HomeMy WebLinkAbout4608 Resolution - 2026-2031 Transportation Improvement Program
Resolution – 2026-2031 Six-Year TIP - 1
RESOLUTION NO. 4608
A RESOLUTION ADOPTING THE 2026-2031 SIX-YEAR
TRANSPORTATION IMPROVEMENT PROGRAM FOR THE CITY OF
PASCO FOR THE PURPOSE OF GUIDING THE DEVELOPMENT,
DESIGN, AND CONSTRUCTION OF LOCAL AND REGIONAL
TRANSPORTATION IMPROVEMENTS.
WHEREAS, RCW 35.77.010 provides for annual revision and extension of the
comprehensive transportation program of each city and town, after public hearing thereon; and
WHEREAS, the City shall annually review the work accomplished under the program and
determine current City transportation needs and from these findings shall prepare and adopt a
revised and extended comprehensive transportation program before July 1 of each year; and
WHEREAS, on April 21, 2025, and May 7, 2025, City staff held open house opportunities
on the revision and extension of the comprehensive transportation program, received and evaluated
all comments; and
WHEREAS, on May 19, 2025, the City Council held a public hearing on the revision and
extension of the comprehensive transportation program, received and evaluated all comments; and
WHEREAS, it is now time to revise and extend the comprehensive transportation program
as identified as the Six-Year Transportation Improvement Program (TIP); and
WHEREAS, the City has determined, based on an assessment of the work accomplished
under this program and the current City transportation needs, that this revised comprehensive
transportation program adequately addresses the City’s future transportation needs.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PASCO, WASHINGTON:
That the City of Pasco hereby adopts the revision and extension of the comprehensive
transportation program for the ensuing six years as attached hereto as Exhibit A, and labeled
“2025-2031 Transportation Improvement Program” incorporated by this reference as though fully
set forth herein; and
Be It Further Resolved, that the comprehensive transportation program shall be filed with
the Benton-Franklin Council of Governments and the Washington State Department of
Transportation.
Be It Further Resolved, that this Resolution shall take effect immediately.
Resolution – 2026-2031 Six-Year TIP - 2
PASSED by the City Council of the City of Pasco, Washington, on this 16th day of June,
2025.
Pete Serrano
Mayor
ATTEST: APPROVED AS TO FORM:
_____________________________ ___________________________
Debra Barham, CMC Kerr Ferguson Law, PLLC
City Clerk City Attorneys
2026-2031 Transportation Improvement Program Final 06/11/2025
Column1 Project Title Road Name Begin/End Termini Prior Year 2026 Year 2027 Year 2028 Year 2029 Year 2030 Year 2031 REMAINDER 6 year- plan
PROJECTS
1 SRTS Argent Rd/Rd 88 & Sandifur Pkwy/Rd 90 Pedestrian Crossings Argent Road Road 88 679,056$ 500,000$ 500,000
2 Lewis Street Underpass Demolition Lewis Street 1st Ave to Tacoma Ave 500,000$ 2,800,000$ 2,800,000
3 Rd 40 E Extension Road 40 East 'A' Street/ East Lewis Place 400,000$ 528,000$ 1,400,000$ 1,928,000
4 Ainsworth Ave Pavement Preservation Ainsworth Ave Oregon Ave/10th ave 400,000$ 1,682,000$ 1,682,000
5 Sylvester St Overpass Pedestrian/Bicycle Access Sylvester Street US 395 Overpass 340,660$ 659,340$ 3,229,340$ 3,888,680
6 Lewis Street Pavement Preservation Lewis Street US12/27th Ave 100,000$ 996,000$ 4,150,000$ 5,146,000
7 Sandifur Pkwy/Rd 76 Intersection Safety Enhancements Sandifur Parkway Road 76 31,000$ 300,000$ 1,700,000$ 2,000,000
8 Clark St Improvements Clark Street 10th St/2nd St 50,000$ 300,000$ 1,450,000$ 1,750,000
9 Rd 76 Overpass Road 76 Chapel Hill/Burden Blvd 2,659,000$ 3,100,000$ 8,000,000$ 12,000,000$ 5,000,000$ 30,759,000
10 Burns Rd/Rd 68 Intersection Improvements Burns Road Rd 68 150,000$ 350,000$ 1,500,000$ 2,000,000
11 Harris Rd Realignment Rd 103 Sandifur Pkwy 250,000$ 1,650,000$ 1,900,000
12 Burns Rd Extension - Missing link Burns Road Road 68/Rio Grande Lane 300,000$ 1,000,000$ 4,700,000$ 6,000,000
13 Burden Blvd/Rd 60 Intersection Improvements Burden Road Road 60 360,000$ 1,810,000$ 2,170,000
14 City Wide Traffic Signal Improvements (Phase 3) Multiple Locations Multiple Locations 300,000$ 2,877,500$ 3,177,500
15 E Lewis St/Heritage Blvd Intersection Improvements E Lewis Street Heritage Blvd 400,000$ 1,500,000$ 500,000$ 2,400,000
16 South Rd 68 Pavement Preservation Court St I-182 700,000$ 1,500,000$ 2,200,000
17 Safe Routes to School Project TBD TBD 300,000$ 1,000,000$ 1,300,000
18 Road 44 FCID Canal Crossing Road 44 FCID Canal (North of Argent PI) 400,000$ 1,600,000$ 2,000,000
19 South 4th Ave (Festival Street Improvements) S 4th Avenue Lewis Street / Columbia Street 290,000$ 790,000$ 1,080,000
20 Sandifur Pkwy/Rd 84 Intersection Improvements Sandifur Parkway Road 84 350,000$ 1,900,000$ 2,250,000
21 Sacajawea Heritage Trail Levee Lowering Sacajawea Heritage Trail Road 54/Road 72 250,000$ 1,500,000$ 1,500,000$ 3,250,000
22 Court & Rd 100 Intersection Improvements Court St Rd 100 500,000$ 1,000,000$ 4,500,000$ 6,000,000
23 Court Street/Road 60 Intersection Improvements Court St Rd 60 450,000$ 2,500,000$ 2,950,000
24 Sandifur Pkwy/Convention Dr Intersection Improvements Sandifur Parkway Convention Dr 410,000$ 1,900,000$ 2,310,000
25 I-182/Broadmoor Blvd I/C Multiuse Pathway/Bridge Broadmoor Boulevard I-182 500,000$ 1,000,000$ 4,000,000$ 4,000,000$ 9,500,000
26 Columbia St Improvements Columbia Street 10th St/2nd St 390,000$ 1,190,000$ 1,580,000
27 Burden Rd/Rd 44 Intersection Improvements Burden Road Road 44 360,000$ 1,810,000$ 2,170,000
28 Rd 40 East Pathway Road 40 East Sacajawea Park/East Lewis Place 540,000$ 590,000$ 840,000$ 1,970,000
29 Rainier Ave/Kartchner St Intersection Improvements Rainier Ave Kartchner 200,000$ 200,000$ 1,500,000$ 500,000$ 2,400,000
30 Court St Improvements- Ped/Bike Court Street Road 96/Harris Road 180,000$ 1,340,000$ 3,456,000$ 2,304,000$ 7,280,000
31 Rd 76 Improvements - Sandifur Pkwy to Cordero Dr Road 76 Sandifur Pkwy/Cordero Dr 300,000$ 1,700,000$ 2,000,000
32 N 4th Ave Pavement Preservation (I-182 to County Line) I-182 County Line (Glade Rd) 150,000$ 1,600,000$ 1,750,000
33 Argent Rd Widening (Phase 4) Argent Road Road 36/Road 44 1,180,000$ 2,360,000$ 2,360,000$ 5,900,000
34 Franklin County Irrigation District Canal Bicycle/Pedestrian Pathway N/A Road 100/Road 76 300,000$ 500,000$ 2,000,000$ 2,800,000
35 Rd 100 Widening Road 100 Court St/Chapel Hill Blvd 625,000$ 950,000$ 7,000,000$ 8,575,000
36 Shoreline Rd Realignment Shoreline Road Court/Burns Road 250,000$ 2,000,000$ 1,000,000$ 7,700,000$ 3,250,000
37 Burns Rd Extension to Glade Rd Burns Road "Road 44"/N Glade Road 2,400,000$ 3,400,000$ 3,000,000$ 24,750,000$ 8,800,000
38 Burden Rd/Madison Ave Intersection Improvements Burden Road Madison Ave 360,000$ 1,810,000$ 2,170,000
39 Court St Safety Improvements Court Street Road 40/Road 68 110,000$ 340,000$ 450,000
40 James St Improvements James Street Oregon Ave/Frontier Lp 250,000$ 1,600,000$ 1,850,000
41 Harris Rd / Crescent Rd Overpass Harris Road Harris Road/Crescent Rd 1,000,000$ 3,000,000$ 47,600,000$ 4,000,000
42 Lewis Street Corridor Improvements (Phase 1) Lewis Street 2nd Ave/ 5th Ave 530,000$ 450,000$ 780,000$ 4,000,000$ 1,230,000
43 Lewis Street Corridor Improvements (Phase 2) Lewis Street 5th Ave/10th Ave 300,000$ 4,800,000$ 300,000
44 I-182/Broadmoor Blvd I/C Improvements - Westbound Broadmoor Boulevard I-182 750,000$ 6,940,000$ 750,000
45 Court St Safety Improvements (Phase 2) Court Street Road 68/Road 96 680,000$ 680,000$ 5,100,000$ 1,360,000
PROGRAMS 161,526,180
46 Annual Pavement Preservation Multiple Locations Multiple Locations 701,000$ 715,500$ 737,000$ 759,200$ 782,000$ 805,500$ 4,500,200$
47 Ped/Bike Gap Program Multiple Locations Multiple Locations 105,000$ 110,250$ 115,763$ 121,551$ 127,628$ 580,191$
48 Neighborhood Traffic Calming program Multiple Locations Multiple Locations 110,250$ 115,763$ 121,551$ 127,628$ 134,010$ 609,201$
PLANS AND STUDIES 5,689,592$
49 Comprehensive Safety Action Plan(SS4A) 250,000$ 150,000$ 150,000$
50 Traffic Analysis for US 12 US 12 A /Tank Farm Road 1,530,000$ 1,530,000$ 3,060,000$
51 Interchange Feasibility Study on I-182 I-182 Multiple Existing Interchanges 200,000$ 250,000$ 450,000$
52 Rd 68/Taylor Flats Rd Intersection Study Road 68 Taylor Flats Rd/Columbia River 350,000$ 350,000$
53 Sign Reflectivity Analysis and Implementation 112,000$ 400,000$ 512,000$
4,522,000
15,265,340$ 31,439,590$ 31,323,013$ 31,731,513$ 29,487,179$ 32,491,138$ 171,737,772
Exhibit A
2026-2031 TransportaƟon Improvement Plan (TIP)
Project DescripƟons
1
1. SRTS Argent Rd/Rd 88 & Sandifur Pkwy/Rd 90 Pedestrian Crossings
Curb extensions/bulb-outs, crossing advance stop bars, median refuge island, reduced curb radii, stop
signs, new marked crosswalks, rectangular rapid flashing beacon (RRFB), lane width reducƟon, sidewalk
(5' +) with curb, pedestrian scale crossing illuminaƟon, ADA curb ramps.
2. Lewis Street Underpass DemoliƟon
This project will demolish the Lewis Street underpass, to 6 feet depth. Backfill aŌer demoliƟon will be
consistent with BNSF requirements.
3. Rd 40 E Extension
This project will extend Road 40 E, as a 1-lane northbound roadway north of A Street to connect to E
Lewis Place. This extension will eliminate a dead-end road at East Lewis Place. Signal adjustments,
striping and signage will be included in the scope of work.
4. Ainsworth Ave Pavement PreservaƟon
This project involves the overlay and restriping of Ainsworth Street/Avenue (SR397) from 10th Avenue to
the West and S Oregon Avenue to the East.
5. Sylvester St Overpass Pedestrian/Bicycle Access
Pedestrian/Bicyclist Overpass, Sidewalk (6'+) with curb, ADA Curb Ramps, Shared use Path/Trail, Bridge
(Part of Shared-use Path).
6. Lewis Street Pavement PreservaƟon
Mill and overlay enƟre exisƟng pavement area. Work includes cuƫng and patching failed areas (Alligator
cracking and spalling), taper mill at curved edges and then overlay with HMA. This allows for unchanged
elevaƟons at exisƟng curbs and addiƟonal structural secƟon for the majority of the roadway. ADA
upgrades will also be included as needed.
7. Sandifur Parkway & Road 76 IntersecƟon Safety Enhancement
This project will convert the two-way stop-controlled intersecƟon into a roundabout or signalized
intersecƟon and will include the following safety enhancements: ADA compliant ramps, marked
crosswalks, and push buƩon assemblies; Flashing yellow arrows (FYA) for all leŌ-turn movements;
emergency vehicle detecƟon; intersecƟon lighƟng. The project will also include design and construcƟon
of intelligent transportaƟon systems (ITS) connecƟons to the Sandifur Parkway/Road 68 intersecƟon for
interconnect capabiliƟes.
8. Clark St Improvements
This project will adjust Clark Street roadway configuraƟon to include vehicle travel lanes, bike lanes,
lighƟng, and bulb-outs at crossing locaƟons for increased pedestrian safety. Conceptual improvements
for this project are included in the adopted Downtown Masterplan.
9. Rd 76 Overpass
This project will extend Road 76 north from Chapel Hill Blvd to Burden Blvd by construcƟng an overpass
across I-182 to connect communiƟes north and south of the exisƟng interstate. This project will include
bicycle and pedestrian faciliƟes.
2026-2031 TransportaƟon Improvement Plan (TIP)
Project DescripƟons
2
10. Burns Rd/ Rd 68 IntersecƟon Improvements
This project will install a traffic signal at the intersecƟon of Burns Road and Road 68 and include any
necessary ADA improvements.
11. Harris Rd Realignment
This project will re-align Harris Road from Road 103 to Broadmoor Blvd to connect to Sandifur Parkway
and eliminate the exisƟng intersecƟon on Broadmoor.
12. Burns Rd Extension – Missing Link
This project will extend Burns Road, from Road 68 to Rio Grande Lane to improve connecƟvity and
access.
13. City Wide Traffic Signal Improvements (Phase 3)
This project will replace obsolete signal equipment with updated signal controllers, signal
equipment, opƟmized corridor Ɵming plans, vehicle detecƟon system and emergency vehicle
priority system. Pedestrian access will be upgraded to meet current ADA right of way
accessibility design guidelines for the signalized intersecƟons.
14. Burden Rd/Rd 60 IntersecƟon Improvements
This project will install a traffic signal at the intersecƟon of Burden Road and Road 60 and include any
necessary ADA improvements.
15. E Lewis St/Heritage Blvd IntersecƟon Improvements
This project will install a traffic signal at the intersecƟon of E Lewis Street and Heritage Blvd and
include any necessary ADA improvements.
16. South Rd 68 Pavement PreservaƟon (NEW)
This project involves the asphalt overlay and restriping of South Road 68 from Court Street to
eastbound on/off I-182 ramp.
17. Safe Routes to School Project
City will conƟnue to work closely with Pasco School District and parents/residents to idenƟfy
and prioriƟze projects that qualify for the state’s biannual Safe Routes to School Program, which
could include several locaƟons. This project typically involves providing sidewalks, enhancing
intersecƟon crossings, providing ADA curb ramps, providing school zone beacons or rectangular
rapid flashing beacons (RRFBs), and other safety related improvements within designated
school walking routes.
18. Road 44 FCID Canal Crossing (NEW)
Project along the west side of Road 44 to provide sidewalk connecƟvity to address exisƟng gap across
Franklin County IrrigaƟon Canal structure.
2026-2031 TransportaƟon Improvement Plan (TIP)
Project DescripƟons
3
19. South 4th Ave (FesƟval Street Improvements)
This project will revise roadway configuraƟon and install sidewalk furnishings, lighƟng, street trees and
landscaping to create a FesƟval Street on South 4th Avenue from Lewis Street to Columbia Street. The
street will be able to be closed to motor vehicles during special events and further enhance the
completed Peanuts Park improvement project to allow for greater and more varied use of Peanuts Park
Plaza. Conceptual improvements for this project are included in the adopted Downtown Masterplan.
20. Sandifur Pkwy/Rd 84 IntersecƟon Improvements
This project will install a traffic signal at the intersecƟon of Sandifur Parkway and Rd 84 and include any
necessary ADA improvements.
21. Sacajawea Heritage Trail Levee Lowering
This project will lower the levee and re-install a wider pathway for pedestrians and bicyclists from Road
52 to Road 72.
22. Court & Rd 100 IntersecƟon Improvements
This project will convert the exisƟng angled T-intersecƟon at Court St and Road 100 into a roundabout or
signalized intersecƟon, enhance traffic flow and safety in the area, and include any necessary ADA
improvements.
23. Court St/Rd 60 IntersecƟon Improvements
This project will install a traffic signal at the intersecƟon of Court St and Road 60 and include any
necessary ADA improvements.
24. Sandifur Pkwy/ConvenƟon Drive IntersecƟon Improvements
This project will install a traffic signal at the intersecƟon of Sandifur Parkway and ConvenƟon Drive and
include any necessary ADA improvements.
25. I-182/Broadmoor Blvd I/C MulƟuse Pathway/Bridge
Construct a ped/bike bridge with a mulƟ-use pathway across I-182 on the west side of the exisƟng
overpass, between ramp terminals.
26. Columbia St Improvements
This project will adjust Columbia Street roadway configuraƟon to include vehicle travel lanes, bike lanes,
lighƟng, and bulb-outs at crossing locaƟons for increased pedestrian safety. Conceptual improvements
for this project are included in the adopted Downtown Masterplan.
27. Burden Rd/Rd 44 IntersecƟon Improvements
This project will install a traffic signal at the intersecƟon of Burden Road and Road 44 and include any
necessary ADA improvements.
28. Rd 40 East Pathway
This project will construct a mulƟ-use pathway along Road 40 E from ”A” Street to Sacajawea Park E.
2026-2031 TransportaƟon Improvement Plan (TIP)
Project DescripƟons
4
29. Rainier Ave/Kartchner St IntersecƟon Improvements
This project will install a traffic signal at the intersecƟon of Rainier Avenue and Kartchner Street at the
locaƟon of the US 395 SB On/Off Ramps and include any necessary ADA improvements.
30. Court Street Improvements – Ped/Bike
This project will improve Court Street from Road 96 to Harris Road to include bike and pedestrian
faciliƟes and permanent traffic calming features.
31. Rd 76 Improvements – Sandifur Pkwy to Cordero Dr
This project will install a traffic signal at the intersecƟon of Wrigley Drive and Road 76 and include any
necessary ADA improvements and reconfigure corridor between Sandifur Pkwy and Cordero Dr.
32. N 4th Ave Pavement PreservaƟon (I-182 to County Line) (NEW)
This project involves the asphalt overlay and restriping North 4th Ave from westbound on/off I-182 ramp
to County Line (Glade Road).
33. Argent Road Widening (Phase 4)
This project is Phase 4 of urban road improvements to Argent Road from Road 36 to Road 44.
Improvements include street widening to a three-lane secƟon, illuminaƟon, stormwater faciliƟes,
curb/guƩer, sidewalk, and related improvements.
34. Franklin County IrrigaƟon District Canal Bicycle/Pedestrian Pathway
This project will construct a mulƟ-use pathway along the piped irrigaƟon canal from Road 100 to Road
76.
35. Rd 100 Widening
This project will widen the Road 100 corridor to a 3-lane secƟon from W Court St to Chapel Hill Blvd.
IntersecƟon Improvements (such as turn lanes) will be evaluated and implemented as part of this
project.
36. Shoreline Rd Realignment
This project will provide for the realignment of Shoreline Road from Shoreline Court to Burns Road. The
realignment would be coordinated with the construcƟon of a park, to the west of the proposed roadway.
37. Burns Rd Extension to Glade Rd
This project will extend Burns Road from the approximate alignment of Road 44 to Glade Road.
38. Burden Rd/Madison Ave IntersecƟon Improvements
This project will install a traffic signal at the intersecƟon of Burden Rd and Madison Ave and include any
necessary ADA improvements.
39. Court St Safety Improvements
This project will reconfigure Court Street from Road 40 to Road 68 to three lanes, with one lane in each
direcƟon and a center two-way-leŌ-turn lane and provides designated bike lanes in each direcƟon, and
pedestrian facility enhancements.
2026-2031 TransportaƟon Improvement Plan (TIP)
Project DescripƟons
5
40. James St Improvements
This project is intended to provide pavement preservaƟon/reconstrucƟon of E James Street.
41. Harris Rd/Crescent Rd Overpass
This project will construct an overpass over I-182 to connect Harris Road and Crescent Road. This project
will connect the communiƟes north and south of I-182 and relieve some of the demand at Broadmoor
Boulevard and the I-182 interchange.
42. Lewis Street Corridor Improvements (Phase 1)
The project is intended to Ɵe the improvements made with the overpass project into those made under
the Peanuts Park improvement project. This project will include ADA improvements, crosswalks,
widened sidewalks, streetlights, re-striping and streetscape. NOTE: A revised scope is being considered
to minimize impacts to businesses during construcƟon.
43. Lewis Street Corridor Improvements (Phase 2)
This project will include ADA improvements, crosswalks, widened sidewalks, streetlights, re-striping and
streetscape between 5th Ave and 10th Ave. NOTE: A revised scope is being considered to minimize
impacts to businesses during construcƟon.
44. I-182/Broadmoor Blvd I/C Improvements – Westbound
New mulƟ-lane roundabout at the I-182 westbound ramp terminal at Broadmoor Blvd on the north side
of I-182.
45. Court St Safety Improvements (Phase 2) (NEW)
This project will reconfigure Court Street from Road 68 to Road 96 to provide designated bike lanes in
each direcƟon, and pedestrian facility enhancements, as well as .
46. Annual Pavement PreservaƟon
The City has implemented an annual Pavement PreservaƟon Program to assess and maintain quality
streets within the City. The program includes crack seal, overlay, chip seal, etc. of city streets.
47. Ped/Bike Gap Program
This program idenƟfies and closes gaps in the pedestrian and bicycle network to enhance connecƟvity
and safety. Annually, locaƟons are selected with stakeholder and community input, prioriƟzing areas
based on traffic volumes, crash history, and proximity to schools, hospitals, transit, and essenƟal
services.
48. Neighborhood Traffic Calming Program
This program aims to enhance safety and livability in residenƟal areas by implemenƟng measures to
reduce vehicle speeds and discourage cut-through traffic. This program includes the implementaƟon of
traffic calming measures, such as: chicanes, islands, speed cushions, traffic circles, radar speed feedback
signs, and other calming devices to create a safer and more pleasant environment for pedestrians,
cyclists, and residents.
2026-2031 TransportaƟon Improvement Plan (TIP)
Project DescripƟons
6
49. Comprehensive Safety AcƟon Plan (SS4A)
Pasco’s Comprehensive Safety AcƟon Plan (CSAP) will help idenƟfy the updated 2024 problem areas
through systemaƟc data collecƟon, recommending innovaƟve and appropriate countermeasures, and
prioriƟzing safety improvements that will benefit all users. The recommended soluƟons will aim to
reduce the frequency and severity of crashes, with an emphasis in reducing fataliƟes and serious
injuries.
50. Traffic Analysis for US 12
This project will consist of a traffic analysis for US 12 from the intersecƟons of A Street to Tank Farm
Road/Sacajawea Park Road. This study will be completed in partnership with WSDOT in search of
pracƟcal soluƟons for safety improvements at these locaƟons.
51. Interchange Feasibility Study
This study will evaluate the potenƟal for modifying exisƟng interchanges along I-182, in order to
improve traffic flow and safety. It serves as a planning document, defining "purpose and need" and
conducƟng traffic analysis to coordinate potenƟal soluƟons with DOT and FHWA.
52. Rd 68/Taylor Flats Rd IntersecƟon Study (NEW)
This study will consist of a traffic and safety analysis for the intersecƟon of Road 68 and Taylor Flats
Road. The intersecƟon has split ownership with Franklin County.
53. Sign ReflecƟvity Analysis & ImplementaƟon
The project will evaluate up to 500 stop signs that are near the end of their service life
(older than 12 years) and upgrade the retro-reflecƟvity as needed. The project will also include the
evaluaƟon of the stop sign size and may increase stop signs from 30” to 36” signs. In addiƟon, red
reflecƟve strips will be added to the stop sign poles as warranted.
2026-2031 TransportaƟon Improvement Plan (TIP)
Project DescripƟons
7
REMOVED PROJECTS
1. Burns Rd/Broadmoor Blvd IntersecƟon Improvements
This project will install a traffic signal at the intersecƟon of Burns Road and Broadmoor Blvd. Sidewalks
and any necessary ADA improvements will be included.
2. Sandifur Pkwy Extension
This project will extend Sandifur Parkway from the vicinity of Road 103 to Road 108. Provisions for future
traffic signals will be included at the intersecƟon of Sandifur and Road 105. A roundabout will be
constructed at the intersecƟon of Sandifur Parkway and Road 108.
3. Sandifur Pkwy/Broadmoor Blvd IntersecƟon Improvements
This project will improve the intersecƟon of Sandifur Parkway and Broadmoor Boulevard. AddiƟonally,
Broadmoor Blvd. widening will be included as part of this project extending north up to Burns Road.
Provisions for a future traffic signal at Buckingham Dr are considered in this project.
4. Road 108 Extension
This project will construct a 2-lanes road from Harris Road to Sandifur Parkway.
5. W 'A' St/6th Ave Pedestrian Crossing
Install Rectangular Rapid Flashing Beacons, curb extensions, illuminaƟon, signing, pavement markings,
and curb ramps.
6. Commercial Ave/Kartchner St IntersecƟon Improvements
This project will install a traffic signal at the intersecƟon of Commercial Ave and Kartchner St at the
locaƟon of the US 395 NB On/Off Ramps and include any necessary ADA improvements.
7. Citywide Injury MinimizaƟon & Speed Management ImplementaƟon
Conduct Citywide speed data collecƟon and study. Install speed limit signing and radar speed feedback
signs.
Ro
a
d
4
4
E Hillsboro St
Ro
a
d
8
4
W Pearl St
E Lewis St
R
o
a
d
6
8
Ro
a
d
3
6
S 1
0
T
h
A
v
e
N
4
T
h
A
v
e
E Doc
k
S
t
S O
r
e
g
o
n
A
v
e
N
O
r
e
g
o
n
A
v
e
N
1
4
T
h
A
v
e
N
R
a
i
l
r
o
a
d
A
v
e
I
n
d
u
s
t
r
i
a
l
W
a
y
Harris Rd
Pasco
K
a
h
l
o
t
u
s
R
d
Burns Rd
Ro
a
d
5
2
G
l
a
d
e
N
o
r
t
h
R
d
Ro
a
d
6
8
W
C
o
u
r
t
S
t
N
C
a
p
i
t
o
l
A
v
e
Burns Rd
N
2
0
T
h
A
v
e
W Le
w
i
s
S
t
W Court St
W Wernett Rd
N
C
o
m
m
e
r
c
i
a
l
A
v
e
W Argent Rd
Chapel Hill Blvd
W Argent Rd
W Court St
E Ains
w
o
r
t
h
A
v
e
Sandifur Pkwy
W Sylvester St
N
4
T
h
A
v
e
E A St
50
52
1
9
25
18
5
4
1
11
242
3
12
43
40
31
9
26
8
4
33
35
21 6
28
6
3
6
37
16
34
39
30
45
3
2
15
29
7 24
13 38 27
20
23
44
10
22
1
1
Transportation
Improvement Program (TIP)
2026-2031
Legend
Project Type
Ped Crossing
Signal/Intersection
Bike/Ped
New Road
Other
Study Area
Admin Boundary
City Limits
Pasco Urban Growth
Boundary
Date Saved: 6/12/2025 11:06 AM
²