Loading...
HomeMy WebLinkAboutHerrera Environmental Group, Inc. - 2022-2032 Stormwater Comprehensive Management Plan PSA (#21-046) - Amendment No. 1AMENDMENT NUMBER I to PROFESSIONAL SERVICES AGREEMENT 2022-2032 Comprehensive Stormwater Management Plan Project No. 21280 AGREEMENT NO. 21-046 WHEREAS, the City and Herrera Environmental Consultants, Inc., entered into a Professional Services Agreement on 11/17/2021 to provide engineering services with respect to the 2022-2032 Comprehensive Stormwater Management Plan project. NOW, THEREFORE, this agreement- is amended to allow Herrera Environmental Consultants, Inc., to provide additional professional services as described on Exhibit A. 1. Scope of Work: See Exhibit A. 2. Fee: The compensation for the additional work is based on a Time & Materials Basis of $14,794.00, increasing the overall total authorization amount to $139,605.00. Please see Exhibit B for further breakdown. 3. Time of performance: No Change. The services shall be complete for the project on or before 12/31/2023. DATED THIS O ( DAY OF ItlaVOrl bet' , 2022. CITY OF PASCO: Worley, PE — Public rector CONSULTANT Herrera Env onmental Consultants, Inc. Theresa M. Wood, Vice President Amendment No. 1 to Professional Services Agreement Page 1 Herrera, Inc. 2022-2032 Comprehensive Stormwater Management Plan EXHIBIT A SCOPE OF SERVICES SUPPORT FOR COMPREHENSIVE STORMWATER MANAGEMENT PLAN AMENDMENT UPDATE OF 2022 COMPREHENSIVE STORMWATER MANAGEMENT PLAN In 2022 Herrera completed an update of the City of Pasco's Comprehensive Stormwater Management Plan (CSMP). The City of Pasco (the City) has determined that the CSMP should be updated to include the entire urban growth area (UGA) as well as a few other small areas within the City in the CSMP. The City authorized Herrera Environmental Consultants (Herrera) to prepare a scope of services and cost estimate outlining services that Herrera will provide to update the CSMP to meet this need. This scope of services includes a discussion of the activities, assumptions, deliverables associated with the following tasks: Task 7 — Project Management • Task 8 — CSMP Update The budget for this work is included as Exhibit B. TASK 7 - PROJECT MANAGEMENT Herrera will be responsible for ongoing management of this project, including preparing monthly invoices, as well as coordination of work efforts with the City's project manager (Michael Henao). Herrera's project manager (Joy Michaud) will have phone and e-mail contact with the City's project manager and other City representatives on an as -needed basis with regard to scope, schedule, budget, and invoicing. Project management activities will include contract set up and close out as well as monthly invoices and progress reports. HERRERA Herrera - 2022-2032 Stormwater Comp Mgt Plan PSA (#21-046) Amend No. 1 -Scope November 23, 2022 Page i of 3 EXHIBIT A - SCOPE OF SERVICES Assumptions • The project will not require monthly meetings with City staff or planned project manager check ins. • It is assumed that project management activities will occur over a period of up to 3 months. Deliverables • Monthly invoices and progress reports TASK 8 — CSMP UPDATE Updating the service area covered by the CSMP will require updating all of the GIS files and the associated figures and tables in the CSMP, as well as minor to substantive revisions to different Sections of the CSMP as detailed in the assumptions below. Assumptions • Update of the CSMP is expected to require the following: o Substantive changes to Section 2 of the CSMP, including the majority of the tables and figures. These changes will require updates to GIS data and regeneration of approximately 6 to 10 tables and 9 to 10 figures. o Moderate changes to Sections 3, 5, and 6 of the CSMP. Updates to Sections 5 and 6 will focus on additional staffing and other needs associated with the expansion of the City's service area due to the recent annexation of most of the UGA. o Minor revisions to Sections 1 and 4 of the CSMP. o There will be no additional assessment of problem areas or identification of CIPS associated with this CSMP update. o In the modification of the basin boundaries, all of the area recently annexed into the City as well as any remaining areas within the UGA, but outside the City will be included as part of Basin 6. The inholdings ("donut holes") inside the City limits will also be included as part of Basin 6 but will be denoted separately as Basin 6A. ( HERRERA Herrera - 2022-2032 Stormwater Comp Mgt Plan PSA (#27-046) Amend No. 1 - Scope _ _ November 23, 2022 Page 2 of 3 EXHIBIT A - SCOPE OF SERVICES The City will provide updated GIS data on the stormwater system (including the conveyance network, outfalls, and facilities), land use zoning, critical areas, and other data as requested to support the update. • One draft of the CSMP in track changes mode will be presented to the City for review. The final CSMP will be prepared and delivered after receiving comments or written approval. There will be no public review or other internal review drafts. Deliverables • Draft CSMP in track changes mode (Microsoft Word) • Final CSMP (Adobe PDF and Microsoft Word) HERRERA Herrera - 2022-2032 Stormwater Comp Mgt Plan PSA (#21-046) Amend No. 1 -Scope November 23, 2022 Page 3 of 3 "0� i i Qi Q WfI � O m O CL 0 2 Itt 0 Lf) U [- C) CL N F - z O U E a W Co 0 O G1 0 = 6 z fn H i� ;p O O N w I I - i It Rt f� ei (rj N ri e I M M N ei O LQ 00 �c U EA fA I Q L rl- O N Nt O O O .MI N w I I - i Lo In = pp (O tG M ! e -I ai �c U EA fA Q L rl- O N Nt O O O .MI N c�-1 M eN-I O il- M N Ti N EA EA t!} f{} eM-1 0 ri ei 0 0 � T-1 T I d N d C O T d} w 04 LO q Tq Ift I I - Lo In = pp (O tG M ! e -I ai �c U EA fA 04 LO q Tq Ift - k = cc J J ! �c U Q L N rl O O C4 C4 f� (s7 O N Nt O O O i i N I� 1• N 1: ti O 0 = N N Ti N EA EA t!} f{} eM-1 0 ri ei 0 0 � T V d N d C O T f6 f6 J N S N N U (1) a w C w w c� Q N v t6 04 LO q Tq Ift m = O O �c U > _ aAn. T T V d N d C O T f6 f6 J N S N N U (1) a w C w w c� Q 04 LO q Tq Ift m �c c T � i 3 T f6 f6 J N S N > N d N v t6 s CS U_ CUO 0 O O X m LL 0 0 0 LL 04 LO q Tq Ift