HomeMy WebLinkAboutSP 2025-005 IAFCJ Church decisionCITY OF PASCO
LAND USE HEARING EXAMINER
IN THE MATTER OF ) FINDINGS OF FACT,
CONCLUSIONS OF LAW,
SP2025-005 ) DECISION AND
IAFCJ Pasco Church Expansion ) CONDITIONS OF APPROVAL
THIS MATTER having come on for hearing in fi•ont of the City of Pasco Hearing Examiner on June 11
2025, the Hearing Examiner having taken evidence hereby submits the following Findings of Fact,
Conclusions of Law, Decision and Conditions of Approval as follows:
I. FINDINGS OF FACT
1. APPLICANT: Joab Romero; 4111 Riverhill Dr.; Pasco, WA 99301
2. REQUEST: Special Permit: Expansion of an existing church.
3. TIMELINE
March 27, 2025
Special Permit Application, SP2025-005, and SEPA (State Environmental
Policy Act) Environmental Checklist, SEPA2025-013, Submitted
April 22, 2025
Applications Deemed Complete
May 19, 2025
SEPA Mitigated Determination of Non -Significance (MDNS) Issued
May 26, 2025
Notice for Public Hearing for SP2025-005 Published in Tri-CityHerald
May 27, 2025
Notice of Public Hearing for SP2025-005 Mailed to Properties Within 300
Feet of the Proposal
May 27, 2025
Public Hearing Staff Report Published
4. PROPERTY DESCRIPTION:
4.1. Le ag_l: SHORT PLAT 2008-09 LOT 1
4.2. Address: 3211 West Wernett Road (Parcel 119231028)
4.3. General Location: Generally located south and west of Interstate 182 East to United States 395
Southbound Ramp, north of West Court Street, and east of Road 36.
4.4. Prope , Size: 1.45 acres.
5. ACCESS: The property has access from West Wernett Road.
6. UTILITIES: Municipal water and sewer are available on Road 32 and West Wernett Road.
7. LAND USE AND ZONING: The property is zoned R-1 (Low Density Residential District) and is
currently developed with a church building, as well as attached and detached garages used for storage.
The site also has parking. Surrounding properties are zoned and developed as follows:
7.1. North: Interstate 182 East to United States 395 Southbound Ramp
7.2. East: R-S-1; Suburban District -Single Family Dwelling Unit/Undeveloped Land
7.3. South: R-S-12; Suburban District -Single Family Dwelling Units
7.4. West: R-2; Medium Density Residential District -Single Family Dwelling Units
SP2025-005
IAFCJ Pasco Church Expansion
Page 1 of 5
8. COMPREHENSIVE PLAN:
8. L The City of Pasco (City) Comprehensive Plan designates the site as "Low Density Residential".
The Low -Density Residential designation is described as a variety of residential housing at a
density of 3 to 6 dwelling units per acre, and may be assigned RS-20, RS-12, R-S-1, R-1, R-1-A,
and R-1-A2 zoning designations. Please note that the proposed church expansion is classified as a
conditional use permit within the R-1 zoning district.
9. ENVIRONMENTAL DETERMINATION: The City is the SEPA lead agency for this project. Based
on SEPA Environmental checklist SEPA2025-013, the adopted City Comprehensive Plan, City
development regulations, and other information, a threshold determination resulting in a MDNS was
issued on May 19, 2025, for this project under WAC 197-11-355.
10. BACKGROUND
10.1. Request: Applicant proposed the construction of a new 60-by-80-foot temple addition to
the existing church building. The new structure will be used exclusively as a place of worship for
the congregation. The proposal also includes the development of additional parking.
11. History
11.1. The site was annexed into the City in 1979 under Ordinance No. 2098 and was initially
designated as R-S-I zoning through that same ordinance. In 2008, the site was rezoned to its
current designation, R-1, through Ordinance No. 3860, accompanied by a Concomitant
Agreement. The agreement addressed minimum lot size requirements and was not related to
church use. Also in 2008, a Special Permit was approved with conditions for the conversion of an
existing single-family residence into a church facility.
12. The applicant proposes to expand an existing church building.
13. Pursuant to Pasco Municipal Code (PMC) 25.45.040 (1) churches and similar places of worship may
be permitted by special permit.
14. While a church use currently exists on the site, the proposed project would expand and intensify that
use.
15. The existing church use was required to provide 43 off-street parking spaces, as specified in the
respective Findings of Fact for the approved special permit.
16. Required parking is calculated at a ratio of one space per four seats based on the maximum seating
capacity of the facility, or at least one space for every 10 lineal feet of bench seating.
17. According to the applicant, the maximum seating capacity is 332.
18. An additional 40 parking spaces will be required on -site for a total of 83, in accordance with PMC
25.185.170.
19. The proposal includes a total of 83 parking stalls, each measuring 9 feet by 19 feet, in accordance with
the applicant's stated maximum seating capacity.
20. In accordance with PMC 25.180.070(2)(a)(iii), a minimum of 2,490 square feet of interior parking lot
landscaping is required based on 83 parking stalls.
21. The proposal is located within Airport Safety Compatibility Zone 6 — Traffic Pattern Zone, which does
not prohibit the proposed use.
22. DISCUSSION OF SPECIAL PERMIT CRITERIA
SP2025-005
IAFCJ Pasco Church Expansion
Page 2 of 5
22.1. The proposal is in accordance with the goals, policies, objectives, maps and/or
narrative text of the Comprehensive Plan;
22.1.1. Land Use Policy LU-1-D: Land uses should be permitted subject to adopted standards
designed to mitigate land use impacts on adjacent, less intensive uses while preserving
constitutionally protected form of expression. The proposal provides an opportunity to
expand an existing church use and to exercise religious freedom in accordance with the First
Amendment of the United States Constitution.
22.2. The proposal will adversely affect public infrastructure;
22.2.1. Access to the site are mostly established and include curb, gutter, sidewalk, and street
lighting. A portion of sidewalk on Homerun Road will be constructed with this proposal.
Utilities are available and have been designed and constructed to support both proposed uses.
The proposed uses are not expected to impact existing utility infrastructure in the area.
22.3. The proposal will be constructed, maintained and operated to be in harmony with the
existing or intended character of the general vicinity;
22.3.1. The surrounding properties are primarily developed with single-family residences. The
proposed expansion of the existing church is not expected to negatively impact the character
of the neighborhood, as the church has operated historically with little to no record of
complaints, indicating general compatibility with adjacent uses.
22.4. The location and height of proposed structures and the site design will discourage the
development of permitted uses on property in the general vicinity or impair the value
thereof,
22.4.1. The proposed expansion will be located adjacent to existing single-family dwelling units
and is designed to reach a maximum height of 24 feet at the peak, which is comparable to the
nearby single -story homes. The construction of the proposed expansion is not expected to
discourage or impair future development in the area.
22.5. The operations in connection with the proposal will be more objectionable to nearby
properties by reason of noise, fumes, vibrations, dust, traffic, or flashing lights than would
be the operation of any permitted uses within the district;
22.5.1. The proposed church expansion has been evaluated under the SEPA, considering potential
impacts such as noise, traffic, lighting, dust, and other typical construction -related effects.
Based on the submitted information and applicable standards in the PMC and Pasco Design
and Construction Standards, it is anticipated that any impacts to the surrounding built and
natural environment will be adequately mitigated. The expansion is not expected to be more
intrusive or objectionable to neighboring properties than the existing church use, especially
with the implementation of the conditions of approval.
22.6. The proposal will endanger the public health or safety if located and developed where
proposed, or in any way will become a nuisance to uses permitted in the district.
22.6.1. The proposal will not endanger public health or safety if located and developed as
proposed, nor is it expected to become a nuisance to permitted uses in the district, as it will
be required to comply with all applicable provisions of the PMC.
23. An open record public hearing was held, after legal notice, on June 11, 2025.
24. Appearing and testifying on behalf of the Applicant was Joab Romero. Pastor Romero testified that he
was an agent authorized to appear and speak on behalf of the property owner and Applicant. Pastor
SP2025-005
IAFCJ Pasco Church Expansion
Page 3 of 5
Romero stated that they agreed with the representations set forth within the staff report and the proposed
Conditions of Approval.
25. No member of the public testified at the hearing.
26. The following exhibits were admitted into the record:
26.1. Ex A Staff Report;
26.2. Ex. B Remainder of Planning Staff File.
27. The City of Pasco Hearing Examiner considered all evidence within the record in rendering this
decision.
28. Any Conclusion of Law that is more correctly a Finding of Fact is hereby incorporated as such by this
reference.
II. CONCLUSIONS OF LAW
1. The Hearing Examiner has been granted the authority to render this decision.
2. As conditioned, this project is consistent with the Pasco Comprehensive Plan and Pasco Municipal
Code.
3. Any Finding of Fact that is more correctly a Conclusion of Law is hereby incorporated as such by this
reference.
III. DECISION
Based on the above Findings of Fact and Conclusions of Law, SP 2025-005 is hereby APPROVED
subject to the following Conditions of Approval.
IV. CONDITIONS OF APPROVAL
1. The special permit shall apply to 3211 West Wernett Road (Parcel 119231028), and any subsequent
subdivision(s) thereof.
2. Prior to the issuance of any ground -disturbing permits, the applicant shall submit either a letter from
the Washington State Department of Archaeology and Historic Preservation (DAHP) assessing
cultural resources within the project's disturbance area, or an archaeological assessment report. This
documentation shall be provided to the City's SEPA Responsible Official and the Tribal Historic
Preservation Officer of the Confederated Tribes of the Colville Reservation.
3. The proposed expansion, including all associated parking improvements, shall be constructed and
situated in substantial conformance with the site plan submitted with the special permit application
and included in the June Hearing Examiner packet.
4. In addition to Condition 3, the proposed walkway shall provide direct access to the eastern entrance
of the expansion and shall extend northward to connect with the northern parking lot.
5. Federal Aviation Administration written approval is required to be submitted prior to issuance of a
building permit.
6. A final review and approval of the proposed parking lot landscaping shall be completed by the City
during the building permit review process to ensure compliance with applicable standards.
7. Maximum building capacity shall be based on current International Fire Code (IFC) fire rating, as
approved by the City of Pasco. Increased capacity shall require improvements meeting City -adopted
IFC standards.
SP2025-005
IAFCJ Pasco Church Expansion
Page 4 of 5
8. The facility shall operate in a professional manner, including day-to-day facility repairs and ongoing
maintenance, security, and upkeep of the property.
9. The site and building plans shall demonstrate compliance with all applicable requirements for
structural integrity, means of egress, stability, sanitation, adequate lighting and ventilation, and life
safety from fire hazards. The plans must also ensure a reasonable level of safety for firefighters and
emergency responders during emergency operations.
10. The special permit shall be null and void if a City Building Permit is not obtained within one year of
Special Permit approval.
Dated this day of June, 2025
CITY Or PASCO HEARING EXAMINER
Andrew L. Kottkamp
Absent a timely appeal, this Decision is final'
1 See Ch. 36.70C RCW (establishing a 21 day appeal period to superior court, and setting forth necessary review
contents, along with filing and service requirements).
SP2025-005
IAFCJ Pasco Church Expansion
Page 5 of 5