Loading...
HomeMy WebLinkAbout4250 Resolution - Zone 3 Water Storage Reservoir - CO3RESOLUTION NO. 4250 A RESOLUTION OF THE CITY OF PASCO, WASHINGTON, AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 3 TO THE DESIGN BUILD INSTITUTE OF AMERICA PHASE 1 AGREEMENT WITH T BAILEY, INC. FOR THE PROGRESSIVE DESIGN - BUILD SERVICES FOR THE ZONE 3 WATER STORAGE RESERVOIR PROJECT. WHEREAS, the City and T Bailey, Inc. entered into an Agreement on November 21, 2021, to provide progressive design -build services; and WHEREAS, the City of Pasco, pursuant to RCW 39.80.050(1), has negotiated a fair and reasonable Design Build Institute of America (DBIA) Phase 1 Agreement with T Bailey, Inc. based on the estimated value of the services including their scope, complexity, and professional nature; and WHEREAS, Phase 1 contract provides for 60% design and permitting activities; and WHEREAS, Change Order No. 1 was in the amount of $608,373.89 (including Sales Tax) for the early acquisition of pipeline materials to offset the long lead-in Ductile iron pipe and fittings associated with this project; and WHEREAS, Change Order No. 2 was a no -cost change order for time extension purposes only; and WHEREAS, Change Order No. 3 was negotiated to allow for early site development, which includes grading, foundation excavation, foundation construction, foundation backfill and acquisition of raw steel to construct the shell of the reservoir; and WHEREAS, Change Order No. 3, in the amount of $5,402,098.04 (including Sales Tax), exceeds the City Manager's authority and thus requires Council approval. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO, WASHINGTON: That Change Order No. 3 is to account for early site work, foundation construction, and acquisition of raw steel to build the shell of the reservoir; and Be It Further Resolved that the City Manager for the City of Pasco is hereby authorized to execute Change Order No. 3, a copy of which is attached hereto, and incorporated by this reference, as Exhibit A. Resolution — Change Order No. 3 to DBIA Agreement with T Bailey, Inc Water Storage Reservoir Zone 3 Progressive Design Build Project - 1 Be It Further Resolved, that this Resolution shall take effect immediately. PASSED by the City Council of the City of Pasco, Washington, this 19th day of September 2022. - W �lvnt Blanche Barajas Mayor v ATTEST: Debra Barham, CMC City Clerk APPROVED AS TO FORM: K�ttome, n Law, PLLC s Resolution — Change Order No. 3 to DBIA Agreement with T Bailey, Inc Water Storage Reservoir Zone 3 Progressive Design Build Project - 2 rnase i %oUntract %.nanye vrurr City of Pasco PO Box 293/525 N. 3"' Ave. Pasco, WA. 99301 PHASE 1 CHANGE ORDER T Bailey, Inc. 9628 South Marchs Point Rd. Anacortes, WA 98221 Project Name: Zone 3 Reservoir Storage Tank Change Order#: 3 COR# Description of Change Change in Change in Total net [check one] X Increase / ❑ Decrease in the Phase 1 NTE by this Change Order $5,402,098.04 Contract Time Phase 1 NTE a Early construction work listed below and further described in 52 working days $3,402,098.04 Exhibit A*. Mobilization, implement TESC (Temporary Erosion and Sediment Control), install construction entrance and access driveway, clear and grub both tank and lay down sites, rough grade of both tank and lay down sites, tank foundation subgrade, install tank foundation and ring wall, install mechanical improvements beneath proposed floor slab including ringwall penetrations, install all electrical and control conduit beneath ro osed floor slab including rin wall penetrations b Raw Steel Advanced Acquisition further described in Exhibit A* 0 working days $2,000,000.00 *The amount of this Change Order includes Design -Builder's Fee Percentage as well as a contingency to account for underground changed conditions for work associated with Exhibit A, and escalation in price of materials from the date of Exhibit A. Any savings in the Phase 1 Not to Exceed Amount shall accrue to Owner. Notwithstanding Section 6.2.3 of the Design -Build Agreement, the Cost of the Work included in this Change Order shall be excluded from the Cost of the Work when calculating the Lump Sum Fee. Original Phase 1 Not to Exceed Amount $388,691.76 Net change by previous authorized Change Orders $608,373.89 Total net [check one] X Increase / ❑ Decrease in the Phase 1 NTE by this Change Order $5,402,098.04 New Phase 1 NTE including this Change Order $6,399,163.69 The new Contract Time including this Change Order is: New Phase 1 Completion Date February 15, 2023 New Interim Milestone Dates: The changes in the Phase 1 Not to Exceed Amount and Contract Time identified in this Change Order include all costs and time extensions associated with performing the changes set forth herein. City of Pasco Design -Builder By: By: Signature Signature Printed Name Printed Name Title: Title: Date: Date: City of Pasco Zone 3 Reservoir EXHIBIT A Description of Change September 2022 Phase 1: Change Order 3 Authorization to proceed with the initial phase of construction concurrent with the final negotiation of the GMP and execution of the Phase 2 contract. This change order provides TBI an opportunity to potentially complete the reservoir foundation and ring wall installation prior to winter weather occurring (based on historical weather records). It is intended that costs and tasks associated with this change order be deducted from the Phase 2 contract and the GMP. Work included in this change order is as follows. • Mobilization • TESC • Construction entrance and construction access driveway installation • Tank site and PSD site clearing and grubbing • Tank site and PSD site construction grading (final grading to be accomplished within Phase 2 contract) • Tank foundation subgrade installation • Tank foundation and ring wall installation • Mechanical improvements penetrating the ringwall and beneath the proposed floor slab • Electrical and control conduit installation penetrating the ringwall and beneath the proposed floor slab • Advance acquisition of Raw Steel for tank fabrication. Items specifically not included with this change order include, but are not limited to, the following. • Tank floor slab • Tank shell and coating • Off-site utilities • Road 90 and otherwise permanent tank site access • Tank site pond excavation or rock • Tank site and PSD site finished grading • Mechanical and electrical improvements on-site or within the tank (unless specifically identified as being included). • Tank site paving, fencing, restoration, or other site improvements unless identified as being included. NOTE: this change order is not intended to include items not specifically identified in the provided itemization of work. Any remaining items will be included in the GMP Phase 2 agreement. 9/8/2022 11:19 AM\\EPSILON\Engineering\Engineering Working Folder\+Proj-Water\21252 -Zone 3 Reservoir Storage\05-Construction Phase\Change Orders\CO #3 Early Site Development\CO3 Description.docx City of Pasco September 2022 Zone 3 Reservoir Phase 1: Change Order 3 Bid Item Work Breakdown A summary of the work included in the pricing for each bid item is as follows. Item 1. Mobilize labor and equipment for the initial work. Includes PM, insurances, bond, and B&O tax associated with this initial work. Item 2. Install all TESC. 5% of TESC not included related to costs for TESC upkeep and removal and the conclusion of the project. Item 3. None. Item 4. Tank site clearing and grubbing, and excess grading on the PSD site. Item 5. Foundation excavation (not including pond excavation or quarry spalls). Item 6. Backfill excavation with crushed rock and prepare foundation subgrade. Item 7. None. Item 8. None. Item 9. PSD clearing, grubbing, and grading. Item 10. None. Item 11. None. Item 12. None. Item 13. Foundation and ringwall. Floor slab not included. Item 14. Raw steel advanced purchase. Item 15. Mechanical penetrations through ringwall and beneath floor slab. Item 16. None. Item 17. Electrical and control conduits through ringwall and beneath floor slab. Item 18. None. Item 19. None. Item 20. None. Item 21. None. 9/8/2022 11:19 AM\\EPSILON\Engineering\Engineering Working Folder\+Proj-Water\21252 - Zone 3 Reservoir Storage\05-Construction Phase\Change Orders\CO #3 Early Site Development\CO3 Description.docx City of Pasco Zone 3 Reservoir Cost Breakdown September 2022 Phase 1: Change Order 3 Item Description Change Order #3 % of Overall Work Adjusted Contingency for CO #3 1 MOB, DEMOB, CLEAN UP $262,200 19 2 TEMP EROSION AND SEDIMENTATION CONTROL $147,250 95 3 TRENCH SAFETY AND SHORING $ - 4 SITE WORK $148,750 35 $35,000 5 EXCAVATION $315,000 90 $90,000 6 BACKFILL $427,500 95 $142,500 7 CRUSHED ROCK $ - 8 SITE UTILITIES $ - 9 OFFSITE IMPROVEMENTS $268,650 27 $ 54,000 10 CONNECTION TO EXISTING WATER MAIN $ - 11 CATHODIC PROTECTION $ - 12 SHOP DRAWING PREP & RESERVOIR COMPONENTS STRUCTURAL CALCULATION $ - 13 RESERVOIR FOUNDATION $1,116,955 97 $48,500 14 RESERVOIR STRUCTURE AND APPURTENANCES $ - 15 RESERVOIR MECHANICAL $30,000 30 $6,000 16 RESERVOIR FINISHES $ - 17 ELECTRICAL $31,500 15 $6,000 18 AUTOMATIC CONTROL $ - 19 CONSTRUCTION RECORDS AND O&M MANUALS $ - 20 TESTING, STARTUP AND TRAINING $ - 21 MINOR CHANGE $ - SUBTOTAL of COST ITEMS $2,747,805.00 $382,000.00 WSST @ 8.7% $239,059.04 $33,234.00 TOTAL w/ WSST INCLUDED $2,986,864.04 $415,234.00 CONTINGENCY $415,234.00 TOTAL COST w/ CONTINGENCY for CO#3 $3,402,098.04 9/8/2022 11:19 AM\\EPSILON\Engineering\Engineering Working Folder\+Proj-Water\21252 -Zone 3 Reservoir Storage\O5-Constructlon Phase\Change Orders\CO R3 Early Site Development\CO3 Description.doa City of Pasco Zone 3 Reservoir Advanced Acquisition Details September 2022 Phase 1: Change Order 3 The tank project includes over 2.6 million pounds of steel, with 1,733,755 pounds of steel in the shell alone, most of which is custom fabricated by the contractor from raw steel. This change order #3 allows for the purchase of the entirety of the steel for the shell of the tank. The purchase is anticipated to include, but is not limited to, material for the fabrication of shell, shafts, center column, roof, floor and floor support reinforcing. Current benchmark price for raw steel is $0.92 per pound. A contingency of 8% for price escalation has been included in the total amount requested for authorization, given the current volatility of the steel market. 9/8/2022 11:19 AM\\EPSILON\Engineering\Engineering Working folder\+Proj-Water\21252 -Zone 3 Reservoir Storage\05-Construction Phase\Change Orders\CO #3 Early Site Development\CO3 Description.docx City of Pasco Zone 3 Reservoir September 2022 Phase 1: Change Order 3 RESERVOIR COURSES Shell Cour 3e gross weight (ib) purchase price S8 23A59 A0 $ 21,582.28 S7 43,896.00 $ 40, 384.32 56 58,154.00 $ 53,501.68 S5 79,702.00 $ 73,325.84 S4 101,238.00 $ 93,138.96 S3 122,774.00 $ 112,952.08 S2 144,311.00 $ 132,766.12 S1 129,508.00 $ 119,147.36 subtotal 703,042.00 $ 646,798.64 Shaft SH 8 69,836.00 $ 54,249.12 SH 7 69,836.00 $ 640249.12 SH 6 69A36.00 $ 64249-12 SH 5 87,296.00 $ 8,: = aL2.32 SH 4 87 296.00 $ 80, 312.32 SH 3 101,845.00 $ 93,697.40 SH 2 101,845.00 93,697.40 SH 1 101,845.00 $ 93,697.40 sub total 689,635,00 634}464.20 Other components PlatfDrm 148,2490.00 $ 136,389.08 Roof 65,181.00 $ 61,270.14 sub tatal 213,430.00 $ 197,659.22 Floor support reinforcing Flange plates 164,721.00 $ 151,543.32 Gusset Plates 156,825.00 $ 144,279.00 Subtotal 321,546.00 $ 295,822.32 TOTAL $ 1,774,744.38 $ 2,000,000.00 Total Authorization $ 1,926,000.00 Available for Purchase order $ 74,000.00 Fee (3.7%) $ 151,255 +62 Contingency 8% 9/8/2022 11:19 AM\\EPSILON\Engineering\Engineering Working Folder\+Proj-Water\21252 -Zone 3 Reservoir Storage\05-Construction Phase\Change Orders\CO N3 Early Site Development\CO3 Description.docc City of Pasco Zone 3 Reservoir September 2022 Phase 1: Change Order 3 Plan Set Work included in this change order has been outlined using green linework in the attached 60 percent plan set. 9/8/2022 11:19 AM\\EPSILON\Engineering\Engineering Working Folder\+Proj-Water\21252 -Zone 3 Reservoir Storage\05-Construction Phase\Change Orders\CO #3 Early Site Development\CO3 Description.doa u III III Ig 1 fgi iffil log Rpl 6$� 1 T m r z f7 RT N c M z N 1 gj a f Y N � N Y N P N �A 5 3 gAr s zw§RAA �§ !x g1plI�,i 1 1 :2, 111 �A Ii1i ;E 91 HH -1111 .. i RIto I Q I RUBIO ii Q ���g��� gq RAS SI 1��� R € NE Nis HIM M IN, 'Mims HIM 1912 22 H2 INN. 11 �o IOU i 11.5 1 meg A :IB 1 i 0 A XQ 521 --$,a —TM armn CITY OF PASCO �FftD ZONE 3 RESERVOIR �y' �' REMONi m y PROGRESSIVE DESIGN BUILD a•. 3a ® a GENERAL NOTES AND INFO g xn naE mormi a .. _ _ Ig III log gj y --$,a —TM armn CITY OF PASCO �FftD ZONE 3 RESERVOIR �y' �' REMONi m y PROGRESSIVE DESIGN BUILD a•. 3a ® a GENERAL NOTES AND INFO g xn naE mormi a .. _ _ 3 IMP S C � t O IIIF] � z II M v a c - r �ilil I I m tv � �Z miN r r a a m s m Z m v "• "`°°"�"'°� TM "" CITY OF PASCO „"g g aoamv R�nst v ZONE 3 RESERVOIR mr PROGRESSIVE DESIGN BUILD SYMBOLS, LEGENDS, AND e a g ABBREVIATIONS N N m g �» s...m I- CITY OF PASCO a.zxo1- 9 ZONE 3 RESERVOIR d ' nFnsroNs PROGRESSIVE DESIGN BUILD SITE ACCESS PLAN b ITY OF PASCO REVISIONS owc 1pMR `l;Cur I RESERVOIR. PROGRESSIVE DESIGN BUILD EXISTING OVERALL SITE PLAN q OFIdV1E'1 M AMV Q C O C i4 1 y�� \o y LLL Oy ti 0 ITY OF PASCO REVISIONS owc 1pMR `l;Cur I RESERVOIR. PROGRESSIVE DESIGN BUILD EXISTING OVERALL SITE PLAN q OFIdV1E'1 M AMV 0 4 m El I 1 ' I 1 I >i I 1 q W I r yr ro4o%,v n�YRF llarae fg4iL neve rnDYMT68. o REVISIONSS ZONE 3 RESERVOIR ®q+ PROGRESSIVE DESIGZN BUILD C WATER MAIN PLAN AND PROFILE 1 (` .. a i a a r I I I r i I I� W I r yr ro4o%,v n�YRF llarae fg4iL neve rnDYMT68. o REVISIONSS ZONE 3 RESERVOIR ®q+ PROGRESSIVE DESIGZN BUILD C WATER MAIN PLAN AND PROFILE 1 (` I� u I I I � I � � I I I II3 I � � p I � Nm _ I IIp1 II' sz I' 4 515 I I' I I 51� I j I 8 s 9 rn § 1 11 518 os avow s °"" "" '"'°°.,,ii I . I --" CITY OF PASCO 5 . Bad MIF •mue Eq4 AE nBnE 2YiOW�119PlM.ii 1e REVISIONSAN ZONE 3 RESERVOIR m „; � y � PROGRESSIVE DESIGN BUILD WATER MAIN PLAN AND PROFILE 2' I ,I I I � I b a I pc y I 999 a I o I \ � mo I I � I yy�m I s�Q _I GI m II 9 s T I Si C I �I iJ I 1 � I / I I g I x I � � I I � n I I i 1 06 GYDtl li CITY OF PASCO IVp— ZONE 3 RESERVOIR REVISIONS PROGRESSIVE DESIGN BUILD WATER MAIN PLAN AND PROFILE 3 �I i I b I !I i i I a I o I \ � mo I I � I yy�m I s�Q _I GI m II 9 s T I Si C I �I iJ I 1 � I / I I g I x I � � I I � n I I i 1 06 GYDtl li CITY OF PASCO IVp— ZONE 3 RESERVOIR REVISIONS PROGRESSIVE DESIGN BUILD WATER MAIN PLAN AND PROFILE 3 m 0 m 0 IV SCO OF PA5C0 FILMISIONS ZONE 3 RESERVOIR PROGRESSIVE DESIGN BUILD ER MAIN PLAN AND PROFILE 4 iAn IV SCO OF PA5C0 FILMISIONS ZONE 3 RESERVOIR PROGRESSIVE DESIGN BUILD ER MAIN PLAN AND PROFILE 4 Q y z 0 n O z m C U 'gQ €� �R Z z =s z z Z O n O =y z �z � c C O zrnQ m z -N+ p z o� z 4 PS PHi 11.9€ CITY OF PASCO REVISIONSP""" ZONE 3 RESERVOIR PROGRESSIVE DESIGN BUILD WATER MAIN CONNECTION DETAILS CITY OF PASCO O g e�iNF mre�1141ffi neve DlMftlnOvq REVISIONSoff"ZONE 3 RESERVOIR y PROGRESSIVE DESIGN BUILD _ . �- 'I CONSTRUCTION GRADING PLAN g �o Av z m Q19 z li p y£� M / z sz Nm l02 m l s N \ � a CITY OF PASCO a1Be IRF 11a�aF py4]� Howe ipOCN1llMA REVISIONS� ZONE 3 RESERVOIR $ *@ PROGRESSIVE DESIGN BUIU` 333 CONSTRUCTION GRADING SECTIONS +��� �� ■` u uim _ ~ I-v - LA ',, ,ta 0 L 1i P ' z �i g s � N 9�a 06 (Wom a CITY OF PA CO c A Y REVtstons 11"u SONE 3i RESERVOIR PROGRESSIVE DESIGN BUILD �— - PROPOSED OVERALL SITE PLAN � R WF hbMd � I I. w 1 r A I II 9 0 IV E w to =�- n o"ril- _ I s Q a�wr enure aotma IONS v VII T R SERVOIR ZONE 3 RESERVOIR � .., REVISIONS gal�• PROGRESSIVE DESIGN BUILD ��E e� l~ PROPOSED SITE AND UTILITY PLAN M 7K y�yFR {F.R� K {fguR 7yyR dyy 7��yyR {f{yyR y�y 7R ���++ 7yR 7!R� N� !R 7R a�wr enure aotma IONS v VII T R SERVOIR ZONE 3 RESERVOIR � .., REVISIONS gal�• PROGRESSIVE DESIGN BUILD ��E e� l~ PROPOSED SITE AND UTILITY PLAN I 3 4 a G 9 9 A 3 9 3 $ '9 q ... s" .� «.&M —M I .-� CITY OF PASCO e�ws �, as4ma xw�LAOCNt,lMV nEnsions ZONE 8 RESERVOIR PROGRESSIVE DESIGN BUILD ly PROPOSED SITE SECTION N f2S•` ��p a G 9 9 A 3 9 3 $ '9 q ... s" .� «.&M —M I .-� CITY OF PASCO e�ws �, as4ma xw�LAOCNt,lMV nEnsions ZONE 8 RESERVOIR PROGRESSIVE DESIGN BUILD ly PROPOSED SITE SECTION N I �I Figv �gn v m �His 121 m MR 'M Hal U— AH � L9 Low o � € XI s �r Q" rp CCpp'' g s m � Ha � m s C � $ � v v � Hil0 1 —M1--ma CITY OFPASCO o' """" aoazoa nsweznoanoaec w9 ZONE 3 RESERVOIR gyp' REVISIONS PROGRESSIVE DESIGN BUILD " - STANDARD DETAILS 1 RST 215, 9Ne § _ g gg ma Qua MOP fu UPI r! r aR A 52A gig ;.m � EMU e $ Q rOlt ®Rg� a Pg a R zRe��Roo e �F; 2 g � H5 $4 $m� '€ c §egg c m q4m � p� g i �s �} z 0 A CITY OF PASCO C $ e�llC wmc M49� REVISIONS 10 g! � REVISIONS �� ZONE 3 RESERVOIR _ PROGRESSIVE DESIGN BUILD GENERAL STRUCTURAL NOTES ems" � �S z� �Q ��K ����� y$yi�^'•�r�. � o �� �_ �3i,.�� r�+3m� �a�s s ��� 4Fo �o o� 3Q t�tP_o a�p����� £ o � � �iAo!f azG r€ ;g�rey�v$�y�Al�a�s��r r 30 2 d aFo9 C _ € G x I x x ]5 mp �� � � Y;� 3D P W x l I x l I I I x x � x I x x x W s $$$ $ W $w r d aFo9 C _ € G x I x x ]5 mp �� � � Y;� 3D P x l I x l I I I x x x I x x x s $$$ OWS VMO 1 £Z #1HS LP81a 4180f MelA UOP"013 31111 POOH Nuel a6aiOIS JIO-H £ WOZ :103POHd KtOL XOI= OOaed :Uano.Ls YJ uma �w ru :ua>.n acute �w ru :u wnvaa wnw� w "max A«re i P�4�� W W �NNPu1P'CwWN+FP 9s woNM DaPwPe.' W WR n uaV1+e.90 �MIW.PI wY�PI Wlio wn io 6w.r WPuepryeged �MNF81PNxtlotl/4.V9�kPq 44�NSIW uoVM.�ua�pwgw rv>wWw Wa A w uwOxs�!eg1'mMM 66s£ -£6Z (ose) :XV.A :al!sgaM Z890i6Z(09£):Hd LZZ86 VM'SOIIMe V 'PH lu!Od 4weW S 8296 YOLV91i1YVdeo,►y�iLL ....031ior" LulaO . 6650'F i SKOfsLAn S#Dlap 6u/did — aoJFTi;DA lj sliolap bu/did aiow iol sbuiMDJO 1Hy of 19Ja8 1,9#01 1,91DM 00 Dd SbuiMD10 1H8 01 lalay i _ 0.9'9 1 S 'A 913 w w010.8 SI/067 0 £-16 o \'fl180 180 Isa 1HN gad sroyouyl IDMUDII 1,911n0 .4d .9c x .01 7d = ,1Z -,Dr .l x .01 7d =,06-0 slauaJJTS –9t JDS-PD7 / v 6mDDds,o–,of la G-O,gDld 190,Y–PIM /M (J --PD1 PUD pabDO) 'JappD7 lou9lx3 .0-,06 x /.9f W-91 (PDN ,6) wollo8 PadollDOS 91Dld w0lloy.91S mul ,9l yli# 1,9PPD7 J Q- Jl t l919woi0 apisu/.0–,06 07 l4S uo 0'1 l4S te 1/ 8101 aaS £/ a19Dl aaS WDl 07 .0–,01 N1M laM laluao 01 4oS 0,61 - i9pPD7 Joualul uwnloo lalueo i 4oloH.16;16 4alDH JOON PUD uuoJlDld J008 laluaO PON 0lpuoy 111 of #DipuDH 1008 ,0 Al sliDlao 1oJ 0'9 l4S aaS I uab JOON 0.9f A V bu/d 1,9p�10 - 0 alla a100 PUD LIOIPUGH sUMV umAoo o ` 0'1 l4S uo 1/ a19D1 -S119YS HUD) c la4a7 1,91,9# 00£99 = +113 00399 OL albu, tuiy ) 1ap s,5nld sI-MI'd BG walJDN 91x11M x Z> QIA 7d J -N .91/F Mo171aA0 „ll Jl x l919woi0 apisu/.0–,06 o ` 0'1 l4S uo 1/ a19D1 -S119YS HUD) c la4a7 1,91,9# 00£99 = +113 00399 OL albu, tuiy ) 1ap s,5nld sI-MI'd BG walJDN 91x11M x Z> QIA 7d J -N .91/F DOAZZ rDcr0o0�'7 rO �fTt mDDmmmAmOmm O=Zp O m (7 r � A Z 0 U1 fTl U1 p � V1 X X (n Ul _N p�K No� H U CD K p n� N L7K z,-- KpG7 C Z G7O Z ZC D Z o Z _�fTl m lOJ m r p A m��� �A y 0 0 0 0 0\\ frl Ul C N N N ..� O fTl g � d) 0 0 0 O O O O O rte O N D r m, C (n D D o a cvi, m �p D .� (5w z — A ZC�mD(7r � N DOAZZ rDcr0o0�'7 rO �fTt mDDmmmAmOmm O=Zp O m (7 r � A Z 0 U1 fTl U1 p � V1 X X (n Ul _N p�K No� p y DOD CD K p n� N L7K z,-- KpG7 C Z G7O Z ZC D Z o Z _�fTl Corz�—�t< m r p A m��� �A y -1 D r•• m fTl A •• O TI z n frl Ul C N N N ..� O fTl ? rt 0 0 0 O O O O O rte O 3 D r m, C (n D D o a cvi, o D .� (5w z — A ZC�mD(7r � l J � 0 0 v v w� O m w m m w� C fAT i p� D D D � W r -P '00 N u7 V mm� (n O O O O O O O Po --4 f� o z � p� oaf Oz cn It Ac,,cAm���� mmAc N z � Z mcn O�pz�mAA CA m D A !Tl fTl O cVnc�c,, A m N ��pp m m � ,a (iii CD 3 DOAZZ rDcr0o0�'7 rO �fTt mDDmmmAmOmm O=Zp O m (7 r � A Z 0 U1 fTl U1 p � V1 X X (n Ul _N p�K No� p y DOD A �TIK � K p n� N L7K z,-- KpG7 C Z G7O Z ZC D Z o Z _�fTl Corz�—�t< m r p A m��� �A y -1 D r•• m fTl A •• O TI z n frl Ul C N N N ..� O fTl fTl O rt 0 0 0 0 0 � •O+ ,SON D z rte O m��y�r*i�c�"nn�p�c D r m, C (n D D o a cvi, o D .� (5w z — A ZC�mD(7r � (D .-f � 0 v v w� O m w m m w� �D fAT i p� D D D � W r -P '00 N u7 z p mm� (n n=Dm�KK< to N O ���00� c,,� cn Po --4 f� o z � p� oaf Oz cn It Ac,,cAm���� mmAc N z � Z mcn O�pz�mAA CA m D A !Tl fTl O cVnc�c,, A m ��pp m m W DOAZZ rDcr0o0�'7 rO �fTt mDDmmmAmOmm O=Zp O m (7 r � A Z 0 U1 fTl U1 p � V1 X X (n Ul _N p�K No� p y DOD A �TIK � K p n� N L7K z,-- KpG7 C Z G7O Z ZC D Z o Z _�fTl Corz�—�t< m r p A m��� �A y -1 D r•• m fTl A •• O TI z n frl Ul C N N N ..� O fTl fTl O O y A A A p r CJ V D Cl1 K D D N p�� p Ul m W D z rte O m��y�r*i�c�"nn�p�c D r m, C (n D D D p m l -i p o D .� (5w z — A ZC�mD(7r � a m AO � 0 O m D � Z fAT i p� D D D � W r -P '00 N u7 z p mm� (n n=Dm�KK< to N O ���00� c,,� cn Po --4 f� o z � p� oaf Oz cn It Ac,,cAm���� mmAc eco? z � Z mcn O�pz�mAA CA m D A !Tl fTl O cVnc�c,, A m ��pp (iii CD D D r D � cn � �m m r � � O z c m � Z � Z II z � 0 N (n S D W W $» /\ y$ } \$ } Q 2 -� 2E (m ■ \\ _ � 2®$ @# ��»� \ j\ k ¥> ,■ f �iQ� m« _ ƒ \ ± ■ C °- " k ®®� � | \� t@ � § K § ,_ &, - - - ----------------- - - - ---------------- § g» 2 k( $ §% � \_ §°■� k @§( § � � §` • � 1 & j ; C', > & 0 k■Tn § @ @! NE M \$ 2}2)§/I ECD `§ - - - \ - w � | --- aDo & -' \ X -r 7f , ;k / Cb C® I( Cb / § J& -=�-O* & < �ƒ q\ ] ■■ S k . 7 | | | � § � --- — - � § k¥ k «� ] •, @ �§,$ ƒ� � 2 � � A/ v\ |§ �' � a§ ! § | / \DO \ / . . 2, § § K\ 1p 2 \ \ t§ ? � $ 1A / ------------ — -- \ Z \ 7 ,■ - §§ % @ c § co § | § � % \ ¥* ƒ k A - \ 2Cb � -;@ @ k � a �! — ° � k - --- k % ` ||| k , \DO r } # � ; q , | \ 0 z z z M m m co m � O 4rn O z I H .arc .e.�ena » moem wro VOLAyr rN.VVV REVISIONS Wo ZONE ZONE 3 RESERVOIR �' w m�. 'ROGRESSIVE DESIGN BUILD s 1 FLOOR AND FOUNDATION PLAN �"�� ♦� N rn M 012 IT! m 13H 0 z z v x1 4 z m 0 z -•- —04e $.4 — m I a<.� CITY OF PASCO N , q e�JIC wme M4Aa nar.awTxG.ovq ,o t, REVISIONS 0 POO ZONE 3 RESERVOIR w PROGRESSIVE DESIGN BUILD FOUNDATION SECTION AND DETAILS e� T - ii o • � q `� H u�}��S 13H 0 z z v x1 4 z m 0 z -•- —04e $.4 — m I a<.� CITY OF PASCO N , q e�JIC wme M4Aa nar.awTxG.ovq ,o t, REVISIONS 0 POO ZONE 3 RESERVOIR w PROGRESSIVE DESIGN BUILD FOUNDATION SECTION AND DETAILS e� T A --(P� CITY OF PASCOWe / O, r�YLF wreoe aq4� Here LMOiEffi➢MD REVISIONS 20NE3RESERVOIR m » 'ROGRESSIVE DESIGN BUILD »� RESERVOIR MECHANICAL PLAN AND b DETAILS N I 9 _ I M Z O 5 mm�1 y O g� z � 9 N $ IRA - ypw Z I ED •� w x 32 V q O m m 1 o �� § ,32 a+ =m O z CITY OF PASCO � REYIS ZONE 3 RESERVOIR t PROGRESSIVE DESIGN BUILD RESERVOIR INLET &OUTLET SECTION 8 w om uoarlu w +�.. -- a o � � 70 M Y A m z � _ O ;V T Fpti LS' K P s � 4 �g �e 1 3 6 A / 1T / / CITY OF PASCO 9. m .�wtF waov� �94ma ,�e�ve LPDAEm1AM, _ <^' Ei REVISIONS ��D ZONE 3 RESERVOIR m , g PROGRESSIVE DESIGN BUILD RESERVOIR OVERFLOW AND DRAIN PIPE SECTION N � t901AY1' M z I I I I c I I z I I � I 52 I I ;m m ftk= I —W '' ^ CITY OF PASCO REVISIONS �'- ZONE 3 RESERVOIR ®p` PROGRESSIVE DESIGN BUILD CATHODIC PROTECTION PLAN AND DETAILS N g E EN IN z I I I I c I I z I I � I 52 I I ;m m ftk= I —W '' ^ CITY OF PASCO REVISIONS �'- ZONE 3 RESERVOIR ®p` PROGRESSIVE DESIGN BUILD CATHODIC PROTECTION PLAN AND DETAILS N