HomeMy WebLinkAbout4276 Resolution - PBS Engineering Amendment 1 to Broadmoor TIF Design RESOLUTION NO. 4276 A RESOLUTION OF THE CITY OF PASCO, WASHINGTON, AUTHORIZING THE INTERIM CITY MANAGER TO EXECUTE AMENDMENT NO. 1 TO THE PROFESSIONAL SERVICES AGREEMENT WITH PBS ENGINEERING & ENVIRONMENTAL, INC. FOR THE BROADMOOR TAX INCREMENT FUNDING AND INTERCHANGE PROJECT. WHEREAS, the City and PBS Engineering & Environmental, Inc., entered into a Professional Services Agreement (PSA) on August 1, 2022, to provide engineering services respecting the Broadmoor Tax Increment Funding and Interchange project; and WHEREAS,this project is funded through tax increment financing funds and will follow local procedures for right-of-way (ROV� acquisition, design, advertisement, environmental permitting, and bidding; and WHEREAS,the City and PBS Engineering& Environmental, Inc., desire to enter into an Amendment to the PSA to provide additional professional design engineering services as described in Exhibit A and add additional time of performance. NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO,WASHINGTON: That the City Council of the City of Pasco approves the terms and conditions of Amendment No. 1 to the Professional Services Agreement between PBS Engineering & Environmental, Inc., and the City of Pasco; a copy of which is attached hereto and incorporated herein by reference as Exhibit A. Be It Further Resolved that the Interim City Manager of the City of Pasco, Washington, is hereby authorized, empowered, and directed to execute said Amendment on behalf of the City of Pasco; and to make minor substantive changes as necessary to execute the Amendment. PASSED by the City Council of the City of Pasco,Washington,this 215t day of November, 2022..----:. Blanche -ajas Mayor ATTEST: APPROVED AS TO FORM: � � Debra Barham, CMC Kerr Fe on Law, PLLC City Clerk Cit torneys Resolution—Broadmoor TIF and Interchange Project- 1 EXHIB�T A AMENDMENT NUMBER 1 to PROFESSIONAL SERVICES AGREEMENT Broadmoor TIF Design Services Project No. 22-337 AGREEMENT NO.22-025 WHEREAS,the City and PBS Engineering &Environmental, Inc., entered into a Professional Services Agreement on 8/1/2022 to provide engineering services with respect to the Broadmoor TIF and Interchange projects. NOW, THEREFORE, this agreement is amended to allow PBS Engineering & Environmental, Inc., to provide additional professional design engineering services as described on Exhibit A and add additional time of performance. l. Scone of Work: See Exhibit A. 2. Fee: The compensation for the additional work is based on a Time &Materials Basis of $957,661.00, increasing the overall total authorization amount to $1,220,333.00. Please see Exhibit B for further breakdown. 3. Time of nerformance: The services shall now be complete for the project on or before 12/31/2024. DATED THIS DAY OF ,2022. CITY OF PASCO: CONSULTANT City of Pasco PBS Engineering&Environmental, Inc. Adam Lincoln—Interim City Manager Jason Mattox,PE—Vice President Amendment No. 1 to Professional Services Agreement Page 1 PBS Engineering&Environmental,Inc. Broadmoor TIF Design Services EXHIBIT A � ` CITY OF PASCO, WASHINGTON Scope of Work Broadmoor TIF - Final Design Projects 1 and 2 City of Pasco Project # 22-377 INTRODUCTION PBS Engineering and Environmental Inc. (PBS)and its Consultant team have been selected by the City of Pasco (City)to perform traffic and design engineering, land surveying,geotechnical engineering, and right of way acquisition services for the Broadmoor Tax Increment Financing (TIF) projects.This project is funded through tax increment financing funds and will follow local procedures for right-of-way(ROV1�acquisition,design, advertisement, environmental permitting,and bidding. The project team currently includes: • Kittelson &Associates, Inc. (KAI)—Signal Design • EPIC Land Solutions(EPIC)—ROW Acquisition This phase of the project(amendment 1)will progress portions of the 30% design to final bid documents. It is assumed that this phase of the project design will last up to 5 months from contract award. PROJECT DESCRIPTION/BACKGROUND A portion of the Broadmoor site roadway network, associated frontage,and signal improvements are planned to be led by the City of Pasco and funded through the TIF process.The City has signed a Letter of Understanding with Broadmoor Properties which commits the City to having improvements related to Broadmoor Boulevard, Sandifur Parkway, and Road 108 designed and out for advertisement in the Winter of 2022.This amendment is to perform the following tasks: • Project 1 —Develop a Please, Specifications, and Estimates (PS&E) package:for rough site grading of Road 108 from Harris to Sandifur Parkway and Sandifur Parkway from Road 108 to Broadmoor;and water and sewer infrastructure along Road 108 and Sandifur Parkway for advertisement mid-December. It is understood that this would complete a majority of the underground utility work for water and sewer associated with the TIF projects and would also seek to advance the City's CIP water infrastructure in the region through the Broadmoor site.The sewer would look to extend from the previously constructed City LID project east toward Broadmoor, as well as extending lines from Harris Road north up Road 108. • Project 2— Develop a PS&E package for Full Construction of Broadmoor Boulevard from the interstate to Burns Road and Sandifur Parkway from Road 105 east to the vicinity of Bedford Street, and the grading for the storm infrastructure along Road 108 to the proposed stormwater facility(shown in the 30%strip maps). OVERALL PROJECT ASSUMPTIONS . Traffic modeling will be performed by DKS under a separate agreement with the City. • DKS will provide signal-related lane configurations and storage lengths. _ , _. ,. City of Pasco Broadmoor TIF—Final Design Projects 1 and 2 October 2022 Paqe 2 of 14 • All environmental permitting and State Environmental Policy Act(SEPA)-related activity has been previously completed by the City under the Environmental Impact Statement(EIS) process for the overall Broadmoor area. No additional permitting efforts are anticipated�to be needed, and are excluded from this work. • Project 3 has been previously identified at the 30%design level which would seek to extend Sandifur Parkway west to Road 108 as a core road.A roundabout would then be constructed at Road 108 and Sandifur Parkway and an extension of Road 108 as a core road extended south to the Harris Road.This project is not currently scoped for design under this contract amendment and would not be bid during the winter of 2022 to 2023.This project would be a separate design and bid package that would be put out later in 2023 for construction after Project 2 is bid. SCOPE OF WORK Task 1: Project Management and Administration PBS shall oversee project tasks and coordinate with City representatives to manage the scope, schedule and budget for the design engineering phase.The current phase of the project is budgeted for a 5 month design window based on City identified schedules and meetings held during the 30% design review process. Subtask 1.1—Contract Administration, lnvoicing,and Progress Reports • Prepare and submit monthly invoices. Each invoice will include:the date period covered by invoice, number of hours worked during the billing period with billing rates shown;expenses and associated markups;total cost for labor and expenses for the billing period; subconsultants fees including markups for the billing period;and a total amount summarizing labor,expenses, and subconsultant fees. • Prepare a Contract Summary Report to accompany the monthly invoices.The Contract Summary Report will list each invoice, as well as the current invoice,with an itemized summary of invoice numbers,dates, and amounts billed for labor,expenses,and subconsultants as well as total amounts for each invoice.The Contract Summary Report will also list the total amount billed to date,total amount remaining under contract,and contract expiration date. • Maintain required contract documentation. Provide copies of project files and records to the City for audits and public information requests. Final documents shall be provided in electronic format as requested. Deliverables • Monthly invoices, Contract Summary Reports, and Project Status Reports. • Project Documentation, upon request Subtask 1.2—Meetings This item includes the coordination and meetings necessary to successfully complete the project. • Up to 20 weekly phone meetings with City Staff. • Up to 20 internal PBS design team coordinations and meetings. • Preparation for and attendance for three monthly project coordination meetings with �ity staff including and up to two PBS staff.Other consultant team members will attend meetings as needed. • Meet with City staff after the review of the 60%, 90%, and final plan submittals.These meetings will be attended instead of the monthly meeting during this deliverable window. PBS Project 66084.002 City of Pasco BroadmoorTlF—Final Design Projects 1 and 2 October 2022 Page 3 of 14 Defiverables • Meeting Agendas and Meeting Summaries • Design Submittal Comment Review and Response Log Subtask 1.3—Management, Coordination, and Direction • The Consultant shall provide management,coordination, and direction to the Project team in order to complete the project on time and within budget.The City fosters a partnership approach of all stakeholders in the Project.The Consultant shall integrate this strategy into the overall management approach. • The Consultant shall establish a quality management program and designate responsibility for review of technical work and other deliverable products. • Prepare and maintain project design schedule.The schedule shall identify Consultant tasks and items provided by City and other consultants.The schedule shall be updated as circumstances require or as requested by the City(assumes one update). • The Consultant shall prepare and submit an activities list and schedule to the City following the Notice to Proceed.The schedule shall show appropriate milestones for the Project, including intermediate and final submittal dates for design documents and key decision points. • The Consultant shall coordinate Consultant tasks and activities with the City. Deliverab(es • Project Schedule and Schedule Updates • Summary notes of coordination efforts • Quality Assurance and Quality Control (QA/QC) Program Deliverab(es Coordination meeting agendas and meeting summaries. Task 2:Surveying Subtask 2.1—Surveying and Base Map Scoped as a part of the original contract for 30% design. Subtask 2.2—Right-of-Way Support Right-of-Way/Property Line Stakes • Consultant will conduct right-of-way and property line stakeouts for applicable properties on one trip. City will confirm what stakes they would like to see placed in the field prior to engagement by PBS and after contact has been made with the property owners. Legal Descriptions/Exhibit Maps for Right-of-WayAcquisitions/Easements • Prepare legal descriptions and exhibits for right-of-way and easement acquisition. It is assumed that there will be three legal descriptions and/or exhibits to prepare(one right-of-way acquisitions and dedications, one TCEs,and one Permanent Easement). PBS Project 66084.002 City of Pasco Broadmoor TIF—Final Design Projects 1 and 2 October 2022 Page 4 of 14 Deliverables • Up to three legal descriptions and exhibits Task 3:Geotechnical Engineering Subtask 3.1—Geotechnical Engineering Scoped as a part of the original contract under 30°/o design. Task 4:Traffic Engineering (Kittleson Project 2) Subtask 4.1 —Contract Administration, Invoicing,and Progress Reports • Prepare and submit monthly invoices with progress reports. Each invoice will include: date period covered by invoice, number of hours worked during the billing period with billing rates shown; expenses;total cost for labor;and expenses for the billing period. • Maintain required contract documentation. Provide copies of project files and records to the City for audits and public information requests. Final documents shall be provided in electronic format as requested. Deliverables • Monthly invoices and Project Status Reports. • Project Documentation, upon request. Subtask 4.2—Meetings This item includes the coordination and meetings necessary to successfully complete the project. • Preparation for and attendance at a two-hour project kickoff meeting over Microsoft Teams with City Staff including up to three Kittelson Staff. • Up to 24 weekly phone meetings with PBS Staff(1 hour in Length). • Preparation for and attendance project coordination meeting (up to three)with City staff including and up to three Kittelson staff. • Meet (three times)with City staff after the review of the 60%, 90%, and final plan submittals, these meetings will be attended instead of the monthly meeting these months. Subtask 4.3—Site Visit Participate in a site visit of the existing project location and condition.As a project team,we will observe and document the local context and inspect the area for any other features relevant to the design of the project. Subtask 4.4—60%Design (PS&E) The consultant will address review comments on the 30% Plans and develop construction documents to the 60% design stage.These documents will consist of plans, a bid item list, and an opinion of probable construction cost. The 60% plans shall include • Signing and Striping Plans • Signing Details • Striping Details PBS Project 66084.002 City of Pasco Broadmoor TIF—Final Design Projects 1 and 2 October 2022 Page 5 of 14 • Illumination Plans(16 Sheets) • Illumination Details (2 Sheets) • Signal Plans (11 Sheets) o Legend (1 Sheet) o Broadmoor Boulevard and Sandifur Parkway(1 Sheet) o Broadmoor Boulevard and Buckingham Drive(1 Sheet) o Broadmoor Boulevard and Burns Road (1 Sheet) o Sandifur Parkway and Road 105 (1 Sheet) o Sandifur Parkway and Road 108(1 Sheet) o Signal Details (5 Sheets) 1. Calculate quantities and prepare a 60%engineer's estimate of construction costs for the plans above. 2. Submit 60% plan set and cost estimate for review 3. Address 30% City review comments regarding the plans. Deliverables • 60% Plans and Cost Estimates (PDF versions) Subtask 4.3—90%Design (PS&E) The consultant will address review comments from the 60% plans and develop construction documents tothe 90% design stage.These documents will consist of plans, specifications, a bid item list, an opinion of probable construction cost,and an anticipated construction schedule. The 90% plan set shall include the following sheets: • Signing and Striping Plans • Signing Details • Striping Details • Illumination Plans • Illumination Details • Signal Plans o Legend o Broadmoor Boulevard and Sandifur Parkway o Broadmoor Boulevard and Buckingham Drive o Broadmoor Boulevard and Burns Road o Sandifur Parkway and Road 105 o Sandifur Parkway and Road 108 o Signal Details 1. Update and compute quantities and prepare an engineer's estimate of construction costs shown on the plans. Identify which bid items will require special provisions. 2. Prepare 90% Level Project Specifications including current Washington State Department of Transportation (WSDO� amendments, General Special Provisions (GSPs) and special provisions necessary for this project. 3. Submit 90% plan set, specifications, and cost estimate for review. PBS Project 66084.002 Ciry of Pasco Broadmoor TIF—Final Design Projects 1 and 2 October 2022 Page 6 of 14 4. Address 60%City review comments regarding the plans and estimate. Deliverables • 90% Plans, Specifications, and �ost Estimates (PDF of the plan set, specifications,and cost estimate) Subtask 4.6—Final Design(PS&E) The consultant will address review comments from the 90%plans and develop construction documents for the final design submittal.These documents will consist of plans, specifications,a bid item list, and an opinion of probable construction cost. Address the 90%comments. Final design phase plan set shall include: • Signing and Striping Plans • Signing Details • Striping Details • Illumination Plans • Illumination Details • Signal Plans o Legend o Broadmoor Boulevard and Sandifur Parkway o Broadmoor Boulevard and Buckingham Drive o Broadmoor Boulevard and Burns Road o Sandifur Parkway and Road 105 o Sandifur Parkway and Road 108 o Signal Details 1. Update and compute quantities and prepare an engineer s estimate of construction costs shown on the plans. Identify which bid items will require special provisions. 2. Prepare Final Project Specifications including current WSDOT amendments, GSPs and special provisions necessary for this project. 3. Submit final plan set, specifications, cost estimate for review 4. Address 90%City review comments regarding the plans and estimate. Deliverables • Final Plans, special provisions, and estimate (PDF). Subtask 4.7- QA/QC The Consultant will provide QA/QC for design work in accordance with the Consultant's Quality Management Plan (QMP).The Consultant will provide senior level design and construction personnel to review plan submittals and provide technical support. Task 5: Environmental Review and Documentation Assume this work has been completed by City under the Broadmoor EIS process. PBS Project 66084.002 City of Pasco Broadmoor TIF—Final Design Projects 1 and 2 October 2022 Page 7 of 14 Task 6: Design Engineering The consultant will advance the design from the(30%) plans during the current phase of the project.The Consultant team will be responsible to provide design engineering services for the deliverables outlined below for the following submittals: • Preliminary{30%) Submittal —Completed • Project 1 —90% Design (PS&E) • Project 1 —Final Design (PS&E) • Project 2—90% Design (Plans and Estimate) • Project 2—90% Design (PS&E) • Project 3—Final Design (PS&E) • QA/QC Subtask 6.1—30%Design (Pre[iminary) Completed as part of the original contract for 30%design. Subtask 6.2—Project 7—90%Design (PS&E) The consultant will progress the previously approved plans (as part of a previous project) along with the conceptual 30% Broadmoor plans to develop 90% plans.These documents will consist of plans, contract specifications in WSDOT format,and an opinion of probable construction cost. Design tasks include the following: • Compute quantities and prepare an engineer's estimate of construction costs • Submit 90% plans for review • Meet with city staff after review of the 90% plans • Prepare project specifications The 90%plan set shall include the following: • Cover sheet • Civil legend sheet • Miscellaneous details • Site prep, erosion control and grading plans • Site prep, erosion control and grading plans • Grading, Sanitary and Waterline plan over profile sheets • Standard details Deliverables • Construction plans, specifications, and opinion of probable construction costs(final) in PDF format Subtask 6.3—Project 1—Final Design (PS&E) The consultant will address review comments from the 90%plans and develop construction documents to the final design stage.These documents will consist of plans, contract specifications in WSDOT format, and an opinion of probable construction cost. PBS Project 66084.002 City of Pasco Broadmoor TIF—final Design Projects 1 and 2 October 2022 Page 8 of 14 Design tasks include the following: • Compute quantities and prepare an engineer's estimate of construction costs • Submit draft final plan set for review • Meet with City staff after review of the draft final plans • Finalize project specifications The final plan set shall include the following: • Cover sheet • Civil legend sheet • Miscellaneous details • Site prep, erosion control and grading plans • Site prep, erosion control and grading plans • Grading, Sanitary and Waterline plan over profile sheets • Standard details Deliverables • Construction plans, specifications,and opinion of probable construction costs (final) in PDF format Subtask 6.4—Project 2—60%Design (Plans and Estimate) The consultant will address review comments from the 30% plans and develop construction documents to the 60°/o design stage.These documents will consist of plans,format,and an opinion of probable construction cost. Design tasks include the following: • Update street design based on comments from 30% plans • Compute quantities and prepare an engineer's estimate of construction costs • Submit 60%plans for review • Meet with city staff after review of the 60% plans The 60%plan set shall include the following: • Cover sheet • Civil legend sheet • Typical sections • Miscellaneous details • Traffic staging plans • Site prep and demolition plans • Erosion control and grading plans • Erosion control notes detail sheets . Roadway and stormwater plan over profile sheets • Sanitary and Waterline design grayscaled fior reference from Project 1 • Signing plans and details(See Task 7) • Striping plans and details (See Task 7) . Illumination plans and details(See Task 5) • Signal Plans and Details (See Task 5) • Landscape plans and details PBS Project 66084.002 City of Pasco Broadmoor TIF—Final Design Projects 1 and 2 October 2022 Page 9 of 14 • Irrigation plans and details • Standard details Deliverables • Construction plans,and opinion of probable construction costs in PDF format • Draft Stormwater Calculations and Memo of Assumptions Subtask 6.5—Project 2—90%Design(PS&E) The consultant will address review comments from the 60% plans and develop construction documents to the 90%design stage.These documents will consist of plans, contract specifications in WSDOT format, and an opinion of probable construction cost. Design tasks include the following: • Update street design based on comments from 60% plans • Compute quantities and prepare an engineer's estimate of construction costs • Submit 90% plan review set for review • Meet with City staff after review of the 90% plans • Project Specifications The 90% plan set shall include the following: • Cover sheet • Civil legend sheet • Typical sections • Miscellaneous details • Traffic staging plans • Site prep and demolition plans • Erosion control and grading plans • Erosion control notes detail sheets • Roadway and stormwater plan over profile sheets • Americans with Disabilities Act(ADA) grading sheets • Sanitary and Waterline information grayscaled for reference from Project 1 • Joint Utility Trench (JU� p�ans and details • Signing plans and details(See Task 5) • Striping plans and details (See Task 5) • Illumination plans and details (See Task 5) • Signal plans and details (See Task 5) • Landscape plans and details • Irrigation plans and details • Standard details Deliverab(es • Construction plans, specifications, and opinion of probable construction costs(final) in PDF format • Final Stormwater Report and Calculations PBS Project 66084.002 City of Pasco Broadmoor TIF—Final Design Projects 1 and 2 October 2022 Page 10 of 14 Subtask 6.6—Project 2—Final Design (PS&E) The Consultant will address review comments from the 90% plans and develop construction documents to the final design stage.These documents will consist of plans, contract specifications in WSDOT format,and an opinion of probable construction cost. Design tasks include the following: • Update street design based on comments from 90% plans • Compute quantities and prepare an engineer's estimate of construction costs • Submit draft final plan set for review • Meet with City staff after review of the draft final plans • Address draft final plan comments from the City and submit final PS&E for construction The final plan set shall include the following: • Cover sheet • Civil legend sheet • Typical sections • Miscellaneous details • Traffic staging plans • Site prep and demolition plans • Erosion control and grading plans • Erosion control notes detail sheets • Roadway and stormwater plan over profile sheets • ADA grading sheets • Sanitary and Waterline information grayscaled for reference from Project 1 • JUT plans and details • Signing plans and details (See Task 5) • Striping plans and details(See Task 5) • Illumination plans and details(See Task 5) • Signal Plans and Details (See Task 5) • Landscape plans and details • Irrigation plans and details • Standard details Deliverables • Construction plans,specifications, and opinion of probable construction costs(final) in PDF format Assumptions • City will compile all bid document packages Subtask 6.5-QA/QC The Consultant will provide QA/QC for design work in accordance with the Consultant's QA/QC Program.The Consultant will provide senior level design and construction personnel to review plan submittals and provide technical support. PBS Project 66084.002 City of Pasco Broadmoor TIF—Final Design Projects 1 and 2 October 20�2 Page 11 of 14 Task 7: Utility Coordination Subtask 7.1 —Preliminary Utility Coordination Completed as part of the original contract for 30%design. Subtask 7.2—Utility Meetings Organize up to two group utility meetings to provide the latest overall project information.Such meetings will address known facilities, potential for impact,timing requirements for potential relocations, and information of reimbursable requirements. Meetings will also allow the exchange of each utility's relocation plans with the other utilities in order to maximize compatibility of relocation designs and utility and roadway construction sequencing. Work may also include 1UT coordination. Subtask 7.3—Conflict Identification,Analysis and Recommended Resolution Identify and analyze utility conflicts,compile, and distribute utility conflict lists involving aboveground, surface, and underground conflicts,and make conflict resolution recommendations to utilities. Revise utility conflict plan sheets based on 60%and 90%design plans and accompanying utility conflict spreadsheets indicating, but not limited to, conflict item number,type of utility, conflict status, average cover during and after construction,whether utility is in or out of public ROW, and comments. Subtask 7.4—Con flict Noti�cation and Utility Relocations Notify the impacted utilities and coordinate the efforts of the utility agencies in developing and executing a plan for relocating utilities to resolve conflicts with the project design.As part of that effort: 1. Prepare and deliver to each involved utility owner a Conflict Notice with attached conflict list and map. Assume up to five different utility operators. Notice shall require a utility response in the form of a proposed facility adjustment plan and schedule to complete the utility work.Allow each utility a 30-day period to respond with a proposal from date of the notice. 2. Review utilities' proposed relocation plans to verify that identified conflict items are addressed and that the plans accommodate and conform to the construction requirements for the project. Provide written approval of each utility's relocation plan. Up to eight total reviews will be performed for the utilities' relocation plans. Task 8: Public Involvement To be included in a future Amendment if required. Task 9: Right-of-Way Subtask 9.T—Right-of-Way Acquisition The consultant will provide labor, equipment, and materials to acquire real property and easements to facilitate project construction. Legal descriptions will be developed as described in 2.2. Property owner lists, maps, and acquisition areas will be developed in subtask 6.4. Right-of-way acquisition activities will conform to the standards contained in the Uniform Act of 1970 and amendments,the laws of the State of Washington, and City policies and procedures. PBS Project 66084.002 City of Pasco Broadmoor TIF—Final Desiqn Projects 1 and 2 October 2022 Page 12 of 14 Preliminary Title Reports The consultant will obtain preliminary title reports for each property acquisition. The consultant will review each preliminary title report for encumbrances, liens, or defects.The consultant will work with the title companies to resolve encumbrances prior to completion of appraisals. Assumptions • There will be two property acquisitions Deliverab(es • Two preliminary title reports Appraisal and Appraisal Review The consultant will use a WSDOT-approved appraiser. The consultant will provide one real estate appraisal for each ownership from which a property interest value of greater than $25,000 is to be acquired. The consultant will complete appraisal waivers for those properties valued at less than $25,000. Appraiser will provide written notice to owners of a planned appraisal inspection and will provide the property owner or designated representative, if any, an invitation to accompany the appraiser on any inspection of the property for appraisal purposes. Appraisal will conform to the Uniform Standards of Professional Appraisal Practice(USPAP). Detiverabfes • Appraisals for one file • Appraisal waivers for one file Atquisition The consultant will conduct property acquisition negotiations on behalf of the City. The consultant will research the ownership status of the parcel and any existing conditions impacting the parcel. The consultant will provide potential courses of action for obtaining clear title for the City. The consultant will compile and/or prepare all essential documents to be submitted to owners using city- approved documents.These include project information letters, acquisition and relocation brochures,offer-benefit letters,acquisition summary statements, copy of the valuation, map of acquisition,and instruments of conveyance. Universal shall make all offers in person or by certified mail. The consultant will provide all property owners with: • A complete copy of the valuation that just compensation is based upon at the initiation of negotiations. The consultant will prepare and maintain written diaries of negotiator contacts with property owners and tenants to document: PBS Project 66084.002 City of Pasco Broadmoor TIF—Final Design Projects 1 and 2 October 2022 Page 13 of 14 • Efforts to achieve amicable settlements • Owners'suggestions for changes in plans • Responses to owners'counterproposals, etc. The consultant will make every reasonable effort to acquire the right-of-way expeditiously by negotiation. Property owners must be given reasonable opportunity to consider the offer and present material the owner believes is relevant to determining the value of the property. Assumptions • No relocation activity is anticipated • The City will pay closing costs • The City will Record documents and pay property owners • Assumes no condemnation activities • There are no federal funds or WSDOT oversight of right of way activities • A project funding estimate is not part of this scope Deliverables • Two completed negotiation packets with documentation for recording Task 10: Construction Management To be included in a future Amendment. City Deliverables to the Consultant City Provided In formation Sample Projects The City will provide copies of sample City plans and specifications.City will also provide standard details for streets,traffic signal, street lighting and other available details. Project Coordination The City will assist the Consultant in managing relationships with other jurisdictions involved in the project, adjacent property owners and the public.The City will provide staff to meet and discuss the project with the Consultant as needed.The City will provide written comments pertaining to the design submittals. Right of Entry Permits The City will obtain the right of access to private parcels for all project developments.The Consultant shall coordinate access. Pavement Design The City will select the pavement type and structural sections based on the pavement recommendation provided by the Consultant. Utility List The City will provide the Consultant with a list of Iocal contacts for utilities within the project limits. Design and plan preparation for the addition or relocation of utilities within the project limits will be done by others. PBS Project 66084.002 City of Pasco Broadmoor TIF—Final Design Projects 1 and 2 October 2022 Page 14 of 14 Street Light and Traffic Signa(Requirements The City will provide the illumination type,the minimum illumination levels and uniformity ratios to be used in the project design.The City will also provide traffic signal design concepts, standards and policies, including traffic interconnect schemes as needed. PBS Project 66084.002 EXHIBIT B Brwdmoor7lF-FlnelDeslgnProjlctslfl2 nn/�r��..r^� lUBcoHA1:.iAM1 .mr ae�.nuu �m.. p.prwyr.y�.,.� �w 'ur .� c �u�r f�rw�M uCb�wr o..uMb. u�+rs'p Wwrnx� MM•�w rywrw q�u.v ey�ti'n eytir+� eyNn� wW�i uo�rr� fYww �Na R�V f Ai�ln� bw+ TmY 4M'w IR 1�M �M '1s[1•oPPrttiblwau�[N)wowMeY6wnroH � I I RCIA A R..d1 �IJlt ISMIR Subwsk].I�Conira��eeminisna�ien,inwitln�amnoeressrseoarts , Si,000.ao x35a: 5355o.m „�Eusk].i�MeeNnp _ _ i .aol 3<, 53a,N0.00 Sw,a9z.pp .ubtafkl.3_Nbrogement,CoerNroNmiMP'rect <;�0. $�i.lsna0 RA50. 565.610.00 16,1 ! tlll� �i9pA Y s .. - -_ $O.W a]SWJ.V 5�3,SN.W -NgM1aleWaSupporto 90.p0 AOD Ox $I6.316.00 SSfi,3t4d0 A�KiZ9F➢�F[vN1f.LLQ�ey�fFAiY�i 6 .1�3p.o u.YY� k3.lGeotecnniuiEngineenng 50.00 343W. 5313WA1U *avc<:rn�rnc crx tcLm �a+.us.m �nr.ias. sx,�ax cask<.1.CnmrxtMminlsmtim.Inroltln�eMRae_�__ _ _ � - - �. Sf.sos.m St.xs.m SUCtaskd.2.Meelings � 0.00 ).903.W . 5�.903. 5"/.9o1.W Sublxk<.3.SteVisit �� ' - - -��-� - ILU15.00 11,0J5.� . 511,Onao 511,On.co - ianlvs9el sao� . Ssa.oz�.00 SSa.oza.m b[akQS-90%Design�GS&E) ,].00� , 533.2i1.00 $33,331.00 e�,..s-F�,��.���E� - -.. fi --- - -- r a��, ,��.�o� �,,.�.� s�ctaka'!-oNa - �- --- -` - -T�- ss.:e s.u.u�.00 sw.zsim A9tS:FNNIMMMFxT�LI1MkW�NDEMUMMT�1roN _- _ _ __ I ` _ - -__ __._���._"'_'___"�`_'____ . : ; ...- s�e��oesarea�m� sxsam. a en zi»o nv. 9ier�es.i:3oieFe� �s�la.umt�.rvl � So.ao �izno,i Sua»o.ao �oe. � nm � a.• s�e�taz-woi�a�-vortrem�:�s�(vssel � ... . . - -.. .. -_.. ... i�a0 SLSm: $SL610.00 $51,630A0 .�btesk6.3-Rajtttt-FinalRsign�PS&E) � I SSS,SW.W SSS,So0.00 btnkfi.C-Roject2-60%Cesign�parisaMEs[imate) 5153,5aom 5153,sna.ao btnk6.5-Vmjectl-9DXCesign�GS&E) �apl 153,SW� 5�53,510 5153,Si0.00 wbtask6.6-amj«t]-Freloes�gn�v58E� �ool 1 � 0.� SIa5,6lo.00 51u,6]O.ap tss-vJa so.ml .. � --- " - -��--- ---�- - � �ss.ao.� sss..ao.w scc.arom uar.limmcaeeow�miu a +aau. ■ iva SLb�nk),IVtitiryCamd'meuon � I � I Sa.m 3�p 534+�o.co SLMukl.2-UEtiryMaEnge - - ' - - ' „ . . . _ . -- 51],36a.00 513,36a SL�tmkJ.3-Cm�fliulEcnti6utian,/uWytieWAecaninrnhEReeduuan , 32.pp�l I _ ' _ _ _ , 19,060.� 519.060.00 5�9,�K0.00 Subivk).4-C,aJliuNa'diutionaMlltiliryRAouuan ppl 3.ppl I bp I I9,O60.�k 5�9��� $�9� 0.51I� N ... . e. i I . _' .. : _ ._ 7 : -- ' . ��sx __ _ __--f � BW� � ... ��I WL ..J. . .' , I �_ _�. . - _. _.. - .. . i�slt N W � I ! � 1 It�66, .106b. i1.KG gM1 f� ... - � I . . :.� '� I � 1. 2as5. lZas 5 ws. 5a3.us.00 SUMuk i 6'A. OJ !aatqUCM IbEMFN I ___� ' N _. . . _._._-______�_�-_ � '_ -� _� I ._�-_ .____. ... ___ 4+nbvw'NeFrsinr.� ____v bm . . � ,�. 5o,m '__-"__""___'_"-_- . '_ " - _ _ �ores � . Sa.m So.W TmM- _- _--- '.- �__'. _-_' _ ' ' . -_ - -' SO.oO 50.00 ' -- _ -'�'. _ _- N.W $O.W . .�'... . . - �Am 'A'�' LLNO110.5 �. 0 � 63a UFLYWTES 215.m 30¢W 1N�, �uns f S nl]nao 5 fmm�ao 5 ».Molltl ]5„�Oo � S 1]S,�OO.OU f�N�OaEO S�l11CGEE 6 5 u]Eo.oE IM.40 5 L610.W$ 5 S IE0.EC S T/3.IB0.tlC 5 1�135A0 1 13Afi6.00 S ]61,1010D i Yv).fi51.00 S t61,6/3.00 S.ilO,R30f1