Loading...
HomeMy WebLinkAboutTTap Construction Services, LLC for Emergency Removal of Damaged Columbia Marina Dock B January 26, 2022 Tyler Tapani TTap Construction Services, LLC 241 Jackrabbit Lane Kennewick, WA 99338 Re: Columbia Marina Dock Removal Dear Mr. Tapani: On January 24, 2022 the City Council declared the January 7, 2022 storm an emergency event. This action gives City staff the authority to resolve the hazardous condition with the dock caused by the storm. City staff is working with the City Attorney to complete a contract for your company, this is expected to take a couple of weeks. Because of the hazardous condition of the dock, it is best to proceed with the removal. We are accepting your bid and its intent. To remind you this is job is prevailing wage,you are required file your intents before any payment can be processed. This will serve as your notice to proceed. The time of completion on this project is fourteen(14) calendar days. We look forward to a successful and timely completion. Sincerely, Dan Dotta Facilities Manager � 1313 N Young St Page 1 of 3 � Kennewick WA 99336 � �509)440-3273 Sitework Proposal Contractor Lic#TTAPCCS87364 Email tyler@ttapconstruction.com CONSTROCTION SERVICES Date: 1/11/2022 ' � - • . � . � - . Quote To: City of Pasco Attention: Dan Dotta Phone: 509�30-6516 Email: Dan Dotta General Sitework 1 Mobilization 1 LS $6,820.00 $6,820.00 2 Fence Removal 1 LS $2,728.00 $2,728.00 3 Dock Demolition 1 EA $25,730.00 $25,730.00 4 Hauloff Debris 1 LS $34,100.00 $34,100.00 5 In Water Debris Containment 1 LS $2,728.00 $2,728.00 6 Cleanup 1 LS $6,820.00 $6,820.00 Total $78,926.00 1313 N Young St � Kennewick WA 99336 (509)440-3273 Page 3 of 3 Contractor Lic#TTAPCCS87364 EmailTyler@ttapconstruction.com Sitework Proposal CONSTRIlGT10N SERVICES Date: #�########### ' . . � - 1 • � - . Clarifications: This proposal is based upon preliminary plans and is subject to change per approved plans. Erosion Control items added by owner or governing agencies,to be completed T&M if required. TTap Const. obligation to perform any work referred to in this proposal assumes that the onsite materials are moveable and compactable by normal means,are stable,dry and otherwise suitable for base rock, paving or any other work to be preformed. S ecific Clari�cations: 1.Asbestos Removal or testing 2. Fence Replacement by others 3.Taxes will be charged at time of invoice unless a resellers permit is received 4. This proposal is dependent on a mutually agreeable schedule 5. Project Bid at current prevailing wage rates Specific Exclusions: 1. Electrical Disconect by others 2. Water meter by others 3. Standard Exclusions: All Taxes,bonds, permits/engineering,survey,construction staking,or as-built verification/ De-watering, excavation of any rock bigger than one cubic yard or requiring alternative methods such as blasting or rock hammering/Testing or abatement of hazardous materials,or contaminants/Moving or re-locating overhead or underground utilities or poles/ Inspecting,geotechnical services,testing fees/Signs and striping/Landscaping/well or septic abandonment/Additional import or export not detailed above. Information changes in drawings or project scope of work to be negotiated upon receipt of drawing/All building and footing layout. This proposal is based on information available at this time,and the quantities &prices listed above. TTap Const LLC.assumes no liability for changes to quantities or prices due to unforeseen conditions, material cost, changes to the plans, or changes required by governing agencies. If you have any questions, please don't hesitate to call. I can be reached at the office at(509)440-3273 (This price is good for 30 days) Tyler Tapani Owner or Authorized Signature Manager Acceptance of Proposal 509-783-8993 � Employment Security Department WASHINGTON STATE May 6, 2022 ESD# 000476011000 UBI# 603267211000 TTAP CONSTRUCTION SERVICES LLC 241 Jackrabbit Lane Kennewick,WA-99338 PASCO, CITY OF Employment Security Department hereby certifies those contributions,penalties and interest due from the above named contractor under the Employment Security Act have been paid in full or provided for with respect to the following public works contract: Description Columbia Marina Dock Removal Contract number 22-003 The Employment Security Department hereby certifies that it has no claim pursuant to RCW 50.24.130 against the public body named above for taY attributable to service performed for said public body by the above named contractor on the above described contract. The Employment Security Department releases its lien on the retained percentage which is provided by RCW 60.28.040 for contributions,penalties and interest due from said contractor. This certificate does not release said contractor from liability for additional contributions, penalties and interest which may be later determined to be due with respect to the above mentioned contract. If we may be of further assistance, please call(360)890-3499 or email publicworks@esd.wa.gov EMPLOYMENT SECURITY DEPARTMENT