAIL 2'-0", TYP.A C 2'-6" 6" 2'-6" 1'-0" VARIES E 2 6" SLAB EXTENSION, TYP. TOP OF FOUNDATION VARIES 6'-10", TYP. 2'-0" FOOTING EXTENSION, TYP. ALL SIDES 1'-0" TYP, FOR ALL SLOPE INTAKE WALLS B FINISHED FLOOR SEE TABLE PIPE INVERT SEE TABLE 12'-0", TYP. D SEE CIVIL DRAWINGS FOR STRUCTURE CORNER POINTS 3 1'-0", TYP. 1 06 / 0 9 / 2 0 2 3 AD D E N D U M N O . 1 TB C KR S 2'-0" 3 06 / 2 9 / 2 0 2 3 AD D E N D U M N O . 3 TD T JM C 4 07 / 1 2 / 2 0 2 3 AD D E N D U M N O . 4 TD T JM C 10 09 / 2 8 / 2 0 2 3 CO N F O R M E D F O R C O N S T R U C T I O N EA R KR S 12 11/10/2023 CHANGE PROPOSAL REQUEST NO. 3 TBC JMC 7 7 11 11/08/2023 CHANGE PROPOSAL REQUEST NO. 1.1 KRS 42" SLIDE GATE TRASH RACK, TYP. OF 2 EMBANKMENT FILL, 8" MAX LIFTS COMPACTED TO 95% MAX DRY DENSITY Dx8" AIR VENT, SEE TABLE #5 @ 6" O.C., E.F., TYP. #5 @ 12" O.C., E.F., E.W., O.F. VERTS, TYP., ALL SLOPED WALLS (REBAR NOT SHOWN) #5 @ 6" O.C., E.F., @ ENDS OF WALL BUNDLE (2) #5 E.F., TYP. BRIDGE ABUTMENT SLIPMETER WHERE REQUIRED. SEE TABLE. SLIDEGATE WHERE REQUIRED. SEE TABLE. 6" CRUSHED SURFACING BASE COURSE. COMPACT TO FIRM AND UNYIELDING CONDITION. #5 @ 12" O.C., T&B, E.W., TYP. 6" FILLET POLYETHYLENE SHEETING, SECURE TOP EDGE WITH POND LINER BATTEN STRIP 8" WIDE FRP STAFF GAUGE FROM EMBANKMENT TO TOP OF ABUTMENT, VPC FIBERGLASS OR EQUAL, TYP OF 4 GRADE VARIES FOR 123 MG OUTLET 12"x8" END SILL ON 123 MG LAGOON OUTLET ONLY (2) #5 HORZ. BARS CENTERED IN SILL #5 @ 12" O.C. CENTERED IN SILL 12"x8" END SILL ON THE 123 MG LAGOON OUTLET ONLY 6" MIN HOOK LENGTH (2) #5 HOOKED WITH HORIZONTAL BARS IN SILL, TYP. ANODE TYP. OF 3, MOUNT ANCHOR HORIZONTAL, PERPENDICULAR TO WALL. MOUNT JUNCTION BOX TO BRIDGE HANDRAIL AT CITY APPROVED LOCATION. 34 4/25/2025 CHANGE PROPOSAL REQUEST NO. 33.1 TBC KRS 1 Pa g e 2 5 o f 6 3 KC P JM C Ap r 2 5 , 2 0 2 5 Ap r 2 5 , 2 0 2 5 CI T Y O F P A S C O 21 - 0 2 3 6 PW R F 2 - D - S T R P 2 . D W G SHOWN S07 123 170 DWG NO.: DA T E DE S C R I P T I O N RE V I S I O N S BY RE V I E W EN G I N E E R : SA V E D A T E : RE V I E W E D : PL O T D A T E : CL I E N T : FI L E N A M E : SHEET NO.: JO B N O . : NO . 0"1"2" DRAWING IS FULL SCALE WHEN BAR MEASURES 2" SCALE: DR A I N C O N T R O L B O X CL AA SECTION A 557.00' TOP OF BOX 556.00' FINAL GRADE DRAIN CONTROL BOX ELEVATIONS POND PIPE INLET INVERT PIPE OUTLET FINISHED FLOOR 4B 301 503 SEE TABLE FINISHED FLOOR SEE CIVIL DRAWINGS FOR STRUCTURE CORNER POINTS CI T Y O F P A S C O PW R F P H A S E 2 : W I N T E R S T O R A G E 302 301 1 06 / 0 9 / 2 0 2 3 AD D E N D U M N O . 1 TB C KR S 10 09 / 2 8 / 2 0 2 3 CO N F O R M E D F O R C O N S T R U C T I O N EA R KR S PLAN VIEW 12 11 / 1 0 / 2 0 2 3 CH A N G E P R O P O S A L R E Q U E S T N O . 3 TB C JC SLIPMETER ANODE MOUNTING LOCATION 3 34 04 / 2 5 / 2 0 2 5 CH A N G E P R O P O S A L R E Q U E S T N O . 3 3 . 1 TB C KR S 18'-8" 14'-8"13'-8" 14'-0" 6" TYP. FULL PERIMETER 1'-10" TYP. FULL PERIMETER 17'-8" 5'-0" 5'-0" 1'-0"1'-0" 4'-0" EMBANKMENT FILL, 8" MAX LIFTS COMPACTED TO 95% MAX DRY DENSITY 42" SLIPMETER 6" CRUSHED SURFACING BASE COURSE. COMPACT TO FIRM AND UNYIELDING CONDITION. #5 @ 6" O.C., E.F., E.W., HORZ. BARS OUTSIDE LAYER TYP., ALL WALLS 8" AIR VENT GALV. STEEL GRATING 19-W-4 WITH 2-1/2" X 3/16" BEARING BARS (WEIGHS 17.2 PSF), 9'-0" SPANNING E-W DIRECTION, TYP. #5 @ 12" O.C., T&B, E.W.VAPOR BARRIER PIPE PENETRATION, TYP. 3" CLR, TYP. 3" CLR, TYP. 3" CLR, TYP. CONCRETE CORNER RST, TYP. WALL OPENING RST, TYP. JUNCTION BOX W/ UNISTRUT SUPPORT, MOUNT TO CONCRETE 5 8" EPOXY ANCHOR BOLT. PLACE 6" FROM OUTER EDGE NOTCH GRATING AS NECESSARY TO ACCOMMODATE SINGLE ANODE INSTALLATION. NOTCHED AREA TO INCLUDE BANDING OF SAME MATERIAL AS GRATING. ANODE JUNCTION BOX DETAIL 1 JUNCTION BOX (2) #6 AWG TO SLIPMETER OR SLIDE GATE ANODE EQUAL TO GALVOTEC MODEL GA-MG-P-50C. SEE TABLE FOR ELEVATION 5 16" SS WELDED LINK CHAIN TO ANODES. ATTACH TO EPOXY ANCHOR AND ANODE WITH SS SHACKLE 5 8" THREADED EPOXY ANCHOR BOLT, EXTEND 6" MIN. FROM TOP OF WALL. ATTACH WASHER AND LOCKING NUT TO SECURE SHACKLE. (2) #6 AWG ANODE WIRE, TYP. ANODE DROP, TYP. OF 3 CABLE CLIP EYE BOLT ATTACH ANODES TO TOP BEAM BOLT SIDE COVER WITH RING TERMINAL. COVER WITH HANDY CAP IP EXOTHERMIC WELD PATCH. SLIDE GATE ANODE MOUNTING LOCATION 2 3 2 1 1 0.1 OHM, 2 AMP SHUNT, TYP. ATTACH ANODES TO TOP FRAME BOLT WITH RING TERMINAL. COVER WITH HANDY CAP IP EXOTHERMIC WELD PATCH. ANODE TYP.1 1" BUTYL MASTIC TAPE WITH POLYPROPYLENE BACKING EQUAL TO CAMO ANODE LOCATIONS AND ELEVATIONS LOCATION EQUIPMENT NUMBER OF ANODES DISTANCE FROM FLOOR TO BOTTOM OF ANODE APPROX. CHAIN LENGTHS Pa g e 2 6 o f 6 3 Page 27 of 63 Page 28 of 63 Page 29 of 63 Pa g e 3 0 o f 6 3 Page 31 of 63 Date:4/21/2025 Project Name:PWRF Phase 2 Contract # Job #242001 C.O. #CPR 34 Description: PLC Processor Modification Hours Rate Hours Rate Superintendent 2 78.78$ 118.17$ HRS 157.55$ Labor Sub Total 157.55$ Labor Overhead & Profit 15%23.63$ Sick Leave 0%-$ Labor Total 181.19$ Equipment #Equipment Description Units Rate Unit Total 5040187 Crew Truck 2 47.37$ HRS 94.74$ Equipment Sub Total 94.74$ Equipment Overhead & Profit 15%14.21$ Equipment Total 108.95$ Unit Rate Quantity Unit Total -$ -$ -$ -$ -$ Material Sub Total -$ Material Overhead & Profit 15%-$ Material Total -$ Unit Rate Quantity Unit Total 12,801.76$ 1 LS 12,801.76$ -$ -$ -$ Sub Contractors Sub Total 12,801.76$ Subcontractor Overhead & Profit 15%1,920.26$ Subcontractor Total 14,722.02$ Unit Rate Quantity Unit Total -$ -$ -$ -$ Other Sub Total -$ Other Overhead & Profit 15%-$ Stipulations Other Total -$ Sub Total 15,012.16$ Accepted by:General Liability Insurance 0.0000% Bond 0.0% Date:Total Amount 15,012.16$ This Change increases the time to complete the project by: Day(s) Force Account/ Change Order Worksheet Description See the attached CPR. This proposal is not protected from tariff price increases. Material Description LABOR EQUIPMENT MATERIAL OTHER Straight Time This proposal is based on the usual cost elements such as labor, material, and normal markups and does not include all costs for additional changes in the sequence of work, delays, disruptions, rescheduling, extended overhead, overtime (unless specified), acceleration, and/or impact costs; and the right is expressly reserved to make claim for any and all (if any) of these related items prior to final completion of this contract. Please consider this language official "notice" as defined in subcontract and/or main contract. Overtime Class Name/Description Unit Total SUBCONTRACTORS Subcontractor Description Silverline Corporate Office PO Box 1900 Battle Ground, WA 98604 360.687.1148 Page 32 of 63 ESTIMATE 39709324 ESTIMATE DATE Apr 18, 2025 J O B A D D R E S S PWRF - Process Water Reuse Facility 957 East Foster Wells Road Pasco, WA 99301 USA Job: E S T I M A T E D E T A I L S CPR - 34 Change CPU: Per CPR-34, providing (2) 1769-L33ER, updating project documents. CO PROPOSAL IS NOT PROTECTED FROM TARIFF PRICE INCREASES SUB-TOTAL $12,801.76 1100 - FRANKLIN COUNTY 8.1%$0.00 TOTAL $12,801.76 Thank you for choosing Silverline Electric! CUSTOMER AUTHORIZATION I have the authority to order the above work and do so order as outlined above. It is agreed that the seller will retain title to any equipment or material furnished until final and complete payment is made, and if settlement is not made as agreed, the seller shall have the right to remove same and the seller will be held harmless for any damages resulting from the removal thereof. In the event of non-payment of any amounts due, the undersigned agrees to pay reasonable interest on all delinquent monies owed and in the event of collection agrees to pay all costs of collection including attorney fees. The Service Provider is not responsible for any cosmetic, equipment or structural damage resulting from the repair or diagnosis of the problem. Silverline Electric LLC 4121 W Clearwater Ave Kennewick, WA 99336 BILL TO Tapani Inc. 1904 Southeast 6th Place # PO Box 1900 Battle Ground, WA 98604 USA Sign here Date Estimate #39709324 Page 1 of 1Page 33 of 63 SILVERLINE BILLING BREAKDOWN FORM Customer Name:Date:4/18/2025 Billing Address: Job Description: QUANTITY UNIT PRICE TOTAL 2 $4,245.00 $8,490.00 1 $75.00 $75.00 2 $141.00 $282.00 2 $131.00 $262.00 2 $123.00 $246.00 10 $111.00 $1,110.00 486 $0.90 $437.40 $10,902.40 15%$12,537.76 $264.00 SUBTOTAL $12,801.76 TAX TOTAL Added Taurus cost 1769-L33ER CPUs (1 will be a spare) Shipping CAD updates Clerical (O&M, ordering) Mobilization Mileage ADMIN MATERIAL TOTAL W/ MARK UP PWRF - CPR 34 MATERIALS USED Engineering review: LABOR MATERIAL MATERIAL SUBTOTAL Page 34 of 63 TJ W CC A Ap r 1 5 , 2 0 2 5 Ap r 1 5 , 2 0 2 5 CI T Y O F P A S C O 21 - 0 2 3 6 PW R F 2 - D - E 1 3 . D W G SHOWN E26 156 170 DWG NO.: DA T E DE S C R I P T I O N RE V I S I O N S BY RE V I E W EN G I N E E R : SA V E D A T E : RE V I E W E D : PL O T D A T E : CL I E N T : FI L E N A M E : SHEET NO.: JO B N O . : NO . 0"1"2" DRAWING IS FULL SCALE WHEN BAR MEASURES 2" SCALE: LI F T S T A T I O N P O W E R L A Y O U T CI T Y O F P A S C O PW R F P H A S E 2 : W I N T E R S T O R A G E LIFT STATION CONTROL PANEL POWER LAYOUT VFD RJ45 ETHERNET SWITCH RJ45 RJ45 RJ45 RJ45 RJ45 RJ45 RJ45RJ45 FIBER FIBER RJ45RJ45 CO M P A C T L O G I X 5 3 7 0 L 3 MO D E L N O . 1 7 6 9 - L 3 3 E R 16 P T D I G I T A L I N P U T M O D U L E MO D E L N O . 1 7 6 9 - I Q 1 6 8 P T R E L A Y O U T P U T M O D U L E MO D E L N O . 1 7 6 9 - O W 8 4 P T A N A L O G I N P U T M O D U L E MO D E L N O . 1 7 6 9 - I F 4 I VFD RJ45 L4 4CB 120P 20A 1CB GND PROTECTOR LINE SURGEL N 120N 24VDC POWER SUPPLY 8CB L N N2 120 VAC 1PH 60HZ 20A 3CB L3 DOOR SWITCH LIGHT L2 12V BATTERY 24P 24N L1 N1 L2 N2 2CB BATTERY DC OUT DC IN UPS 24 VDC BATTERY DC OUT DC IN FIBER SWITCH PANELVIEW CB BAT AC POWER FAIL N3 N4 PLC 9CB 24P1 24VDC TO 24VDC POWER SUPPLY DC OUT DC IN DC OUT DC IN PANEL RECEPTACLE L8 N8 10CB 11CB 12CB DC POWER FAIL 24P3 24P5 15CB 24P4 PLC DISCRETE INPUTS PLC DISCRETE OUTPUTS 14CB PLC ANALOG INPUTS 16CB 24P7 SPARE 13CB CB PF SPARE 7CB L7 N7 N5L5 5CB EXTERIOR LIGHT 6CB L6 N6 DPF CR LIFT STATION CONTROL PANEL COMMUNICATIONS LAYOUT BACKUP FLOAT CIRCUIT RE M O T E I / O P O W E R S U P P L Y MO D E L N O . 1 7 6 9 - P A 4 10 09 / 2 8 / 2 0 2 3 CO N F O R M E D F O R C O N S T R U C T I O N EA R KR S 35 35 04 / 1 5 / 2 0 2 5 CH A N G E P R O P O S A L R E Q U E S T N O . 3 4 TJ W CC A Pa g e 3 5 o f 6 3 Page 36 of 63 Date:5/19/2025 Project Name:PWRF Phase 2 Contract # Job #242001 C.O. #CPR 35 Description: PRRC and Lagoon Gate Controls Hours Rate Hours Rate Superintendent 5 78.78$ 118.17$ HRS 393.89$ Labor Sub Total 393.89$ Labor Overhead & Profit 15%59.08$ Sick Leave 0%-$ Labor Total 452.97$ Equipment #Equipment Description Units Rate Unit Total 5040187 Crew Truck 5 47.37$ HRS 236.85$ Equipment Sub Total 236.85$ Equipment Overhead & Profit 15%35.53$ Equipment Total 272.38$ Unit Rate Quantity Unit Total -$ -$ -$ -$ -$ Material Sub Total -$ Material Overhead & Profit 15%-$ Material Total -$ Unit Rate Quantity Unit Total 15,311.19$ 1 LS 15,311.19$ -$ -$ -$ Sub Contractors Sub Total 15,311.19$ Subcontractor Overhead & Profit 15%2,296.68$ Subcontractor Total 17,607.87$ Unit Rate Quantity Unit Total 1,000.00$ 1 LS 1,000.00$ -$ -$ -$ Other Sub Total 1,000.00$ Other Overhead & Profit 15%150.00$ Stipulations Other Total 1,150.00$ Sub Total 19,483.22$ Accepted by:General Liability Insurance 0.0000% Bond 0.0% Date:Total Amount 19,483.22$ This Change increases the time to complete the project by: Day(s) Force Account/ Change Order Worksheet Description See the attached CPR. This proposal is not protected from tariff price increases. Material Description LABOR EQUIPMENT MATERIAL OTHER Straight Time Core Drilling This proposal is based on the usual cost elements such as labor, material, and normal markups and does not include all costs for additional changes in the sequence of work, delays, disruptions, rescheduling, extended overhead, overtime (unless specified), acceleration, and/or impact costs; and the right is expressly reserved to make claim for any and all (if any) of these related items prior to final completion of this contract. Please consider this language official "notice" as defined in subcontract and/or main contract. Overtime Class Name/Description Unit Total SUBCONTRACTORS Subcontractor Description Silverline Corporate Office PO Box 1900 Battle Ground, WA 98604 360.687.1148 Page 37 of 63 ESTIMATE 39891714 ESTIMATE DATE May 07, 2025 J O B A D D R E S S PWRF - Process Water Reuse Facility 957 East Foster Wells Road Pasco, WA 99301 USA Job: E S T I M A T E D E T A I L S CPR 35: -Added (2) additional 15 Amp breakers to switchboard. Power will be provided to the PRRC 30" and Lagoon 48" Gates. -Added power and communication from inside the IPS building to each gate. Conduit should be routed on the IPS building where it does not block the stairs or become a hazard. -Added communication to the PRRC 30” and Lagoon 48” Gates. SUB-TOTAL $15,311.19 1100 - FRANKLIN COUNTY 8.1%$0.00 TOTAL $15,311.19 EST. FINANCING $164.44 Thank you for choosing Silverline Electric! CUSTOMER AUTHORIZATION I have the authority to order the above work and do so order as outlined above. It is agreed that the seller will retain title to any equipment or material furnished until final and complete payment is made, and if settlement is not made as agreed, the seller shall have the right to remove same and the seller will be held harmless for any damages resulting from the removal thereof. In the event of non-payment of any amounts due, the undersigned agrees to pay reasonable interest on all delinquent monies owed and in the event of collection agrees to pay all costs of collection including attorney fees. The Service Provider is not responsible for any cosmetic, equipment or structural damage resulting from the repair or diagnosis of the problem. Silverline Electric LLC 4121 W Clearwater Ave Kennewick, WA 99336 BILL TO Tapani Inc. 1904 Southeast 6th Place # PO Box 1900 Battle Ground, WA 98604 USA Sign here Date Estimate #39891714 Page 1 of 1 * The 15 amp breakers and mounting hardware needed to install them has a 10-12 week lead time. Page 38 of 63 SILVERLINE BILLING FORM Customer Name:Date:7-May Billing Address: Job Description: QUANTITY UNIT PRICE TOTAL 140 $2.57 $359.80 6 $8.69 $52.14 2 $151.00 $302.00 1500 $0.23 $345.00 16 $2.31 $36.96 4 $3.57 $14.28 10 $3.11 $31.10 40 $3.21 $128.40 12 $1.30 $15.60 140 $4.08 $571.20 6 $13.58 $81.48 1000 $0.12 $120.00 16 $3.52 $56.32 4 $5.50 $22.00 10 $4.62 $46.20 12 $1.80 $21.60 1 $6,350.00 $6,350.00 $8,554.08 $9,837.19 40 $5,474.00 SUBTOTAL $15,311.19 TAX TOTAL ft of deep slotted strut 3/4 straps w/ clasp back (cast Iron 1 hole) ft of 1" rigid 1" rigid 90's PERMIT FEE TOTAL HRS MATERIAL TOTAL W/ MARK UP CPR35 Tapani Inc MATERIALS USED 3/4" rigid 3/4 rigid 90's 6x6x4 NVENT/HOFFMAN BOX #12 thhn feet of 3/4 LFMC 3/4 LFMC straight connectors 3/4 rigid couplings 1" rigid couplings 1" rigid straps with clasp back (cast Iron 1 hole) Platt quote for 2 Eaton 15 amp 3 pole 480V breakers with mounting hardware ft of cat5 600v rated ft of 1" LFMC 1" LFMC straight connectors MATERIAL SUBTOTAL Page 39 of 63 Description: Irrigation Pump Station II Quote #2559638 Updated On: 05/07/2025 Company Name: Silverline Electric LLC Billing Address: Silverline Electric LLC (146616) 4121 W Clearwater Ave Kennewick, WA 99336-2629 Created Date: 5/7/25 Shipping Address: 4121 W Clearwater Ave Kennewick, WA 99336-2629 USA Shipping Method: Direct FOB: Factory Sales Person: Rob Roberts III rob.roberts@platt.com Branch: Kennewick #6 5097837451 PRODUCTS QTY UNT PR / UOM TOTALS Entire Quote: Sub Total:$6,350.00 S/H:Not Included Other Charges:$0.00 Tax:$0.00 Total:$6,350.00 Prices are subject to change at any time prior to shipment unless agreed to otherwise in writing signed by an authorized Seller representative. Orders related to this quotation must be received, accepted and released by Seller within 48 hours of issuance of the quotation and are subject to availability. Seller reserves the right to pass through any changes in delivery date, price, scope and quantity of supply arising from actions of Seller's manufacturing partners or vendors and/or resulting from any Force Majeure event including any imposition of new or additional tariffs that occurs after the issuance of the quotation. Delivery dates are estimated only. Seller shall not be liable for failure to meet such dates resulting from product shortages or manufacturing delays. Be advised that Seller considers any changes imposed by its manufacturing partners and other vendors or government agencies outside of Seller's reasonable control and therefore subject to Force Majeure provisions or similar common law doctrines such as "frustration" or "impossibility". 1. PRL4 Retrofit Kit 1 $6,350.00 EA $6,350.00 Products Type Mfr Qty Per below BOM (1) PRL4 Retrofit Kit Number: KPRL4FDC3015TXX Circuit breaker, FDC, 15A/15A X Space Required: 3 PRL4 Retrofit Kit - Existing Panel width is 36(in) (1) F Frame 3 Pole Connector Kit (2) 15A 3P FDC Breakers (1) 6X Blank Filler Cover ( 36-44IN Wide Box ) *** allow 8-10 weeks to ship *** FOB Factory 000 Page 40 of 63 TJ W CC A Ap r 2 2 , 2 0 2 5 Ap r 2 2 , 2 0 2 5 CI T Y O F P A S C O 21 - 0 2 3 6 PW R F 2 - D - E 0 2 . D W G SHOWN E04 134 170 DWG NO.: DA T E DE S C R I P T I O N RE V I S I O N S BY RE V I E W EN G I N E E R : SA V E D A T E : RE V I E W E D : PL O T D A T E : CL I E N T : FI L E N A M E : SHEET NO.: JO B N O . : NO . 0"1"2" DRAWING IS FULL SCALE WHEN BAR MEASURES 2" SCALE: EL E C T R I C A L O N E - L I N E S O U T H CI T Y O F P A S C O PW R F P H A S E 2 : W I N T E R S T O R A G E 6.25A X 1.25 = 7.81 AMPS 3.00A X 1.00 = 3.00 AMPS 3.00A X 1.00 = 3.00 AMPS 6.25A X 1.00 = 6.25 AMPS 2.00A X 1.00 = 2.00 AMPS 6.00A X 1.00 = 6.00 AMPS IPS SPLITTER BOX CONTROL TRANSFORMER (3kVA) IPS SPLITTER BOX CONTROL GATE MOTOR 1 IPS SPLITTER BOX CONTROL GATE MOTOR 2 123 MG DRAIN CONTROL TRANSFORMER (3kVA) PRRC 30" GATE LAGOON 48" GATE LOAD CALCULATIONS TOTAL 28.06 AMPS 123 MG DRAIN CONTROL PANEL, 480V, 3Ø, 4W 20/3 TM 480/277 - VOLT EXISTING TRANSFORMER M EXISTING IRRIGATION PUMP STATION BUILDING, 480V, 3Ø, 4W 20/3 TM 20/3 TM IPS SPLITTER BOX CONTROL PANEL, 480V, 3Ø, 4W20/3 TM 15/3 TM 1.5 HP 20/2 TM 480V 3KVA, 1Ø, 3W 240/120V GATE MOTOR 1 GND BUS NEUTRAL 20/2 TM 480V 3KVA, 1Ø, 3W 240/120V ONE-LINE DIAGRAM 1. CONTRACTOR TO MODIFY EXISTING EATON PLR-C SWITCHBOARD FOR ADDITION OF (4) PROPOSED CIRCUIT BREAKERS. EXISTING SWITCHBOARD IS G.O. NO SKW1072479. 2. SEE DWG NO. E15 FOR CONDUIT AND CONDUCTOR SCHEDULE. 3. SEE DWG NO. E15 FOR ELECTRICAL EQUIPMENT SCHEDULE. ELECTRICAL NOTES 20/1 TM LI G H T PL C 20/1 TM 20/1 TM LI G H T RE M O T E I / O 20/1 TM EXISTING UTILITY METER 15/3 TM 1.5 HP GATE MOTOR 2 SL I P M E T E R 20/1 TM 1 1 1 10 09 / 2 8 / 2 0 2 3 CO N F O R M E D F O R C O N S T R U C T I O N EA R KR S 15/3 TM 1 0.5 HP PRRC 30" 3.2 HP LAGOON 48" 36 36 36 15/3 TM 1 36 36 04 / 2 3 / 2 0 2 5 CH A N G E P R O P O S A L R E Q U E S T N O . 3 5 TJ W CC A 36 36 36 Pa g e 4 1 o f 6 3 J A1 A1 P F F P TJ W CC A Ap r 2 2 , 2 0 2 5 Ap r 2 2 , 2 0 2 5 CI T Y O F P A S C O 21 - 0 2 3 6 PW R F 2 - D - E 1 6 . D W G SHOWN E06 136 170 DWG NO.: DA T E DE S C R I P T I O N RE V I S I O N S BY RE V I E W EN G I N E E R : SA V E D A T E : RE V I E W E D : PL O T D A T E : CL I E N T : FI L E N A M E : SHEET NO.: JO B N O . : NO . 0"1"2" DRAWING IS FULL SCALE WHEN BAR MEASURES 2" SCALE: EL E C T R I C A L S I T E S O U T H CI T Y O F P A S C O PW R F P H A S E 2 : W I N T E R S T O R A G E IRRIGATION PUMP STATION IPS SPLITTER BOX PANEL PLAN 1. SEE DWG NO. E05 FOR HANDHOLE SCHEDULE 2. CONTRACTOR TO TERMINATE TO EXISTING FIBER ENCLOSURE IN BUILDING. SEE COMMUNICATION OVERVIEW FOR DETAILS. 3. CONTRACTOR TO TERMINATE TO EXISTING SWITCHBOARD. SEE ONE-LINE FOR DETAILS. 4. TERMINATE AUTOMATED GATE CIRCUIT TO EXISTING LIGHTING PANEL IN EXISTING MOTOR CONTROL CENTER 'MCC' UTILIZING EXISTING SPARE 30/2 CIRCUIT BREAKER. IF GATE REQUIRES CIRCUIT OF LESS AMPERAGE, CONTRACTOR TO ADJUST CONDUCTORS AND REPLACE CIRCUIT BREAKER. 5. CONTRACTOR TO COORDINATE WITH FRANKLIN COUNTY PUD FOR UTILITY CONNECTION TO EXISTING POWER POLE. 6. CONTRACTOR TO TERMINATE TO EXISTING IPS CONTROL PANEL ETHERNET SWITCH. 7. THIS PLAN IS DIAGRAMMATIC AND INTENDED TO SHOW APPROXIMATE LOCATION OF ELECTRICAL ITEMS. NOT ALL ELECTRICAL, MECHANICAL, STRUCTURAL OR OTHER ELEMENTS SHOWN. 8. SEE DWG NO. E12 FOR LIGHTING SCHEDULE. 9. SEE DWG NO. E15 FOR CONDUIT AND CONDUCTOR SCHEDULE. 10. SEE DWG NO. E15 FOR ELECTRICAL EQUIPMENT SCHEDULE. ELECTRICAL NOTES A# 1 HH-V6POWER IPS SPLITTER BOX CONTROL PANEL CONTINUES TO EFFLUENT SPLITTER BOX PANEL PLAN, DWG NO. E07 123 MG DRAIN CONTROL PANEL10021002 1 HH-POWER MASTER KEYPAD LOCATION 218 AUTOMATIC GATE OPERATOR, INSTALL PER MANUFACTURER INSTRUCTIONS CONDUIT AND CONDUCTORS PER MANUFACTURER REQUIREMENTS FOR KEYPAD, MINIMUM 3/4" WITH (6) - #22 CONDUCTORS. AUTOMATIC GATE WIRING SCHEMATIC ELECTRICAL VAULT CONNECTION PLAN 1 EXISTING ELECTRICAL VAULT 2 4 3 2 3 4 AUTOMATIC SLIDING GATE OPERATOR MASTER ACCESS KEYPAD PANEL WSDOT TYPE 1 JUNCTION BOX PHOTO EYE SENSOR MOUNTED ON GATE POST SLAVE ACCESS KEYPAD PANEL NOTE: PROVIDE GROUNDING CONNECTIONS, CONDUITS, AND CONDUCTORS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. SLAVE KEYPAD LOCATION HH-FIBER1 HH-FIBER 1 CONTINUES TO HAND HOLE AT PRRC SITE, SEE DWG NO. E05 EXISTING FIBER HAND HOLE 5 5 SLIPMETER CONTROL PANEL MOUNTED ON BRACKET 10 09 / 2 8 / 2 0 2 3 CO N F O R M E D F O R C O N S T R U C T I O N EA R KR S 36 04 / 2 3 / 2 0 2 5 CH A N G E P R O P O S A L R E Q U E S T N O . 3 5 TJ W CC A 18 03 / 2 0 / 2 0 2 4 CH A N G E P R O P O S A L R E Q U E S T N O . 1 2 TJ W CC A 36 36 36 636 Pa g e 4 2 o f 6 3 TJ W CC A Ap r 2 2 , 2 0 2 5 Ap r 2 2 , 2 0 2 5 CI T Y O F P A S C O 21 - 0 2 3 6 PW R F 2 - D - E 0 7 . D W G SHOWN E15 145 170 DWG NO.: DA T E DE S C R I P T I O N RE V I S I O N S BY RE V I E W EN G I N E E R : SA V E D A T E : RE V I E W E D : PL O T D A T E : CL I E N T : FI L E N A M E : SHEET NO.: JO B N O . : NO . 0"1"2" DRAWING IS FULL SCALE WHEN BAR MEASURES 2" SCALE: EL E C T R I C A L S C H E D U L E S CI T Y O F P A S C O PW R F P H A S E 2 : W I N T E R S T O R A G E POWER CONDUIT AND CONDUCTOR SCHEDULE INSTRUMENTATION CONDUIT AND CONDUCTOR SCHEDULE CIRCUIT SOURCE DESTINATION TRADE SIZE (QUANTITY) CONDUCTORS NOTES C001 EFFLUENT SPLITTER BOX PANEL EFFLUENT SPLITTER BOX HIGH FLOAT SWITCH 1"MANUFACTURER CABLE C002 LAGOON CONTROL PANEL LAGOON CONTROL HIGH FLOAT SWITCH 1"MANUFACTURER CABLE C003 LAGOON CONTROL PANEL DRY WELL FLOOD SWITCH 3/4"(2) - #14, (1) #14 GND C004 120 MG LAGOON DRAIN CONTROL PANEL DRY WELL FLOOD SWITCH 3/4"(2) - #14, (1) #14 GND C005 120 MG LAGOON DRAIN CONTROL PANEL 120 MG LAGOON DRAIN CONTROL HIGH FLOAT SWITCH 1"MANUFACTURER CABLE C006 120 MG LAGOON DRAIN CONTROL PANEL 120 MG LAGOON DRAIN CONTROL STRUCTURE HIGH FLOAT SWITCH 1"MANUFACTURER CABLE C007 IPS SPLITTER BOX CONTROL PANEL IPS SPLITTER BOX CONTROL HIGH FLOAT SWITCH 1"MANUFACTURER CABLE C008 LIFT STATION PUMP CONTROL PANEL DRY WELL FLOOD SWITCH 3/4"(2) - #14, (1) #14 GND C009 LIFT STATION PUMP CONTROL PANEL LIFT STATION LOW FLOAT SWITCH 1"MANUFACTURER CABLE C010 LIFT STATION PUMP CONTROL PANEL LIFT STATION HIGH FLOAT SWITCH 1"MANUFACTURER CABLE C011 106 MG LAGOON DRAIN CONTROL PANEL 106 MG LAGOON DRAIN CONTROL HIGH FLOAT SWITCH 1"MANUFACTURER CABLE C012 106 MG LAGOON DRAIN CONTROL PANEL 106 MG LAGOON DRAIN CONTROL STRUCTURE HIGH FLOAT SWITCH 1"MANUFACTURER CABLE C013 103 MG LAGOON DRAIN CONTROL PANEL 103 MG LAGOON DRAIN CONTROL HIGH FLOAT SWITCH 1"MANUFACTURER CABLE C014 103 MG LAGOON DRAIN CONTROL PANEL 103 MG LAGOON DRAIN CONTROL STRUCTURE HIGH FLOAT SWITCH 1"MANUFACTURER CABLE C015 123 MG LAGOON DRAIN CONTROL PANEL 123 MG LAGOON DRAIN CONTROL STRUCTURE HIGH FLOAT SWITCH 1"MANUFACTURER CABLE C016 103 MG LAGOON DRAIN CONTROL PANEL DRY WELL FLOOD SWITCH 3/4"(2) - #14, (1) #14 GND C017 IPS BUILDING MAIN CONTROL PANEL PH METER CONTROLLER N/A (2) - #12, (1) #12 GND, (1) - 2-CONDUCTOR SHIELDED CABLE USE 1" EXISTING CONDUIT CONTROL CONDUIT AND CONDUCTOR SCHEDULE CIRCUIT SOURCE DESTINATION TRADE SIZE (QUANTITY) CONDUCTORS NOTES J001 IRRIGATION PUMP STATION IPS SPLITTER BOX CONTROL PANEL 2"FIBER J002 IPS SPLITTER BOX CONTROL PANEL 123 MG LAGOON DRAIN CONTROL PANEL 2"FIBER J003 123 MG LAGOON DRAIN CONTROL PANEL EFFLUENT SPLITTER BOX CONTROL PANEL 2"FIBER J004 EFFLUENT SPLITTER BOX CONTROL PANEL FIBER HAND HOLE 2"FIBER J005 FIBER HAND HOLE LAGOON CONTROL PANEL 2"FIBER J006 FIBER HAND HOLE 103 MG LAGOON DRAIN CONTROL PANEL 2"FIBER J007 103 MG LAGOON DRAIN CONTROL PANEL VALVE VAULT CONTROL PANEL 2"FIBER J008 VALVE VAULT CONTROL PANEL 103 MG LAGOON FILL CONTROL PANEL 2"FIBER J009 103 MG LAGOON FILL CONTROL PANEL LIFT STATION CONTROL PANEL 2"FIBER J010 LIFT STATION CONTROL PANEL 106 MG LAGOON DRAIN CONTROL PANEL 2"FIBER J011 LIFT STATION CONTROL PANEL 106 MG LAGOON FILL CONTROL PANEL 2"FIBER J012 106 MG LAGOON FILL CONTROL PANEL 120 MG LAGOON DRAIN CONTROL PANEL 2"FIBER J013 IPS SPLITTER BOX CONTROL PANEL IPS SPLITTER BOX CONTROL LEVEL TRANSDUCER 1"MANUFACTURER CABLE J014 IPS SPLITTER BOX CONTROL PANEL IPS SPLITTER BOX CONTROL JUNCTION BOX 1"(2) CAT 5E ETHERNET CABLES J015 IPS SPLITTER BOX CONTROL JUNCTION BOX IPS SPLITTER BOX CONTROL GATE 1 1"(1) CAT 5E ETHERNET CABLE J016 IPS SPLITTER BOX CONTROL JUNCTION BOX IPS SPLITTER BOX CONTROL GATE 2 1"(1) CAT 5E ETHERNET CABLE J017 123 MG LAGOON DRAIN CONTROL PANEL 123 MG LAGOON DRAIN CONTROL STRUCTURE LEVEL TRANSDUCER 1"MANUFACTURER CABLE J018 123 MG LAGOON DRAIN CONTROL PANEL 123 MG LAGOON DRAIN SLIPMETER CONTROL 1"(1) CAT 5E ETHERNET CABLE J019 EFFLUENT SPLITTER BOX CONTROL PANEL EFFLUENT SPLITTER BOX CONTROL LEVEL TRANSDUCER 1"MANUFACTURER CABLE J020 EFFLUENT SPLITTER BOX CONTROL PANEL EFFLUENT SPLITTER BOX CONTROL JUNCTION BOX 1"(3) CAT 5E ETHERNET CABLES J021 EFFLUENT SPLITTER BOX CONTROL JUNCTION BOX EFFLUENT SPLITTER BOX CONTROL GATE 1 1"(1) CAT 5E ETHERNET CABLE J022 EFFLUENT SPLITTER BOX CONTROL JUNCTION BOX EFFLUENT SPLITTER BOX SLIPMETER PEDESTAL 1"(1) CAT 5E ETHERNET CABLE J023 LAGOON CONTROL PANEL LAGOON CONTROL LEVEL TRANSDUCER 1"MANUFACTURER CABLE J024 LAGOON CONTROL PANEL LAGOON CONTROL JUNCTION BOX 1"(5) CAT 5E ETHERNET CABLES J025 LAGOON CONTROL JUNCTION BOX LAGOON CONTROL GATE 1 1"(1) CAT 5E ETHERNET CABLE J026 LAGOON CONTROL JUNCTION BOX LAGOON CONTROL GATE 2 1"(1) CAT 5E ETHERNET CABLE J027 LAGOON CONTROL JUNCTION BOX LAGOON CONTROL GATE 3 1"(1) CAT 5E ETHERNET CABLE J028 LAGOON CONTROL JUNCTION BOX LAGOON CONTROL GATE 4 1"(1) CAT 5E ETHERNET CABLE J029 LAGOON CONTROL JUNCTION BOX LAGOON CONTROL GATE 5 1"(1) CAT 5E ETHERNET CABLE J030 103 MG LAGOON DRAIN CONTROL PANEL 103 MG LAGOON DRAIN CONTROL LEVEL TRANSDUCER 1"MANUFACTURER CABLE J031 103 MG LAGOON DRAIN CONTROL PANEL 103 MG LAGOON DRAIN CONTROL STRUCTURE LEVEL TRANSDUCER 1"MANUFACTURER CABLE J032 103 MG LAGOON DRAIN CONTROL PANEL 103 MG LAGOON DRAIN SLIPMETER PEDESTAL 1"(1) CAT 5E ETHERNET CABLE J033 103 MG LAGOON DRAIN CONTROL PANEL 103 MG LAGOON DRAIN CONTROL GATE 1 1"(1) CAT 5E ETHERNET CABLE J034 LIFT STATION PUMP CONTROL PANEL LIFT STATION RADAR LEVEL TRANSDUCER 1"MANUFACTURER CABLE J035 LIFT STATION PUMP CONTROL PANEL LIFT STATION PRESSURE TRANSMITTER 1"(1) 2-CONDUCTOR SHIELDED CABLE J036 106 MG LAGOON DRAIN CONTROL PANEL 106 MG LAGOON DRAIN CONTROL LEVEL TRANSDUCER 1"MANUFACTURER CABLE J037 106 MG LAGOON DRAIN CONTROL PANEL 106 MG LAGOON DRAIN CONTROL STRUCTURE LEVEL TRANSDUCER 1"MANUFACTURER CABLE J038 106 MG LAGOON DRAIN CONTROL PANEL 106 MG LAGOON DRAIN SLIPMETER PEDESTAL 1"(1) CAT 5E ETHERNET CABLE J039 106 MG LAGOON DRAIN CONTROL PANEL 106 MG LAGOON DRAIN CONTROL GATE 1 1"(1) CAT 5E ETHERNET CABLE J040 106 MG LAGOON FILL CONTROL PANEL 106 MG LAGOON FILL CONTROL FLOW METER 1"(1) CAT 5E ETHERNET CABLE, (2) #12, (1) #12 GND J041 106 MG LAGOON FILL CONTROL PANEL 106 MG LAGOON FILL CONTROL VALVE 1"(1) CAT 5E ETHERNET CABLE J042 120 MG LAGOON DRAIN CONTROL PANEL 120 MG LAGOON DRAIN CONTROL LEVEL TRANSDUCER 1"MANUFACTURER CABLE J043 120 MG LAGOON DRAIN CONTROL PANEL 120 MG LAGOON DRAIN CONTROL STRUCTURE LEVEL TRANSDUCER 1"MANUFACTURER CABLE J044 120 MG LAGOON DRAIN CONTROL PANEL 120 MG LAGOON DRAIN SLIPMETER PEDESTAL 1"(1) CAT 5E ETHERNET CABLE J045 120 MG LAGOON DRAIN CONTROL PANEL 120 MG LAGOON DRAIN CONTROL GATE 1 1"(1) CAT 5E ETHERNET CABLE J046 103 MG LAGOON FILL CONTROL PANEL 103 MG LAGOON FILL CONTROL FLOW METER 1"(1) CAT 5E ETHERNET CABLE, (2) #12, (1) #12 GND J047 103 MG LAGOON FILL CONTROL PANEL 103 MG LAGOON FILL CONTROL VALVE 1"(1) CAT 5E ETHERNET CABLE J048 VAULT CONTROL PANEL VAULT FLOW METER 1"(1) CAT 5E ETHERNET CABLE, (2) #12, (1) #12 GND J049 VAULT CONTROL PANEL VAULT VALVE 1"(1) CAT 5E ETHERNET CABLE J050 EXISTING FIBER HAND HOLE FIBER HANDHOLE 2"FIBER J051 EFFLUENT SPLITTER BOX CONTROL JUNCTION BOX EFFLUENT SPLITTER BOX CONTROL GATE 2 1"(1) CAT 5E ETHERNET CABLE J052 103 MG LAGOON DRAIN CONTROL PANEL DARIGOLD DAR-FIT-01 FLOW METER 1"(1) CAT 5E ETHERNET CABLE, (2) #12, (1) #12 GND J053 103 MG LAGOON DRAIN CONTROL PANEL DARIGOLD DAR-FCV-01 VALVE 1"(1) CAT 5E ETHERNET CABLE J054 PH METER CONTROLLER EXISTING FLOW METER VAULT JUNCTION BOX 3/4"(1) - 2-CONDUCTOR SHIELDED CABLE J055 EXISTING FLOW METER VAULT JUNCTION BOX PH METER 3/4"(1) - MANUFACTURER'S CABLE J056 IRRIGATION PUMP STATION CONTROL PANEL PRRC 30" GATE 1"(1) CAT 5E ETHERNET CABLE J057 IRRIGATION PUMP STATION CONTROL PANEL LAGOON 48" GATE 1"(1) CAT 5E ETHERNET CABLE CIRCUIT SOURCE DESTINATION TRADE SIZE (QUANTITY) CONDUCTORS NOTES P101 ELECTRICAL VAULT PAD-MOUNTED TRANSFORMER 4"PULL CORD P102 PAD-MOUNTED TRANSFORMER UTILITY METER 3"(3) - #3/0, (1) - #3/0 N P103 UTILITY METER DISTRIBUTION PANEL 3"(3) - #3/0, (1) - #3/0 N P104 DISTRIBUTION PANEL EFFLUENT SPLITTER BOX PANEL 3/4"(3) - #12, (1) - #12 N, (1) #12 GND P105 EFFLUENT SPLITTER BOX PANEL EFFLUENT SPLITTER BOX GATE 1 3/4"(3) - #12, (1) #12 GND P106 EFFLUENT SPLITTER BOX PANEL EFFLUENT SPLITTER BOX LIGHT 3/4"(2) - #12, (1) #12 GND P107 EFFLUENT SPLITTER BOX PANEL EFFLUENT SPLITTER SLIPMETER PEDESTAL 3/4"(2) - #12, (1) #12 GND P108 DISTRIBUTION PANEL POWER HAND HOLE 2"(3) - #8, (1) - #8 N, (1) #10 GND, (3) - #8, (1) - #8 N, (1) #8 GND CONTAINS CIRCUITS P109 AND P116 P109 POWER HAND HOLE LAGOON CONTROL PANEL 3/4"(3) - #8, (1) - #8 N, (1) #10 GND P110 LAGOON CONTROL PANEL LAGOON GATE 1 3/4"(3) - #12, (1) #12 GND P111 LAGOON CONTROL PANEL LAGOON GATE 2 3/4"(3) - #12, (1) #12 GND P112 LAGOON CONTROL PANEL LAGOON GATE 3 3/4"(3) - #12, (1) #12 GND P113 LAGOON CONTROL PANEL LAGOON GATE 4 3/4"(3) - #12, (1) #12 GND P114 LAGOON CONTROL PANEL LAGOON GATE 5 3/4"(3) - #12, (1) #12 GND P115 LAGOON CONTROL PANEL LAGOON CONTROL LIGHT 3/4"(2) - #12, (1) #12 GND P116 POWER HAND HOLE 103 MG LAGOON DRAIN CONTROL PANEL 2"(3) - #8, (1) - #8 N, (1) #8 GND P117 103 MG LAGOON DRAIN CONTROL PANEL 103 MG LAGOON DRAIN CONTROL GATE 1 3/4"(3) - #12, (1) #12 GND P118 103 MG LAGOON DRAIN CONTROL PANEL 103 MG LAGOON DRAIN CONTROL LIGHT 3/4"(2) - #12, (1) #12 GND P119 103 MG LAGOON DRAIN CONTROL PANEL 103 MG LAGOON DRAIN SLIPMETER PEDESTAL 3/4"(2) - #12, (1) #12 GND P120 IRRIGATION PUMP STATION POWER HAND HOLE 3/4"(6) - #12, (2) - #12 N, (2) #12 GND P121 POWER HAND HOLE IPS SPLITTER BOX CONTROL PANEL 3/4"(3) - #12, (1) #12 N, (1) #12 GND P122 IPS SPLITTER BOX CONTROL PANEL IPS SPLITTER BOX CONTROL GATE 1 3/4"(3) - #12, (1) #12 GND P123 IPS SPLITTER BOX CONTROL PANEL IPS SPLITTER BOX CONTROL GATE 2 3/4"(3) - #12, (1) #12 GND P124 IPS SPLITTER BOX CONTROL PANEL IPS SPLITTER BOX CONTROL LIGHT 3/4"(2) - #12, (1) #12 GND P125 POWER HAND HOLE 123 MG LAGOON DRAIN CONTROL PANEL 3/4"(3) - #12, (1) #12 N, (1) #12 GND P126 123 MG LAGOON DRAIN CONTROL PANEL 123 MG LAGOON DRAIN CONTROL LIGHT 3/4"(2) - #12, (1) #12 GND P127 123 MG LAGOON DRAIN CONTROL PANEL 123 MG LAGOON DRAIN SLIPMETER CONTROL 3/4"(2) - #12, (1) #12 GND P128 EXISTING IPS LIGHTING PANEL AUTOMATED GATE OPERATOR 1"(2) - #10, (1) #10 GND P129 EFFLUENT SPLITTER SLIPMETER PEDESTAL EFFLUENT SPLITTER BOX SLIPMETER 2"MANUFACTURER'S CABLES P130 103 MG LAGOON DRAIN SLIPMETER PEDESTAL 103 MG LAGOON DRAIN SLIPMETER 2"MANUFACTURER'S CABLES P131 123 MG LAGOON DRAIN SLIPMETER CONTROL 123 MG LAGOON DRAIN SLIPMETER 2"MANUFACTURER'S CABLES P132 EFFLUENT SPLITTER BOX PANEL EFFLUENT SPLITTER BOX GATE 2 3/4"(3) - #12, (1) #12 GND P133 103 MG LAGOON DRAIN CONTROL PANEL DARIGOLD DAR-FCV-01 VALVE 3/4"(3) - #12, (1) #12 GND P134 IRRIGATION PUMP STATION PRRC 30" GATE 3/4"(3) - #12, (1) #12 GND P135 IRRIGATION PUMP STATION LAGOON 48" GATE 3/4"(3) - #12, (1) #12 GND P001 EXISTING ELECTRICAL VAULT V-8.2 ELECTRICAL VAULT 6"PULL CORD P002 PAD-MOUNTED TRANSFORMER UTILITY METER 3"(3) - #3/0, (1) - #3/0 N P003 UTILITY METER DISTRIBUTION PANEL 3"(3) - #3/0, (1) - #3/0 N P004 DISTRIBUTION PANEL 106 MG LAGOON DRAIN CONTROL PANEL 3/4"(3) - #12, (1) - #12 N, (1) #12 GND P005 106 MG LAGOON DRAIN CONTROL PANEL 106 MG LAGOON DRAIN CONTROL GATE 1 3/4"(3) - #12, (1) #12 GND P006 106 MG LAGOON DRAIN CONTROL PANEL 106 MG LAGOON DRAIN CONTROL LIGHT 3/4"(2) - #12, (1) #12 GND P007 106 MG LAGOON DRAIN CONTROL PANEL 106 MG LAGOON DRAIN SLIPMETER PEDESTAL 3/4"(2) - #12, (1) #12 GND P008 DISTRIBUTION PANEL LIFT STATION PUMP CONTROL PANEL 2"(3) - #1/0, (1) - #1/0 N, (1) #6 GND P009 LIFT STATION PUMP CONTROL PANEL LIFT STATION PUMP 1 1"(3) - #6, (1) #8 GND P010 LIFT STATION PUMP CONTROL PANEL LIFT STATION PUMP 2 1"(3) - #6, (1) #8 GND P011 LIFT STATION PUMP CONTROL PANEL LIFT STATION PUMP CONTROL LIGHT 3/4"(2) - #12, (1) #12 GND P012 DISTRIBUTION PANEL POWER HAND HOLE 3/4"(6) - #12, (2) - #12 N, (2) #12 GND P013 POWER HAND HOLE 106 MG LAGOON FILL CONTROL PANEL 3/4"(3) - #12, (1) - #12 N, (1) #12 GND P014 106 MG LAGOON FILL CONTROL PANEL 106 MG LAGOON FILL CONTROL LIGHT 3/4"(2) - #12, (1) #12 GND P015 POWER HAND HOLE 120 MG LAGOON DRAIN CONTROL PANEL 2"(3) - #6, (1) - #6 N, (1) #6 GND P016 120 MG LAGOON DRAIN CONTROL PANEL 120 MG LAGOON DRAIN CONTROL GATE 1 3/4"(3) - #12, (1) #12 GND P017 120 MG LAGOON DRAIN CONTROL PANEL 120 MG LAGOON DRAIN CONTROL LIGHT 3/4"(2) - #12, (1) #12 GND P018 120 MG LAGOON DRAIN CONTROL PANEL 120 MG LAGOON DRAIN SLIPMETER PEDESTAL 3/4"(2) - #12, (1) #12 GND P019 DISTRIBUTION PANEL POWER HAND HOLE 1 1/4"(6) - #12, (2) - #12 N, (2) #12 GND P020 POWER HAND HOLE 103 MG LAGOON FILL CONTROL PANEL 3/4"(3) - #12, (1) - #12 N, (1) #12 GND P021 103 MG LAGOON FILL CONTROL PANEL 103 MG LAGOON FILL CONTROL LIGHT 3/4"(2) - #12, (1) #12 GND P022 POWER HAND HOLE VALVE VAULT PANEL 3/4"(3) - #12, (1) - #12 N, (1) #12 GND P023 VALVE VAULT PANEL VALVE VAULT LIGHT 3/4"(2) - #12, (1) #12 GND P024 LAGOON CONTROL PANEL DRY WELL FUTURE PUMP 2"PULL CORD CAP CONDUIT INSIDE DRY WELL P025 120 MG LAGOON DRAIN CONTROL PANEL DRY WELL FUTURE PUMP 2"PULL CORD CAP CONDUIT INSIDE DRY WELL P026 LIFT STATION PUMP CONTROL PANEL DRY WELL FUTURE PUMP 2"PULL CORD CAP CONDUIT INSIDE DRY WELL P027 103 MG LAGOON DRAIN CONTROL PANEL DRY WELL FUTURE PUMP 2"PULL CORD CAP CONDUIT INSIDE DRY WELL P028 ELECTRICAL VAULT PAD-MOUNTED TRANSFORMER 4"PULL CORD P029 106 MG LAGOON DRAIN SLIPMETER PEDESTAL 106 MG LAGOON DRAIN SLIPMETER 2"MANUFACTURER'S CABLES P030 120 MG LAGOON DRAIN SLIPMETER PEDESTAL 120 MG LAGOON DRAIN SLIPMETER 2"MANUFACTURER'S CABLES P031 106 MG LAGOON FILL CONTROL PANEL 106 MG LAGOON FILL CONTROL VALVE 3/4"(3) - #12, (1) #12 GND P032 103 MG LAGOON FILL CONTROL PANEL 103 MG LAGOON FILL CONTROL VALVE 3/4"(3) - #12, (1) #12 GND P033 VALVE VAULT PANEL VALVE VAULT CONTROL VALVE 3/4"(3) - #12, (1) #12 GND P034 V-8.2 ELECTRICAL VAULT ELECTRICAL VAULT 4"PULL CORD 3 06 / 2 9 / 2 0 2 3 AD D E N D U M N O . 3 TJ W CC A 10 09 / 2 8 / 2 0 2 3 CO N F O R M E D F O R C O N S T R U C T I O N EA R KR S ITEM DESCRIPTION MANUFACTURER MODEL NO. A DISTRIBUTION PANEL 480Y/277V VAC 3ɸ, NEMA 3R, SEE ONE LINE FOR REQUIRED CURRENT RATINGS EATON PRL4B OR EQUAL B RADAR LEVEL TRANSDUCER SEE SPECS SEE SPECS C LIQUID LEVEL TRANSDUCER SEE SPECS SEE SPECS D FLOAT SWITCH SEE SPECS SEE SPECS E PRESSURE TRANSDUCER SEE SPECS SEE SPECS F TEMPERATURE TRANSMITTER SEE SPECS SEE SPECS G PH SENSOR CONTROLLER, 24V DC POWER, MULTI-PARAMETER PROMINENT DULCOMETER DACB H PH SENSOR, 5 METER CABLE PROMINENT REV M2 INDUSTRIAL CPVC BODY PH SENSOR, MODEL 7760769 ELECTRICAL EQUIPMENT AND INSTRUMENTATION SCHEDULE 14 01 / 0 8 / 2 0 2 4 CH A N G E P R O P O S A L R E Q U E S T N O . 6 TJ W CC A 18 03 / 2 0 / 2 0 2 4 CH A N G E P R O P O S A L R E Q U E S T N O . 1 2 TJ W CC A 25 08/07/2024 CHANGE PROPOSAL REQUEST NO. 20 TJW CCA 26 10/17/2024 CHANGE PROPOSAL REQUEST NO. 21.1 TJW CCA 30 02/06/2025 CHANGE PROPOSAL REQUEST NO. 28 TJW CCA 36 36 36 36 36 04/23/2025 CHANGE PROPOSAL REQUEST NO. 35 TJW CCA Pa g e 4 3 o f 6 3 TJ W CC A Ap r 2 2 , 2 0 2 5 Ap r 2 2 , 2 0 2 5 CI T Y O F P A S C O 21 - 0 2 3 6 PW R F 2 - D - E 0 9 . D W G SHOWN E17 147 170 DWG NO.: DA T E DE S C R I P T I O N RE V I S I O N S BY RE V I E W EN G I N E E R : SA V E D A T E : RE V I E W E D : PL O T D A T E : CL I E N T : FI L E N A M E : SHEET NO.: JO B N O . : NO . 0"1"2" DRAWING IS FULL SCALE WHEN BAR MEASURES 2" SCALE: CO M M U N I C A T I O N O V E R V I E W CI T Y O F P A S C O PW R F P H A S E 2 : W I N T E R S T O R A G E COMMUNICATION OVERVIEW 1. PROVIDE SFP MODULE FOR INSTALLATION INTO EXISTING CISCO SWITCH. 2. PROVIDE 100' PATCH CABLE FOR INSTALLATION BETWEEN TERMINATION LOCATION AND EXISTING SWITCH. 3. CONTRACTOR TO TERMINATE TO EXISTING FIBER COMMUNICATION PANEL. 4. FIBER TERMINATION, TYP. PROVIDE MINIMUM TERMINATION SHOWN PLUS 2 SPARE PER LOCATION. 5. CONTRACTOR SHALL PROVIDE ALL MATERIALS FOR A COMPLETE SYSTEM. ALL FIBER, SWITCHES, SFP MODULES, TERMINATION PANELS, CONNECTORS, AND PATCH CABLES SHALL MATCH IN TYPE AND STYLE. 6. NOT ALL CONNECTIONS AND DETAILS SHOWN. SEE CONTROL PANEL DRAWINGS FOR COMPLETE PANEL, COMMUNICATION, POWER, AND I/O DETAILS. ELECTRICAL NOTES 1 2 3 4 IRRIGATION PUMP STATION BUILDING IPS SPLITTER BOX CONTROL PANEL GATE 1 GATE 2 PANELVIEW PLC EFFLUENT SPLITTER BOX CONTROL PANEL GATE 1 GATE 2 SLIPMETER PANELVIEW LAGOON CONTROL PANEL PANELVIEW PLC GATE 1 GATE 2 GATE 3 GATE 4 GATE 5 LIFT STATION CONTROL PANEL PANELVIEW PLC GATE 1 103 MG LAGOON DRAIN CONTROL PANEL SLIPMETER GATE PLC 106 MG LAGOON DRAIN CONTROL PANEL SLIPMETER GATE PLC 103 MG LAGOON FILL CONTROL PANEL FLOW METER PLC 120 MG LAGOON DRAIN CONTROL PANEL SLIPMETER GATE PLC VALVE VAULT CONTROL PANEL FLOW METER PLC 123 MG LAGOON DRAIN CONTROL PANEL SLIPMETER PLC 4 106 MG LAGOON FILL CONTROL PANEL FLOW METER PLC 10 09 / 2 8 / 2 0 2 3 CO N F O R M E D F O R C O N S T R U C T I O N EA R KR S VALVE VALVEVALVE 14 01 / 0 8 / 2 0 2 4 CH A N G E P R O P O S A L R E Q U E S T N O . 6 TJ W CC A 1 2 3 PLC 25 08 / 0 7 / 2 0 2 4 CH A N G E P R O P O S A L R E Q U E S T N O . 2 0 TJ W CC A DARIGOLD DAR-FIT-01 FLOW METER 26 10 / 1 7 / 2 0 2 4 CH A N G E P R O P O S A L R E Q U E S T N O . 2 1 . 1 TJ W CC A DARIGOLD DAR-FCV-01 VALVE PRRC 30" GATE LAGOON 48" GATE 36 36 04/23/2025 CHANGE PROPOSAL REQUEST NO. 35 TJW CCA Pa g e 4 4 o f 6 3 Resolution – PWRF PH 2 Project PSA Amend 7 - 1 RESOLUTION NO. _________ A RESOLUTION OF THE CITY OF PASCO, WASHINGTON. AUTHORIZING THE CITY MANAGER TO EXECUTE AMENDMENT NO. 7 FOR THE PROFESSIONAL SERVICES AGREEMENT WITH RH2 ENGINEERING, INC. FOR THE PROCESS WATER REUSE FACILITY (PWRF) PRETREATMENT IMPROVEMENT PHASE 2: WINTER STORAGE. WHEREAS, the City of Pasco (City) and RH2 Engineering, Inc., entered into a Professional Service Agreement on August 10, 2021, to provide Engineering services with respect to the PWRF Improvements project; and WHEREAS, the City and RH2 Engineering, Inc., entered into Amendment No. 1 on May 9, 2022, to add additional professional engineering (design) services for additional winter storage; and WHEREAS, the City and RH2 Engineering, Inc., entered into Amendment No. 2 on July 12, 2022, to add additional professional engineering services for the acquisition of additional land from the United States Bureau of Reclamation (USBR); and WHEREAS, the City and RH2 Engineering, Inc., entered into Amendment No. 3 on August 26, 2022, to add additional services for cultural and environmental field work and associated reporting for an additional 160-acre parcel owned by the USBR, and additional permitting support to facilitate the acquisition process being administered by the USBR to meet funding requirements; and WHEREAS, the City and RH2 Engineering, Inc., entered into Amendment No. 4 on January 6, 2023, to add additional professional engineering services for supporting the future operations of the facility by interconnecting ponds, coordinating work between the m ultiple ongoing phases of the project at the PWRF site; and WHEREAS, the City and RH2 Engineering, Inc., entered into Amendment No. 5 on January 18, 2024, to allow RH2 Engineering, Inc., to provide additional professional engineering services during construction including construction contract administration, project management duties in compliance with Federal regulations of the Clean Water State Revolving Fund (CWSRF) loan; and WHEREAS, the City and RH2 Engineering, Inc., entered into Amendment No. 6 on December 16, 2024, to extend the PSA contract with RH2 Engineering, Inc., to December 31, 2025, with no change in Scope and Fee; and WHEREAS, the City Council of the City of Pasco, Washington, has after due consideration, determined that it is in the best interest of the City to enter into Amendment No. 7 with RH2 Engineering, Inc. Page 45 of 63 Resolution – PWRF PH 2 Project PSA Amend 7 - 2 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO, WASHINGTON: That the City Council of the City of Pasco approves the terms and conditions of Amendment No. 7 between the City of Pasco and RH2 Engineering as attached hereto and incorporated herein as Exhibit A. Be It Further Resolved, that the City Manager of the City of Pasco, Washington, is hereby authorized, empowered, and directed to execute said Amendment No. 7 on behalf of the City of Pasco; and to make minor substantive changes as necessary to execute this Amendment. Be It Further Resolved, that this Resolution shall take effect immediately. PASSED by the City Council of the City of Pasco, Washington, on this ___ day of _____, 2025. _____________________________ Pete Serrano Mayor ATTEST: APPROVED AS TO FORM: _____________________________ ___________________________ Debra Barham, CMC Kerr Ferguson Law, PLLC City Clerk City Attorneys Page 46 of 63 RH2 Engineering – Amendment No. 21039-7 to PSA Process Water Reuse Facility Pretreatment Improvements – Phase 2: Winter Storage Project N0. 21298 Page 1 AMENDMENT NUMBER 7 to PROFESSIONAL SERVICES AGREEMENT Process Water Reuse Facility Pretreatment Improvements – Phase 2: Winter Storage PROJECT: 21298 AGREEMENT NO. 21-039 WHEREAS, the City and RH2 Engineering, Inc. entered into a Professional Services Agreement on 8/10/2021 to provide engineering services with respect to the Process Water Reuse Facility (PWRF) Pretreatment Improvements – Phase 2: Winter Storage project. WHEREAS, the City and RH2 Engineering, Inc. entered into Amendment No. 1 to provide additional engineering services on 5/19/2022. WHEREAS, the City and RH2 Engineering, Inc. entered into Amendment No. 2 to provide additional engineering services and add permitting services on 7/12/2022. WHEREAS, the City and RH2 Engineering, Inc. entered into Amendment No. 3 to provide additional engineering services on 8/26/2022. WHEREAS, the City and RH2 Engineering, Inc. entered into Amendment No. 4 to provide additional engineering services on 1/6/2023. WHEREAS, the City and RH2 Engineering, Inc. entered into Amendment No. 5 to provide additional engineering services and add construction related services on 1/18/2024. WHEREAS, the City and RH2 Engineering, Inc. entered into Amendment No. 6 to allow for additional time of performance services on 12/16/2024. NOW, THEREFORE, this agreement is amended to allow RH2 Engineering, Inc. to provide additional engineering services, additional construction related services. 1. Scope of Work: See Exhibit A. 2. Fee: The compensation for the additional work is based on a Time & Materials Basis of $237,854.00, increasing the overall total authorization amount to $3,770,455.00. For further detail please see Exhibit B. 3. Time of performance: The services shall be complete for the project on or before 12/31/2025. DATED THIS DAY______________________________. [date of execution] CITY OF PASCO, WASHINGTON RH2 ENGINEERING, INC. Dave Zabell Dan Mahlum, PE Interim City Manager Principal Page 47 of 63 1 7/11/2025 9:47:45 AM J:\Data\PSC\21-0236\00 Contract\A-7\Amend No. 7_SOW_PWRF PH 2 SDC.docx Scope of Work Amendment No. 7 City of Pasco Process Water Reuse Facility Improvements Winter Storage July 2025 Background The City of Pasco (City) has requested that RH2 Engineering, Inc., (RH2) perform additional tasks beyond the original scope of work for services during construction (SDC). The tasks include coordinating with the City and contractor for the installation of monitoring wells, coordinating with the City and Cascade Natural Gas Corporation (CNGC) on the installation of a gas line to the Pasco Resource Recovery Center (PRRC), designing power to automated slide gates on the Irrigation Pump Station (IPS), and preparing easement documents for the Process Water Reuse Facility (PWRF) and PRRC. This Scope of Work also includes additional effort to coordinate with Burnham RNG, LLC, (Burnham) for the PWRF and PRRC. Task 8 – Services During Construction (Regular) Objective: Provide additional coordination as requested by the City during SDC. These subtasks are additive to Contract Amendment No. 5, Task 8. Approach: Review and comment on proposals from Valley Science and Engineering, Inc., for the drilling of the groundwater monitoring wells. Coordinate with the City and the Washington State Department of Ecology (Ecology) to identify ways to implement the monitoring well drilling task with available funding. Coordinate utility installation with purveyors, including CNGC, during construction. Provide the design for extending power from the IPS electrical room to the automated slide gates on the wet well. Provide AutoCAD drawings to MGS Pasco, Inc., (MGS) for the creation of recordable PWRF/PRRC easement drawings related to the CNGC pipeline and Franklin Public Utility District (FPUD) power easements. Provide programming and integration services for the controls installed during construction. Programming will include programmable logic controllers (PLCs), operator interface screens (OIS), and the computer-based supervisory control and data acquisition (SCADA) system. It is assumed the programming will be based on standard programming developed for the City by RH2’s subsidiary, Control Systems NW LLC. Integrate the programming of the upgrades with existing City systems, including connecting the existing Historian system to the SCADA system EXHIBIT A Page 48 of 63 City of Pasco Exhibit A – Scope of Work PWRF Improvements – Winter Storage Amendment No. 7 2 7/11/2025 9:47:45 AM J:\Data\PSC\21-0236\00 Contract\A-7\Amend No. 7_SOW_PWRF PH 2 SDC.docx programmed as part of this project. It is assumed that the City will purchase all licensing and hardware needed for the SCADA portion directly from the vendor. Assumptions: •All deliverables will be provided in electronic format (PDF). Provided by the City: •Legal review and recording of the easement documents prepared by MGS. •SCADA licensing and hardware. RH2 Deliverables: •A change proposal request for extending power to the automated slide gates on the IPS wet well. •Linework for easement documents to be prepared by MGS for recording by Franklin County. •Programmed and integrated PLCs, OIS, and SCADA system. Task 11 – Additional Burnham Coordination Objective: Work with the City and Burnham on various issues related to the startup of PRRC. Provide additional SDC efforts for PWRF Phase 2 related to the delayed startup at PRRC. These subtasks are additive to Amendment No. 4, Task 11. Approach: Provide additional coordination with Burnham and the City during PRRC startup Provide additional PWRF Phase 2 SDC efforts related to the delayed PRRC startup. Assumptions: • • All deliverables will be provided in electronic format (PDF). •Construction on the 123 million gallon (MG) outlet structure will begin prior to July 11, 2025. •Ecology’s Dam Safety Office will not require Shannon & Wilson, Inc. or Hydrogeophysics, Inc. as subconsultants for construction observation during the 123 MG lagoon embankment reconstruction. RH2 Deliverables: •Attendance at on-site and virtual meetings. •Additional on-site observation and administrative work (progress meetings, pay requests, certified payroll processing, Ecology coordination, etc.) caused by the delayed PRRC startup. Schedule •RH2 is prepared to begin the project immediately after authorization from the City. Page 49 of 63 EXHIBIT B Fee Estimate Amendment No. 7 City of Pasco Process Water Reuse Facility Improvements Winter Storage Jul-25 Description Total Hours Total RH2 Labor Total Hours Total CSNW Labor Total ALL Labor Total Subconsultant Total Expense Total Cost Task 8 Services During Construction (Regular)102 27,210$ 352 73,342$ 100,552$ 3,220$ 3,067$ 106,839$ Task 11 Additional Burnham Coordination 530 119,358$ --$ 119,358$ 5,750$ 5,907$ 131,015$ PROJECT TOTAL 632 146,568$ 352 73,342$ 219,910$ 8,970$ 8,974$ 237,854$ J:\Data\PSC\21-0236\00 Contract\A-7\Amend No. 7_FEE_PWRF PH 2 SDC 7/10/2025 11:05 AMPage 50 of 63 RATE LIST RATE UNIT Professional I $175 $/hr Professional II $191 $/hr Professional III $213 $/hr Professional IV $234 $/hr Professional V $249 $/hr Professional VI $269 $/hr Professional VII $294 $/hr Professional VIII $317 $/hr Professional IX $326 $/hr Technician I $134 $/hr Technician II $148 $/hr Technician III $171 $/hr Technician IV $182 $/hr Technician V $198 $/hr Technician VI $217 $/hr Technician VII $236 $/hr Technician VIII $247 $/hr Control Specialist I $175 $/hr Control Specialist II $191 $/hr Control Specialist III $213 $/hr Control Specialist IV $234 $/hr Control Specialist V $249 $/hr Control Specialist VI $269 $/hr Control Specialist VII $294 $/hr Control Specialist VIII $317 $/hr Control Specialist IX $326 $/hr Control Technician I $134 $/hr Control Technician II $148 $/hr Control Technician III $171 $/hr Control Technician IV $182 $/hr Control Technician V $198 $/hr Control Technician VI $217 $/hr Control Technician VII $236 $/hr Control Technician VIII $247 $/hr Administrative I $90 $/hr Administrative II $105 $/hr Administrative III $124 $/hr Administrative IV $148 $/hr Administrative V $173 $/hr CAD/GIS System $27.50 $/hr CAD Plots - Half Size $2.50 price per plot CAD Plots - Full Size $10.00 price per plot CAD Plots - Large $25.00 price per plot Copies (bw) 8.5" X 11"$0.09 price per copy Copies (bw) 8.5" X 14"$0.14 price per copy Copies (bw) 11" X 17"$0.20 price per copy Copies (color) 8.5" X 11"$0.90 price per copy Copies (color) 8.5" X 14"$1.20 price per copy Copies (color) 11" X 17"$2.00 price per copy Technology Charge 2.50%% of Direct Labor Night Work 10.00%% of Direct Labor Mileage $0.7000 price per mile (or Current IRS Rate) Subconsultants 15%Cost + Outside Services at cost RH2 ENGINEERING, INC. 2025 SCHEDULE OF RATES AND CHARGES Rates listed are adjusted annually. Page 51 of 63 Pasco City Council August 11, 2025 Workshop Pa g e 5 2 o f 6 3 PWRF Improvements Phase 2 CO No. 11 With Tapani, Inc. & PSA Amendment No. 7 with RH2 August 11, 2025 Pasco City Council Pa g e 5 3 o f 6 3 PWRF Improvements - Phase 2: Winter Storage 2018 Existing Facility 2025 Expanded Facility Existing Irrigation Pump Station (IPS) New winter storage: 330MG Existing winter storage: 165MG Phase 3 Improv (PRRC) Pa g e 5 4 o f 6 3 PWRF Improvements - Phase 2: Winter Storage Pa g e 5 5 o f 6 3 PWRF Improvements - Phase 2: Winter Storage Pa g e 5 6 o f 6 3 PWRF Improvements - Phase 2: Winter Storage Pa g e 5 7 o f 6 3 PWRF Improvements - Phase 2: Winter Storage Proposed Change OrderNo.11 for construction contract with Tapani, Inc. $33,019,585.73Awarded Construction Contract and previous COs No. 1-10 $85,531.01Proposed Change OrderNo. 11 $33,105,116.74New Contract Amount Pa g e 5 8 o f 6 3 PWRF Improvements - Phase 2: Winter Storage Proposed Amendment No. 7 for Prof Serv. Agreement with RH2 Engineering $3,532,601.00Previously approved PSA and amendments 1-6 $237,854.00Amendment No. 7 $3,770,455.00New PSA Total Pa g e 5 9 o f 6 3 PWRF Improvements - Phase 2: Winter Storage Summary Total Fiscal Impact $85,531.01Proposed Change OrderNo. 11 $237,854.00Amendment No. 7 $323,385.01New PSA Total Both the proposed amendment and change order can be accommodated within the existing project budget. Pa g e 6 0 o f 6 3 Questions? Pa g e 6 1 o f 6 3 Promote a high-quality of life through quality programs, services and appropriate investment and re- investment in community infrastructure. City Council Goals QUALITY OF LIFE 2024-2025 Enhance the long-term viability, value, and service levels of services and programs. FINANCIAL SUSTAINABILITY Promote a highly functional multi-modal transportation system. COMMUNITY TRANSPORTATION NETWORK Implement targeted strategies to reduce crime through strategic investments in infrastructure, staffing, and equipment. COMMUNITY SAFETY Promote and encourage economic vitality. ECONOMIC VITALITY Identify opportunities to enhance City of Pasco identity, cohesion, and image. CITY IDENTITY Page 62 of 63 METAS DEL CONCEJO MUNICIPAL 2024-2025 Promover una alta calidad de vida a través de programas, servicios y inversion apropiada y reinversión en la comunidad infraestructura comunitaria. CALIDAD DE VIDA Promover viabilidad financiera a largo plazo, valor, y niveles de calidad de los servicios y programas. SOSTENIBIILIDAD FINANCIERA Promover un sistema de transporte multimodal altamente funcional. RED DE TRANSPORTE DE LA COMUNIDAD Implementar estrategias específicas para reducir la delincuencia por medios de inversiones estratégicas en infraestructura, personal y equipo. SEGURIDAD DE NUESTRA COMUNIDAD Promover y fomentar vitalidad económica. VITALIDAD ECONOMICA Identificar oportunidades para mejorar la identidad comunitaria, la cohesión, y la imagen. IDENTIDAD COMUNITARIA Page 63 of 63