HomeMy WebLinkAbout4591 Resolution - RH2 PSA NW Irrigation Pump Station Amend 2Resolution – NW Irrigation Systems Expansion PSA Amendment No. 2 - 1 RESOLUTION NO. 4591 A RESOLUTION OF THE CITY OF PASCO, WASHINGTON, AUTHORIZING THE INTERIM CITY MANAGER TO EXECUTE AMENDMENT NO. 2 FOR THE PROFESSIONAL SERVICES AGREEMENT (PSA) WITH RH2 ENGINEERING, INC. FOR NORTHWEST IRRIGATION SYSTEMS EXPANSION PROJECT. WHEREAS, the City of Pasco (City) and RH2 Engineering, Inc. (RH2) entered into a Professional Services Agreement on April 26, 2022, to provide Engineering services with respect to the NW Irrigation Systems Expansion Project; and WHEREAS, the City and RH2 entered into Amendment No. 1 on November 28, 2023, a no cost time extension, to the original engineering contract to complete engineering (design) services; and WHEREAS, the City and RH2 desire to enter into Amendment No. 2 to the professional Services Agreement to provide additional professional engineering services as described in Exhibit A. These additional services include, but not limited to, update to site plan due to the subdivision changes, coordination with South Columbia Basin Irrigation District, and updates to the functionality of the pump station site; and WHEREAS, the City Council of the City of Pasco, Washington, has after due consideration, determined that it is in the best interest of the City of Pasco to enter into Amendment No. 2 to the Professional Services Agreement with RH2. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO, WASHINGTON: That the City Council of the City of Pasco approves the terms and conditions of Amendment No. 2 to the Professional Services Agreement between the City of Pasco and RH2 Engineering, Inc. as attached hereto and incorporated herein as Exhibit A. Be It Further Resolved, that the Interim City Manager of the City of Pasco, Washington, is hereby authorized, empowered, and directed to execute said Amendment No. 2 to the Professional Services Agreement on behalf of the City of Pasco; and to make minor substantive changes as necessary to execute this Amendment. Be It Further Resolved, that this Resolution shall take effect immediately. Resolution – NW Irrigation Systems Expansion PSA Amendment No. 2 - 2 PASSED by the City Council of the City of Pasco, Washington, on this 21st day of April, 2025. _____________________________ Pete Serrano Mayor ATTEST: APPROVED AS TO FORM: _____________________________ ___________________________ Debra Barham, MMC Kerr Ferguson Law, PLLC City Clerk City Attorneys RH2 Engineering, Inc. – Amendment No. 2 to PSA Northwest Irrigation System Upgrade – Project No. 23-242 Version 2.19.2025 Page 1 AMENDMENT NUMBER 2 to PROFESSIONAL SERVICES AGREEMENT Northwest Irrigation System Upgrade PROJECT: 23-242 AGREEMENT NO. 22-013 WHEREAS, the City and RH2 Engineering, Inc. entered into a Professional Services Agreement on 4/26/2022 to provide engineering services with respect to the Northwest Irrigation System Upgrade project. WHEREAS, the City and RH2 Engineering, Inc. entered into an Amendment No. 1 to provide additional time of performance on 11/28/2023. NOW, THEREFORE, this agreement is amended to allow RH2 Engineering, Inc. to provide additional engineering services and additional time of performance as described in Exhibit A. 1. Scope of Work: See Exhibit A. 2. Fee: The compensation for the work is based on a Time and Materials Basis not to exceed the amount of $233,857.00 for a total authorization amount of $529,519.00. See Exhibit B. 3. Time of performance: The services shall now be complete for the project on or before 12/31/2026. DATED THIS DAY______________________________. [date of execution] CITY OF PASCO, WASHINGTON RH2 ENGINEERING, INC. Dave Zabell, Interim City Manager Paul Cross, PE, Principal 1 3/31/2025 10:20:12 AM \\CORP.RH2.COM\PROJECTS\PROJECT\DATA\PSC\22-0079\00 CONTRACT\AMEND NO. 2\AMEND NO. 2_SOW_NW IRR SYSTEM UPGRADE.DOCX Scope of Work Amendment No. 2 City of Pasco Northwest Irrigation System Upgrade April 2025 Background The City of Pasco (City) is planning for water, sewer, and irrigation system expansion to meet Growth Management Act concurrency requirements for the expanded Urban Growth Area (UGA) boundaries proposed by the City’s 2018-2038 Comprehensive Plan for land use. The City’s Community and Economic Development Department anticipates that a significant amount of the 20 -year growth will occur in the northwest planning areas that currently are not served by City utilities. The City asked RH2 Engineering, Inc., (RH2) to prepare the Northwest Irrigation System Study to build upon other recent studies prepared by RH2 for the City for both sewer in the Addendum to the Comprehensive Sewer Plan (2021) and irrigation in the Irrigation System Capacity Analysis (2018) and Future Irrigation System Supply (2019) reports. This first phase of the study was intended to develop a preliminary layout of a trunkline irrigation system with proposed pressure zones and to consider the source of supply coming directly or indirectly from the Columbia River, groundwater supplies, the South Columbia Basin Irrigation District (SCBID), or some combination thereof based upon the advantages and disadvantages of each alternative. In the second phase, the City asked RH2 to complete the preliminary design of a Municipal and Industrial (M&I) Pump Station with supply from SCBID. Primary coordination with Barker Heights, Solstice Community (Solstice), and SCBID occurred to determine an interim operational plan for Barker Heights and Solstice and a long-term operational plan with SCBID to draw directly from the Pumping Plant 6.0 lateral (PPL) and recover water from the PPL 6.0 wasteway when it is filled during power outages and canal treatments. The third phase of the study involves performing a final design of the M&I Pump Station and working with SCBID and Barker Heights on delivery and pipeline details to serve both the upper and lower zones within the expanded service area. Preliminary cost estimates and methods of repayment will be advanced as details of the final design and M&I Pump Station service contract with the U.S. Bureau of Reclamation (Reclamation) are formalized. As discussed with City staff, RH2 has expended the fee originally intended for the final design of the M&I Pump Station due to repeated design changes brought about by City requests and changes in the Barker Heights development, coordination with SCBID, and the City’s Special Use Permit process. Some key changes included multiple changes to the site’s location, dimensions, setbacks, easements, and off-site improvement requirements. Additionally, the design scope has been expanded to include the design of additional improvements both on and off-site to streamline cross-agency coordination and finalize the design. EXHIBIT A City of Pasco Amendment No. 2 Northwest Irrigation System Upgrade Exhibit A – Scope of Work 2 3/28/2025 1:52:26 PM \\CORP.RH2.COM\PROJECTS\PROJECT\DATA\PSC\22-0079\00 CONTRACT\AMEND NO. 2\AMEND NO. 2_SOW_NW IRR SYSTEM UPGRADE.DOCX This Scope of Work outlines the remaining effort for final design updates and replenishes the expended budget that was originally intended for permitting assistance, supervisory control and data acquisition (SCADA) and control system coordination, services during bidding, and limited services during construction. This Scope of Work will be supported by RH2’s subsidiary, Control Systems NW LLC (CSNW), via intercompany subcontract services agreement. Task 1 – Project Management Objective: Administer, manage, and monitor the RH2 project team, resources, communications, scope progress, budget, files, and records. Approach: Review and monitor project progress, schedule, scope, and budget. Manage the RH2 project team and resources. Provide monthly invoices with progress reports documenting work performed and budget status. Communicate with the City regarding project progress, invoicing, and schedule. Maintain electronic project files and records. RH2 Deliverables: • Monthly invoices and progress reports in electronic PDF. Task 2 – Bid-Ready Design Objective: Prepare bid-ready design plans, specifications, and an Engineer’s opinion of probable construction cost (OPCC) for the project. Approach: Coordinate with SCBID to determine the pump station suction line alignment and requirements for the suction line turnout structure and emergency overflow wasteway culverts. Coordinate with the Barker Heights developer’s representative (JF Engineering, Inc., [JF Engineering]) to obtain the AutoCAD and topography files from the Barker Heights Subdivision to use the same topography and boundary files for the M&I Pump Station and transmission main improvements. Prepare the cover sheet, general information drawings, and phasing plan drawing(s). Prepare the site/civil plan drawings showing existing site and facility layouts, temporary erosion control and construction measures and layouts, site grading improvements, proposed facility layouts, surface improvements, and utility improvements. Prepare a Stormwater Pollution Prevention Plan and a Traffic Control Plan. City of Pasco Amendment No. 2 Northwest Irrigation System Upgrade Exhibit A – Scope of Work 3 3/28/2025 1:52:26 PM \\CORP.RH2.COM\PROJECTS\PROJECT\DATA\PSC\22-0079\00 CONTRACT\AMEND NO. 2\AMEND NO. 2_SOW_NW IRR SYSTEM UPGRADE.DOCX Prepare the mechanical drawings showing the proposed pipe routing and equipment installation. Size piping and size and select equipment and pumps. RH2 indicated to the City in June 2023 that noise level from the proposed pump may reach approximately 67 dba at nearby properties, with the proposed wall anticipated to help slightly reduce these levels. The City’s Special Use Permit indicates a maximum of 45 dba is allowed at the neighboring properties at night. RH2 indicated it is unlikely that the proposed wall will reduce noise levels at neighboring properties to 45 dba. However, City direction to RH2 has remained that the proposed Pump Station shall be an exterior facility without additional sound dampening improvements. Provide a hydraulic assessment of the proposed improvements , including a surge and transient analysis for pumping to and controlling pressures based upon water levels in the irrigation reservoir at Road 68 and Sandifur Boulevard. a) Analyze up to three (3) scenarios of an extended period simulation of the M&I Pump Station and perform a hydraulic transient analysis using HAMMER. b) Prepare a summary report of the hydraulic transient analysis and mitigation options. c) For this Scope of Work, the surge and transient analysis will be limited to forty (40) hours. Any assistance beyond forty (40) hours is outside of the scope of this contract and will be negotiated through a contract amendment. Prepare structural design, calculations, and details for the proposed pump station slab and ancillary supports and structures. Prepare electrical, instrumentation, and control design, including electrical design, standby generator design, process and instrumentation control, and telemetry systems to interface with the City’s existing system. Prepare design plans for off-site transmission mains. Coordinate points of connection with JF Engineering. Prepare design plans for the PP 6.0 turnout and PPL 6.0 wasteway culverts. Coordinate with SCBID on construction scheduling requirements and delineation of construction responsibilities for inclusion in the specifications. Prepare the OPCC based on 90-percent design documents. Develop non-technical (front-end) and technical specifications. Provide the advertisement for bids, instructions to bidders, general conditions, construction contract, insurance provisions, and other typical forms used for the bidding and engagement of public works contracts. Prepare Division 1 (general) through Division 18 (measurement and payment) of the technical specifications. It is assumed that the front-end documents will be based on City-provided bid forms and construction contract documents and modified by RH2. It is assumed that RH2 will use its modified Construction Specifications Institute (CSI) specifications for the technical specifications. City of Pasco Amendment No. 2 Northwest Irrigation System Upgrade Exhibit A – Scope of Work 4 3/28/2025 1:52:26 PM \\CORP.RH2.COM\PROJECTS\PROJECT\DATA\PSC\22-0079\00 CONTRACT\AMEND NO. 2\AMEND NO. 2_SOW_NW IRR SYSTEM UPGRADE.DOCX Perform internal quality assurance and quality control (QA/QC) review of the 99-percent design plans and specifications. Submit the 99-percent design plans, specifications, and OPCC to the City, SCBID, and Barker Heights developer’s representative (JF Engineering, Inc.). Prepare meeting agenda and attend one (1) meeting with the City to discuss 99-percent review comments. Prepare meeting minutes. Review and respond to the City’s third-party review of the 90-percent design documents (if any). Incorporate 99-percent and QA/QC review comments and permitting conditions into the plans and specifications. Prepare bid-ready plans and specifications and a final OPCC. Assumptions: • SCBID reviews will be limited to components related to delivery of water from the PP 6.0 lateral, retrieval of water from the PPL 6.0 wasteway, and improvements either crossing or located within the PPL 6.0 wasteway. • SCBID will design or provide adequate details to be incorporated into the plan set for the 30-inch-diameter delivery on the PP 6.0 lateral that will be connected to the M&I Pump Station suction line. • Power extensions for the project will include sufficient three-phase power to the Phase 1, Lot 1 site. The electrical service provider will bring a ground-level pad-mounted transformer to the site for use on this project. • RH2 will rely upon the accuracy and completeness of information, data, and materials generated or produced by the City or others in relation to this Scope of Work. RH2 assumes that the entity providing such information is either the owner of such information or has obtained written authorization from the owner to distribute said information. • Meetings are assumed to take place at the City’s public works and engineering offices but may take place virtually depending on health and safety protocols in effect at the time of the meeting. The City and RH2 will mutually agree on the meeting format. • The design will utilize City standard details and City general contractual conditions and forms to the extent applicable. • The design does not include additional provisions for other utilities. If additional utilities are added to this Scope of Work, an amendment will need to be mutually determined between the City and RH2. • Upon reviewing information, materials, or data provided by others in relation to this project, RH2 will coordinate with the City to identify missing or incomplete information deemed necessary to complete the work. Any work outside of this Scope of Work will be negotiated as part of an amendment. It is assumed that the Barker Heights development plat map and proposed M&I BPS site reviewed with the City on December 3, 2024, reflect the final configuration of the Barker Heights development, and there shall be no additional developer-driven changes requiring another re-design of the M&I BPS. Any additional work City of Pasco Amendment No. 2 Northwest Irrigation System Upgrade Exhibit A – Scope of Work 5 3/28/2025 1:52:26 PM \\CORP.RH2.COM\PROJECTS\PROJECT\DATA\PSC\22-0079\00 CONTRACT\AMEND NO. 2\AMEND NO. 2_SOW_NW IRR SYSTEM UPGRADE.DOCX triggered by future changes to the Barker Heights development will be considered work performed outside of this Scope of Work. • It is assumed that the irrigation main construction will be done in the right-of-way (ROW), within dedicated streets of the proposed subdivision, or within a defined easement; therefore, there is no need to research or provide services for easement acquisition. • It is assumed that no utilities with cathodic protection are present in the vicinity of the proposed alignment. Provided by City: • Front-end bid forms and construction contract documents in MS Word format. • Review comments on 90-percent design documents. • Attendance at 99-percent design review meeting. RH2 Deliverables: • Stormwater Pollution Prevention Plan and Traffic Control Plan in electronic PDF. • Summary report of hydraulic transient analysis in electronic PDF. • Structural calculations in electronic PDF. • 99-percent plans, specifications, and OPCC in electronic PDF. • Meeting agenda and minutes for the 99-percent design review meeting in electronic PDF. • Bid-ready documents in electronic PDF. Task 3 – Permitting Assistance Objective: Assist the City with the preparation of documents and permit submittals to meet local and state requirements for Franklin County’s (County) ROW Permit and encroachment process, as well as other required City permit processes. Approach: Attend up to two (2) meetings with the City to discuss permitting tasks and progress. Prepare meeting agenda and minutes for each meeting. Prepare and submit a ROW Permit application to the County for review and final submittal for irrigation lines encroaching and crossing Burns Road. A ROW Permit from the County is not required for Broadmoor Boulevard and the portion of Burns Road that is within the City limits. Assumptions: • This Scope of Work assumes that previous State Environmental Policy Act (SEPA) checklists and determinations for the Barker Heights subdivision are applicable to this project. No additional SEPA coordination is included in this Scope of Work. City of Pasco Amendment No. 2 Northwest Irrigation System Upgrade Exhibit A – Scope of Work 6 3/28/2025 1:52:26 PM \\CORP.RH2.COM\PROJECTS\PROJECT\DATA\PSC\22-0079\00 CONTRACT\AMEND NO. 2\AMEND NO. 2_SOW_NW IRR SYSTEM UPGRADE.DOCX • This Scope of Work assumes that previous cultural assessments for Barker Heights and the USBR PPL 6.0 wasteway are applicable to this project. No additional coordination with the Washington State Department of Archaeology and Historic Preservation (DAHP) and affected local Tribes is included in this Scope of Work. • If human remains are found within the project area, all cultural field investigations will cease immediately, proper authorities will be notified, and field investigations will not resume until applicable state laws are addressed. • This Scope of Work assumes that an Inadvertent Discovery Plan (IDP) and a Cultural Resources Survey to assess potential project impacts was provided to DAHP, the Tribes, and other regulatory agencies for consultation as part of the Barker Heights development, and that another IDP will not be required as part of this project. • No engineering report will be required for review and approval. • The City will submit all final permit applications directly. • The City will pay all permit and review fees directly. • No federal or state funds are involved in the project that would require additional coordination. • Reclamation may require additional federal permitting, federal biological assessments, or evaluations. This work is outside of this Scope of Work and will require an amendment to this contract if requested. • Archaeological monitoring, more detailed scientific assessment, or other requirements imposed as part of the permit approval process will require additional authorization and a modification to this Scope of Work. • Permitting-related work will be conducted on a time and expense basis with the goal that the required permitting can be accomplished within the proposed permitting budget included in the attached Fee Estimate. • No date is warranted or implied for agency response or approval and acceptance of permit applications is beyond the control of RH2 and the City. • Meetings are assumed to take place at the City’s public works and engineering offices but may take place virtually depending on health and safety protocols in effect at the time of the meeting. The City and RH2 will mutually agree on the meeting format prior to each meeting. • Preparation and submission of a Reclamation/SCBID Crossing Permit for the PPL 6.0 wasteway for both the upper and lower zone pipelines is covered under a separate contract. Provided by City: • Easement negotiations, if necessary. • Review and comment on draft permit applications prior to submittal. City of Pasco Amendment No. 2 Northwest Irrigation System Upgrade Exhibit A – Scope of Work 7 3/28/2025 1:52:26 PM \\CORP.RH2.COM\PROJECTS\PROJECT\DATA\PSC\22-0079\00 CONTRACT\AMEND NO. 2\AMEND NO. 2_SOW_NW IRR SYSTEM UPGRADE.DOCX • Submittal of permit applications and payment of permit application fees. • Determination and publication elements of permit applications. RH2 Deliverables: • One (1) completed County ROW Permit in electronic PDF. • Attendance at up to two (2) meetings with agency and City staff. Meeting agendas and minutes for each meeting in electronic PDF. Task 4 – SCADA and Control System Coordination Objective: Prepare communications and control strategy for the M&I Pump Station to be controlled off the tank level in the irrigation standpipe at Road 68 and Sandifur Boulevard. This Task will be supported by RH2’s wholly owned subsidiary CSNW. Approach: Attend one (1) kick-off meeting with City staff and its SCADA system integrator to discuss communications and control strategies for the M&I Pump Station. Confirm the equipment requirements necessary to meet City standards for communications and control. Identify elements of the work that will be performed by RH2 and CSNW and those that will be performed by City staff and the City’s integrator once the system is ready for startup. Assist the City with controls during startup so that the M&I Pump Station can continue to operate at the delivery flows without interruption, necessitating any changes in supply to occur within the existing City system. Prepare a technical memorandum documenting the control strategy and decisions made. Effort for startup and control assistance is difficult to predict. For this Scope of Work, startup and control assistance will be limited to six (6) hours from RH2 and sixteen (16) hours from CSNW. Any assistance beyond twenty-two (22) hours is outside of the scope of this contract and will be negotiated through a contract amendment. Assumptions: • The City will be required to order an instantaneous supply of water from SCBID and take it at the same rate until the order can be modified through SCBID. This includes adding supplies from the PPL 6.0 wasteway when required. If overall supplies within the City system are greater than demand, the pressure will increase, and the standpipe reservoir will fill. If the reservoir levels exceed control levels, wells and/or the Columbia River Intake supplies will be curtailed to avoid changes in the M&I Pump Station discharge. Provided by City: • Attendance at kick-off meeting. • Programming of the City system to accept communications and reservoir level feedback to the M&I Pump Station site. City of Pasco Amendment No. 2 Northwest Irrigation System Upgrade Exhibit A – Scope of Work 8 3/28/2025 1:52:26 PM \\CORP.RH2.COM\PROJECTS\PROJECT\DATA\PSC\22-0079\00 CONTRACT\AMEND NO. 2\AMEND NO. 2_SOW_NW IRR SYSTEM UPGRADE.DOCX • Programming of the City system to adjust supplies to maintain M&I Pump Station flow requirements. RH2 Deliverables: • Attendance at kick-off meeting with City integrator and City staff. Meeting agenda and minutes in electronic PDF. • Technical memorandum summarizing communications and control strategy in electronic PDF. Task 5 – Services During Bidding Objective: Provide engineering assistance throughout the bidding phase to prepare documentation and respond to contractor questions. Approach: Prepare advertisement for bids, contact potential bidders, and coordinate the timing and placement of the bid advertisement with the City. The City will submit the advertisement to the appropriate publications and directly pay for the advertisements. Respond to contractor and supplier questions during bidding, review product prequalification requirements, and document responses to the file. Prepare up to three (3) addenda when determined necessary to clarify, revise, or change construction plans, technical specifications, or project conditions during the bidding process. Attend one (1) site visit with prospective bidders and the City. Review bids and assist the City with the evaluation of the qualifications and references for the apparent low bidder. The City will administer the bid opening and prepare the bid tabulation to confirm total bid prices. The City will prepare and issue the project award recommendation letter. Assumptions: • Because services during bidding can vary in nature, Task 5 services will be performed to the level of effort identified in the attached Fee Estimate. If needed, additional work will be mutually determined by the City and RH2. Provided by City: • Submit and pay for the advertisements to the appropriate publications. • Bid tabulation. • Project award recommendation letter and construction contract execution. RH2 Deliverables: Advertisement for bid in electronic PDF. Written responses to vendor and bidder questions during the advertisement phase, submitted to the City in electronic PDF or via email. City of Pasco Amendment No. 2 Northwest Irrigation System Upgrade Exhibit A – Scope of Work 9 3/28/2025 1:52:26 PM \\CORP.RH2.COM\PROJECTS\PROJECT\DATA\PSC\22-0079\00 CONTRACT\AMEND NO. 2\AMEND NO. 2_SOW_NW IRR SYSTEM UPGRADE.DOCX Up to three (3) addenda in electronic PDF. Attendance at one (1) site visit with bidders and the City. Reference check of lowest bidder. Task 6 – Services During Construction (Limited) Objective: Provide technical services during project construction to support the City. As the engineer of record, perform at least one (1) site visit to observe the construction progress. Coordinate with the City and its designated utility and special inspector to respond to technical questions and issues that arise when RH2 is offsite. It is anticipated the City will take the lead in inspection and construction contract administration and will handle day-to-day responsibilities. Approach: Assist the City for a maximum of one hundred twenty (120) hours to perform on -site observation and respond to contractor’s requests for information (RFIs) or change orders. Assumptions: • It is assumed that the City will provide most services during construction. If the City determines it needs technical support from RH2, a maximum of one hundred twenty (120) hours to respond to contractor questions, observe construction activities, observe special inspections, or assist with RFIs and change orders is provided in this Scope of Work and Fee Estimate. Effort for these services in excess of one hundred twenty (120) hours are outside of this Scope of Work and will be negotiated as part of an amendment. • RH2 is not responsible for site safety or for directing the contractor in their work. RH2 Deliverables: • Applicable field observation reports and documentation in electronic PDF. • Written responses to RFIs and change order requests in electronic PDF. Task 7 – Management Reserve Objective: Provide additional services as requested by the City. Approach: Provide additional services as requested and authorized by the City. The City shall provide written authorization to proceed with any supplemental services. RH2 Deliverables: • Other deliverables as requested by the City under the authorization for supplemental services. City of Pasco Amendment No. 2 Northwest Irrigation System Upgrade Exhibit A – Scope of Work 10 3/28/2025 1:52:26 PM \\CORP.RH2.COM\PROJECTS\PROJECT\DATA\PSC\22-0079\00 CONTRACT\AMEND NO. 2\AMEND NO. 2_SOW_NW IRR SYSTEM UPGRADE.DOCX Project Schedule RH2 is prepared to commence with the work upon written authorization from the City. Project construction, startup, and testing is scheduled for completion in April 2027, or ninety-three (93) weeks following authorization to commence work, whichever comes later. EXHIBIT B Fee Estimate Amendment No. 2 City of Pasco Northwest Irrigation System Upgrade Apr-25 Description Total Hours Total RH2 Labor Total Hours Total CSNW Labor Total Expense Total Cost Task 1 Project Management 33 7,601$ --$ 190$ 7,791$ Task 2 Bid-Ready Design 620 131,192$ --$ 13,042$ 144,234$ Task 3 Permitting Assistance 39 9,386$ --$ 976$ 10,362$ Task 4 SCADA and Control System Coordination 8 2,152$ 32 8,608$ 605$ 11,365$ Task 5 Services During Bidding 46 10,656$ --$ 480$ 11,136$ Task 6 Services During Construction (Limited)120 25,566$ --$ 2,614$ 28,180$ Task 7 Management Reserve 80 19,960$ --$ 829$ 20,789$ PROJECT TOTAL 946 206,513$ 32 8,608$ 18,736$ 233,857$ J:\Data\PSC\22-0079\00 Contract\Amend No. 2\Amend No. 2_FEE_NW Irr System Upgrade 3/28/2025 9:52 AM RATE LIST RATE UNIT Professional I $172 $/hr Professional II $188 $/hr Professional III $209 $/hr Professional IV $231 $/hr Professional V $246 $/hr Professional VI $263 $/hr Professional VII $287 $/hr Professional VIII $309 $/hr Professional IX $318 $/hr Technician I $133 $/hr Technician II $146 $/hr Technician III $165 $/hr Technician IV $179 $/hr Technician V $197 $/hr Technician VI $215 $/hr Technician VII $234 $/hr Technician VIII $244 $/hr Control Specialist I $175 $/hr Control Specialist II $191 $/hr Control Specialist III $213 $/hr Control Specialist IV $234 $/hr Control Specialist V $249 $/hr Control Specialist VI $269 $/hr Control Specialist VII $294 $/hr Control Specialist VIII $317 $/hr Control Specialist IX $326 $/hr Control Technician I $134 $/hr Control Technician II $148 $/hr Control Technician III $171 $/hr Control Technician IV $182 $/hr Control Technician V $198 $/hr Control Technician VI $217 $/hr Control Technician VII $236 $/hr Control Technician VIII $247 $/hr Administrative I $89 $/hr Administrative II $104 $/hr Administrative III $122 $/hr Administrative IV $145 $/hr Administrative V $171 $/hr CAD/GIS System $27.50 $/hr CAD Plots - Half Size $2.50 price per plot CAD Plots - Full Size $10.00 price per plot CAD Plots - Large $25.00 price per plot Copies (bw) 8.5" X 11"$0.09 price per copy Copies (bw) 8.5" X 14"$0.14 price per copy Copies (bw) 11" X 17"$0.20 price per copy Copies (color) 8.5" X 11"$0.90 price per copy Copies (color) 8.5" X 14"$1.20 price per copy Copies (color) 11" X 17"$2.00 price per copy Technology Charge 2.50%% of Direct Labor Night Work 10.00%% of Direct Labor Mileage $0.7000 price per mile (or Current IRS Rate) Subconsultants 15%Cost + Outside Services at cost RH2 ENGINEERING, INC. 2025 SCHEDULE OF RATES AND CHARGES Rates listed are adjusted annually.