HomeMy WebLinkAboutTTap Construction Services, LLC for Emergency Removal of Damaged Columbia Marina Dock B January 26, 2022
Tyler Tapani
TTap Construction Services, LLC
241 Jackrabbit Lane
Kennewick, WA 99338
Re: Columbia Marina Dock Removal
Dear Mr. Tapani:
On January 24, 2022 the City Council declared the January 7, 2022 storm an emergency
event. This action gives City staff the authority to resolve the hazardous condition with
the dock caused by the storm. City staff is working with the City Attorney to complete a
contract for your company, this is expected to take a couple of weeks. Because of the
hazardous condition of the dock, it is best to proceed with the removal. We are accepting
your bid and its intent. To remind you this is job is prevailing wage,you are required file
your intents before any payment can be processed. This will serve as your notice to
proceed. The time of completion on this project is fourteen(14) calendar days. We look
forward to a successful and timely completion.
Sincerely,
Dan Dotta
Facilities Manager
� 1313 N Young St Page 1 of 3
� Kennewick WA 99336
� �509)440-3273 Sitework Proposal
Contractor Lic#TTAPCCS87364
Email tyler@ttapconstruction.com
CONSTROCTION SERVICES Date: 1/11/2022
' � - • . � . � - .
Quote To: City of Pasco
Attention: Dan Dotta
Phone: 509�30-6516
Email: Dan Dotta
General Sitework
1 Mobilization 1 LS $6,820.00 $6,820.00
2 Fence Removal 1 LS $2,728.00 $2,728.00
3 Dock Demolition 1 EA $25,730.00 $25,730.00
4 Hauloff Debris 1 LS $34,100.00 $34,100.00
5 In Water Debris Containment 1 LS $2,728.00 $2,728.00
6 Cleanup 1 LS $6,820.00 $6,820.00
Total $78,926.00
1313 N Young St
� Kennewick WA 99336
(509)440-3273 Page 3 of 3
Contractor Lic#TTAPCCS87364
EmailTyler@ttapconstruction.com Sitework Proposal
CONSTRIlGT10N SERVICES Date: #�###########
' . . � - 1 • � - .
Clarifications:
This proposal is based upon preliminary plans and is subject to change per approved plans.
Erosion Control items added by owner or governing agencies,to be completed T&M if required.
TTap Const. obligation to perform any work referred to in this proposal assumes that the onsite materials are
moveable and compactable by normal means,are stable,dry and otherwise suitable for base rock, paving or any
other work to be preformed.
S ecific Clari�cations:
1.Asbestos Removal or testing
2. Fence Replacement by others
3.Taxes will be charged at time of invoice unless a resellers permit is received
4. This proposal is dependent on a mutually agreeable schedule
5. Project Bid at current prevailing wage rates
Specific Exclusions:
1. Electrical Disconect by others
2. Water meter by others
3.
Standard Exclusions:
All Taxes,bonds, permits/engineering,survey,construction staking,or as-built verification/ De-watering, excavation of
any rock bigger than one cubic yard or requiring alternative methods such as blasting or rock hammering/Testing or
abatement of hazardous materials,or contaminants/Moving or re-locating overhead or underground utilities or poles/
Inspecting,geotechnical services,testing fees/Signs and striping/Landscaping/well or septic abandonment/Additional
import or export not detailed above. Information changes in drawings or project scope of work to be negotiated upon
receipt of drawing/All building and footing layout.
This proposal is based on information available at this time,and the quantities &prices listed above.
TTap Const LLC.assumes no liability for changes to quantities or prices due to unforeseen conditions, material cost,
changes to the plans, or changes required by governing agencies. If you have any questions, please don't hesitate to call.
I can be reached at the office at(509)440-3273 (This price is good for 30 days)
Tyler Tapani Owner or Authorized Signature
Manager Acceptance of Proposal
509-783-8993
� Employment Security Department
WASHINGTON STATE
May 6, 2022
ESD# 000476011000
UBI# 603267211000
TTAP CONSTRUCTION SERVICES LLC
241 Jackrabbit Lane
Kennewick,WA-99338
PASCO, CITY OF
Employment Security Department hereby certifies those contributions,penalties and
interest due from the above named contractor under the Employment Security Act have
been paid in full or provided for with respect to the following public works contract:
Description Columbia Marina Dock Removal
Contract number 22-003
The Employment Security Department hereby certifies that it has no claim pursuant to RCW
50.24.130 against the public body named above for taY attributable to service performed for said
public body by the above named contractor on the above described contract. The Employment
Security Department releases its lien on the retained percentage which is provided by RCW
60.28.040 for contributions,penalties and interest due from said contractor.
This certificate does not release said contractor from liability for additional contributions,
penalties and interest which may be later determined to be due with respect to the above
mentioned contract.
If we may be of further assistance, please call(360)890-3499 or email
publicworks@esd.wa.gov
EMPLOYMENT SECURITY DEPARTMENT