HomeMy WebLinkAbout4401 Resolution - Change Orders 22-27 LSORESOLUTION NO.4401
A RESOLUTION OF THE CITY OF PASCO, WASHINGTON,
AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER
NOS. 22-27 TO THE CONSTRUCTION CONTRACT WITH CASCADE
BRIDGE, LLC. FOR THE LEWIS STREET OVERPASS PROJECT.
WHEREAS, the City of Pasco, Washington and Cascade Bridge, LLC. entered into a Construction
contract on March 1, 2021, for construction of the Lewis Street Overpass Project; and
WHEREAS, this project involves the construction of a new 562-foot, 4-span, pre -stressed
Concrete overpass, over the BNSF Railway yard and a new 63-foot, voided slab, overpass over
First Avenue. Along with roadway improvements, backfilling, partial structure removal, retaining
wall construction, earthwork, paving with HMA, landscaping, storm drainage, illumination, water
mains, sanitary sewer, and other associated work; and
WHEREAS, the City of Pasco, Washington and Cascade Bridge, LLC. executed Change
Orders Nos. 1 through 21 to provide for additional work not included in the original contract; and
WHEREAS, proposed Change Orders Nos. 22 through 27 involve additional work related
to: BNSF Security Fence, BNSF Bridge No. Signs, Modified BNSF Water Service, SEW Wall
Design Revisions, and Traffic Control items and temporary barrier for a total of $1,774,244.93;
and
WHEREAS, the City Council of the City of Pasco, Washington, has after due
consideration, determined that it is in the best interest of the City of Pasco to enter into Change
Order Nos. 22-27 with Cascade Bridge, LLC.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PASCO, WASHINGTON:
That the City Council of the City of Pasco approves the terms and conditions of the Change
Order Nos. 22-27 between the City of Pasco and Cascade Bridge, LLC. as attached hereto and
incorporated herein as Exhibit A.
Be it Further Resolved, that the City Manager of the City of Pasco, Washington, is hereby
authorized, empowered, and directed to execute said Change Order Nos. 22-27 on behalf of the
City of Pasco.
Be It Further Resolved, that this Resolution will take effect immediately.
Resolution — CO 22-27 for Lewis St Overpass - 1
PASSED by the City Council of the City of Pasco, Washington, on this 20'h day of
November, 2023.
Blanc a Ba
Mayor
ATTEST:
&c4,A--
Debra Barham, CMC
City Clerk
Resolution — CO 22-27 for Lewis St Overpass - 2
APPROVED AS TO FORM:
Kerr son Law, PLLC
CiqAxttomeys
EXHIBIT A
CITY OF PASCO
I li*A f PUBLIC WORKS DEPARTMENT
CONTRACT CHANGE ORDER NO. 22
�I X Standard
❑ Unilateral
Project No: Project No: 13007 Project Title: Lewis Street Overpass
FED -AID #: STPUS-HLP-3530(006)
WSDOT: TA4087
Contractor: Cascade Bridge LLC
Reason for Change: BNSF Security Fence
Detail as Appropriate: This change order creates a force account pay item to reimburse the contractor for the costs of
renting, placing, and maintaining security fencing per BNSF direction.
Contract Bid Amount:
SALES TAX Q 8.6%:
Total:
$22,344,999.88
1 22,344,999.88
PREVIOUS CHANGE ORDER
CURRENT CHANGE ORDER
Subtotal $1,918 499.66
Subtotal $ 20 000.00
Sales tax (rate varies) $17 296.43
Sales tax ® 8.9%.
Total $1,935,796.09
Total $ 20,000.00
Total Change Orders To Date $ 1,955,796.09
New Contract Amount
IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER
Contract Time Prior to this Change Order .................................
Modification to Contract time by this Change Order ....................
Revised Total Contract Time ....................................................
$ 24,300,795.97
460
0
460
NO
It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the
compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order.
Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the
previously executed Contract Documents shall apply to this Change Order.
®REP 7PTED:/ ROVED: -2 8/29/23
CT Date PROJECTMANAGER Data
PROVED: APPROVED:
CONST. MANAGER Dale CIP MANAGER Date PUBLIC WORKS DIRECTOR Date
Add the Following Bid hems:
Bid Item:
A-186 BNSF Security Fencing 1 LS $ 20,000.00
Sales Tax 8.9%
Subtotal, Additions ...............................................
Total this Change Order ............................................... $ 20,000.00
CITY OF PASCO
PUBLIC WORKS DEPARTMENT
CONTRACT CHANGE ORDER NO.23
X Standard
[] Unilateral
Project No: Project No: 13007 Project Title: Lewis Street Overpass
FED -AID #: STPUS-HLP-3530(006)
WSDOT: TA4087
Contractor: Cascade Bridge LLC
Reason for Change: BNSF Bridge No. Signs
Detali as Appropriate: This change order adds one new item, A-187 BNSF Bridge No. Signs. This item shall be full
compensation for all materials, tools, and equipment necessary to provide and install two bridge
number signs as shown on new plan sheet SS-2 (attached).
Contract Bid Amount:
SALES TAX @ 6.6%:
Total:
$22,344,999.88
$ 22,344,999.68
PREVIOUS CHANGE ORDER
CURRENT CHANGE ORDER
Subtotal $1 938 499.66
Subtotal $ 1,855.51
Sales tax (rate varies) $17,296.43
Sales tax Q 8.91A
Total $1,955,796.09
Total $ 1,855.51
Total Change Orders To Oata $ 1,957,651.60
New Contract Amount $ 24,302,651 AS
IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER NO
Contract Time Prior to this Change Order ................................. 460
Modification to Contract time by this Change Order .................... 0
Revised Total Contract Time .................................................... 460
It is mutually agreed by both parties that this Change Order fully describes the change($) that is (are) being made and that the
compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order.
Further, it is mutually agreed that this document Will supplement the present Contract Documents and that the provisions of the
previously executed Contract Documents shall apply to this Change Order.
E T A CEPTED PROVED:
Z5 Z 2, 8/29/23
T Dab PROJECT MANAGER Dale
PROVED: APPROVED:
CONST. MANAGER Date CIP MANAGER Date PUBLIC WORKS DIRECTOR Dab
Add the Following Bid Items:
Bid Item:
A-187 BNSF Bridge No. Signs 1 LS $ 1,855.61
Sales Tax 8.9%
Subtotal, Additions ...............................................
Total this Change Order ......••••.•...•...••••.•..••...........••.•..• b 1,855.51
f,�
S BRACKET BRACKETS
S BARRIER COLUMN BARRIER COLUMNS m
6 6 z
5.5 SEE BRACKET DETAIL ITYP.)
W
moo 711E
W N L O a
-lr z
m L�WVIS ST. OVER 'SS S W 3
WrO HOLE.TYP. j o N = aLL
J.T. N0. 9 7780 BRACKETS „)d)
BARRIER COLUMNS F Y 1
3.5 10.6 3 4.9 3 19.6 3.5
4. 1 9.3 1 31 5.8 13 1 17.6 4.648
n j TYPj �R�
I I X
1 I
2.0" RedI., 0.5" Border, 1.0" Indent Bkck - WNRe;
CAST M PLACE 11/2"0 x LONG R �_ � GALVANIZED
GALV.OR. A36 THREADED ROD WI -- PL 10"X6"XIW 4X�Yf
"LEWIS ST. OVERPASS" White, D 2K; 3.5" EMBEDMENT. SEE NOTE <, TYP.n€U
"O.O.T. NO. 97780OL" White, D 2K; 3" 3"
�bS�1
LEWIS ST OVERPASS DOT SIGN BRACKET DETAIL
g
ATTACH TO OUTSIDE
FACE OF PEDESTRIAN
BARRIER
Rlln
SIGN PLACEMENT DETAIL
NOTES:
1. INSTALL THE LEWIS ST OVERPASS DOT SIGN ON THE
OUTSIDE OF THE PEDESTRIAN BARRIER DIRECTLY OVER MAIN
TRACK 3.
2. APPROXIMATE STATION OF MAIN TRACK 3 AT THE NORTH
EDGE OF BRIDGE IS 22-20.
3. APPROXIMATE STATION OF MAIN TRACK 3 AT THE SOUTH
EDGE OF BRIDGE IS 22v12.
4. MOUNT SKIN WITH GALV.LOCK WASHER AND HEX NUT.
ENSURE ADEQUATE LENGTH OF THREADED ROD PROTRUDES
TO ACCOMMODATE MOUNTING HARDWARE.
Z
0
yZ
aGo
Ui
W3
0
rn a
wo
J
T
SS-2
CITY OF PASCO
PUBLIC WORKS DEPARTMENT
r.
CONTRACT CHANGE ORDER NO.24
X Standard
❑ Unilateral
Project No: Project No: 13007 Project Tide: Lewis Street Overpass
FED -AID #: STPUS-HLP-3530(006)
WSDOT: TA4087
Contractor. Cascade Bridge LLC
Reason for Change: Modified BNSF Water Service
Detail as Appropriate: This change order adds one new item, C-081 Railroad RPBA 8 In. This item shag be full
compensation for all materials, tools, and equipment necessary to provide and install the BNSF RPSA
as shown on revised plan sheets RD-4, WS-4, WS-7, WSD-1, and information sheets for the Safe-T-
Cover enclosure, eMchicai riser, and junction box (attached).
Also attached to this change order for reference is a cut sheet for the Neptune Mach 10 water meter
which will be provided and installed by the City of Pasco.
The detail for the Railroad Water Service now includes two valves, and the RPBA requires an
upstream valve. Therefore, the quantities of Eld Item C-024 Cate Valve 8 im will be increased by two
(2) for the added valves. Bid Item C-056 Railroad Water Ser Ace 8 in. will be maintained as bid.
Contract Bid Amount $22.344,999.88
SALES TAX @ 8.61A: — -
Total: ; 4344,999.80
PREVIOUS CHANGE ORDER CURRENT CHANGE ORDER
Subtotal 51.940 355.17 Subtotal _; 130.690.00
Sales tax (rate varies) $17296A3 Saks tax @ 6.2% S i i 631.41
i+stat _ 1.957.651.60 Total _ 3 142,321.41
Total Change Orders To Date ; 2,0N,9T3.01
New Contract Amount ; 24,444,972.89
IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER
Contract Time Prior to tMs Change Order. ................................ _ 460
Modification to Contract time by this Change Order .................... 0
Revised Total Contract Time .................................................... 460
m
it is mutually agreed by both parties that this change order fully describes the change(s) that Is (are)betrg made and that the
compensation for this Change Order Is full and complete and is the only compensation due or owing for this Change Order.
Further, it is mutually agreed that this document will supplement the presets Contract Documents and that the provisions of the
previously executed Contract Documents shall apply to this Change Order.
APPROVED:
DPR6JECTMANAGER Date
APPROVED: APPROVED:
CON8T. MANAGER nets CP MANAGER Dane ..... PUBLIC WORKS DIRECTOR nets -. - -
Add the Following Bid Items: -
Bid Item:
C-061 Rafted RPeA 8 h. 1 LS $ 126,690.00
C-024 Gate Vat" 8 kl. 2 Each $ 3,8W.00
Sales Tax 8.9%
Subroral, Additions ..............................................
S 11 a41 11
S 130,690.00
Total this Change Order..................................1............ ; 142,321A1
POINT!
G
I STATION !OFFSET
4. 1 Ines rm
3
1 L 24.4129 1.16 L
4
L 24V .4D IR L
s
Ln
� 35:T7S4
SEC._29 T.9N. R.30E. W.M.
FRANKLIN COUNTY
1
I
I--- - -----'
CIARK STREET
Zac^s
o
Z UN� J.I
m 3 LL
Lu
D 20 40 j m
2\ 1 I 1 1 j' , �...� SCALE IN FEET Y
NOTE:'
I''h_� '_3EC•
5 p
ELECTRICAL DESIGN IS BASED ON THE ENCLOSURE YODEL AND HEATERS SHOWN ON a L,� 1UNCTbN BOX ��kv
WS61. IF ENCLOSURE MANUFACTURER OR MODEL CHANGES. NOTIFY ENGINEER TOPOLEr� f^VERIFY ELECTRICAL SERVICE I Y'i1TY XFMR
I 7 SS r CND.4A1D, -
4
PSA HEATED-tYtO GND �. S6
' - I I COMBINATION UTILITY-
ENCLOSURE LOCATION- 1 .ti`- METER /SERVICE PANEL �� -'a - - •_ _ _ _ ._ ._ �- w
••per GI- G-_ p__ p._-G-_ p _ G- 0- •N
i
lW--4W^F^W--- —N--•1'�ri--
.W—w—w."MTW -11L • '"—W"—W—W—W—W— W
r 1 I -- ` , r"'? ------------- w
-0
1 3" SPA. 4 i
1
L PC 24.76.1' . -1
Y CC
u IliM fT 1 ' 2$1
MTD'bI11z I
1
F� I 4TAI/V1k&
WALL I
' I 7
j I INSTALL VAULTS (2)
E
' CONTRACTOR INSTALL
' I i URL SUPPLY PIPE
f 21'10 FPUD.
n
__ _....._._.._._._ .....
_._.._._..._.__.._._.._... d8
(t�(19'�JCI LEWIS TY° �_�-._.__._:
ar ar Ae-- - r-r�R-s r-. sr -aas,� mar -Ar -AP-'fir' W "M26c W W—W—W—M�Sw—M EM"�.Nl' �•
- ----14Y_- NTo°Ds`1i �GP— -�---- -�-"--H='-s�=po;_------'➢Ft-----��,=-cr-`�=—F--'--H
i
y
;)SEE UP PLANS FOR LrRLUITY CONDUIT CONSTRUCTION,
Y-O{i_ b ------f---------------------------------- ------- F�
--r-'-- - ------------
SEE UNDERPASS PREPARATION PLANS '
l"IkAfF'IMM.§Tri"6N I x
DETAILS THROUGH EXISTING UNDERPASS x
z
O
I-
RD-4
SEC. 29 T.9N. R.30E. W.M.
mANKUN COUNTY
RESTRAINE0JOINTPPE t`R1--
AND FITTWOS FROM RP9A TO 'II LF
1 EAST OF WATER METER VAULT
4 L21. ,43'LT TO L25.3], 65'LT
O 220 4 M -2
I
SCALE 0] 3
I f_-�y"•"�'vv'vv"i^"'v"vvv•/'.r''r�ra.1"4^xr+ � � N FEET
, e i EXIST. LOW AREA i 1 : >� NOTE:
1 I ONSP RAILWAY w I P INV EL. 375.94 1 �~, I W SEE GENERAL WATER AND Y
REORAOE TO L._..__ __- - - 1 FI SEWER NOTES ON
L 2N39.59, 57 -LT 1 ' EL: 779.1s 195 CY3)1 t
- I - 1 I WATER A SEWER .yS xLAN
1 I 1 8" d "THRUST
T BEND I ,r. "•+Y`*"a' - `1
4W THRUST BLOCK I I �✓2 R F.T.. ,tl. - B' VERiSCEIE R TI 'i SEE DETAIL B- I:�:,t ' 1DHORI2. CLEAR `r
1 j INV EL: RJ (S) I ) f L N.71.68, WATER
(CENTER I VAULT)
B' FLrMJ OV "RJ ($) I{( 1 RIULROAD WATER OPSTSERVICE 6 G B' WATER METER BEET VJ&] 1, �J y, L 26-12.57, B3,57 LT i;
B" RFCA (E) , I 1 PNO VAULT PER COP 5T0 DWG W.I. FQ PRECAST 1 ', I•, `�+ RETAIN AND PROTEC EXIST. SSMH r� ]x
57T VAVLT OR EQUAL ORIENTED AS SHOWN. PPE) �' .. 1 1 I r tt D.I.P WA, Is277LF1 bre.i�.•
1 ,{ C-.'• r L 24.39.��41.56'LT %� 1 jj '. y� PLUG EXIST. SEWER PIPE (SOUT!✓J ya A2 MM. LAVER >nAnt
f. 1 PENETRATIONS TO BE GROUTED. -J" x
8'0.PBA PER COP SIG OWL(' Wte I RBA EL:3'79.6i •j r 8'O.I.P 617E (J2001F) ', 1 ) x• 1 i AS MODINED ON SHT W50.1 1 M{ I B" N9l M4V EL 374.50 - j W 42' MIN. COVER.
`I CV W RJ (l 21.76.96, 5444' LT) �• 1 DEFLECT PPE JOINTS• I Ty.-z x- -y-
8'MJXMJ04 WRJ 21. _ II { . k ,...•. .e ,I 1 (L 60.34, 52M' IT)
VERTICALLY AS { - =
4 k
S4.tin..,+tMA.�...a./'.s�/•J NECESSARY 1 .ri•�_n_--- p �- p -- 6 - 0 - �. ®•-- 9 = � B�®gib'
EY
w�.w-�_W w-..mow w•�_w� _IY --w--_ w-- wF-_w —W—W-
--w
w.r�__
-_ - -MF �/ W
R A I .. ^'�,,j•�,2''D.I.P. NOL Is21LP) - ^'�j ..y}•,/,,�- �/�!' p& /ppp 2 9ii!
�' {� ! i :LL! I t✓.../ti/a..'�/aA✓./.As✓'- ABANDON MA FILL EXIST ro5 �A51NN00NED bTn
B'S$ PIPE (AISILF)PER la BE
^ , , �_ 1 '! '��'•--- - `OPEC r.4te,J15) ��• 4 + -•-L 36.30.13,48.74LT TO L 25-56.34,6228'Rf-
L5 1•1 - I' .. _._ - _ \..* I I r I ^.. - it �� 1 , ,2'oLP. PJ WL WZA'B ETD WR STI CASNG (:1tN�F). CASING
EL:3n.ALOONTRACTOR SHALL DETERMINE IF ADo ZONAL-
�I " -, --�_,• �y T COVER IS REQUIRED TO PROTECT CASING 8 WL CURING �•- ® € ]4
W $ 1 M1 $ I -41,
I CONSTRUCTION. SEE DETAIL 82 ON WSD-I, i S
yn 23 ) !1 L.LINE 24 ! 1 1 I * �a.
n
1 I -4FOLEWIS ST- 1 1 li� I -._� WAA METER g����
W I ' -4 PR ILE ..'...wv.,-� .1' _
V'y I II k ! e UI P.YN, (s156L i { 26 '��IR - -
"42"MW COVER
ta .t --ilI {.._ •I. L!R 9. L71.7
V 01 MJxMJ VERT I { Ic
< , 'i, • BENDJUJHRUST BLOCK 1 _
INV EL: 311,11
O
22171A7 1032B RT -- I- S' OJ.P. WL (15LF) L 24.39.59.79A TRT ; 1 I I .__ -_ _, -- - - _ 3p•�� "� .. h
8'DIM I
.( JxMJ VEFIT Z
DI RU I CUT -IN TEE I, Y15 EHO W THRV5T BLOCK '`. I 1 1 `. I ; ••_•_ _- �'�i
MFTCHAR (3 EA)
LOCK �N1( EL' 377 35 i x 1 • `• I PLUG P.X-iSEWER PIPE,
L.,•' v -m1, 1 _ W�cQ 0
ECT TO EXIST, W r L 22.76,07,1 W.20 FIT TO L Z! 38.0�, iO3?D 1 L 24.3959, 10),IO' RT I 3 •i H
TER SERVICE DIG V DIP, RJ NIL W 1WO STO WT STL CASING _ 1 % I 8' gMJxA1J W' BENq - n y
E• J ) I 1 I 1- jrq MJ1MJ 45�BEND q OF PIPE E OCRTgN. U) z y
ND VERIFY LOCATION, (S16gF W MIN. SSFT COVER. CASING W TNRV,ST BLOCK 1 .'
£PTH SIZE AND W. EL: 371.10. I ) ABANDON AND FILL E7JST. % 44I I v '`� y Q =
BEE DETAIL B2 ON W50.1, I \\\ I I "THRUST BLOCK ! V R y
7EWAL OF EAST. PIPE ' ! ,'1 \ j ( 6-WL PIPE (2131XF)
\ll SAD FOR t6'L. 1 J
B' WATER METER VAULT 1 ABANDON t .�12' D.I.P YAL (sBLF) PER SPEC 7-0&3
TO BE REMOVED. EXIST, VALVE i I (5) dial 4J Q
9yy I PLUG EAST. WATER PIPE r 3 L 2T.S0,.96TRT W
I 12` q MJxMJ 400 L� �' •`"� sV
8'gMJ CAP "THRUST Bl,.::K I - 'i PLUG XIST. WATER '!
ie
BE D- W AAhN _ -.MI'= "THRUST RIOCK - - yF(�,PIPE (2 EA) - wee O O N
r 1 f s.. '�)°''�-_.�-__DI',� L•�..T�-°�-'•"4•_r d-ao.�--cw-- "--av--w�,".==-,rW'-=='c3' -• yN
r O BE ABAM-.�j�W= w 'fit •9 = � :aa'=� - � .d"�'i vY 'e
5 ) J - •.'t. 14+ 12• EXIST, 12 VOLN!L T BE ABANOU-NED EAST. 12•"t TO BE ABANOCNED y 4
m
�1 I O K
tar _
V tj� ,,�yT,� D.I.P.P. WI�l y1
1 C ,_____----,-,^ •� 8'"l x 1C NG S DIP. WL (saLF)../ (a9LF1 I SEE DETAIL C L 2G EX T. WART F
S j I � ' {.� -----r-••' i " PLUG EXIST. WATER PIPE (Z EA- M-
5 c I, ; I 1p':. 1: , • • " - - 16' D.LP^ ILL (itOLHj t P - SHEET WS•7 I g W O
WH74 i x II--`�i'"''i—' .-,._.-... .. .. _.....__ - .:_:_:_:_:-.-.-._.-.-•-.-.� 3S
,I { .s y .. ._.. ,._. _
AY- '� I - - sr -Aa• sr - ar -AR- ar - - -A9- sr - sr -AD S-gK-er=� sr - /iT -AB- T' ••_ "L •. •••w tz DJ P W1 (s43LF)-•_ _
� E4-L)NzF .. IN cw � pp' — w — w wt2— W — W -24- w
• ,. ;(EXISTMG))LEWIS STIREET
W , j IJ rl SEE UP-28 AND UP-3 V ~ I - - _ - f - - - 17 D I.P. WA. W51 ��d'
..-aFOR LF) os� wtn
E - t A` ` �.:...x....wn4 . EL b•4.Op. 10.001T , EL 26.25.91, 4.W LT
.• 16"FL 12-FL IN ECCENTRIC RED, SEE UP-312' DI y "' �. i• JND
"THRUST KOCK 3
SEE N3-3 3 '. ( 1Y FCA EXIST. 6, N1l {t
--------------------------------a % --------------=---=------------------- --------- ------- �"
o-ac-_�rsa Nc=� ��tiar��r���f'!c���s=
SEE UNDERPASS PREPARATION PUNS —1`
(UP-1-UP-7)FOR WATER MA94 PROFILE AND
CONSTRUCTION DETAILS THROUGH FXISRNG XIST. FIRE HYDRANT
UNDER PASS I TO REMAIN
SH,EETNUMBER:
WS-4
NOTE:REFER TO
SHEET WB-0 FOR
( EXIST. VALVE PHASING
-_-_-• ---'L--_-_---••-__-----_ �-----------------
I PER I I I
D 2.3.
TON rarloN ---'--- --._.--�_.�_
_ EL 17+60.74, 24.BB LT
TEMPORARY CONNECTION ALLEY
ABANDON
EXIST. VALVE (� � ANSTALLTION MUMS: 12*FwQ'w Di
I _ CUT -IN TEE W/ THRUST BLOCK 12- FCA (2 EA),
CONNECT TO EXIST. 12'WA. PER COP STD
DWG 1.1. DIG AND VERIFY LOCATION, DEPTH,
B / { SIZE, AND MATERIAL OF EXIST. PIPE.
i y4 3
-Sr-LSt--qT--Sr--9T--Si -s .ABANDONMENT MIST. WATER PIP (2 TEE
AND FCAF, PLUG EXIST. WATER PIPE (2 EA),
CONNECT WATER MAN TO SOUTH.
I � {
I ? {
8
J/ 3 17 D.I.P. W1L (xBLF)
SEE WS3 { EL 17+68.79,4.WLT
1r MJri7FL OI TEE
SEE W63 I WITHRUST BLOCK
10-FLxAU BFV (N)
1V WI.-
174901 j `SEE WS-3
EL 17.60.76,4AD'LT 1
12' MJ%10• FL d TEE
WTHRUST BLOCK
17 FL w a" (M0 ; b
I
~�-17 OJ.P. VAL (z32LF)
1 '
I I
I {
8 t - EL 17+6h79, 27.SORT
( CONNECT TO EXIST. 10- WL
DIG AND VERIFY LOCATION,
S EL 17+6816.19.97'RT fI + OEFTH,SIZE, AND MATERIAL
;. OF EXIST. POPE.
I PLI1G E%MST. WATEN RPE
SJI.
__sr-=si'-MY=I'sr -ICB- TlC d84F�'.�'
PLUG
EL 17-6177.26.36RT
EXIST. WATER PIPE
7::FEXNOSTVHYDRANT
AALVE
EL 17+68.91. 34.27 FIT - TO REMAIN
ADJUST VALVE BOX
:
.11 I
li I �
g ---
1
' I �
DETAL A (SEE SHEET WS-3) o —`""5 o
SCALE IN FEET
COMB
VACUUN
2 N. PER
I
L 26.25.10,69.3TLT
1
it DI FLrFL TEE ' WITHRUST BLOCK, j
INV EL 37210
12"FL.NU BFV (S) R 5 I
12. FLxr FL 01 RED ((WWjj I1
I
1
7 FLXMJ OV WRJ
Ir RFCA IS)
6'pVAS'
BEND (22 EA) EA) W THR THRUST }
BLOCK 3T VERT OFFSET
^
-
I
j
.I
L 28+1B.98, 87,6T 1T 4`0.' I I
J
,AIR RELEASE/AIR-
VALVE ASSEMBLY
:DP STD OM 2b 1 I
3 I
'
L
PILT-�
PLUG EXIST. WATER Pied
IST.WA ER
4
DETAIL B (SEE SHEET WS-4)
A� I
0 5 1D
SCALE IN FEET
@ EL 26.17.76, 42.7SL7 1 h
EXIST, FIRE NT� 1 I
TO RE WATER RER PIPE. 1
PllXi EXIST PIPE
j!a
EXIST.
VALVE
O 1r D.I.P. WW (*IOLF) t J
EL 25+2D.92, 2237LT
O lr DI W" 90- BEND W THRUST BLOCK A
EL 26-23,42.22.IT LT�
@PLUG EXIST. WATER PIPE A
01r D.I.P. WL C1SLF)-
DETAIL C (SEE SHEET III
NOTES:
1.REFER TO SHEET VJS.0 FOR PHASING
LTEMPCRARY CONNECTION ALLEY E
•INSTALLATION INCLUDES:
ITEMS IDENTIFIED BYO
•ABANDONMENT INCLUDES.
ITEMS IDENTIFIED BY@
L 26+31.90.70.69' LT
it M W FL DI TEE W W AND
THRUST BLOCK 5' FU MJ GV
CONNECT TO EXIST.wvaB
DK3 AND VERIFY LOCATKN.DEPTIL
SIZE_ AND MATERIAL OF EXIST, PIPE,
0 5 10
SCALE IN FEET
EL 26.20.93, 32.3r LT
% it 01 &WAN 97 BEND W THRUST BLOCK O
CONNECT TO EXIST.12'YM
DIG AND VERIFY LOCATION,DEPTH,SIZE.
AND MATERIAL OF EXIST. PIPE
PLUG EXIST. WATER PIPE
O7 DKi AMC VERIFY ELEV. OF
EXIST. 1r WN. ® CROSSING
EL 26+25.92 22,36'LT
O 1r 01 MJ%MJ 90- BEND W THRUST ROCK
@REMOVE 97 BEND AND CONNECT
WATER MAIN TO SOUTH
o s 1D
SCALE IN FEET
V VS-!
f"J U•B
Baddiow AssemblV Above Ground Enclosure: Enclosures shall be provided for freeze FxlsnNo GRADE ,- REMOVE VALVE sox DovEa Ci
m
,protection. Acceptable encbsures indudeAquastdeld, Weds Sate-T-Cover, and Hot Box '
m m
SEE SPECIFICATIONS FOR tfibeiglass, stainless steel, Ornamental rock, and ornamental stump _ -.. ° bi m' � & ^ E
BOX V.:':: FREEZE w
PROTECTION IS REQUIRED 44.. _. '4''!`'-''^.:- �„AJ4.JwJa'•i"•1'.,A.'..: .A�.'!.'�'s+".m�°"..
3� 2'• W tQNL P°8
FP SEE NOTE 1 ~ ICLObyr'T%F ,� Z PP P 4
f SEE SPECIFICATIONS f L7 �'33
h raPVE ii
SAFE -COVER Z UN
......�___.''.. Y ALU$M"MIBL:,.- ? I W o if nub'
' 60LTVALVE,.L, HEATED ENCLOSURE BD
�. 10000-ALORAPPROVE 7' Do
� EtlIAP. ANOi1at PER jSSS
L CEN I-Q (K)Xa!7YIZ• s. •'fF-L
MANUFACNNERSOXTHICK O(A:^.cTE PAD RECOMMENDATX**. 2REMOVEVALVSLOPiEFLOOR SEE NOTE6 _.E9) ANDFJ(TENBONTO rO.LP--'L9STH AB q �FILL VOID IF RO ND CEMENT E (ONLYTE�'�, ' TO ISLEVREQUIRED
OF SURROUNDING GRADE (ONLY
REQUIRED F VALVE 19 UNDER PROPOSED
IYLO DRAa04E - ` 's �W eX.,t PAVED AREA SEE NOTE 2) y1+A'At
• 1 tL r•Ir FLOOD PLAIN,
1�21•-9B'�. oCEw VVHW44EVER IB .�e MM
38•MIN+•I ," GREATER 1 CLOSE VALVE
{ (JStj EIUST. VALVE AND WATER MAIN
! 91.ffVE CRUSIr HED Y - �/ TO SE ABANDONEDMETER
Box GFA6 CONT. Tl Ai7VL) wa5lc
AND BOTTW f ASTMOISR
ttff�� 9D• £1D VN
26•�MbIi OG - •• '�Li, —
SPLICE TRACER IMRE CONTINUITY
TOGETHER _
AND CHECK FOR CONTINUITY
r f _ a.c•! `'. .. ..• - BASE OF ENCLOSURE 4,...,...�.:'.:': NOTES:
^..1 s'•'.Y:• f�i :• .:TOP OFtiAe +`;. •, E
"i•v''%.%�y 24'MIN.,`•,� •�ELN.3TD75 "" t T. CLOSE VALVE PRIOR TO ABANDONMENT
;~T= may;; i•;•; :, ;; +•' •;riv-: + { (/Q, ABANDON EXIST, VALVE 2 B AREAS AND
COMPACT,
OF PROPOSED PAVEMENT, %£S
3rWN 24•ar ,J t ,F ..::' : • ' :+ ffff \ "1 SCALE: N.TS BACKFILL AND COMPACT iXa:
FLOW
BOX Ltj t LIIIIIIIIIIIII III IN I �y A PIPE .1. ... STEEL CASING PIPE
IZM14 ! As- ,—WRAP AROUND
END SEALS
ARONDEIFSCORPEP BAAS _ _ - F •1 ! \f
AT EI.CN CORNEA fOFt EACH j I DUCTILE IRON WATER MAIN
aNrINuoLmelwra+AND RPDA & RPBA INSTALLATION raxr.-.crrnrs-ararj Z
FORREDUCED PRESSURE DEFECTOR A9SFla31.Ya REDUCE PPE83lRE- ' CASING 99� O
{ .. v „_.r.v.. - �r -. �. [. Gw SPACER �. 7 r` Q m
- i ,— ♦ FFF�y..f
T •F PAD +, .t GAAOI91ON9, i ��.- \ In 4
S T .. .. NOMENENG7NEER Q C
UU
NOTES: - -
J ( 1. MUUBEONTHELAiS I�Fi U�§T�A OiOSA(%A(i WPREVfMf10NA88EM�UES.•••J•-+•. �•.�•_..s_ ,?1'r:.. ./ 03 CT 3
2. MUST SE I STALLED ABOVE GROUND. MRO" IY CLEARANCE ABOVE THE FLOOD PLAIN AND IN THE ORIENTATION AS A `"-� N U q
12• W 0E
AND TESTING
G(REMOVABLEUSC ENCLOSLAB ANDURE
E OR OPENS DENT. SIDE
CE S TO THE
T GT COCKS). FOR ROUTINE MAINTENANCE CDUCTA"t E UPON / STAINLESS STEEL BANDS y < d $ - AAID TESTRJG(REl10VA0lE ENCLOSURE OR OPENS ON THE SIDE PoRAGCE5870THE 71:St COCKS). TWIN. CLEAR - CARRIER PIPE TIGHTEN AS REQUP'ED N1 �
S. OPITOVU.PVCSLEEVETOEXTENDrABOVEAN011--CONa>ET£PADTO-OWFOR SETnEMENTOFPAD. 0)O Q
w y 4. FREEZE PROTECTION IS THE RESPONSa70.RY OF THE OW14M
---„ 1 J !•� ; 5. PIPE SUPPORTS ARE REQUIRED ON ASSEMBLIES OVER Y. CA61N O SPACER NOTES: S CASING PIPE e-
6. THE BACNROWASSEMBLY S TO BE TESTED AT THE TIME OF INSTALLATION BY A CERTIFIED TESTER APPROVED BY THE CITY UNLESS + ! 1. CASING SPACERS SHALL BE MANUFACTURED STAINLESS STEEL. Cj
J POLYETHYLENE, OR EPa(Y COATED, SIZED FOR THE TYPE OF PIPE
2'MW. CLEAR.
PRE -APPROVED CROSS CONNECTION SPECIALIST.
`d a CASING SIZE PER 1TE MANUFACTURERS RECOMMENDATION.
yt`--
{• T. THESEWASHI GTON O DEPARTMENT
ASSEMBLY INSTALLATION STANDARDS REFLECT AFORMMREQUIR COOEa N COMPLY APPROVED DE 4.� SEE NOTE 3. 2. NOMINAL SPACING OF CASING SPACERS:13'OR u'LENGTH OF
WASFiINGTON OEPARTAEMOF FRJLLTH REOIRATpNSM'AC 2d67Bo4a0F AND URFORM PLIIABRIG CODE, UNAPPROVED DEVUITON CARRIER PIPE•ARMMLIM OF 2 SPACERS PER STICKtg.2DLENGTH
MAY RESULT INTHE
CRY RE.ECTNG THE R75TAllA o AND THE CERTFICATEOF OCCUPANCY A6WELL ALL REQUESTS FOR ( vI a CARRIER PIPEMINIMUM OF 3 SPACERS PER SOCK INSTALL
DEVIATION TO THESE STANDARDS MUST BE SUBMITTED R7 WRITING AND APPROVED BY THE CIT" CROS6•CDNNECTION SPECWJST. PER MANUFACTURERS RECOMMENDATIONS.
3. CASING SPACERS SMALL BE SIZED TO PROVIDE CLEARANCE FROM
S fA __ CARRIER PIPE ID OF CASING PIPEACTUAL CLEARANCE AFTER INSTALLATION
CITY OF PASCO -STANDARD DETAIL
RPDA & RPBA INSTALLATION W-18 S \ MAY VARY DUE TO MINOR DEFLECTION OF CASING PIPE
5 .,�
LARGER THAN 2' MIN. YLYEAR-- — PIPE BELL A. SEE SPECIAL PROVISIONS 7-09 FOR ADDITIONAL REOLNREMEMS.
AT PIPE BELL SECTION A,A & END SEALS SHALL BE SPLIT WRAPAROUND STYLE WITH BUTYL
a_-.•. �_.v._w_ti,�u �. w.....i w.+.�. MASTIC STRIPS FOR ADHESIVE, FLEXIBLE COAL TAR REINFORCED
- '- .+.....wd✓`w_....�.rLa-"�"�'�. "-• " "I"^•-^-' ^-"`"'-'�.w•^� ^ ^-•'�^�"'-^=�•�+l'� WITH FIBERGlAS& MN. THCKNESS OF IV. WATERPROOF.
g OP -STD DWG W-18,MODIFIED) BZ CASING SPACER AND END SEAL DETAIL SHEETNUMBER:
9CAlE; NTS W S D-1
(N) RPSA HEATED ENCLOSURE
W(2) 2000W, 240V HEATERS
S Y OTHERS)
(E) U11UTY
POWER POLE-
COMBINATION UTILITY (N) UTILITY XFMR
ER/SERVICE PANEL i I
n-
(N) 1- CND, 3
0 GND 4 /10, (N) GROUNDING ELECTRODE (I
SYSTEM PER N.E.C.-----: " - B
ELECTRICAL RISER DIAGRAM
PANEL SCHEDULE FOR SERVICE PANEL.
MEW
DESCRIPTION
S1
TOTAL VALET
TOTAL VARK
TOTAL VA
TOTAL MPS
4 B A,P
00 1w
1000
0 2011
0 20/1
0
1000 1000
100D 1000
2000 20W1
17 17
(N) SERVICE RISER
CONDUIT & WIRE
(BY FRANKLIN PUD)
SECONDARY JUNCTION
(SEE NOTE 2)
Load
A B
NOTES:
1. PROVIDE AND INSTALL (N) COMBINATION UTILITY METER/SERVICE PANEL.
METER SHALL BE 120/24OV, 10, 3W, 4-JAW RING TYPE. PANEL MALL
BE RATED 100 AMP NTH 40 AMP MAIN BREAKER AND INCLUDE BRANCH
BREAKERS AS SHOWN ON SCHEDULE. UNIT SHALL BE EQUAL TO SQUARE D
#SC162MIODS. PROVIDE SS UNISTRUT AND CONCRETE BASES AS REQUIRED
TO INSTALL UNIT.
2. PROVIDE AND INSTALL (N) SECONDARY JUNCTION BOX PER FRANKLIN PUD
DWG /272.VSIA,
3. PROVIDE AND INSTALL ALL CONDUIT AND WIRE FROM JUNCTION BOX TO
METER/SERVICE PANEL AND TO RPDA HEATED ENCLOSURE. CONDUIT AND
WIRE SHALL BE SCHEDULE 40 PVC AND TYPE 14HN/THWN. PROVIDE ALL
TRENCHING AND BACKFILL AS REQUIRED FOR CONDUIT INSTALLATION.
4. PROVIDE WEATHERPROOF CONNECTIONS IN SECONDARY JUNCTION BOX AND
RPBA HEATED ENCLOSURE AS REQUIRED.
5 CONTACT WAYNE REXN AT FRANKUN PUD FOR ANY SERVICE COORDINATION
REQUIREMENTS (509-542-5347).
100 AAW PANEL WITH WIN BREAKER (40 MP)
1201240 VOLTS 1 PHASE 3 WIRE
DESCRIPTION: _ COM O UTILITY AETERISERNCE PANEL
SRKR VOLT•AlAPS
AIP
A
S
j DESCRIPTION
15f2
100D
RPBAHEATER#2
1000
2011
0
�SPARE
20A
0
SPARE _--�
0
SPACE - ----
0
SPADE
TOTAL CONNECTED LOAD REMARKS:
4000 VA 17 MPS SERVICE PANEL W BNTEGRAL AFTER BASE
TOTAL FEEDER DEMAND LOAD
4000 VA 17 MPS
�Z CITY OFPASCO ELECTRICAL RISER DIAGRAM
-• • LEWIS ST. OVERPASS & PANEL SCHEDULE
Description
C001 169 Field Office Trailer
C002 DBE COA Deletion
C003 A170 BNSF Crossing Permit
0004 A171 Girder Embedded Plates Sole Plates
C005 A172 Added Drainage and Drywells Bridge Abt
C006 A173 BNSF Force Account
C007 C057 C07 Replace Waterline - Alley C & D
C008 A174 Removal of Fuel Tank
C009 A175 Unexpected Site Conditions -Subgrade
C010 A176 Schedule 80 Conduit and Trenching
C011 C058 Extra Waterline Work
C012 C059 Clark St. Butterfly Valve
C013 A177 BNSF Force Account 2
C014 A178 Remaining Subgrade FA
C01S C060 Remaining Waterline FA
C016 Sales Tax from CO 11
C017 A180 2022 Minor Changes Reconciliation
C018 A181 BNSF Bridge 53 Rebar Modification
C019 A182 SEW Subsurface Delay
CO20 A183 Modification to Girder Sweep Means and Methods
CO21 A184,185 Modified Approach Slab - Sleeper Slab and Strip Seal
CO22 A186 BNSF Security Fence
CO23 A187 BNSF Bridge No. Signs
CO24 C061 Modified BNSF Water Service
CO25 A188 Extended Overhead for SEW Redesign Delay
CO26 A189 Increased Cost for Modifications to SEW Walls 3, 4, 7,8
Added Days
Taxes
81
Total Current CO
Total Previous
Total To Date
Total Contract
0 $
3,065.56
$ 35,646.02
$
38,711.58
$ -
$ 38,711.58
$ 22,383,711.46
0 $
-
$ -
$
-
$ 38,711.58
$ 38,711.58
$ 22,383,711.46
0 $
$ 100,000.00
$
1001000.00
$ 38,711.58
$ 138,711.58
$ 22,483,711.46
0 $
$ 33,112.30
$
33,112.30
$ 138,711.58
$ 171,823.88
$ 22,516,823.76
0 $
$ 16,915.44
$
16,915.44
$ 171,823.88
$ 188,739.32
$ 22,533,739.20
0 $
$ 20,000.00
$
20,000.00
$ 198,739.32
$ 208,739.32
$ 22,553,739.20
0 $
12,290.12
$ 141,265.79
$
153,555.91
$ 208,739.32
$ 362,295.23
$ 22,707,295.11
0 $
-
$ 29,206.78
$
29,206.78
$ 362,295.23
$ 391,502.01
$ 22,736,501.89
D $
$ 210,949.79
$
210,949.79
$ 391,502.01
$ 602,451.80
$ 22,947,451.68
0 $
$ 36,559.01
$
36,559.01
$ 602,451.80
$ 639,010.81
$ 22,994,010.69
0
$ 13,925.36
$
13,925.36
$ 639,010.81
$ 652,936.17
$ 22,997,936.05
0 $
302.92
$ 3,403.55
$
3,706.47
$ 652,936.17
$ 656,642.64
$ 23,001,642.52
0 $
$ 10,000.00
$
10,000.00
$ 656,642.64
$ 666,642.64
$ 23,011,642.52
0 $
$ 20,029.27
$
20,029.27
$ 666,642.64
$ 696,671.91
$ 23,031,671.79
0 $
398.47
$ 4,477.23
$
4,875.70
$ 686,671.91
$ 691,547.61
$ 23,036,547.49,
0 $
1,239.36
$
1,239.36
$ 691,547.61
$ 692,786.97
$ 23,037,786.85
0 $
-
$ 19,041.80
$
19,041.80
$ 692,786.97
$ 711,828.77
$ 23,056,828.65
0 $
$ 41,160.96
$
41,160.96
$ 711,828.77
$ 752,989.73
$ 23,097,989.61
0 $
$ 848,788.71
$
848,788.71
$ 752,989.73
$ 1,601,778.44
$ 23,946,778.32
60 $
$ 77,192.65
$
77,192.65
$ 1,601,778.44
$ 1,678,971.09
$ 24,023,970.97
0 $
$ 256,825.00
$
256,825.00
$ 1,678,971.09
$ 1,935,796.09
$ 24,280,795.97
0 $
$ 20,000.00
$
20,000.00
$ 1,935,796.09
$ 1,955,796.09
$ 24,300,795.97
0 $
$ 1,855.51
$
1,855.51
$ 1,955,796.09
$ 1,957,651.60
$ 24,302,651.48
0 $
11,631.41
$ 130,690.OD
$
142,321,41
$ 1,957,651.60
5 2,099,973.01
$ 24,444,972.89
Superior Accuracy.
Zero Maintenance.
NeptuneO MACH 100 Ultrasonic Meter
1P
Pt
,t
r
The MACH 100 ultrasonic water meter features solid state ultrasonic technology including a factory -
calibrated, replaceable unitized measuring element (UME) with no degradation of accuracy over time.
Combined with a corrosion -resistant, lead free, high -copper alloy maincase, the MACH 10 is built to
withstand demanding service conditions and deliver sustained accuracy over the life of the meter.
• Sizes 3" through 12"
• Extended low -flow range for
superior leak detection
• Accuracy sustained over
meter life
• Can be installed in
both horizontal and
vertical applications
• Advanced ultrasonic
technology with easily
replaceable LIME design
• Lead free, high -copper
alloy maincase
• UL Listed and
FM Approved (standard)
• Available in standard turbine
and compound lay lengths
• Open flow path design with low
pressure loss • No maintenance
•
NePTUNe
TECHNOLOGY GROUP
#winyourday
Specifications
AWWA C715 Compliant
NSF/ANSI 61 Certified
UL Listed/FM Approved
(Standard)
Maximum Operating
Water Pressure
• 175 psi
Operating Water
Temperature Range
+33°F to +122°F (+0.5°C to +50°C)
Environmental Conditions
Operating temperature:
+14°F to +149°F (-10°C to +65°C)
• Storage temperature:
-40°F to +158°F (-40°C to +70°C)
Applications
• Potable water
• Fire service
• Reclaim water
Warranty
• Neptune provides a limited
warranty for performance,
materials, and workmanship. See
warranty statement for details.
System Compatibility
• Compatible with Neptune
R900® System. Also available
as MACH 10®)R9001' for an
integrated radio solution and
MACH 10®)TC for Sensus Touch
Coupler compatibility.
Operating Characteristics
Safe Maximum
Extended Low
Normal Operating
Operating Capacity
Meter
Size
Flow @ 100%
Accuracy
Range @ 100°k
Normal
(+/- 3.0%)
Accurac (+1-1.5%)
y
Operation Fire Service
(Non Fire Service)
3"
0.50 U.S. gpm
0.75 to 500 U.S, gpm
500 U.S. gpm
420 U.S. gpm
4"
0.75 U.S. gpm
1.5 to 1250 U.S. gpm
1250 U.S. gpm
1100 U.S. gpm
6"
1.0 U.S. gpm
2.0 to 2000 U.S. gpm
2000 U.S. gpm
1800 U.S. gpm
8"
4.0 U.S. gpm
6.0 to 4000 U.S. gpm
4000 U.S. gpm
4000 U.S. gpm
10"
6.0 U.S. gpm
10.0 to 6500 U.S. gpm
6500 U.S. gpm
6500 U.S. gpm
12"
8.0 U.S. gpm
12.0 to 8000 U.S, gpm
1 8000 U.S. gpm
8000 U.S. gpm
Registration
High Resolution
(8-digit reading)
3"
4"
6" -12"
1
U.S. Gallons
J
J
10
U.S. Gallons
J
0.1
Cubic Feet
J
J
1
Cubic Feet
J
0.01
Cubic Metres
J
J
0.1
Cubic Metres
J
LCD Display
9-digit display for extra resolution
on manual reads.
Forward Flow + Warning for Excessive Flow
Leak Reverse Empty Low
I Flow Pipe Battery
,
AN. --,, r--:1
L0-0B.n0nRn0*
P, C(QU---QU
RATE 9Wr� On, gallons CU ft M3
t I L. __— __ __ -_ _. ___ l
Rate and Units Cumulative Units
Pressure Loss
This chart shows typical meter performance. Individual results may vary.
e V—
7.5
7 /
65 /
it Ss /
n 5 3.
O 4.5 4'
a 4 (` r— 6 g• ;
w 3 /
a zs J
1.5
100 ,No ,a000
Flow Rate (U.S. gpm)
® 2021 Neptune Technology Group Inc. All Rights Reserved. The trademarks, logos and service marks displayed in this
document herein are the property of Neptune Technology Group Inc., its affiliates or other third parties. Availability and
technical specifications are subject to change without notice. 21.005626 PS Cl MACH 10 3-12 05.21
Dimensions
Meter
Size
L0-0B.n0nRn0*
P, C(QU---QU
RATE 9Wr� On, gallons CU ft M3
t I L. __— __ __ -_ _. ___ l
Rate and Units Cumulative Units
Pressure Loss
This chart shows typical meter performance. Individual results may vary.
e V—
7.5
7 /
65 /
it Ss /
n 5 3.
O 4.5 4'
a 4 (` r— 6 g• ;
w 3 /
a zs J
1.5
100 ,No ,a000
Flow Rate (U.S. gpm)
® 2021 Neptune Technology Group Inc. All Rights Reserved. The trademarks, logos and service marks displayed in this
document herein are the property of Neptune Technology Group Inc., its affiliates or other third parties. Availability and
technical specifications are subject to change without notice. 21.005626 PS Cl MACH 10 3-12 05.21
Dimensions
Meter
Size
Length
Height
Weight
3"
12"
9'/2"
39lbs
17"
9'h"
42lbs
4"
14"
11"
51lbs
20"
11"
57lbs
6"
18"
12Y4"
79lbs
24"
123/4"
—
91lbs
a"
20"
15 bf"
1601b
5
264 Ibs
16" Width
Available Units of Measure
Consumption Rate
Gallons GPM
Cubic Feet GPM
Cubic Metres LPM
nitized Measuring
lement (UME)
Neptune Technology Group
1600 Alabama Highway 229
Tallassee, AL 36078
800-633-8754 334-283-7293
PENTA HEAD BOLTS (2)
�<W
o
I�
1
a
tp
3i
+i
t
� Y
�
1 FOR USE IN AREAS
NOT
SUBJECT
TO VEHICULAR TRAFFIC
272.VS 1.1.DWG
r—
SECONDARY JUNCTION VAULT
ANKLIN
io
DWN.
DATE: 1/I0/07 DWG. NO.
WR
APP,
D. SAMS
UPDATM: ll,,22< 2019
272.VS1.1
THE POWER IS YOURS
ENCLOSURE MODEL: IOOOD-AL
JOB: ----
IRAWN BY: MTP SCALE: NONE DATE: 11/28/22
ELEVATION VIEW
18GA ALUMINUM - ROOF PANELS ARE REMOVABLE FOR MAINTENANCE
3" INSULATION ROOF (RI8)
REMOVABLE ACCESS
I TWO THIS SIDE
TWO FAR SIDE
I 384W x 78"H
W
0
�n
z
00
fl-
I I I
I i I
HCH2O00-120
SLA8 MOUNTED HEATER
ASSE 1060 TIF
PLAN VIEW
REMOVABLE ACCESS J
TWO THIS SIDE
TWO FAR SIDE
38i"W x 78"H
I
I
I
I
158" CONCRETE
1"" INSIDE
BLE ACCESS 1 REMOVABLE ACCESS
` 384"W x 78"H 38z"W x 78"H
t •
r-------
------
HCH2O00-120 - HCH2O00-120
L— — — — — — L — — — — — —
MOSURES OESOWD FOR THE VYORLDS Mf4TER SYSTEMS
V&BSITE: SAFE-T-COVERCOM PHONE: (800, 2464M
EMAIL: SALESjjBAFE-T•COVEH.COM FAIL.(81sl 2694 1
CONFIDENTIAL: THIS DRAWING IS INTENDED FOR USE ONLY BY THOSE AUTHORIZED TO RECEIVE IT.
DISSEMINATION, DISTRIBUTION OR COPY OF THIS INFORMATION IS STRICTLY PROHIBITED. US PATENT 5,609,784
IL
J o
a -
I
o �
o W
o UJ
o =
U)
W Z 00
N
� O
� X
OJ W
w � 00
r`
J p X cn
Q N _ O
p Z = a
d W Lu
nf
O in X W
-i oO Ix
V c' Z
O Z d O
1: W O` U
Lo 10 n
N
— rn
C6 (n
W
LU Z W W
J — Z Z
U Sc
z UU
L F m
O a Z Z
}- (n O O
1- Z H H
O O Q Q
�
N J
U W N in
Z X: Z Z
0 J
J
Q
LL.
Q
NrM4
ENCLOSUWS DESIGNED FOR THE WORLDS WATER SYSTEMS'"
• Roof, walls, and drain panel — 5052-H32 marine
grade aluminum (.050118 gauge), mill finish,
ASTM B209 outside
• Drain panel hinge and spring — stainless steel
• Insulation 1%" (9 "R" value) minimum thickness
polyisocyanurate foam laminated to a glass fiber
reinforced facer (each side), non -wicking
• Mounting hardware — 300 series stainless steel or
T 6 aluminum
• Wedge anchors — Powers SDI -'/2" x 33/4"
rrrr+.rw+
• ASSE 1060
• ASTM B209
El Yes — see separate specification submittal sheet
❑ No
Specification Submittal Sheet
Series 1000 — Panel Design
Insulated Enclosures
The enclosure is designed to provide freeze and vandal
protection of above ground backflow prevention assemblies,
meters, PRV, etc. The enclosure provides for safe and easy
testing and maintenance.
The enclosure disassembles easily if full equipment
replacement is needed.
l= —
Model Inside Dimensions Concrete Pad Ship Access Access Panel Size Drain Opening
W L H W L H Weight Panels W H W H
1000-AL T 40 144 80 54 158 6 580 3 38'% 80 38% 6Y2
1000D-AL 90 144 78 104 158 6 761 4 38Y4 78 38Y44 6'/2 1
1000DS-AL
90
174
78
104
188
6
896
4
38'/4
78
38'/4
6Y2
1000LU880-AL*
48
48
56
62
62
6
330
2
_ 40
56
40
6'/2
1000S-AL
1000T-AL
40
40
174
144
78
90
54
54
188
158
6
6
632
588
4
3
38%
38'/4
78
90
38%
38'/,
6'/
6'/
1000TD-AL
_
90
144
90
104
158
6
827
4
38%
90
38%
6Y2
1000TDS-AL
1000TLU880-AL*
90
64
_ 174
48
90
56
104
78
188
62
6
6
1035
397
4
2
38'%
56
90
56
38%
56
6'/2
6%
1000TS-AL
40
174
90
54
188
6
708
4
38'/4
90
38Y44
6Y2
1000TLU880M-AL*
63
57
62
77
T71
6
536
2
40
_
62
40
�6'/
*Standard compact design models include hinged lift -up roof All dimensions in inches.
A freeze and vandal protective enclosure shall be installed over above ground plumbing systems. The enclosure shall be
constructed of 5052-H32 marine grade aluminum with a minimum R9 in the walls and R18 in the roof. Molded fiberglass
enclosures will be rejected. Cut board insulation shall be used for uniform insulation thickness. Sprayed insulation shall be
reason for rejection. Redwood post and beams shall be utilized for structural support. The use of "Particle board" shall be reason
for rejection. The roof of the enclosure shall be removable for maintenance. Enclosures requiring tape to seal the roof seams are
prohibited. The enclosures shall have a fully insulated drain panel designed to remain closed, except when discharging water.
The drain panel shall be sized to accommodate the maximum discharge for backflow installations. The enclosure shall be
mounted securely to a concrete pad and remain locked even if outside screws are removed. All mounting hardware shall be
furnished. The enclosure shall withstand winds up to 110 mph with standard anchoring hardware. Anchoring hardware designed
for 130 mph winds will be available upon special request (130 mph hardware may require a thicker concrete slab).
When heat is required, a slab mounted UL or ETL listed heater shall be provided that has been independently certified to meet
the UL-2021 "Rain Test" for damp or wet conditions. Wall -mounted air heaters and self-regulating cables shall not be used as the
heat source. The enclosure shall be certified to the most recent ASSE Standard 1060 (Class I or Class II). The insulated enclosure
shall be a Safe-T-Cover Series 1000.
Hydrocowl, Inc.
Nashville, TN • Phone 1-800-245-6333
FAX (615) 259-4481 • www.safe-t-cover.com
SS71020
1'A !
ENCLOSURES DESIGNED FOR THE WORLDS WATER SYSTEMS'
• Heating element — steel sheathed; casted in type 380
aluminum; rated 2000W @120/240Vac
• High temperature wire — type MGT or equivalent;
10 AWG; rated 600V, 450°C
• Ring terminal — rated 600V, 900°F
• Junction well — group B, C, D, E, F; Class I,
Division II; rubber sea] provided with cover
• Conduit, conduit fittings, thermostat — liquid -tight
• Conforms to UL-2021 section 49 Rain Test
• Certified to CAN/CSA C22.6 NO.46
• ETL Listed 108666
• Economical • Durable
• Effective • Efficient
ZL
Specification Submittal Sheet
Series HCH/HCHS
Insulated Enclosure Slab Mount Heating System
U.S. Patent 5,609,784
The Safe-T Cover slab mount heating system
provides freeze protection to the plumbing & water
works equipment installed within an enclosure.
This patented heating system virtually eliminates
heat stratification within the enclosure, which
reduces energy consumption. By mounting the
heater on the slab, freeze protection is provided to
the underground vertical riser pipes. The system is
designed to withstand water spray conditions inside
the enclosure. The heater has been independently
certified to meet section 49 of UL-2021 for damp or
wet conditions.
Model No.
Voltage
Wattage BTUH
Phase Amps
Length (in)
HCHS500-120
120
500 1707
Single 4.16
23
HCHS1000-120�
---
120
1000 3413
Single 8.33
23
HCHS1000-240
240
1000 3413
Single 4.16
23
Two for HCH2O00-120
120
2000 6824
Single 16.66
37
100OD-AL HCH2O00-240
240
2000 6824
Single 8.33
37
120 volt is standard for 1000D-AL.
Contractor needs to
specify
.
240 volt at time of order as indicated on sheet WSD-1.
A slab mount heating system shall be installed to provide freeze protection for plumbing & water works equipment
installed within an enclosure. The heating system shall maintain a temperature of +40°F at an outside temperature
of —30°F. The heating system shall be installed on the concrete pad and designed to operate without damage or
impeding performance during water spray conditions. A thermostat capable of a temperature control range of +40°F
to +100°F with fittings suitable for watertight installations shall be provided. The slab mount heating system shall be
a Safe-T Cover Series HCH or HCHS. The heater has been independently certified to meet section 49 of UL-2021
for damp or wet conditions..
Nashville, TN - Phone 1-800-245-6333
Fax (615) 2594481 • Website www.safe-t-cover.com SSS-1116
Safe-T-CoverTM
BACKFLOW PREVENTION ASSEMBLY ENCLOSURE
SPECIFICATION
PART 1 GENERAL
1.1 WORK INCLUDED
A. Provide manufactured backflow prevention assembly enclosure.
1.2 QUALITY ASSURANCE
A. Qualifications: The backflow prevention assembly enclosure manufacturer shall
be a company specializing in the manufacture of backflow prevention assembly
enclosures with at least 5 years of successful experience designing and selling enclosures to
various customers in different climatic regions.
1.3 STORAGE AND HANDLING
A. Store products in shipping containers and maintain in dry place until installation.
1.4 ACCEPTABLE MANUFACTURERS
A. Safe-T-CoverTm or Engineer approved equal.
1.5 REFERENCES
A. ASTM 13209.
B. ASSE 1060-Performance Requirements for Outdoor Enclosures for Backflow Prevention
Assemblies.
PART 2 PRODUCTS
2.1 MODEL NO. & SIZE
A. Model No. shall be 1000D-AL.
B. Inside dimensions shall be 90"W x 144"L x 78"H.
2.2 MATERIALS OF FABRICATION
A. Material of fabrication shall be 5052-1132 marine grade aluminum (.050/18 gauge), mill finish
and shall meet ASTM B209.
B. Insulation shall be 1.5" (9.0"R" value) minimum thickness polyisocyanurate foam laminated to a
glass fiber reinforced facer (each side). The insulation shall have the following properties:
1. Dimensional Stability -Less than 2% linear change, ASTM D-2126;
2. Compressive Strength-20PSI, ASTM D-1621;
3. Water Absorption -Less than I% by volume, ASTM C-209;
4. Moisture Vapor Transmission -Less than one (1) perm, ASTM E-96;
5, Product Density -Nominal 2.0 lbs. per cubic foot, ASTM D-1622;
6, Flame Spread=25, ASTM E-84;
7. Service Temperature= -100QF to +250OF maximum.
8. The insulation shall be of uniform thickness.
HCF1000D-AL-1
C. Structural members shall be redwood.
2.3 ROOF, WALLS & PANELS
A. The roof, walls & panels of the enclosure shall be constructed of 5052-H32 (.050/18 gauge)
marine grade aluminum, mill finish, ASTM B209 outside with insulation 1 1/2" (9.0 "R" value) thick
in the walls and panels and 3" (18.0 "R" value) thick in the roof.
B. The aluminum, insulation and redwood shall be securely bonded together to form a composite
panel.
C. The aluminum panels shall be provided with a PVC or similar exterior film to prevent damage
before installation. The film shall be removed before installation.
D. The complete assembly, including valve stems, shall be protected by being inside the enclosure.
E. The roof shall be securely attached to the walls with screws and inside roof connections
F. All screws shall attach to redwood members.
G. The walls of the enclosure shall be securely attached to the concrete base with inside anchoring
brackets.
H. Access panels shall be four (4) in number and each shall be 38 1/4"W x 78"H. Two access panels
shall contain drain panels.
I. Access panels shall be completely removable.
J. Access panels shall be provided with built-in pad lockable folding T-handles.
K. Clear opening drain panel area shall be 38 1/2"W x 6 1/2"H.
L. Drain panel shall have a stainless steel hinge and a stainless steel light strength spring as a positive
means of closure so that the drain panel will not be activated by wind.
M. Drain panel shall be designed to remain closed except during water discharge.
2.4 Heating Equipment (ASSE 1060 Class I -Required; ASSE 1060 Class H-Optional)
A. Heating equipment shall be furnished and designed by the manufacturer of the enclosure to
maintain an interior temperature of +40OF with an outside temperature of -300F.
B. The heater shall have two electrical resistance elements completely enclosed within a solid
aluminum cast platen base.
C. The platen heater shall be designed for installation to the concrete base with mounting hardware
provided.
HCFI OOOD-AL-2
D. The platen heater shall be suitable for installation underneath a reduced pressure zone device and
designed to sustain water spray without damage to or impeding the performance of the heater.
E. The platen heater shall be provided with a thermostat adjustable from +40°F to +100°F. The
thermostat, all conduits and wiring fittings provided shall be suitable for "water -tight" installation.
2.5 MOUNTING HARDWARE
A. Mounting hardware shall be furnished and shall be 300 series stainless steel and/or T-6
aluminum.
B. All threaded fasteners shall be furnished and shall be 400 series stainless steel and/or Hilti type
Tap -Fast w/QuickcoatTM and Flo Seal washer or equal.
C. All masonry fasteners shall be furnished and shall be stud type Hilti Kwik Bolt IlTM and/or Hilti
type Hit Anchors or equal.
D. All necessary drill bits shall be furnished.
PART 3 INSTALLATION
A. Enclosure shall be mounted on a concrete pad 104"W x 160"L x 6"Thick.
B. Enclosure shall be assembled and mounted to concrete pad according to manufacturer's
instructions.
C. Enclosure shall be assembled and mounted to concrete pad in such a way that it will remain
locked and secured to pad even if outside screws are removed.
HCF1000D-AL-3
CITY OF PASCO
Paso PUBLIC WORKS DEPARTMENT
CONTRACT CHANGE ORDER NO.25
I ❑ Standard
X Unilateral
Project No: Project No: 13007 Project Title: Lewis Street Overpass
FED -AID #: STPUS-HLP-3530(006)
WSDOT: TA4087
Contractor: Cascade Bridge LLC
Reason for Change: SEW Redesign Delay
Detail as Appropriate: This change order adds one new item, A-188 Extended Overhead for SEW Redesign Delay. This
item shall be full compensation for all direct and indirect overhead costs resulting from the project
time extension caused by the redesign of SEW Walls 3, 4, 7, and 8. Per schedule analysis
performed by the City's Construction Managment Represenative, WSP, the Contractor is due 119
additional working days related to SEW wall modifications. 67 of the 119 additional working days
are compensable at the Contractor's established overhead rate.
Contract Bid Amount:
SALES TAX @ 8.6%:
Total:
$22, 344,999.88
$ 22,344,999.88
PREVIOUS CHANGE ORDER
CURRENT CHANGE ORDER
Subtotal $2,071,045.17
Subtotal $ 997,699.01
Sales tax (rate varies) $28,927.84
Sales tax @ 8.9%
Total $2,099,973.01
Total $ 997,699.01
Total Change Orders To Date
New Contract Amount
IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER
Contract Time Prior to this Change Order ................................
Modification to Contract time by this Change Order ....................
Revised Total Contract Time .................................................
$ 3,097,672.02
$ 25,442,671.90
YES
460
119
579
It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the
compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order.
Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the
previously executed Contract Documents shall apply to this Change Order.
AGREED TO AND ACCEPTED:
CONTRACTOR Date
APPROVED:
APPROVED:
PROJECT MANAGER Date
APPROVED:
CONST. MANAGER Date CIP MANAGER Date PUBLIC WORKS DIRECTOR Date
Add the Following Bid Items:
Bid Item:
A-188 Extended Overhead for SEW 1 LS $ 997,699.01
Redesign Delay
Sales Tax 8.9%
Subtotal, Additions ........................•........••
Total this Change Order .......................................... • • • • • $ 997,699.01
CITY OF PASCO
PUBLIC WORKS DEPARTMENT
CONTRACT CHANGE ORDER NO. 26
Standard
X Unilateral
Project No: Project No: 13007 Project Title: Lewis Street
FED -AID #: STPUS-HLP-3530(006)
WSDOT: TA4087
Contractor: Cascade Bridge LLC
Reason for Change: Modified SEW Walls 3, 4, 7, 8
Detail as Appropriate: This change order increases the quantity of existing item A-167 by 5,058 CY at the existing bid unit
price. This change order will also delete Item A-038 and replace it with a new item, A-189 Revised
Structural Earth Wall, for modifications required to SEW Walls 3, 4, 7, 8 . These items shall be full
compensation for all the additional labor, materials, tools, and equipment necessary to provide and
install the revised SEW Walls 3, 4, 7, and 8, due to the August 2022 redesign.
Contract Bid Amount:
SALES TAX @ 8.6%:
Total:
$22,344,999.88
$ 22,344,999.88
PREVIOUS CHANGE ORDER
CURRENT CHANGE ORDER
Subtotal $3,068,744.18
Subtotal $ 566,769.00
Sales tax (rate varies) $28,927.84
Sales tax @ 8.9%
Total $3,097,672.02
Total $ 566,769.00
Total Change Orders To Date $ 3,664,441.02
New Contract Amount $ 26,009,440.90
IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER
Contract Time Prior to this Change Order .................................
Modification to Contract time by this Change Order ....................
Revised Total Contract Time .................................................
NO
579
0
579
It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the
compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further,
it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously
executed Contract Documents shall apply to this Change Order.
AGREED TO AND ACCEPTED:
CONTRACTOR Date
APPROVED:
APPROVED:
PROJECT MANAGER Date
APPROVED:
CONST. MANAGER Date CIP MANAGER Date PUBLIC WORKS DIRECTOR Date
Add the Following Bid Items:
Bid Item:
A-167 Gravel Borrow for SEW Ind Haul
A-038 Structural Earth Wall
A-189 Revised Structural Earth Wall
Sales Tax 8.9%
Subtotal, Additions ............ • • • • ...............................
Total this Change Order .......................................... • • • • •
5,058.00 CY $ 151,740.00
(55, 065.00) SF (2, 202, 600.00)
53, 421.00 SF $ 2, 617, 629.00
$ 566,769.00
CITY OF PASCO
I�dSCOI PUBLIC WORKS DEPARTMENT
CONTRACT CHANGE ORDER NO.27
I X Standard
❑ Unilateral
Project No: Project No: 13007 Project Title: Lewis Street Overpass
FED -AID #: STPUS-HLP-3530(006)
WSDOT: TA4087
Contractor: Cascade Bridqe LLC
Reason for Change: Phase 1A Traffic Control
Detail as Appropriate: This change order adds traffic control plans TC-7 and TC-7A for Phase 1A traffic control on the east
and west end of the project.
Quantities are increased for bid item A-111 Temporary Barrier by 350 LF. Bid Item A-136 Temporary
Pavement Markings - Short Duration and A-133 Other Traffic Control Labor (labor for installing and
maintaining the traffic control devices fro Phase 1A) will be tracked and paid under the existing bid
items.
One new item, Phase 1A Traffic Control, is added. This item is full compensation for all management,
surveying, materials (cones, barrels, barricades, temporary signing, etc.), tools, and equipment
necessary to implement the Phase 1A Traffic Control.
Public outreach and traffic signal modifications shall be performed by the City of Pasco.
Schedule impacts for this change order have not been quantified yet and will be addressed on a later
change order if determined valid. Schedule impacts may include additional contract time and/or
additional costs associated with this time.
Contract Bid Amount:
SALES TAX @ 8.6%:
Total:
$22,344,999.88
$ 22,344,999.88
PREVIOUS CHANGE ORDER CURRENT CHANGE ORDER
Subtotal $3,635,513.18 Subtotal $ 45,600.00
Sales tax (rate varies) $28,927.84 Sales tax @ 8.9% $ -
Total $3,664,441.02 Total $ 45,600.00
Total Change Orders To Date $ 3,710,041.02
New Contract Amount $ 26,055,040.90
IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER
Contract Time Prior to this Change Order ................................
Modification to Contract time by this Change Order ....................
Revised Total Contract Time .................................................
NO
579
0
579
It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the
compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further,
it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously
executed Contract Documents shall apply to this Change Order.
AGREED TO AND ACCEPTED:
CONTRACTOR Date
APPROVED:
CONST. MANAGER Date CIP MANAGER Date
Add the Following Bid Items:
Bid Item:
A-111 Temporary Barrier
A-186 Phase 1A Traffic Control
Sales Tax 8.9%
Subtotal, Additions ...............................................
Total this Change Order .......................................... • • • • •
APPROVED:
PROJECT MANAGER Date
APPROVED:
PUBLIC WORKS DIRECTOR Date
350.00 LF $ 9,100.00
1.00 LS 36,500.00