HomeMy WebLinkAboutResolution No. 2024-07 - Amendment No. 1 to Progressive Design Build Contract Amendment for Design Construction PhaseRESOLUTION NO. 2024-07
A RESOLUTION OF THE PASCO PUBLIC FACILITIES DISTRICT
BOARD, DIRECTING THE EXECUTIVE DIRECTOR TO NEGOTIATE AND
SIGN THE AMENDMENT NO. 1 TO THE PROGRESSIVE DESIGN -BUILD
CONTRACT WITH BOUTEN CONSTRUCTION COMPANY/NAC.
WHEREAS, the Pasco Public Facilities District (PPFD) was duly formed pursuant to
Chapter 35.57 of the Revised Code of Washington on July 15, 2002, by the adoption of City of
Pasco Ordinance No. 3558, and granted all powers provided by law pursuant to RCW 35.57.010;
and
WHEREAS, pursuant to RCW 35.57.070, the PPFD may secure services by means of an
agreement with a service provider. The PPFD shall publish notice, establish criteria, receive and
evaluate proposals, and negotiate with respondents under requirements set forth by District
Resolution; and
WHEREAS, the PPFD adopted Resolution 2023-15 on December 13, 2023, approving the
agreement with Bouten Construction Company/NAC to perform design —build services for the
Pasco Aquatics Facility Project; and
WHEREAS, the PPFD adopted Resolution 2024-06 on July 23, 2024, accepting the Pasco
Aquatics Facility Validation Report.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF
THE PASCO PUBLIC FACILITIES DISTRICT as follows:
Section 1. That the PPFD Executive Director for the Pasco Public Facilities District
(PPFD), is hereby authorized, empowered, and directed to negotiate and sign the Amendment No.
1 to the progressive design -build contract with Bouten Construction Company/NAC, based on a
copy of 2023 Bouten Construction Co for Owner & Design -Builder Agreement, which is attached
hereto and incorporated herein by reference as Exhibit A, in an amount not to exceed $2.5 million;
and to make minor substantive changes as necessary to execute the Amendment.
Section 2. That this Amendment No. 1 will authorize the progressive design -builder to
proceed with design and construction Phase 1 services, in keeping with the validation report and
the contract.
Section 3. That this Resolution shall take effect immediately.
Resolution 2024-07 — Direct Executive Director to Finalize and Sign Progressive Design Build Contract
Amendment No. 1 for Design & Construction Phase- 1
PASSED by the Pasco Public Facilities District Board of Directors, of Pasco, Washington,
this 23rd day of July, 2024.
PASCO PUBLIC FACILITIES DISTRICT
Mary
ar Morrissette, oard President
ATTEST:
Ca ne Bowdish, Secreta /Treasurer
Pasco Public Facilities District
APPROVED AS TO FORM:
Kerr Fer on Law, PLLC
Atto94 for PPFD
Resolution 2024-07 — Direct Executive Director to Finalize and Sign Progressive Design Build Contract
Amendment No. 1 for Design & Construction Phase- 2
FORM OF VALIDATION AMENDMENT
PASCO PFD
PROGRESSIVE DESIGN -BUILD AGREEMENT
Unless the parties agree in writing otherwise, the Validation Amendment shall be in a
substantially similar form as follow:
1. Pursuant to Section 6.6.1 of the Agreement, this Validation Amendment incorporates the
following terms into the Agreement. To the extent any terms set forth in this Validation Amendment
conflict with the Agreement, the terms in this Validation Amendment shall govern.
2. The Design -Builder has submitted to Owner the Validation Proposal pursuant to Section 2.02.1-11 of
Exhibit C.
3. The parties have collaboratively developed the terms of this Amendment pursuant to Section
6.6.1 of the Agreement.
4. The Parties agree to enter into this Validation Amendment to continue Phase 1 of the Project
pursuant to Section 6.6.1.2.b of the Agreement.
5. The parties hereby establish the following Commercial Terms:
Phase 1 Not to Exceed Amount $ 3 167 861
Phase 1 Completion Date February 11, 2025
Validated GMP $ 37,460,000
6. Other Commercial Terms are set forth in the following Exhibits to this Amendment, which are
incorporated as if fully set forth herein:
Exhibit A: Level of Effort
Exhibit B: Updated Phase 1 Schedule
Exhibit C: Phase 1 Scope of Work
Exhibit D: Target Schedule
Exhibit E: Validated GMP and Updated Cost Model with Phase 2 Schedule of Values
Exhibit F: Initial Project Scope
Exhibit G: Design Submittal Packages
Exhibit H: Subcontract Plan
Exhibit I: Inclusion Plan for Disadvantaged and Small Businesses
Exhibit J: Design Quality Management Plan
7. Pursuant to Section 10.2 of the Agreement, Design -Builder shall provide a Payment and
Performance Bond pursuant to RCW Chapter 39.08 equal to one hundred percent (100%) of the amount
of the Phase 1 Not to Exceed Amount set forth above.
FORM OF VALIDATION AMENDMENT
PASCO PFD
PROGRESSIVE DESIGN -BUILD AGREEMENT
In executing this Amendment, Owner and Design -Builder each individually represents that it has the
necessary financial resources to fulfill its obligations under this Amendment, and each has the necessary
corporate approvals to execute this Amendment, and perform the services described herein.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed on the date set
forth below.
PASCO PUBLIC FACILITIES DISTRICT DESIGN -BUILDER
By — --
Bouten Construction Company
Name of Design -Builder
Its - - - - — - - By
Its
Date: Date:
DESIGN -BUILDER'S ADDRESS AND
PHONE:
EXHIBIT A
Bo�l�n N nC Phase 1 - Design and Preconstruction I Level of Effort
Pasco Public Fa cilnias District I Pasco Aquato Center
n a c N, t c c T u k 1 Pasco, Washington
July 18, —
ITEM S ACTIVITY
DESIGN s
20L
NOTES
JULY AUG sEP OCT NOV DEC JAN FEB
Phase t -Dee n + Pneon.-.it- Phase
1
1
2
3
4
5
S
7
8
9
10
11
12
13
14
11
16
17
1B
18
20
21
22
23
24
M
28
27
28
29
30
31
M
38
33
34
35
38
3]
Pfuse 1 - deagn & preconstruckn ticko8
Team-velidenon deere111enaa,s learrwd/reypi seerd
0w pro rsmmiig nvisw
User group al gn meetings
Poet valMxion NO budgsl update
Flnlehea, rasew .de— end Mr3wn inei IPoetlurwand types
Lghbng lxabonsand lyps
Muni ...h.—liend Ebddcel Adursel locations
Rumbbg, Meclwnbals.d Elewinl a".-dwlp, mMg, xs.
xlblen egasmeol fu,i
Equlpmem CooNimOon
Ames COmml- type, bulb..,& functlsm
She coerdhugon
Sh - pdexrbn access, fire e¢asa, wash, wall, a.duaping. etc.
Rey rdinmmormbn of tea ons.
Canfimetbn of sllowanua end mntbgandes
She & bndaup design
S•uuw typ se--es-40,
E—rie Ravieiole emp&deejln'
MEPays—fin.lintiolro
lo— FmisM. Se—n
CM of Pescc er-p.—I upaba
0ea1gn-dev.1i prod
Pmled spcvkelbr,a 8 mrretmcdon daoumxgs On progress)
Constrvel ey R—
Sul—nura ling plan review and approval (GWI)
Pmcurementl tong bad N.— sbabgy- Phu lagd.*
TVDbudget rs0nemem(corainuvus)
Sib Logis—
GMP-1 bid pcbgl^g
Ovmer Pel tum end 501E DO spp—I
GMP I -Sae snd Long Ii Equipment
Plus, 2 kicks.
Subconlsacting pan review and approve l(GMP-2)
Pheaa 2 plan Mrg, budget sM ecledub algnmam
Moblllzadon pr•prMnew and xal-kick<0 revell
Pl,esa 1 and Phss 2 sup mrdkw8on — -
Owne.ppr—IGMP
ITEM
RESOURCE
2024
2125
FIRS fMR TOTAL Notes
JUL AUG SEP OCT NOV DEC JAN FEB
PRECONSTRUCTION EFFORT (Time and Metal
1 Pmject Executive - Brandon Potts
0
20
35
35
35
15
0
0
140
$
220 S
30,800
See Nom 5
2 Oesign-BUIb Project Manager- Jordan Ti
0
45
85
85
a5
40
0
0
340
f
138 f
48,920
See Nato 5
3 Design -Build Estimator- Sean Goesetl
0
40
40
40
40
40
40
40
280
f
147 $
41,180
See Nom 5
4 Project Coordinator - Harmony Birbtimar
0
10
10
10
20
10
0
0
60
S
79 S
4,740
See Nom5
5 Ea0rui support- Ed Lemben or Other
0
20
20
20
20
20
40
40
ISO
f
119 S
21,420
See Nom,
6 Supenn or- Steve H,rVJIm Publem
0
10
10
80
170
0
0
0
270
f
140 S
37,000
See Note 5
7 Onscmr of Safaty - Weldon Barker
0
D
D
10
10
0
0
0
20
f
11, f
2,2A0
See Nom 5
a quality Management Specialist -Cynthia Miller
0
0
S
8
32
0
0
0
db
f
115 S
5,520
Sae Note 5
e
Personnel Total Noun & Cost Bouten Only) D
145
208
280
412
125
80
80 1398 f
180,800
DESIGN EFFORT
10
AfE Foe. (Lump Sum per sus— Fee Sdndd.)
0
0
0
0
0
0
0 LS f - S
1,255,172
Gee Nom 7, 9
11
gn-BUIW
DesiAllNote
0
0
0
0
0
0
0 LS f - f
198,721
Soo 9
12
Do.91-Build ArcJNACE
0
0
0
0
D
D
0 LS $ - S
138,576
Sue Nam 9
13
Design and Prem—licn Contingency
S
80,000
„oa No 8
14
Oeaign A_sis[ Pmcum 1/ Truce P.doar Cost Support
S
20,000
Sea Nom
15
Geotechnlcel Dasgn Consultant
$
15,000
16
0
0
0
0
D
D
C f - f
17
Subsoil Design and Consultant
f
2,087,689
Subtotal Phase 1 Design and Preconsbuctlon
DIRECT
COSTS
I EXPENSES
REM
REM NAME
TOTAL
NOTEB
1
Pnnting, Mailing, Advertising,+Mier. Expenses
f
1,500
2
Toi and Fuel
S
5,000
3
Terimology and Schwan, (VDC, Laser Scanning, JOIN)
$
5,D00
4
Other C.—Rents - Pool Builder
f
10,000
DIRECT COST TOTAL f
21e500
TOTAL
DIRECT &
PERSONNEL
COSTS
S
Insurance (1.0%) $
2,299,769
22,998
Design -Builder Fee(3.75%) $
87,104
B & O Tax (.48%) $
11,567
Payment & Performance Bond (1.0a.6) $
24,214
Sales Tax (8.9%) $ 281,940 sae Nora e
TOTAL VALIDATION AND PRIECONSTRUCTION with SALES TAX S 2,727.592
1 Premnstruc[ion/ designactivitles shown in blue
2 Procurement/budgetactivltfesshowningold
3 Additional design consultants and or trade parinersui required for Vlldation will be determined upon NTP. Costs are estimated for these consultants or trade partners
4 Phase l Design and Preconstruction costs start mid -August 2024
5 Construction personnel IPM, Supt, PC, QCI are mvered undl the initial GMP Is signed only (mid Dec). Estlmatingtlme Is mwred until the Final GMP (mid Feb)
6 Salestaxlseacluded from the mntractvalue and shown for reference only
7 Seefee schedule attached for Inclusions
a Contingency for design and consultants In Phase 1
n.ewm M sau,an camuucaon rye t a 1 i:Mcn.>eb uem.ac\esto leero passel\mvdmecmvcsoanP nl.rueam.nK
►1A[40
ARCHITECTURE
Project Fee Information
Project: Pasco Aquatics
Project No: 111-22044-01Aa
Date: 7/16/24
33,278 SF (New)
$29,153,282 MACC
6.78% Basic Fee (New Constr)
$1,976,593
Consultant
F Validation
Phase 1 Phase 1 1 Phase 2
Phase 2
Proposal
NTE Allowances
NTE Allowances
TOTALS
Basic Services
Firm
Notes
Structural
193,500
193,500
3,850
138,700
51,300
1,875
DO
Fire Protection
15,000
15,000
-
12,000
3,000
-
TBD
fee estimate
Architectural
$ 1,288,633
239,460
675,469
16,000
373,704
24,000
NAC
40 trips over 20 mo
Subtotals - Basic Services
$ 1,497,133
$ 243,310
$ 826,169
$ 16,000
$ 428,004
$ 25,875
$ 1,539,356
Fixed Additional Services w/markup
Survey
11,10D
12,210
12,210
-
PBS
Geotech
-
-
By Owner
Shrub Steppe Mitigation fees
-
-
-
Bouten cover fees
Aquatic Design
254,300
279,730
42,856
201,274
3,440
35,600
4,590
WTI
TBD
Civil Engineering
226,000
248,600
34,100
152,295
62,205
-
PBS
Landscape Architect
39,500
43,450
30,850
2,860
12,600
5,720
TBD
Acoustical Consultant
14,000
15,400
10,934
4,466
TBD
Beyond base scope Signage
-
add service (not included)
Civic Campus Master Planning
add service (not included)
Envelope Consultant
add service (not included)
3rd Party Energy Code
add service (not included)
VE Participation
-
included in basic sery
CR Participation
-
Included in basic sery
Cx Coordination
add service (not Included)
Conformed Set
-
included in basic sery
Record Documents
add service (not included)
Video Fly-Throughs
add service (not included)
Comm Engagement beyond base efforl
examples: new online surveys,
all new graphics,
Conversion to CAD (as needed)
-
add service (not included)
CUP/Special Permitting
not required
Traffic Impact Assessment
-
add service (not included) $15-20k
Trip Generation Letter
5,0D0
5,500
5,500
PBS
required by City
SEPA Checklist
3,500
3,850
3,850
PBS
required by City
ub Stotals -Fixed Add'I Services
$ 608,740
1 S 89,166
1 $ 404,703 1
$ 6,300
$ 114,871
$ 10,3101
$ 625,350
Reimbursable Expenses
Travel Time and Expenses
Other (mist. printing,etc.)
5,419
1,100
see above
2,000
see above
1,000
la::owance
aowance
Subtotals- Reimbursable Expenses
$ 6,519
37,185 $ 2,174,227
NTE total with NTEs
convert to fixed
total lump sum 1,255,17
Exclusions: Cultural Resource Survey/Monitoring
Inspections and testing
C: IUsem0han/eylOesklopTasco101Ae Pmjecf_Fee _Breakdow-3.xlsx
Amendment to Bouten/NAC Agreement
for Phase 1 / Design and Preconstruction
ZZ'9
Cmin�ellpt, s soga0 see Nose 0
malt p~ cm Stlpp f 20:000 Sea N. S
R.r[ F $5,000
F 5,000
VC. laser S..mip. JOIN) x S,OW
fdw x 10.000
TOTAL PHASE 1 PRONCTEO COST S 3,167,861
wet shwn in add
is and or trade partner support raquhed IM vMid tlm vM be datatrdred u MP. Costs xe esta ted for these con hoots nr v w p.nners
tnl MM MM st.rt mod August 2024
I, 4q0, a, OC) are covered untl the inn,al GMP y caned ang (mJ Deq. Fstimatelg time. is ct ed a:mil the Final CM? I—s Feb)
»tdU t v.We attd stwwn Mr re}erane—IV
x U.Wsi—