Loading...
HomeMy WebLinkAbout4608 Resolution - 2026-2031 Transportation Improvement Program Resolution – 2026-2031 Six-Year TIP - 1 RESOLUTION NO. 4608 A RESOLUTION ADOPTING THE 2026-2031 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM FOR THE CITY OF PASCO FOR THE PURPOSE OF GUIDING THE DEVELOPMENT, DESIGN, AND CONSTRUCTION OF LOCAL AND REGIONAL TRANSPORTATION IMPROVEMENTS. WHEREAS, RCW 35.77.010 provides for annual revision and extension of the comprehensive transportation program of each city and town, after public hearing thereon; and WHEREAS, the City shall annually review the work accomplished under the program and determine current City transportation needs and from these findings shall prepare and adopt a revised and extended comprehensive transportation program before July 1 of each year; and WHEREAS, on April 21, 2025, and May 7, 2025, City staff held open house opportunities on the revision and extension of the comprehensive transportation program, received and evaluated all comments; and WHEREAS, on May 19, 2025, the City Council held a public hearing on the revision and extension of the comprehensive transportation program, received and evaluated all comments; and WHEREAS, it is now time to revise and extend the comprehensive transportation program as identified as the Six-Year Transportation Improvement Program (TIP); and WHEREAS, the City has determined, based on an assessment of the work accomplished under this program and the current City transportation needs, that this revised comprehensive transportation program adequately addresses the City’s future transportation needs. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO, WASHINGTON: That the City of Pasco hereby adopts the revision and extension of the comprehensive transportation program for the ensuing six years as attached hereto as Exhibit A, and labeled “2025-2031 Transportation Improvement Program” incorporated by this reference as though fully set forth herein; and Be It Further Resolved, that the comprehensive transportation program shall be filed with the Benton-Franklin Council of Governments and the Washington State Department of Transportation. Be It Further Resolved, that this Resolution shall take effect immediately. Resolution – 2026-2031 Six-Year TIP - 2 PASSED by the City Council of the City of Pasco, Washington, on this 16th day of June, 2025. Pete Serrano Mayor ATTEST: APPROVED AS TO FORM: _____________________________ ___________________________ Debra Barham, CMC Kerr Ferguson Law, PLLC City Clerk City Attorneys 2026-2031 Transportation Improvement Program Final 06/11/2025 Column1 Project Title Road Name Begin/End Termini Prior Year 2026 Year 2027 Year 2028 Year 2029 Year 2030 Year 2031 REMAINDER 6 year- plan PROJECTS 1 SRTS Argent Rd/Rd 88 & Sandifur Pkwy/Rd 90 Pedestrian Crossings Argent Road Road 88 679,056$ 500,000$ 500,000 2 Lewis Street Underpass Demolition Lewis Street 1st Ave to Tacoma Ave 500,000$ 2,800,000$ 2,800,000 3 Rd 40 E Extension Road 40 East 'A' Street/ East Lewis Place 400,000$ 528,000$ 1,400,000$ 1,928,000 4 Ainsworth Ave Pavement Preservation Ainsworth Ave Oregon Ave/10th ave 400,000$ 1,682,000$ 1,682,000 5 Sylvester St Overpass Pedestrian/Bicycle Access Sylvester Street US 395 Overpass 340,660$ 659,340$ 3,229,340$ 3,888,680 6 Lewis Street Pavement Preservation Lewis Street US12/27th Ave 100,000$ 996,000$ 4,150,000$ 5,146,000 7 Sandifur Pkwy/Rd 76 Intersection Safety Enhancements Sandifur Parkway Road 76 31,000$ 300,000$ 1,700,000$ 2,000,000 8 Clark St Improvements Clark Street 10th St/2nd St 50,000$ 300,000$ 1,450,000$ 1,750,000 9 Rd 76 Overpass Road 76 Chapel Hill/Burden Blvd 2,659,000$ 3,100,000$ 8,000,000$ 12,000,000$ 5,000,000$ 30,759,000 10 Burns Rd/Rd 68 Intersection Improvements Burns Road Rd 68 150,000$ 350,000$ 1,500,000$ 2,000,000 11 Harris Rd Realignment Rd 103 Sandifur Pkwy 250,000$ 1,650,000$ 1,900,000 12 Burns Rd Extension - Missing link Burns Road Road 68/Rio Grande Lane 300,000$ 1,000,000$ 4,700,000$ 6,000,000 13 Burden Blvd/Rd 60 Intersection Improvements Burden Road Road 60 360,000$ 1,810,000$ 2,170,000 14 City Wide Traffic Signal Improvements (Phase 3) Multiple Locations Multiple Locations 300,000$ 2,877,500$ 3,177,500 15 E Lewis St/Heritage Blvd Intersection Improvements E Lewis Street Heritage Blvd 400,000$ 1,500,000$ 500,000$ 2,400,000 16 South Rd 68 Pavement Preservation Court St I-182 700,000$ 1,500,000$ 2,200,000 17 Safe Routes to School Project TBD TBD 300,000$ 1,000,000$ 1,300,000 18 Road 44 FCID Canal Crossing Road 44 FCID Canal (North of Argent PI) 400,000$ 1,600,000$ 2,000,000 19 South 4th Ave (Festival Street Improvements) S 4th Avenue Lewis Street / Columbia Street 290,000$ 790,000$ 1,080,000 20 Sandifur Pkwy/Rd 84 Intersection Improvements Sandifur Parkway Road 84 350,000$ 1,900,000$ 2,250,000 21 Sacajawea Heritage Trail Levee Lowering Sacajawea Heritage Trail Road 54/Road 72 250,000$ 1,500,000$ 1,500,000$ 3,250,000 22 Court & Rd 100 Intersection Improvements Court St Rd 100 500,000$ 1,000,000$ 4,500,000$ 6,000,000 23 Court Street/Road 60 Intersection Improvements Court St Rd 60 450,000$ 2,500,000$ 2,950,000 24 Sandifur Pkwy/Convention Dr Intersection Improvements Sandifur Parkway Convention Dr 410,000$ 1,900,000$ 2,310,000 25 I-182/Broadmoor Blvd I/C Multiuse Pathway/Bridge Broadmoor Boulevard I-182 500,000$ 1,000,000$ 4,000,000$ 4,000,000$ 9,500,000 26 Columbia St Improvements Columbia Street 10th St/2nd St 390,000$ 1,190,000$ 1,580,000 27 Burden Rd/Rd 44 Intersection Improvements Burden Road Road 44 360,000$ 1,810,000$ 2,170,000 28 Rd 40 East Pathway Road 40 East Sacajawea Park/East Lewis Place 540,000$ 590,000$ 840,000$ 1,970,000 29 Rainier Ave/Kartchner St Intersection Improvements Rainier Ave Kartchner 200,000$ 200,000$ 1,500,000$ 500,000$ 2,400,000 30 Court St Improvements- Ped/Bike Court Street Road 96/Harris Road 180,000$ 1,340,000$ 3,456,000$ 2,304,000$ 7,280,000 31 Rd 76 Improvements - Sandifur Pkwy to Cordero Dr Road 76 Sandifur Pkwy/Cordero Dr 300,000$ 1,700,000$ 2,000,000 32 N 4th Ave Pavement Preservation (I-182 to County Line) I-182 County Line (Glade Rd) 150,000$ 1,600,000$ 1,750,000 33 Argent Rd Widening (Phase 4) Argent Road Road 36/Road 44 1,180,000$ 2,360,000$ 2,360,000$ 5,900,000 34 Franklin County Irrigation District Canal Bicycle/Pedestrian Pathway N/A Road 100/Road 76 300,000$ 500,000$ 2,000,000$ 2,800,000 35 Rd 100 Widening Road 100 Court St/Chapel Hill Blvd 625,000$ 950,000$ 7,000,000$ 8,575,000 36 Shoreline Rd Realignment Shoreline Road Court/Burns Road 250,000$ 2,000,000$ 1,000,000$ 7,700,000$ 3,250,000 37 Burns Rd Extension to Glade Rd Burns Road "Road 44"/N Glade Road 2,400,000$ 3,400,000$ 3,000,000$ 24,750,000$ 8,800,000 38 Burden Rd/Madison Ave Intersection Improvements Burden Road Madison Ave 360,000$ 1,810,000$ 2,170,000 39 Court St Safety Improvements Court Street Road 40/Road 68 110,000$ 340,000$ 450,000 40 James St Improvements James Street Oregon Ave/Frontier Lp 250,000$ 1,600,000$ 1,850,000 41 Harris Rd / Crescent Rd Overpass Harris Road Harris Road/Crescent Rd 1,000,000$ 3,000,000$ 47,600,000$ 4,000,000 42 Lewis Street Corridor Improvements (Phase 1) Lewis Street 2nd Ave/ 5th Ave 530,000$ 450,000$ 780,000$ 4,000,000$ 1,230,000 43 Lewis Street Corridor Improvements (Phase 2) Lewis Street 5th Ave/10th Ave 300,000$ 4,800,000$ 300,000 44 I-182/Broadmoor Blvd I/C Improvements - Westbound Broadmoor Boulevard I-182 750,000$ 6,940,000$ 750,000 45 Court St Safety Improvements (Phase 2) Court Street Road 68/Road 96 680,000$ 680,000$ 5,100,000$ 1,360,000 PROGRAMS 161,526,180 46 Annual Pavement Preservation Multiple Locations Multiple Locations 701,000$ 715,500$ 737,000$ 759,200$ 782,000$ 805,500$ 4,500,200$ 47 Ped/Bike Gap Program Multiple Locations Multiple Locations 105,000$ 110,250$ 115,763$ 121,551$ 127,628$ 580,191$ 48 Neighborhood Traffic Calming program Multiple Locations Multiple Locations 110,250$ 115,763$ 121,551$ 127,628$ 134,010$ 609,201$ PLANS AND STUDIES 5,689,592$ 49 Comprehensive Safety Action Plan(SS4A) 250,000$ 150,000$ 150,000$ 50 Traffic Analysis for US 12 US 12 A /Tank Farm Road 1,530,000$ 1,530,000$ 3,060,000$ 51 Interchange Feasibility Study on I-182 I-182 Multiple Existing Interchanges 200,000$ 250,000$ 450,000$ 52 Rd 68/Taylor Flats Rd Intersection Study Road 68 Taylor Flats Rd/Columbia River 350,000$ 350,000$ 53 Sign Reflectivity Analysis and Implementation 112,000$ 400,000$ 512,000$ 4,522,000 15,265,340$ 31,439,590$ 31,323,013$ 31,731,513$ 29,487,179$ 32,491,138$ 171,737,772 Exhibit A 2026-2031 TransportaƟon Improvement Plan (TIP) Project DescripƟons 1 1. SRTS Argent Rd/Rd 88 & Sandifur Pkwy/Rd 90 Pedestrian Crossings Curb extensions/bulb-outs, crossing advance stop bars, median refuge island, reduced curb radii, stop signs, new marked crosswalks, rectangular rapid flashing beacon (RRFB), lane width reducƟon, sidewalk (5' +) with curb, pedestrian scale crossing illuminaƟon, ADA curb ramps. 2. Lewis Street Underpass DemoliƟon This project will demolish the Lewis Street underpass, to 6 feet depth. Backfill aŌer demoliƟon will be consistent with BNSF requirements. 3. Rd 40 E Extension This project will extend Road 40 E, as a 1-lane northbound roadway north of A Street to connect to E Lewis Place. This extension will eliminate a dead-end road at East Lewis Place. Signal adjustments, striping and signage will be included in the scope of work. 4. Ainsworth Ave Pavement PreservaƟon This project involves the overlay and restriping of Ainsworth Street/Avenue (SR397) from 10th Avenue to the West and S Oregon Avenue to the East. 5. Sylvester St Overpass Pedestrian/Bicycle Access Pedestrian/Bicyclist Overpass, Sidewalk (6'+) with curb, ADA Curb Ramps, Shared use Path/Trail, Bridge (Part of Shared-use Path). 6. Lewis Street Pavement PreservaƟon Mill and overlay enƟre exisƟng pavement area. Work includes cuƫng and patching failed areas (Alligator cracking and spalling), taper mill at curved edges and then overlay with HMA. This allows for unchanged elevaƟons at exisƟng curbs and addiƟonal structural secƟon for the majority of the roadway. ADA upgrades will also be included as needed. 7. Sandifur Parkway & Road 76 IntersecƟon Safety Enhancement This project will convert the two-way stop-controlled intersecƟon into a roundabout or signalized intersecƟon and will include the following safety enhancements: ADA compliant ramps, marked crosswalks, and push buƩon assemblies; Flashing yellow arrows (FYA) for all leŌ-turn movements; emergency vehicle detecƟon; intersecƟon lighƟng. The project will also include design and construcƟon of intelligent transportaƟon systems (ITS) connecƟons to the Sandifur Parkway/Road 68 intersecƟon for interconnect capabiliƟes. 8. Clark St Improvements This project will adjust Clark Street roadway configuraƟon to include vehicle travel lanes, bike lanes, lighƟng, and bulb-outs at crossing locaƟons for increased pedestrian safety. Conceptual improvements for this project are included in the adopted Downtown Masterplan. 9. Rd 76 Overpass This project will extend Road 76 north from Chapel Hill Blvd to Burden Blvd by construcƟng an overpass across I-182 to connect communiƟes north and south of the exisƟng interstate. This project will include bicycle and pedestrian faciliƟes. 2026-2031 TransportaƟon Improvement Plan (TIP) Project DescripƟons 2 10. Burns Rd/ Rd 68 IntersecƟon Improvements This project will install a traffic signal at the intersecƟon of Burns Road and Road 68 and include any necessary ADA improvements. 11. Harris Rd Realignment This project will re-align Harris Road from Road 103 to Broadmoor Blvd to connect to Sandifur Parkway and eliminate the exisƟng intersecƟon on Broadmoor. 12. Burns Rd Extension – Missing Link This project will extend Burns Road, from Road 68 to Rio Grande Lane to improve connecƟvity and access. 13. City Wide Traffic Signal Improvements (Phase 3) This project will replace obsolete signal equipment with updated signal controllers, signal equipment, opƟmized corridor Ɵming plans, vehicle detecƟon system and emergency vehicle priority system. Pedestrian access will be upgraded to meet current ADA right of way accessibility design guidelines for the signalized intersecƟons. 14. Burden Rd/Rd 60 IntersecƟon Improvements This project will install a traffic signal at the intersecƟon of Burden Road and Road 60 and include any necessary ADA improvements. 15. E Lewis St/Heritage Blvd IntersecƟon Improvements This project will install a traffic signal at the intersecƟon of E Lewis Street and Heritage Blvd and include any necessary ADA improvements. 16. South Rd 68 Pavement PreservaƟon (NEW) This project involves the asphalt overlay and restriping of South Road 68 from Court Street to eastbound on/off I-182 ramp. 17. Safe Routes to School Project City will conƟnue to work closely with Pasco School District and parents/residents to idenƟfy and prioriƟze projects that qualify for the state’s biannual Safe Routes to School Program, which could include several locaƟons. This project typically involves providing sidewalks, enhancing intersecƟon crossings, providing ADA curb ramps, providing school zone beacons or rectangular rapid flashing beacons (RRFBs), and other safety related improvements within designated school walking routes. 18. Road 44 FCID Canal Crossing (NEW) Project along the west side of Road 44 to provide sidewalk connecƟvity to address exisƟng gap across Franklin County IrrigaƟon Canal structure. 2026-2031 TransportaƟon Improvement Plan (TIP) Project DescripƟons 3 19. South 4th Ave (FesƟval Street Improvements) This project will revise roadway configuraƟon and install sidewalk furnishings, lighƟng, street trees and landscaping to create a FesƟval Street on South 4th Avenue from Lewis Street to Columbia Street. The street will be able to be closed to motor vehicles during special events and further enhance the completed Peanuts Park improvement project to allow for greater and more varied use of Peanuts Park Plaza. Conceptual improvements for this project are included in the adopted Downtown Masterplan. 20. Sandifur Pkwy/Rd 84 IntersecƟon Improvements This project will install a traffic signal at the intersecƟon of Sandifur Parkway and Rd 84 and include any necessary ADA improvements. 21. Sacajawea Heritage Trail Levee Lowering This project will lower the levee and re-install a wider pathway for pedestrians and bicyclists from Road 52 to Road 72. 22. Court & Rd 100 IntersecƟon Improvements This project will convert the exisƟng angled T-intersecƟon at Court St and Road 100 into a roundabout or signalized intersecƟon, enhance traffic flow and safety in the area, and include any necessary ADA improvements. 23. Court St/Rd 60 IntersecƟon Improvements This project will install a traffic signal at the intersecƟon of Court St and Road 60 and include any necessary ADA improvements. 24. Sandifur Pkwy/ConvenƟon Drive IntersecƟon Improvements This project will install a traffic signal at the intersecƟon of Sandifur Parkway and ConvenƟon Drive and include any necessary ADA improvements. 25. I-182/Broadmoor Blvd I/C MulƟuse Pathway/Bridge Construct a ped/bike bridge with a mulƟ-use pathway across I-182 on the west side of the exisƟng overpass, between ramp terminals. 26. Columbia St Improvements This project will adjust Columbia Street roadway configuraƟon to include vehicle travel lanes, bike lanes, lighƟng, and bulb-outs at crossing locaƟons for increased pedestrian safety. Conceptual improvements for this project are included in the adopted Downtown Masterplan. 27. Burden Rd/Rd 44 IntersecƟon Improvements This project will install a traffic signal at the intersecƟon of Burden Road and Road 44 and include any necessary ADA improvements. 28. Rd 40 East Pathway This project will construct a mulƟ-use pathway along Road 40 E from ”A” Street to Sacajawea Park E. 2026-2031 TransportaƟon Improvement Plan (TIP) Project DescripƟons 4 29. Rainier Ave/Kartchner St IntersecƟon Improvements This project will install a traffic signal at the intersecƟon of Rainier Avenue and Kartchner Street at the locaƟon of the US 395 SB On/Off Ramps and include any necessary ADA improvements. 30. Court Street Improvements – Ped/Bike This project will improve Court Street from Road 96 to Harris Road to include bike and pedestrian faciliƟes and permanent traffic calming features. 31. Rd 76 Improvements – Sandifur Pkwy to Cordero Dr This project will install a traffic signal at the intersecƟon of Wrigley Drive and Road 76 and include any necessary ADA improvements and reconfigure corridor between Sandifur Pkwy and Cordero Dr. 32. N 4th Ave Pavement PreservaƟon (I-182 to County Line) (NEW) This project involves the asphalt overlay and restriping North 4th Ave from westbound on/off I-182 ramp to County Line (Glade Road). 33. Argent Road Widening (Phase 4) This project is Phase 4 of urban road improvements to Argent Road from Road 36 to Road 44. Improvements include street widening to a three-lane secƟon, illuminaƟon, stormwater faciliƟes, curb/guƩer, sidewalk, and related improvements. 34. Franklin County IrrigaƟon District Canal Bicycle/Pedestrian Pathway This project will construct a mulƟ-use pathway along the piped irrigaƟon canal from Road 100 to Road 76. 35. Rd 100 Widening This project will widen the Road 100 corridor to a 3-lane secƟon from W Court St to Chapel Hill Blvd. IntersecƟon Improvements (such as turn lanes) will be evaluated and implemented as part of this project. 36. Shoreline Rd Realignment This project will provide for the realignment of Shoreline Road from Shoreline Court to Burns Road. The realignment would be coordinated with the construcƟon of a park, to the west of the proposed roadway. 37. Burns Rd Extension to Glade Rd This project will extend Burns Road from the approximate alignment of Road 44 to Glade Road. 38. Burden Rd/Madison Ave IntersecƟon Improvements This project will install a traffic signal at the intersecƟon of Burden Rd and Madison Ave and include any necessary ADA improvements. 39. Court St Safety Improvements This project will reconfigure Court Street from Road 40 to Road 68 to three lanes, with one lane in each direcƟon and a center two-way-leŌ-turn lane and provides designated bike lanes in each direcƟon, and pedestrian facility enhancements. 2026-2031 TransportaƟon Improvement Plan (TIP) Project DescripƟons 5 40. James St Improvements This project is intended to provide pavement preservaƟon/reconstrucƟon of E James Street. 41. Harris Rd/Crescent Rd Overpass This project will construct an overpass over I-182 to connect Harris Road and Crescent Road. This project will connect the communiƟes north and south of I-182 and relieve some of the demand at Broadmoor Boulevard and the I-182 interchange. 42. Lewis Street Corridor Improvements (Phase 1) The project is intended to Ɵe the improvements made with the overpass project into those made under the Peanuts Park improvement project. This project will include ADA improvements, crosswalks, widened sidewalks, streetlights, re-striping and streetscape. NOTE: A revised scope is being considered to minimize impacts to businesses during construcƟon. 43. Lewis Street Corridor Improvements (Phase 2) This project will include ADA improvements, crosswalks, widened sidewalks, streetlights, re-striping and streetscape between 5th Ave and 10th Ave. NOTE: A revised scope is being considered to minimize impacts to businesses during construcƟon. 44. I-182/Broadmoor Blvd I/C Improvements – Westbound New mulƟ-lane roundabout at the I-182 westbound ramp terminal at Broadmoor Blvd on the north side of I-182. 45. Court St Safety Improvements (Phase 2) (NEW) This project will reconfigure Court Street from Road 68 to Road 96 to provide designated bike lanes in each direcƟon, and pedestrian facility enhancements, as well as . 46. Annual Pavement PreservaƟon The City has implemented an annual Pavement PreservaƟon Program to assess and maintain quality streets within the City. The program includes crack seal, overlay, chip seal, etc. of city streets. 47. Ped/Bike Gap Program This program idenƟfies and closes gaps in the pedestrian and bicycle network to enhance connecƟvity and safety. Annually, locaƟons are selected with stakeholder and community input, prioriƟzing areas based on traffic volumes, crash history, and proximity to schools, hospitals, transit, and essenƟal services. 48. Neighborhood Traffic Calming Program This program aims to enhance safety and livability in residenƟal areas by implemenƟng measures to reduce vehicle speeds and discourage cut-through traffic. This program includes the implementaƟon of traffic calming measures, such as: chicanes, islands, speed cushions, traffic circles, radar speed feedback signs, and other calming devices to create a safer and more pleasant environment for pedestrians, cyclists, and residents. 2026-2031 TransportaƟon Improvement Plan (TIP) Project DescripƟons 6 49. Comprehensive Safety AcƟon Plan (SS4A) Pasco’s Comprehensive Safety AcƟon Plan (CSAP) will help idenƟfy the updated 2024 problem areas through systemaƟc data collecƟon, recommending innovaƟve and appropriate countermeasures, and prioriƟzing safety improvements that will benefit all users. The recommended soluƟons will aim to reduce the frequency and severity of crashes, with an emphasis in reducing fataliƟes and serious injuries. 50. Traffic Analysis for US 12 This project will consist of a traffic analysis for US 12 from the intersecƟons of A Street to Tank Farm Road/Sacajawea Park Road. This study will be completed in partnership with WSDOT in search of pracƟcal soluƟons for safety improvements at these locaƟons. 51. Interchange Feasibility Study This study will evaluate the potenƟal for modifying exisƟng interchanges along I-182, in order to improve traffic flow and safety. It serves as a planning document, defining "purpose and need" and conducƟng traffic analysis to coordinate potenƟal soluƟons with DOT and FHWA. 52. Rd 68/Taylor Flats Rd IntersecƟon Study (NEW) This study will consist of a traffic and safety analysis for the intersecƟon of Road 68 and Taylor Flats Road. The intersecƟon has split ownership with Franklin County. 53. Sign ReflecƟvity Analysis & ImplementaƟon The project will evaluate up to 500 stop signs that are near the end of their service life (older than 12 years) and upgrade the retro-reflecƟvity as needed. The project will also include the evaluaƟon of the stop sign size and may increase stop signs from 30” to 36” signs. In addiƟon, red reflecƟve strips will be added to the stop sign poles as warranted. 2026-2031 TransportaƟon Improvement Plan (TIP) Project DescripƟons 7 REMOVED PROJECTS 1. Burns Rd/Broadmoor Blvd IntersecƟon Improvements This project will install a traffic signal at the intersecƟon of Burns Road and Broadmoor Blvd. Sidewalks and any necessary ADA improvements will be included. 2. Sandifur Pkwy Extension This project will extend Sandifur Parkway from the vicinity of Road 103 to Road 108. Provisions for future traffic signals will be included at the intersecƟon of Sandifur and Road 105. A roundabout will be constructed at the intersecƟon of Sandifur Parkway and Road 108. 3. Sandifur Pkwy/Broadmoor Blvd IntersecƟon Improvements This project will improve the intersecƟon of Sandifur Parkway and Broadmoor Boulevard. AddiƟonally, Broadmoor Blvd. widening will be included as part of this project extending north up to Burns Road. Provisions for a future traffic signal at Buckingham Dr are considered in this project. 4. Road 108 Extension This project will construct a 2-lanes road from Harris Road to Sandifur Parkway. 5. W 'A' St/6th Ave Pedestrian Crossing Install Rectangular Rapid Flashing Beacons, curb extensions, illuminaƟon, signing, pavement markings, and curb ramps. 6. Commercial Ave/Kartchner St IntersecƟon Improvements This project will install a traffic signal at the intersecƟon of Commercial Ave and Kartchner St at the locaƟon of the US 395 NB On/Off Ramps and include any necessary ADA improvements. 7. Citywide Injury MinimizaƟon & Speed Management ImplementaƟon Conduct Citywide speed data collecƟon and study. Install speed limit signing and radar speed feedback signs. Ro a d 4 4 E Hillsboro St Ro a d 8 4 W Pearl St E Lewis St R o a d 6 8 Ro a d 3 6 S 1 0 T h A v e N 4 T h A v e E Doc k S t S O r e g o n A v e N O r e g o n A v e N 1 4 T h A v e N R a i l r o a d A v e I n d u s t r i a l W a y Harris Rd Pasco K a h l o t u s R d Burns Rd Ro a d 5 2 G l a d e N o r t h R d Ro a d 6 8 W C o u r t S t N C a p i t o l A v e Burns Rd N 2 0 T h A v e W Le w i s S t W Court St W Wernett Rd N C o m m e r c i a l A v e W Argent Rd Chapel Hill Blvd W Argent Rd W Court St E Ains w o r t h A v e Sandifur Pkwy W Sylvester St N 4 T h A v e E A St 50 52 1 9 25 18 5 4 1 11 242 3 12 43 40 31 9 26 8 4 33 35 21 6 28 6 3 6 37 16 34 39 30 45 3 2 15 29 7 24 13 38 27 20 23 44 10 22 1 1 Transportation Improvement Program (TIP) 2026-2031 Legend Project Type Ped Crossing Signal/Intersection Bike/Ped New Road Other Study Area Admin Boundary City Limits Pasco Urban Growth Boundary Date Saved: 6/12/2025 11:06 AM ²