EXHIBIT G
FORM PHASE 1 CHANGE ORDER
Fide 1 f�oniract t�nan a urger
Pasco PFD Design -Builder
Project Name: Pasco Aquatics Facility
Change Order#: 03
COR#
Description of Change
Change in
Contract Time
Change in
GMP
03
Phase 1 design for betterments 2,12,13,18,22, and 30
0 days
$ 94,693
Original Guaranteed Maximum Price
$ 622,828
$ 2,545,033
Net change by previous authorized Change Orders
Total net (check one) ❑ ® Increase / ❑ ❑❑ Decrease in the GMP by this
Change Order
$ 94,693
New Guaranteed Maximum Price including this Change Order
$ 3,262,554
The new Contract Time including this Change Order is:
New Scheduled Substantial Completion Date For Phase 1:
February 11, 2025
New Scheduled Interim Milestone Dates:
100% CD Documents Due:
February 11, 2025
New Final Completion Date
N/A
The changes in the GMP and Contract Time identified in this Change Order include all costs and time extensions
associated with performing the changes set forth herein.
Pasco Public Facilities District
By:
Signature
Printed Name
Title:
Date:
Design -Builder
By:
Signature
Brandon Potts
Printed Name
Title: Vice President
Date: 11 /18/2024
p Phase 1 - Design and Preconstruction (CO 03 for Betterments) I Level of Effort
BOUTEn Pasco Public Facilities District I Pasco Aquatic Center
o o n a c w r t c 1 u a r Pasco, Washington
November 12. 2024
PHASE i DESIGN AND PRECONSTRUCTION PLAN ACTIVITIES
-tititititil---
-----
KEY PERSONNEL
PRECONSTRUCTION EFFORT (Time and Malarial)
1
broad Exe 9 - Brandon Potts
0
20
35
35
35
15
0
0
0
i
220 $
- See Note 5
2
Design -Build Project Manager - Jordan frogs
0
45
65
85
85
40
0
0
0
$
138 $
- See Note 5
3
Dewfle-Build Estimator- Sean Gossett
0
40
40
40
40
40
40
40
0
$
147 S
- See Note 5
4
Project Coordinator - Harmony Birkhimer
0
10
10
10
20
10
0
0
0
$
79 $
See Note 5
5
Estimator support - Ed Lambert or Other
0
20
20
20
20
20
40
40
0
i
119 $
See Note 5
6
Superimardent- Steve HerVJim Putnarn
0
10
10
80
170
0
0
0
0
$
1" It
- See Note 5
7
Director of Safety- Weldon Barker
0
0
0
10
10
0
0
0
0
3
112 S
- Sea Net.5
6
Quality Management Specialist - Cynthia Miller
0
0
8
8
32
0
0
0
0
3
115 $
- See Note 5
9
P.nonrtel Total He.. & Coat Soot.. Only) 0
145
208
288
412
125
80
80
0
1 $
DESIGN EFFORT
10
AVE Fees (Lump Sum per attached Fee Schedule)
0
0
0
0
0
0
0
LS
S - $
$7,065
See Note ], 9
11
SEPA Checiklst for Re -Zone Applieation
0
0
0
0
0
0
0
LS
$ - $
1,980
Sea Note 9
12
Dealgn-Build Arc/NACE
0
0
0
0
0
0
0
LS
$ - S
-
See Note 9
13
Decign and Pracon to lion Contingency
$
-
See Note 8
14
Deslgn-Assist Procurement t Trade Panther Coat Support
$
See Note 3
15
Geolechnical Design Consultant
$
-
16
0
0
0
0
0
0
0
$ $
17
Subtotal I n and Con..IUnl.
S
89,045
Subtotal Phs— 1DesipnaM Pr.eonatnto0on
$
89,W5 S
-
REY8
REM NAME
DIRECT
COSTS
I EXPENSES
TOTAL
NOTES
1
Pnndslg, Meiling, Advertising, a Mise. Expenses
$
-
2
Travel and Fuel
It
-
3
Techndogy end Software (VDC, L.—Scanning, JOIN)
S
-
4
00wr Consuhants - Pod B.9der
S
DIRECT COST TOTAL
i
insurance (1,0%) $
890
Design -Builder Fee (3.75%) $
3,373
B & O Tax (.481/.) $
448
Payment & Performance Bond (1.0%) $
938
Sales Tax(8.9%) $
• • •1103,121
8,428
Sales Tax (SAN) $ 290,367 See Net.6
TOTALD
PreconstruRion /design activities shown in blue
2 Procurement / budget activities shown in gold
3 Additional design consultants and or trade partner support required for validation will be determined upon N1 P. Costs are estimated for these [....hems or trade partners
4 Phase 1 Design and Prec b—otion costs start mid -August 2024
5 Construction personnel (PM, Supt, PC, QC) are covered until the initial GMP is signed only (mid Dec). Estimating time is covered until the Final GMP (mid Feb)
6 Sales tax is excluded from the contract value and shown for reference only
7 See fee schedule attached for inclusions
8 Contingency for design and consultants in Phase 1
NAC
ARCHITECTURE
Project Fee Information
Project: Pasco Aquatics
Project No: 111-22044-OtAa
Date: 11n124
33,278 SF(New)
$29,153,282 MACC
6.78% Basic Fee (New Constr)
$1,976,593
Consultant
Validation
Phase 1 Phase 1 Phase 2
Phase 2
Pro asal
NTE Allowances
NTE Allowances
TOTALS
Basic Services
Firm
Notes
Structural
195,700
195,700
5.700
138,700
51,300
1,875
DO
added $2200 CO-01
Fire Protection
15,800
15,900
12,294
3,506
-
Greenbusch
Fee per 8/20/24 proposal from GB
Architectural
$ 1,288,633
239,810
675,119
16,000
373,704
24,000
NAC
40 trips over 20 mo (added $30K
CO-01)
Subtotals - Basic Services
$ 1,500,133
1 $ 24.5,5101
$ 826,113
$ 16,000
$ 428,510
$ 25,875
$ 1.542,008
Fixed Additional Services w/marku
Survey
11,100
12,210
12,210
-
PBS
Geotech
14,700
16,170
16,170
By Owner
Shrub Steppe Mitigation fees
-
-
-
Bouten cover fees
Aquatic Design
254,300
279,730
42,856
201,274
3,440
35,600
4,590
WTI
Civil Engineering
228,000
250,800
36,300
152,295
62,205
-
PBS
add $2200 CO-01
Landscape Architect
39,500
43,450
30,850
2,860
12,600
5,720
SPVV
Acoustical Consultant
13,591
14,950
10,990
3,960
Greenbusch
Fee per 8120/24 proposal from GB
Beyond base scope Signage
-
add service (not included)
Civic Campus Master Planning
-
add service (not included)
Envelope Consultant
-
add service (not included)
3rd Party Energy Code
-
-
add service (not included)
VE Participation
-
included in basic sery
CR Participation
-
included in basic sery
Cx Coordination
add service (not included)
Conformed Set
-
included in basic sery
Record Documents
add service (not included)
Video Fly-Throughs
-
add service (not included)
Comm Engagement beyond base effoi
examples: new online surveys,all
new graphics,
Conversion to CAD (as needed)
add service (not included)
CUP/Special Permitting
not required
Traffic Impact Assessment
add service (not included) $15-20k
Trip Generation Letter
51000
5,500
5,500
PBS
required by City
SEPA Checklist
3,500
3,850
3,850
PBS
requiredb City
Subtotals -Fixed Add'I Services
$ 626,660
$ 91,366
$ 420,929
$ 6,300
$ 114,365
$ 10,310
$ 643,270
CO 03 for Betterments
1.980
eet erment, 2, Re -Zone "2, 1 i, 18, 22, 30 I 1,800 I f 1,980 I $ 87.065 I - \I I $ 35,562
Subtotals -CO.03 I I I I S 89.045 , I S 35.5621 1 $ 124-607
Reimbursable Expenses
Travel Time and Expenses
Other (mist. printing, etc.)
5,419
1,100
-
see above
2,000
see above
1,000
allowance
allowance
Subtotals -Reimbursable Ex enses
S 6,519
Totals I $ 343,395 1 $ 1,336,087 1 $ 24,3001 $ 578,437 $ 37,1851 1 $ 2,319,404
validation fixed NTE fixed NTE total with NTEs
convert to fixed
total lump sum
Exclusions: Cultural Resource Survey/Monitoring
Inspections and testing
1-111111Pmjeds_ SP01111-22044101_Contracts_Financ A Fae_Docu fs_con tsw_Cli nPhese 1 * 2 Fe 101Ae Prgect_Fee _Bfeakdow 5-CC-003.xlsx
Mtn NAC PROJECT BETTERMENTS LIST
A R C H I T E C T U R E Accepted Pasco Aquatic Center
Betterments Validation Budget Current Budget
: 2.285,000 $ 37,458,776 $ 39,743,776 8-Nov-24
1 Add 3rd waterslide $ 380,000 4/30/2025 Highest
Base Estimate: Provisions (piping, platform, etc) are included for a future waterslide, 10/11: Design for 3rd slide within current budget,
but the waterslide itself is not included. wait on this betterment for now and update the
Pr000sed Betterment: Add a third waterslide Decision Date to pull back from opening day.
8/2: High priority
11/8: Continue to focus - High priority
2
Add Nwd)en chlorinator
$ 340,000 1211W2024
Highest ACCEPTED
Base Estimate: Conventional chlorine disinfection system. Bulk chlorine is delivered
8/2: High priority
to the facilityfrom a third -party supplier and stored on -site until utilized.
10/11: Still high priority, highest priorityfor City of
Pr000sed Betterment: Upgrade to NexGen chlorine generator to produce on -site
Pasco
chlorine as a solution of hypochlorous acid. The only raw material required is
conventional salt (inert), which can be stored in a feeder on -site.
3
Add enhanced sound system
$ 210,000 5/31/2025
TBD
Base Estimate: A paging system is included.
Pr000sed Betterment: The outdoor pool deck will be enhanced with an amplified
sound system that included building and pole mounted wet -rated speakers and wet -
rated microphones. The indoor pool sound system would be upgraded to include an
amplified sound system with wet -rated speakers and wet -rated microphones. The
paging system functionality would remain.
4
Beach volleyball- 2 full courts in Phase 2 building's footprint
$ 110,000 7/30/2025
TBD
Base Estimate: This scope of work is not included in the base estimate.
Proposed Betterment: Add two full beach volleyball courts in the Phase 2 building
footprint. Provisions for site court lighting are included. Spectator seating is not
included.
5
Epoxy flooring (Natatorium & Locker Rooms)
$ 140,000 9/30/2025
TBD
Base Estimate: The Natatorium and Locker Rooms flooring is comprised of a
transparent concrete sealer. The floor would look like a grey concrete slab.
Pr000sed Betterment: Sealed concrete would be upgraded to epoxy (fluid applied)
flooring. Epoxy flooring comes is a variety of colors
6
NinjaCross course Interior Natatorium (Purchase/Install of equip only)
$ 760,000 9/13/2025
Highest
Base Estimate: The natatorium and associated structure will be sized to accommodate
10/11: Still high priority
a future indoor NinjaCross. The NinjaCross equipment itself is not included.
11/8: Focus on dialing in cost, High Priority
Pr000sed Betterment: The NinjaCross equipment would be furnished and installed as
part of the Design/Build scope of work.
7
Additional four shade structures / cabanas (includes power)
$ 80,000 5/31/2025
TBD
Base Estimate: Provisions for apx. ten shade structures and ten cabanas (depending
on type and features) are included in the base estimate. Shade structures include
provisions for electrical convenience power.
Proposed Betterment: Add four additional cabanas.
Page 1 of 6
BoOn NAC
PROJECT BETTERMENTS LIST
(ONSTRUCTMK COMPANY A R C H n E C T u e E
Accepted
Pasco Aquatic Center
Betterments
Validation Budget
Current Budget
000
$ 37,458,776 $
39,743,776 8-Nov-24
8 Additional600 sf of exterior pool area
$ 360,000
9/13/2024
Middle REJECTED
Base Estimate: This scope of work is not included in the base estimate.
8/2: Too many changes to outdoor program. 9/27:
Proposed Betterment: Add apx. 500sf of "water area" to the outdoor pool. The outdoor
Leave as rejected for now
pool apron area remains unchanged.
9 Additional outdoor pool activity feature
$ 140,000
12/18/2024
TBD
Base Estimate: This scope of work is not included in the base estimate.
10/10: Leave on list for now but scope would need
Proposed Betterment: Add pool element(s) equivalentto apex. $100k direct cost. Any
defined.
revisions to the pool equipment supportingthese features would need to be reflected
in this allowance as well.
10A Myrtha pool vessel (outdoor/indoor) $ 1,300,000 9/13/2024
Middle REJECTED
Base Estimate: A conventional concrete pool vessel is included for both the indoor and
8/2: Currently rejected.
outdoor pool.
Proposed Betterment: Provide a Myrtha pool vessel. Myrtha pools are engineered
using a proprietary modular stainless steeUPVC system with an array of finish
selections.
10B Myrtha pool vessel (indoor leisure pool only, not hot tub) $ 700,000 9/13/2024
Middle REJECTED
Base Estimate: A conventional concrete pool vessel is included for the indoor pool.
8/6: Pending Pricing
Proposed Betterment: Provide a Myrtha pool vessel for the indoor pool only. Myrtha
10/10: Pricing needs updated for new pool layout
pools are engineered using a proprietary modular stainless steeUPVC system with an
array of finish selections.
11 Indoor or outdoor LED screen (includes support structure) $ 250,000 5/31/2025
TBD
Base Estimate: This item is not included in the base scope of work.
Proposed Betterment: Provide a large -format indoor or outdoor LED screen. Provisions
for a support structure are included. It would be recommended that the betterment
for enhanced sound be accepted in conjunction with this betterment.
12 Additional 10% interior Natatorium area $ 1,200,000 9/27/2024 Highest
9/13: If bondingworks, this is HIGH priority
8/2: TBD - pending indoor aquatic programming.
Base Estimate: The natatorium is pproximately.12,000sf to be a anticipated 9/19: Proceed with incorporating into design and firm
p
Proposed Betterment: Enlarge the Natatorium appx 10%or 1,200sf. up pricing.
10/11: Proceeding with design, pending board
approval of the increase to the D/B budget.
13 Additional colorful UgWng (interior and exterior) $ 60.000 11/15/2024 Highest ACCEPTED
Base Estimate: Tunable lighting included in the party rooms 10/11: Define what features can be added for next
Proposed Betterment: Enhanced color changing lighting fixtures in the Natatorium, and time
post mounted theatrical style color changing lighting elements in the outdoor pool
area.
Page 2of6
Mtn
NAC
PROJECT BETTERMENTS LIST
CONSTRUCTION C04lukY ARCHITECTURE
Accepted
Pasco Aquatic Center
Betterments
Validation Budget
Current Budget
$
2,=,000
$ 37,458,776 $
39,743,776 8-Nov-24
N.�
N- , N, -AwdLum,
-
14 Additional 10% deck or landscaping area within pool enclosure
$
25,000
8/31/2025
TBD
Base Estimate: The base estimate includes appx. 12,800 sf of pool deck.
Pronosed Betterment: Enlarge the pool deck (or pool deck landscaping) and
associated enclosure (fencing) by appx. 10%.
15 Additional Nanawall opening in the Natatorium
$
50,000
12/18/2024
TBD REJECTED
Base Estimate: Appx. 401f of Nanawall folding glass wall are included. (20' inside, 20'
10/11: Reject for now. Design team to explore
outside)
replacing the natatorium base scope with another
Proposed Betterment: Enlarge the Nanawall are by apx 25%
opening scheme.
16 Add pickleball courts (Phase 2 footprint)
$
150,000
7/30/2025
TBD
Base Estimate: This scope of work is not included in the base estimate
Proposed Betterment: Add four pickleball courts (asphalt base) in the Phase 2
17 Additional landscaping feature $ 140,000 8/31/2025 TBD
Base Estimate: Landscaping is priced at $6/sf (typical schooVcivil campus). There are
no specific provisions for specific landscaping features.
Proposed Betterment: Provide an allowance (appx. $100k direct cost) for landscaping
enhancements or a special landscaping feature, TBD.
18 Add skylights In the Natatorium = 395,000 12M2024 MEDIUM -HIGH ACCEPTED
Base Estimate: No skylights included in the Natatorium atthis time 10/11: Design team to study and propose this
Proposed Betterment: Add appx. 1200sf of skylights within the Natatorium. Pricing betterment atthe next meeting with an updated
includes provisions for enhanced lighting control. price.
19 Additional sunshade devices for Natatorium (Exterior) $ 140,000 11/15/2024 LOW
Base Est4mate: Provisions for standard horizontal aluminum sunshades at top of
windows.
Proposed Betterment: Vertical sunshade (see Validation rendering).
10/11: Evolving with the base scope, low priority for
now.
11/8: Covered in the base scope with laminated glass
and mechanical shades.
20 Allowance for single Party Room upgrade $ 20,000 12/18/2024 LOW
Base Estimate: Party rooms include resilient flooring, acousticaltile ceilings, painted 10/11: Design team to finish design and we will
walls, and appx. 8lf of plastic laminate casework each.
revisit in a future design meeting.
Proposed Betterment: Additional room features, TBD (more casework, architectural 11/8: Scope potentially upgraded refer and
features, etc.) casework.
21 Increase parking count $ 120,000 8/31/2024 Middle REJECTED
Base Estimate: Includes appx. 140 paved parking stalls 8/2: For now not a high priority
Proposed Betterment: Add 40 additional paved parking stalls. Included provisions for
added electric vehicle charging stations per Washington State Energy Code
requirements.
22 Add soft cladding to exposed metal deck (exterior of building) $ 100.000 11/15/2024 MEDIUM -HIGH ACCEPT
Base Estimate: The roof overhangs are exposed (beams and metal decking). 10/11: Medium High Priority, design team to update
Pronosed Betterment: Provide soffit cladding at roof overhangs to cover structural the plan and budget
elements
Page 3 of 6
n NAC PROJECT BETTERMENTS LIST
LURSTRUCTMM CONFAWY ARCH I TECTURE Accepted Pasco Aquatic Center
Betterments VaUdation Budget Current Budget
$ 2,M.000 $ 37,458,776 $ 39,743,776 8-Nov-24
$ -. --. --- . +BB £i9SED
Base Eath ate. Pool pe sketches (avpx. 4,825 st of wate a ea� WR! Added
id
aeeo nelate a fntti e Revu de . Prom ot s to pool equil, ne t to stlpvo t FIev. Ridei
are iotinekvded-
$—
3?}i6fzS24
+BB
W2. Added
what may i ieitidi ig elect esi eapse ty imm.,
25
Add Flow Rider
$
3,950,000 12/18/2024
TBD
REJECTED
Base Estimate: This element is not included
8/2: Added. Includes all scope identified in Flow
Proposed Betterment: Provide flow rider and associated pool equipment and piping.
Rider make ready
10/11: Rejected
26
Make ready for future outdoor amenity(TBD)
$
- 12/18/2024
HIGHEST
10/11: Conduits, sewer water (no mech room),
Base Estimate: This element is not included
possible electrical capacity.
Proposed Betterment: Provide plunge pool area, or area to accommodate future slide
10/25: Pricingwith 50%DD
runout.
11/8: Scope to be defined. Use basis asflow rider
sized amenity. Focus on developing
27a
Outdoor slide complex (all runouts)
$
2,070,000 12/18/2024
MEDIUM -HIGH
Base Estimate: This element is not included
8/30 Added.
Pr000sed Betterment: Provide an outdoor slide complex
11/8: 38.5' Platform priced
27b
Outdoor slide complex (without Raft Slide)
$
1,390,000 12/18/2024
MEDIUM -HIGH
8/30 Added.
Base Estimate: This element is not included
10/11: Higher priority than the 3rd indoor slide
Proposed Betterment: Provide outdoor slide complex (without the raft slide)
**Can we go 35' or40'??
11/8: 38.5' Platform priced
28
Outdoor slide complex (make-ready only)
$
517,588 12/18/2024
HIGHEST
8/30 Added.
Base Estimate: This element is not included
10/10: Needs more research and scope defined
Proposed Betterment: Provide infastructure to add outdoor slide complex
10/25: Pricing with 50% DD - Placehotder cost for
additional pool mechanical and um
(piping/conduit), p p p pit, etc.
now
11/8: High priority -focus on developing
29
Base Est! llate!:H is eke e t is lot inektided
$
%75;966 i2yi&2624
MEDIUM-Fff6hf
see BetcciT:Tci1,
9/39 Added.
Page 4 of 6
On NAC
PROJECT BETTERMENTS LIST
coesrwdioA
cosrAwr A R C H I T E C T U R E
Accepted
Pasco Aquatic Center
Betterments
Validation Budget
Current Budget
$ 2,?d.i',000
$ 37,458,776 $
39,743,776 8-Nov-24
r.
r .
"Iffim. r
30 Rein Cloud (Sun Showel with Sound Coordinetlon
$ 190.000
IVISM24
HIGHEST ACCEPTED
Base Estimate: This element is not included
10/8Added.
Pronosed Betterment: Provide pool piping overhead in natatorium for rain cloud,
10111: High priority - Pursue and understand better
including electrical for lighting effects, and coordination with sound system.
how this integrates with the other lighting
betterments
31 Color changing lights in the pool? Or some other way to enhance experience $ 1/15/2025 Medium
Base Estimate: Tradidional Pool Lighting 10/10 Added. Pricing
Proposed Betterment: Provide pool piping overhead in natatorium for rain cloud, 10/25: Updating with 50% DD
including electrical for lighting effects, and coordination with sound system.
11/8: Will provide at 100%DD
32 Access Control-10 Additional Devices (card readers and control boards) $
Base stimat .: 7 Devices accounted for in base scope
Pronosed Betterment: Provide 10 additional card readers and associated access
control infrastructure
1/15/2025 High
10/10 Added. Pricing
10/25: Updating with 50% DD
11/8: Will provide at 100%DD
33 Room scheduling rough -in and cabling 3 party room locations $
5/31/2025 High
Base Estimate: No room scheduling infrastructure in base scope
10/11: Plan to accept in a future meeting
Proposed Betterment: Provide 3 locations at party rooms - Rough -in and cabling to add
10/25: Updating with 50% DD
scheduling monitors in the future.
11/8: Will provide at 100%DD
34 Slide camera and monitor for operator at top to see the people at the runouts. $
1/15/2025 High
Base Estimate: No slide tower operator camera/monitor system in base scope
10/11: High priority.
Pr000sed Betterment: Provide camera at base of slide tower and monitoring device at
10/25: Updating with 50% DD
top of slide tower for the lifeguard to easily see that runouts have cleared
11/8: Will provide at 100%DD
35 Cameras in parking lot (rough -in) $ 5/31/2025 High
Base Estimate: No cameras at parking lot light poles in base scope 10/11: High priority
Proposed Betterment: Provide conduit rough -in to all parking lot light standards to add 10/25: Updating with 50% DD
parking lot cameras in the future. 11/8: Will provide at 100%DD
36 Splashtacular Aquatic Game $ 5/31/2025 Medium
Base Estimate: Not in chided in base scope. 10/11: Added
Pr000sed Betterment: Provide rough -in for future aquatic game that splashtacular has 11/8: Will provide at 100%DD
under development. Touch -screen game where one player gets a bucket of water
dropped on them
Page 5of6
Mtn NAC
<Owsnumov— ARC H ITECTVRE
PROJECT BETTERMENTS LIST
Accepted Pasco Aquatic Center
Betterments Validation Budget Current Budget
$ 2,2W,000 $ 37,458,776 $ 39,743,776 8-Nov-24
Item Description ROM Cost Decision Date Priority Leveli1i Notes
Cost Reduction Opportunities ROM Cost Decision Date Priority Level
NOT
1 Values shown are rough order of magnitude. Finalvalues to be updated upon scope alignment and requirements.
2 Dates shown are for initial discussions and may be adjusted based on timing of further design meetings and space planning.
3 Values represent total design -build cost inclusive of Washington State Sales Tax.
Page 6of6