Name change from Audit & Finance.
To — Budget & Finance.
Audit & Finance Committee is not part of the audit process.
Name change would be consistent with Committee's purpose.
Watkins Endeavor, LLC review:
Caroline Bowdish and I met to conduct the review
Watkins Endeavor is a District vendor.
Review requested by City Manager's office.
Review dated presented to City Manager 01-28-2025.
r
;' J, A , l )
l � C-
t�= (D
Summary review included following:
1.) Overall Committee finds Matt Watkins work is good.
2.) City has requirements regarding reporting to the City, and vendor insurance coverage.
3.) Financial management —continuing education financial literacy.
4.) Communication —taxpayers & Board members. Visual information would be helpful.
5.) Compensation — 2.9% increase from $10,390 to $10,691 per month.
Mark Morrissette, Committee Chair
Audit & Finance Committee
02-18-2025
PPFD - Aquatics Facility WENAHA
MASTER BUDGET - BIG SHEET G R O U R
A
e
c
D
E=B-D
Sub -Area
Description
Original
Budget
Revised
Budget
Cost To Date
Forecast Total
Revised
Budget vs.
Forecast
Bond
& Legal
Bond Counsel
$ 70,000
$ -
$ -
$ -
Bond Sales
$ 310,000
$
$
$
Municipal Advisor
$ 70,000
Insurance - Builder's Risk- In PDB
$
$
$
6576.1
6576.2
Outside Counsel - PDB
Other Le al Costs
$ 20,000
$ 45,000
$ 20,000
$ 45,000
$ 30,460
$ 20,000
$ 45.000
$
$
Subtotal
$ 515,000
$ 65,000
1 $ 56,815
$ 65,000
1 $
6576.3
Miscellaneous
$
$ -
$
6576.4
Project Staff Costs - PPFD Staff
$ 312,000
$ 312,000
$
$ 312,000
$
6576.5
lCity of Pasco Staff - ILA
$ 450,000
$ 450,000
$
$ 450,000
$
Archaeological cosultant - In PDB
$
$ -
$
iTesting & Inspection / Special Inspections - In PDB
$
$
$
Plan Check, Building Permits - In PDB
$
$
$
Environmental/SEPA -InPDB
$
$
$
6576.6
Other AHJFees / System Development Char es
$
$
$
6562.1
Electrical / Utility Fees
$ 100,000
$ 100,000
$
$ 100,000
$
6576.7
State Commerce Department Review
$ 30,000
$ 50,000
$ 30,000
$ 50,000
$
6576.8
Shrub Steppe Mitigation - In PDB
$
$
$
6576.9
Other Admin Costs
$ 30,000
1 $ 30,000
$ 10000
$ 30D00
1 $
Subtotal
$ 922,000
1 $ 942,000
$ 40,000
$ 942,000
IS
Off -Site Related Costs
TemporaryOffices-,nPDB
Offsite road and utility improvements
$ 2,000,000
$
$
$ -
$
6540.1
Property Acquisition
$ 3,600,000
$ 4,950,000
$ 4,626,380
$ 4,950,000
$
Other Off -site Costs
$
$ _
$
Subtotal
$ 5,600,000
$ 4,950,D00
$ 4,626,380
$ 4,950,000
$
Ir
Professional Fees
6562.2
Project Management
$ 850,000
Aw
$ 850,000 1 $
372,974
$ 850,000
$
Architectural & Engineering- In PDB
$
-
$
$
Survey -InPDB
$
$
$ 10,000
$
$
Geotechnical Engineer- In PDB
$ 30,000 $ 10,000 $
Hazardous Materials Consultants
$
$
$
Building Envelope Consultant- In PDB
$
$
$
,Commissioning - In PDB
$
$
$
PDB Validation Costs - DB
$
$
$ 50,000
$
1 $
nde endent Estimating
$ 50,000 1 $ 50.000 $
Subtotal
1 $ 930,000
$ 910,000 $
772,974
$ 910,000
$
Building. • 'D: Contract
6549.1
Design -Builder
$ 30,250,000
$ 32,720,000
$ 2,095,872
$ 32,720,000
$
6562.3
Archeological Consultant
$ 50,000
$ 50,000
$ -
$ 50,000
$
6562.4
Testing and Special Inspections
$ 150,000
$ 150,000
$
$ 150,000
$
6562.5
Plan Check, Building Permits
$ 300,D00
$ 300,000
$
$ 300,000
$
6562.6
Environmental/SEPA
$ 10,000
$ 10,000
$
$ 30,000
$
Additional Funds for Option 2
$ 3,430,000
$
$ 3,430,000
$
$ 800,000
$
$ 800,000
$
Added Betterments
$ 2,300,000
$ 2,300,000
Sale Tax included above
$
$
$
Subtotal
$ 30,760,0 01
$ 39,760,DD0
1 $ 2,095,872
$ 39,760,000
$
Furnishings & Equipment
FF&E
$ 600,000
$ 600,000
$
$ 600,000
$
Network Equipment
$
$ _
$
Telecommunications
$ 20,000
$ 20,DD0
$
$ 20,000
$
XSubtotal
Moving Expenses
$$_
$
FF&E Consultant
$ 20,000
$ 20,000
$
$ 20,000
$
Other FF&E Costs
$$$$$
$ 640,000
$ 640,000
1 $
$ 640,000
$ -
Contingency
6578.1 Owner's Contingency 7.7%of construction cost $ 2,580,000 $ 3,590AD0 $ 500.000 1 $ 3 590,400 $
Subtotal $ 2,580,000 $ 3,590,400 $ 3,590,400 $
Under/(Over)
TOTAL $ 41,947,000 $ 50,857,400 $ 7,192,041 $ 50,857,400 1 $ -
IIncome & Project Under/Over
Bond Proceeds
$ 50,046,928
Interest Income
$
PPFD Cash Reserves
$ 1,000,000
$
7otallncome
J $ 51,046,928
Page 1
Total Project cost
$ 50,857,400
7otallncome
$ 51,046,928
Under/(Over)
S 189,528
Total Expenses to Date $ 7,192,041
PLANT SCHEDULE
CODE BOTANICAL I COMMON NAME
CONT CAL. DETAIL
TREES
ACER RUBRWRRMSTRONG'IARMSTRONGREOMMLE
Bt8
20C-
AW AMELANCNIERX GlUIbIFLORA'AIIRAAN BRLLLLNMCE' I AUTUMN BRILLIANCE WPLE SERY—ERRY
PAP %NUS NIORA'ARNOLOSENNNEL'/ ARNOIDSENTINELALSTRIM'RIFE
B&B
BBB
—CAL. ibld00
21CK TA-500
TSL TLJATOLENTOSAI.BYERLPIDEN
BtB
2.5'CK. 1bL1+00
CODE BOTANICAL / COMMON NAME
517E
DETAIL
SHRUBS
BEB EIM]NYMIl3AlATUSCOMPACTl1S'/Cd.PACTBVRHNG8U5H
SGLL
I %NUS MIgO'-1110'/—ART —FINE
BSLL
EVERGREEN GROUNDCOVER
JSl JUNIPERU. MORIZOMAL156LIlE FOREST/BLUE FgiESi CREE%NG JUNPER
2-
2 M
1BL500
NATIVE PERENNIAL
BG8 B SAMORHILT CARET'ANAI WREV5 flALSMBi00T
tGN.
1Mi00
ES ESCNSCNRRI14 OBI. —I KOSUSTA SE
SALVIA DOMII INCANA ROBUSTA'I ROBVSTA DESERT SApE
1GAL
10AL
1LiM0
1B150G
SGG SPHAERALCEA GP0.RSIAARIFOLIA II,OO,SEBERRTIfAF GLOBEMALLOW
1GLL
tBi-SW
NATIVE SHRUB
ATS ARIEJJISIA TFtIOEIflATAI BIG SAGEBRUSH
MT ATW%EXAf i"`( `PA/TUSERQEDYLT6USH
CIRYSOTiW,LNV5V5CIDIFLORUS/YELLOW RABBReRUSH
SGAL
SGAL
SGAL
131d00
IM-500
1M5W
CRO CORNUSSERICEAIREDTWIGOOGWOOO
ENR NAUSEOW IRUBBER RABBITBRUSH
G.H G(UTIA S%NOSA1 S%NY MOFSAGE
SB. 3%RAEA BETIJUFOLIA/BIRCHlR1F SPIfEA
SDS RPIRAEA DOUGLASIII WESTERN 9PIRF,L
SGAL
SAL
]OAL
3GAL
SGAL
M-500
1MLW
1Ma00
ORNAMENTAL GRASSES
G(F CUAJMGRD5TL5XAGUTRIOM Ir FOSTER'/KARL FOERSTER FEATHER REED GRASS
1SAL
14L-Stb
FIF FE.iUCA IONMOENSIS/10.VW FESCUEER
PHG PMICUM VRWTUM'HEAW MEFALI HELW METAL —CH CRASS
1GAL
tGAL
191L00
19t-500
GENERAL PLANTING NOTES:
1. SEE CORRESPOHONG EMCIF—ION SECTION(S)FOR MORE INFORMATION.
ENSURE THAT ALL RELATED ARCHITECTURAL MID C— SHEETS ARE
TFIORIXIWILY REVIEWED A. REFERENCE TO INFORMATION ON THE LANDSCAPE
Arro 1--n- SHEET..
2. VERIFY LOCATION OF ALL EXISTING AND PROPO.ED UFFLT. EITHER ABOVE OR
BELOW +MDE PRIOR TO BE(YNNINO ANY WORK. COORV NATE WRH ALL OTHER
CON TL CTORS TO AVOID CONFLWTS BETWEEN IRRIGATRIN EQUIPMENT AND
TREE5I—FLACEMEM. ANW OTHE R SITE AMENITIES.
3 VE RFY THAT SUB GRADE PREPARATKN HAS BEEN.—ETEO TO ACCEPTABLE
TOLERANCES PRIOR TO BEGINNING ANY WORK
A ALL WORK COMPLETE D.HN. L BE GUARANTEED FOR ONE(1) FULL YEAR.
5. L SCAPED AREAS TO RECENE,'OF APPRDVEO TOPSOILAND
B' M ALL SHRUB FLAMING AREAS.
6, ACCEPTABLE TOP.OE SHALL BE ETHER TAKEN FROM VNSIiF'STRIP—
E SOIL TAKFN ONLY FROM RETHE F HORIZON ASDEMERMNED BY
THE USDA SOIL CONSERVATION ANDOSERWE;FREEFROM TOXIC IMTERIAL, NO%IW.
MMETEEDS, SDILSWL, STpJE3 AIA OTHER OEBRIS GREATER T : M 1'
DLMIETER. MAXIMUM ELE PERCENTAGE.
1IT IE U MLLJOR-1. (IMUM
EXCHANGEABLE REE PERCENTAGE:tNt, PH'.B.sTNF ORGANICCONTENT .s
-T% PROVIDE THREE.EPBLSC—CE. $AMPLESIiAKENFROMiCHREIFFEREHT
—A.
LOCATKNS VRTHBI THESOIL SOURCE]. SUBMITTEST RESULTSST REVIEW AND
ARPROVAL BY THE OWNERAAfID.GAPE ARCHITECT PRIOR TO INSTALLATION.
T. ALL LANDS WE AREA. SHALL BE RRIGATED BY AN AUTOMATIC RRIWTION
SYSTEM.
B. COORDIIUTE WITH OFNEML CONTRACTOR FOR THE PROTECTRN AND
WATERING OF EX— PLANT MATERIAL IDENTIFIED AS TO REM N UNTL THE
NEW IRRIWTgN SYSTEM IS OPERABLE.
S. RHRUBPLMTTINOAREASSHALLRECENE WEEDBMRIERFAMICINSTALLEDPER
MANVFACTMER5 RECOWAENOATKINS AND BE MITI— WRH L' OF APPROVED
CLEAN FRACTURED BASALT, Z TO S' IN SIZE, IN— OTHENWI5E NOTED.
FNISHEO GRADE OF MULCH SHALL NOT BE ABOVE OR MORE THAN 1' BELOW
ADXHNING SURFACER.
10. uwN AREAS SHALL BE—ED WITH LOCruY PRODUCED soD.
1 ANY PART OF THE SITE DISTURBED BY WORK OF THIS CONTRACT NEEDS TO BE
RESEEDED WTTM AM APPROVED M—ND GRASS EROSION COIRROL
12. PUUIT SYMBOLS — DICTATE COUNT.
REFERENCE NOTES SCHEDULE
SYMBOL DESCRIPTION DETAIL
SODTURFGRASS
APPROVED DRTLAND NASS EROSION SEED MIX -SEE pENERAI
� —I— NO1E111 FOOR MORE NFORMAnON
ROCK AND BOULDER
®NCUNDWASHEDRWRROCK-SdSOE F'DEEP 15A.SM
FRACTUPED BASALT MULCH - IT S¢E, t-OEEP. SEE FLAMING
NOTES CH —ET — FOR MORE ERdtIMTION
I�BA3ALT COBBLE. T-6' 90E
o BASALTBDU DER 2,�2.'X 6- SITE FURNISHINGS
S IANOSCAPE FORus Cooper IASaB
M SERIES LOOP BIKE RACK ALUW NUM FASTING W ITH POWDER COAT
FINISH,
BX(E RACK FINISHFOALWINUM, TYP
O LAFpSCAPE FORY. LANESIOE UTIERRECEPTAf1E-35 GALLON
CAPACITY, TOP OPENING PlA51M CVi STEEL.
® BASALT COLUMN -VERTICALLY SET. IM"
1 Y TO?•' WIDTH. HEIGHT VARIES
FROM Z i0 s'
N
J
t¢
K {�
v~i y
�V
N
W
�a J �
LL
a;
=a
d 0 0
O yuj 3
a C
1
Nnc
ARCH ITICTURR
nacarcnrteaure.com
vcro 111-Z204C
NMC
nvP TCS
0 30 60 901-t
NORTH
I UNrn�Nl
I i _-Inn I
`^1 i..�... .■ r �.rse• r.
''r y
r mot' ' �:.,•'�} •�} �s9