HomeMy WebLinkAbout4250 Resolution - Zone 3 Water Storage Reservoir - CO3RESOLUTION NO. 4250
A RESOLUTION OF THE CITY OF PASCO, WASHINGTON,
AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO.
3 TO THE DESIGN BUILD INSTITUTE OF AMERICA PHASE 1
AGREEMENT WITH T BAILEY, INC. FOR THE PROGRESSIVE DESIGN -
BUILD SERVICES FOR THE ZONE 3 WATER STORAGE RESERVOIR
PROJECT.
WHEREAS, the City and T Bailey, Inc. entered into an Agreement on November 21, 2021,
to provide progressive design -build services; and
WHEREAS, the City of Pasco, pursuant to RCW 39.80.050(1), has negotiated a fair and
reasonable Design Build Institute of America (DBIA) Phase 1 Agreement with T Bailey, Inc. based
on the estimated value of the services including their scope, complexity, and professional nature;
and
WHEREAS, Phase 1 contract provides for 60% design and permitting activities; and
WHEREAS, Change Order No. 1 was in the amount of $608,373.89 (including Sales Tax)
for the early acquisition of pipeline materials to offset the long lead-in Ductile iron pipe and fittings
associated with this project; and
WHEREAS, Change Order No. 2 was a no -cost change order for time extension purposes
only; and
WHEREAS, Change Order No. 3 was negotiated to allow for early site development,
which includes grading, foundation excavation, foundation construction, foundation backfill and
acquisition of raw steel to construct the shell of the reservoir; and
WHEREAS, Change Order No. 3, in the amount of $5,402,098.04 (including Sales Tax),
exceeds the City Manager's authority and thus requires Council approval.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PASCO, WASHINGTON:
That Change Order No. 3 is to account for early site work, foundation construction, and
acquisition of raw steel to build the shell of the reservoir; and
Be It Further Resolved that the City Manager for the City of Pasco is hereby authorized
to execute Change Order No. 3, a copy of which is attached hereto, and incorporated by this
reference, as Exhibit A.
Resolution — Change Order No. 3 to DBIA Agreement with T Bailey, Inc
Water Storage Reservoir Zone 3 Progressive Design Build Project - 1
Be It Further Resolved, that this Resolution shall take effect immediately.
PASSED by the City Council of the City of Pasco, Washington, this 19th day of September
2022.
- W
�lvnt Blanche Barajas
Mayor
v
ATTEST:
Debra Barham, CMC
City Clerk
APPROVED AS TO FORM:
K�ttome,
n Law, PLLC
s
Resolution — Change Order No. 3 to DBIA Agreement with T Bailey, Inc
Water Storage Reservoir Zone 3 Progressive Design Build Project - 2
rnase i %oUntract %.nanye vrurr
City of Pasco
PO Box 293/525 N. 3"' Ave.
Pasco, WA. 99301
PHASE 1 CHANGE ORDER
T Bailey, Inc.
9628 South Marchs Point Rd.
Anacortes, WA 98221
Project Name: Zone 3 Reservoir Storage Tank Change Order#: 3
COR#
Description of Change
Change in
Change in
Total net [check one] X Increase / ❑ Decrease in the Phase 1 NTE by this
Change Order
$5,402,098.04
Contract Time
Phase 1 NTE
a
Early construction work listed below and further described in
52 working days
$3,402,098.04
Exhibit A*.
Mobilization, implement TESC (Temporary Erosion and Sediment
Control), install construction entrance and access driveway, clear and
grub both tank and lay down sites, rough grade of both tank and lay
down sites, tank foundation subgrade, install tank foundation and ring
wall, install mechanical improvements beneath proposed floor slab
including ringwall penetrations, install all electrical and control conduit
beneath ro osed floor slab including rin wall penetrations
b
Raw Steel Advanced Acquisition further described in Exhibit A*
0 working days
$2,000,000.00
*The amount of this Change Order includes Design -Builder's Fee Percentage as well as a contingency to account for
underground changed conditions for work associated with Exhibit A, and escalation in price of materials from the date of
Exhibit A. Any savings in the Phase 1 Not to Exceed Amount shall accrue to Owner. Notwithstanding Section 6.2.3 of
the Design -Build Agreement, the Cost of the Work included in this Change Order shall be excluded from the Cost
of the Work when calculating the Lump Sum Fee.
Original Phase 1 Not to Exceed Amount
$388,691.76
Net change by previous authorized Change Orders
$608,373.89
Total net [check one] X Increase / ❑ Decrease in the Phase 1 NTE by this
Change Order
$5,402,098.04
New Phase 1 NTE including this Change Order
$6,399,163.69
The new Contract Time including this Change Order is:
New Phase 1 Completion Date
February 15, 2023
New Interim Milestone Dates:
The changes in the Phase 1 Not to Exceed Amount and Contract Time identified in this Change Order include all costs
and time extensions associated with performing the changes set forth herein.
City of Pasco Design -Builder
By: By:
Signature Signature
Printed Name Printed Name
Title: Title:
Date: Date:
City of Pasco
Zone 3 Reservoir
EXHIBIT A
Description of Change
September 2022
Phase 1: Change Order 3
Authorization to proceed with the initial phase of construction concurrent with the final negotiation of the
GMP and execution of the Phase 2 contract. This change order provides TBI an opportunity to potentially
complete the reservoir foundation and ring wall installation prior to winter weather occurring (based on
historical weather records). It is intended that costs and tasks associated with this change order be deducted
from the Phase 2 contract and the GMP.
Work included in this change order is as follows.
• Mobilization
• TESC
• Construction entrance and construction access driveway installation
• Tank site and PSD site clearing and grubbing
• Tank site and PSD site construction grading (final grading to be accomplished within Phase 2 contract)
• Tank foundation subgrade installation
• Tank foundation and ring wall installation
• Mechanical improvements penetrating the ringwall and beneath the proposed floor slab
• Electrical and control conduit installation penetrating the ringwall and beneath the proposed floor slab
• Advance acquisition of Raw Steel for tank fabrication.
Items specifically not included with this change order include, but are not limited to, the following.
• Tank floor slab
• Tank shell and coating
• Off-site utilities
• Road 90 and otherwise permanent tank site access
• Tank site pond excavation or rock
• Tank site and PSD site finished grading
• Mechanical and electrical improvements on-site or within the tank (unless specifically identified as
being included).
• Tank site paving, fencing, restoration, or other site improvements unless identified as being included.
NOTE: this change order is not intended to include items not specifically identified in the provided itemization
of work. Any remaining items will be included in the GMP Phase 2 agreement.
9/8/2022 11:19 AM\\EPSILON\Engineering\Engineering Working Folder\+Proj-Water\21252 -Zone 3 Reservoir Storage\05-Construction Phase\Change Orders\CO #3 Early Site Development\CO3 Description.docx
City of Pasco September 2022
Zone 3 Reservoir Phase 1: Change Order 3
Bid Item Work Breakdown
A summary of the work included in the pricing for each bid item is as follows.
Item 1. Mobilize labor and equipment for the initial work. Includes PM, insurances, bond, and B&O tax
associated with this initial work.
Item 2. Install all TESC. 5% of TESC not included related to costs for TESC upkeep and removal and the
conclusion of the project.
Item 3. None.
Item 4. Tank site clearing and grubbing, and excess grading on the PSD site.
Item 5. Foundation excavation (not including pond excavation or quarry spalls).
Item 6. Backfill excavation with crushed rock and prepare foundation subgrade.
Item 7. None.
Item 8. None.
Item 9. PSD clearing, grubbing, and grading.
Item 10. None.
Item 11. None.
Item 12. None.
Item 13. Foundation and ringwall. Floor slab not included.
Item 14. Raw steel advanced purchase.
Item 15. Mechanical penetrations through ringwall and beneath floor slab.
Item 16. None.
Item 17. Electrical and control conduits through ringwall and beneath floor slab.
Item 18. None.
Item 19. None.
Item 20. None.
Item 21. None.
9/8/2022 11:19 AM\\EPSILON\Engineering\Engineering Working Folder\+Proj-Water\21252 - Zone 3 Reservoir Storage\05-Construction Phase\Change Orders\CO #3 Early Site Development\CO3 Description.docx
City of Pasco
Zone 3 Reservoir
Cost Breakdown
September 2022
Phase 1: Change Order 3
Item
Description
Change Order #3
% of
Overall
Work
Adjusted
Contingency
for CO #3
1
MOB, DEMOB, CLEAN UP
$262,200
19
2
TEMP EROSION AND SEDIMENTATION CONTROL
$147,250
95
3
TRENCH SAFETY AND SHORING
$ -
4
SITE WORK
$148,750
35
$35,000
5
EXCAVATION
$315,000
90
$90,000
6
BACKFILL
$427,500
95
$142,500
7
CRUSHED ROCK
$ -
8
SITE UTILITIES
$ -
9
OFFSITE IMPROVEMENTS
$268,650
27
$ 54,000
10
CONNECTION TO EXISTING WATER MAIN
$ -
11
CATHODIC PROTECTION
$ -
12
SHOP DRAWING PREP & RESERVOIR
COMPONENTS STRUCTURAL CALCULATION
$ -
13
RESERVOIR FOUNDATION
$1,116,955
97
$48,500
14
RESERVOIR STRUCTURE AND APPURTENANCES
$ -
15
RESERVOIR MECHANICAL
$30,000
30
$6,000
16
RESERVOIR FINISHES
$ -
17
ELECTRICAL
$31,500
15
$6,000
18
AUTOMATIC CONTROL
$ -
19
CONSTRUCTION RECORDS AND O&M MANUALS
$ -
20
TESTING, STARTUP AND TRAINING
$ -
21
MINOR CHANGE
$ -
SUBTOTAL of COST ITEMS
$2,747,805.00
$382,000.00
WSST @ 8.7%
$239,059.04
$33,234.00
TOTAL w/ WSST INCLUDED
$2,986,864.04
$415,234.00
CONTINGENCY
$415,234.00
TOTAL COST w/ CONTINGENCY for CO#3
$3,402,098.04
9/8/2022 11:19 AM\\EPSILON\Engineering\Engineering Working Folder\+Proj-Water\21252 -Zone 3 Reservoir Storage\O5-Constructlon Phase\Change Orders\CO R3 Early Site Development\CO3 Description.doa
City of Pasco
Zone 3 Reservoir
Advanced Acquisition Details
September 2022
Phase 1: Change Order 3
The tank project includes over 2.6 million pounds of steel, with 1,733,755 pounds of steel in the shell alone,
most of which is custom fabricated by the contractor from raw steel.
This change order #3 allows for the purchase of the entirety of the steel for the shell of the tank. The purchase
is anticipated to include, but is not limited to, material for the fabrication of shell, shafts, center column, roof,
floor and floor support reinforcing.
Current benchmark price for raw steel is $0.92 per pound.
A contingency of 8% for price escalation has been included in the total amount requested for authorization,
given the current volatility of the steel market.
9/8/2022 11:19 AM\\EPSILON\Engineering\Engineering Working folder\+Proj-Water\21252 -Zone 3 Reservoir Storage\05-Construction Phase\Change Orders\CO #3 Early Site Development\CO3 Description.docx
City of Pasco
Zone 3 Reservoir
September 2022
Phase 1: Change Order 3
RESERVOIR COURSES
Shell
Cour 3e
gross weight (ib)
purchase price
S8
23A59 A0
$ 21,582.28
S7
43,896.00
$ 40, 384.32
56
58,154.00
$ 53,501.68
S5
79,702.00
$ 73,325.84
S4
101,238.00
$ 93,138.96
S3
122,774.00
$ 112,952.08
S2
144,311.00
$ 132,766.12
S1
129,508.00
$ 119,147.36
subtotal
703,042.00
$ 646,798.64
Shaft
SH 8
69,836.00
$ 54,249.12
SH 7
69,836.00
$ 640249.12
SH 6
69A36.00
$ 64249-12
SH 5
87,296.00
$ 8,: = aL2.32
SH 4
87 296.00
$ 80, 312.32
SH 3
101,845.00
$ 93,697.40
SH 2
101,845.00
93,697.40
SH 1
101,845.00
$ 93,697.40
sub total
689,635,00
634}464.20
Other components
PlatfDrm
148,2490.00
$ 136,389.08
Roof
65,181.00 $ 61,270.14
sub tatal
213,430.00
$ 197,659.22
Floor support reinforcing
Flange plates
164,721.00 $ 151,543.32
Gusset Plates
156,825.00 $ 144,279.00
Subtotal
321,546.00 $ 295,822.32
TOTAL $ 1,774,744.38
$ 2,000,000.00 Total Authorization
$ 1,926,000.00 Available for Purchase order
$ 74,000.00 Fee (3.7%)
$ 151,255 +62 Contingency 8%
9/8/2022 11:19 AM\\EPSILON\Engineering\Engineering Working Folder\+Proj-Water\21252 -Zone 3 Reservoir Storage\05-Construction Phase\Change Orders\CO N3 Early Site Development\CO3 Description.docc
City of Pasco
Zone 3 Reservoir
September 2022
Phase 1: Change Order 3
Plan Set
Work included in this change order has been outlined using green linework in the attached 60 percent plan
set.
9/8/2022 11:19 AM\\EPSILON\Engineering\Engineering Working Folder\+Proj-Water\21252 -Zone 3 Reservoir Storage\05-Construction Phase\Change Orders\CO #3 Early Site Development\CO3 Description.doa
u III III
Ig
1 fgi iffil
log
Rpl
6$�
1
T
m
r
z
f7
RT
N
c
M
z
N
1
gj
a f Y N � N Y N P N
�A 5 3 gAr s zw§RAA �§ !x g1plI�,i 1 1 :2, 111 �A Ii1i ;E
91 HH -1111 .. i RIto I
Q I RUBIO ii Q ���g��� gq RAS SI 1���
R €
NE
Nis
HIM M IN,
'Mims HIM 1912 22 H2
INN. 11
�o IOU i 11.5 1
meg A :IB
1 i 0 A
XQ 521
--$,a —TM armn CITY OF PASCO
�FftD ZONE 3 RESERVOIR �y' �'
REMONi m
y
PROGRESSIVE DESIGN BUILD a•. 3a ® a
GENERAL NOTES AND INFO
g xn naE mormi a .. _ _
Ig
III
log
gj
y
--$,a —TM armn CITY OF PASCO
�FftD ZONE 3 RESERVOIR �y' �'
REMONi m
y
PROGRESSIVE DESIGN BUILD a•. 3a ® a
GENERAL NOTES AND INFO
g xn naE mormi a .. _ _
3 IMP
S C
� t
O
IIIF] �
z II M
v a
c -
r
�ilil I I m tv
� �Z
miN
r r
a a m
s m Z
m v
"• "`°°"�"'°� TM "" CITY OF PASCO
„"g g aoamv R�nst v ZONE 3 RESERVOIR mr
PROGRESSIVE DESIGN BUILD
SYMBOLS, LEGENDS, AND e a
g ABBREVIATIONS N
N
m
g
�» s...m I- CITY OF PASCO
a.zxo1- 9 ZONE 3 RESERVOIR d '
nFnsroNs PROGRESSIVE DESIGN BUILD
SITE ACCESS PLAN
b
ITY OF PASCO
REVISIONS owc 1pMR `l;Cur I RESERVOIR.
PROGRESSIVE DESIGN BUILD
EXISTING OVERALL SITE PLAN
q OFIdV1E'1 M AMV
Q
C O
C
i4
1
y��
\o y
LLL
Oy
ti 0
ITY OF PASCO
REVISIONS owc 1pMR `l;Cur I RESERVOIR.
PROGRESSIVE DESIGN BUILD
EXISTING OVERALL SITE PLAN
q OFIdV1E'1 M AMV
0
4 m
El
I
1
'
I
1
I
>i
I
1
q
W I r yr ro4o%,v
n�YRF llarae fg4iL neve rnDYMT68.
o REVISIONSS ZONE 3 RESERVOIR ®q+
PROGRESSIVE DESIGZN BUILD
C WATER MAIN PLAN AND PROFILE 1 (`
..
a
i
a
a r
I
I
I
r
i
I
I�
W I r yr ro4o%,v
n�YRF llarae fg4iL neve rnDYMT68.
o REVISIONSS ZONE 3 RESERVOIR ®q+
PROGRESSIVE DESIGZN BUILD
C WATER MAIN PLAN AND PROFILE 1 (`
I� u
I I
I �
I �
� I
I
I
II3
I � �
p
I �
Nm _
I
IIp1
II' sz
I'
4
515
I
I'
I
I 51�
I j
I
8
s
9
rn § 1 11 518
os avow
s
°"" "" '"'°°.,,ii I . I --" CITY OF PASCO
5 . Bad MIF •mue Eq4 AE nBnE 2YiOW�119PlM.ii
1e REVISIONSAN ZONE 3 RESERVOIR m „;
� y � PROGRESSIVE DESIGN BUILD
WATER MAIN PLAN AND PROFILE 2'
I
,I
I
I
� I
b
a
I
pc
y
I
999
a
I o
I \ � mo
I
I �
I yy�m
I s�Q
_I
GI
m II
9
s T I
Si C I �I
iJ I
1
� I
/ I
I
g
I x
I � �
I
I �
n I I i
1
06 GYDtl
li
CITY OF PASCO
IVp— ZONE 3 RESERVOIR
REVISIONS
PROGRESSIVE DESIGN BUILD
WATER MAIN PLAN AND PROFILE 3
�I
i
I
b
I
!I
i
i
I
a
I o
I \ � mo
I
I �
I yy�m
I s�Q
_I
GI
m II
9
s T I
Si C I �I
iJ I
1
� I
/ I
I
g
I x
I � �
I
I �
n I I i
1
06 GYDtl
li
CITY OF PASCO
IVp— ZONE 3 RESERVOIR
REVISIONS
PROGRESSIVE DESIGN BUILD
WATER MAIN PLAN AND PROFILE 3
m
0
m
0
IV SCO OF PA5C0
FILMISIONS ZONE 3 RESERVOIR
PROGRESSIVE DESIGN BUILD
ER MAIN PLAN AND PROFILE 4
iAn
IV SCO OF PA5C0
FILMISIONS ZONE 3 RESERVOIR
PROGRESSIVE DESIGN BUILD
ER MAIN PLAN AND PROFILE 4
Q
y
z
0
n
O
z
m
C
U 'gQ
€� �R
Z
z =s
z
z Z
O n
O
=y z
�z
� c
C O
zrnQ
m
z -N+
p
z
o�
z 4
PS
PHi
11.9€
CITY OF PASCO
REVISIONSP""" ZONE 3 RESERVOIR
PROGRESSIVE DESIGN BUILD
WATER MAIN CONNECTION DETAILS
CITY OF PASCO
O g e�iNF mre�1141ffi neve DlMftlnOvq
REVISIONSoff"ZONE 3 RESERVOIR
y PROGRESSIVE DESIGN BUILD _ . �-
'I CONSTRUCTION GRADING PLAN
g
�o
Av
z
m
Q19
z li
p
y£�
M
/
z sz
Nm l02
m l
s
N \
� a
CITY OF PASCO
a1Be IRF 11a�aF py4]� Howe ipOCN1llMA
REVISIONS� ZONE 3 RESERVOIR
$ *@ PROGRESSIVE DESIGN BUIU`
333 CONSTRUCTION GRADING SECTIONS +��� �� ■`
u
uim _ ~
I-v -
LA
',,
,ta
0
L 1i
P '
z
�i
g
s �
N
9�a
06 (Wom
a
CITY OF PA CO
c A Y REVtstons 11"u SONE 3i RESERVOIR
PROGRESSIVE DESIGN BUILD
�— - PROPOSED OVERALL SITE PLAN
� R WF hbMd
� I
I. w
1 r
A
I
II
9
0
IV
E
w
to
=�-
n o"ril- _
I
s Q
a�wr enure aotma IONS v VII T R SERVOIR
ZONE 3 RESERVOIR � ..,
REVISIONS
gal�• PROGRESSIVE DESIGN BUILD ��E e�
l~ PROPOSED SITE AND UTILITY PLAN
M 7K y�yFR {F.R� K {fguR 7yyR dyy 7��yyR {f{yyR y�y 7R ���++ 7yR 7!R� N� !R 7R
a�wr enure aotma IONS v VII T R SERVOIR
ZONE 3 RESERVOIR � ..,
REVISIONS
gal�• PROGRESSIVE DESIGN BUILD ��E e�
l~ PROPOSED SITE AND UTILITY PLAN
I 3 4
a G 9 9
A 3 9 3
$ '9 q
... s" .� «.&M —M I .-� CITY OF PASCO
e�ws �, as4ma xw�LAOCNt,lMV
nEnsions ZONE 8 RESERVOIR
PROGRESSIVE DESIGN BUILD
ly PROPOSED SITE SECTION
N
f2S•`
��p
a G 9 9
A 3 9 3
$ '9 q
... s" .� «.&M —M I .-� CITY OF PASCO
e�ws �, as4ma xw�LAOCNt,lMV
nEnsions ZONE 8 RESERVOIR
PROGRESSIVE DESIGN BUILD
ly PROPOSED SITE SECTION
N
I
�I Figv
�gn v
m
�His 121
m
MR
'M Hal
U—
AH �
L9
Low
o
� € XI
s �r
Q"
rp
CCpp''
g s
m � Ha �
m s
C � $
� v
v �
Hil0
1 —M1--ma CITY OFPASCO
o' """" aoazoa nsweznoanoaec w9 ZONE 3 RESERVOIR gyp'
REVISIONS PROGRESSIVE DESIGN BUILD
" - STANDARD DETAILS 1
RST
215,
9Ne
§ _ g gg ma Qua
MOP
fu UPI
r! r aR
A 52A
gig
;.m � EMU
e $ Q rOlt
®Rg�
a Pg a R zRe��Roo e
�F;
2 g
� H5 $4
$m� '€
c §egg
c m q4m �
p� g
i
�s
�}
z
0
A
CITY OF PASCO
C $ e�llC wmc M49�
REVISIONS
10
g! � REVISIONS �� ZONE 3 RESERVOIR
_ PROGRESSIVE DESIGN BUILD
GENERAL STRUCTURAL NOTES ems"
� �S z� �Q ��K ����� y$yi�^'•�r�. � o �� �_
�3i,.�� r�+3m�
�a�s s
��� 4Fo �o o� 3Q
t�tP_o a�p�����
£ o � � �iAo!f
azG
r€
;g�rey�v$�y�Al�a�s��r
r
30
2
d
aFo9
C
_
€ G
x
I
x x
]5
mp
��
�
�
Y;�
3D
P
W
x
l I
x l
I I
I
x
x
�
x
I
x
x
x
W
s
$$$
$
W $w
r
d
aFo9
C
_
€ G
x
I
x x
]5
mp
��
�
�
Y;�
3D
P
x
l I
x l
I I
I
x
x
x
I
x
x
x
s
$$$
OWS VMO 1 £Z #1HS LP81a 4180f
MelA UOP"013 31111
POOH Nuel a6aiOIS JIO-H £ WOZ :103POHd
KtOL XOI= OOaed :Uano.Ls YJ
uma �w ru :ua>.n acute �w ru :u wnvaa
wnw� w "max A«re i
P�4�� W W �NNPu1P'CwWN+FP 9s woNM DaPwPe.' W WR n uaV1+e.90 �MIW.PI wY�PI Wlio wn
io 6w.r WPuepryeged �MNF81PNxtlotl/4.V9�kPq 44�NSIW uoVM.�ua�pwgw rv>wWw Wa
A w uwOxs�!eg1'mMM 66s£ -£6Z (ose) :XV.A
:al!sgaM Z890i6Z(09£):Hd
LZZ86 VM'SOIIMe V
'PH lu!Od 4weW S 8296
YOLV91i1YVdeo,►y�iLL
....031ior"
LulaO .
6650'F
i
SKOfsLAn
S#Dlap 6u/did — aoJFTi;DA lj sliolap bu/did aiow iol
sbuiMDJO 1Hy of 19Ja8 1,9#01 1,91DM 00 Dd SbuiMD10 1H8 01 lalay
i
_
0.9'9 1 S 'A 913
w w010.8
SI/067 0 £-16 o \'fl180 180 Isa
1HN gad sroyouyl
IDMUDII
1,911n0 .4d
.9c x .01 7d = ,1Z -,Dr
.l x .01 7d =,06-0
slauaJJTS –9t
JDS-PD7 / v
6mDDds,o–,of la
G-O,gDld 190,Y–PIM /M
(J --PD1 PUD
pabDO) 'JappD7 lou9lx3
.0-,06
x /.9f
W-91
(PDN ,6) wollo8 PadollDOS
91Dld w0lloy.91S
mul ,9l
yli# 1,9PPD7 J
Q-
Jl
t
l919woi0 apisu/.0–,06
07 l4S uo
0'1 l4S te
1/ 8101 aaS
£/ a19Dl aaS
WDl
07 .0–,01
N1M laM laluao
01 4oS 0,61
- i9pPD7 Joualul uwnloo lalueo
i 4oloH.16;16
4alDH JOON PUD
uuoJlDld J008 laluaO PON 0lpuoy 111
of #DipuDH 1008 ,0 Al
sliDlao 1oJ 0'9 l4S aaS
I uab JOON 0.9f
A
V
bu/d 1,9p�10 -
0
alla
a100 PUD LIOIPUGH
sUMV umAoo
o ` 0'1 l4S uo
1/ a19D1 -S119YS HUD)
c la4a7 1,91,9# 00£99
= +113
00399 OL
albu, tuiy
) 1ap
s,5nld sI-MI'd
BG walJDN 91x11M x Z>
QIA 7d J -N .91/F
Mo171aA0 „ll
Jl
x
l919woi0 apisu/.0–,06
o ` 0'1 l4S uo
1/ a19D1 -S119YS HUD)
c la4a7 1,91,9# 00£99
= +113
00399 OL
albu, tuiy
) 1ap
s,5nld sI-MI'd
BG walJDN 91x11M x Z>
QIA 7d J -N .91/F
DOAZZ
rDcr0o0�'7
rO
�fTt
mDDmmmAmOmm
O=Zp
O
m
(7 r
�
A Z
0 U1
fTl U1
p �
V1 X
X (n
Ul _N
p�K
No�
H
U
CD
K
p n�
N
L7K
z,--
KpG7
C Z
G7O
Z ZC
D
Z o
Z
_�fTl
m
lOJ
m
r p
A m���
�A
y
0
0
0
0
0\\
frl Ul
C
N N
N ..�
O fTl
g
�
d)
0
0
0
O
O
O
O
O
rte
O
N
D
r m,
C
(n
D D
o
a
cvi,
m
�p
D .�
(5w
z —
A
ZC�mD(7r
�
N
DOAZZ
rDcr0o0�'7
rO
�fTt
mDDmmmAmOmm
O=Zp
O
m
(7 r
�
A Z
0 U1
fTl U1
p �
V1 X
X (n
Ul _N
p�K
No�
p
y DOD
CD
K
p n�
N
L7K
z,--
KpG7
C Z
G7O
Z ZC
D
Z o
Z
_�fTl
Corz�—�t<
m
r p
A m���
�A
y
-1
D
r••
m
fTl
A ••
O TI
z n
frl Ul
C
N N
N ..�
O fTl
?
rt
0
0
0
O
O
O
O
O
rte
O
3
D
r m,
C
(n
D D
o
a
cvi,
o
D .�
(5w
z —
A
ZC�mD(7r
�
l J
� 0
0
v
v
w�
O m
w
m
m
w�
C
fAT i p�
D
D D
�
W r
-P '00
N u7
V
mm�
(n
O
O
O
O
O
O
O
Po --4
f�
o
z
�
p�
oaf
Oz
cn
It
Ac,,cAm����
mmAc
N
z
�
Z
mcn
O�pz�mAA
CA
m
D
A !Tl
fTl O
cVnc�c,,
A
m
N
��pp
m
m
�
,a
(iii
CD
3
DOAZZ
rDcr0o0�'7
rO
�fTt
mDDmmmAmOmm
O=Zp
O
m
(7 r
�
A Z
0 U1
fTl U1
p �
V1 X
X (n
Ul _N
p�K
No�
p
y DOD
A �TIK
�
K
p n�
N
L7K
z,--
KpG7
C Z
G7O
Z ZC
D
Z o
Z
_�fTl
Corz�—�t<
m
r p
A m���
�A
y
-1
D
r••
m
fTl
A ••
O TI
z n
frl Ul
C
N N
N ..�
O fTl
fTl O
rt
0
0
0
0
0
�
•O+
,SON
D z
rte
O
m��y�r*i�c�"nn�p�c
D
r m,
C
(n
D D
o
a
cvi,
o
D .�
(5w
z —
A
ZC�mD(7r
�
(D
.-f
� 0
v
v
w�
O m
w
m
m
w�
�D
fAT i p�
D
D D
�
W r
-P '00
N u7
z
p
mm�
(n
n=Dm�KK<
to
N
O
���00�
c,,�
cn
Po --4
f�
o
z
�
p�
oaf
Oz
cn
It
Ac,,cAm����
mmAc
N
z
�
Z
mcn
O�pz�mAA
CA
m
D
A !Tl
fTl O
cVnc�c,,
A
m
��pp
m
m
W
DOAZZ
rDcr0o0�'7
rO
�fTt
mDDmmmAmOmm
O=Zp
O
m
(7 r
�
A Z
0 U1
fTl U1
p �
V1 X
X (n
Ul _N
p�K
No�
p
y DOD
A �TIK
�
K
p n�
N
L7K
z,--
KpG7
C Z
G7O
Z ZC
D
Z o
Z
_�fTl
Corz�—�t<
m
r p
A m���
�A
y
-1
D
r••
m
fTl
A ••
O TI
z n
frl Ul
C
N N
N ..�
O fTl
fTl O
O y
A A
A
p r
CJ
V D
Cl1 K
D
D
N p��
p Ul
m W
D z
rte
O
m��y�r*i�c�"nn�p�c
D
r m,
C
(n
D D
D p
m
l -i
p
o
D .�
(5w
z —
A
ZC�mD(7r
�
a m
AO
� 0
O m
D
�
Z
fAT i p�
D
D D
�
W r
-P '00
N u7
z
p
mm�
(n
n=Dm�KK<
to
N
O
���00�
c,,�
cn
Po --4
f�
o
z
�
p�
oaf
Oz
cn
It
Ac,,cAm����
mmAc
eco?
z
�
Z
mcn
O�pz�mAA
CA
m
D
A !Tl
fTl O
cVnc�c,,
A
m
��pp
(iii
CD
D
D
r
D
�
cn
�
�m
m
r
�
�
O
z
c
m
�
Z
�
Z
II
z
�
0
N
(n
S
D
W
W
$»
/\
y$
}
\$
}
Q
2
-�
2E
(m
■
\\
_
�
2®$
@#
��»�
\
j\
k
¥>
,■
f
�iQ�
m«
_
ƒ
\
±
■
C
°-
"
k
®®�
�
|
\�
t@
�
§
K
§
,_
&,
- - -
-----------------
- - - ----------------
§ g»
2 k(
$ §%
� \_
§°■� k
@§(
§
� �
§`
• �
1
&
j
;
C',
>
&
0
k■Tn
§ @ @!
NE
M
\$
2}2)§/I
ECD
`§ - - -
\
-
w
�
|
---
aDo
&
-'
\
X -r
7f ,
;k /
Cb
C®
I(
Cb /
§ J& -=�-O* &
<
�ƒ
q\
]
■■
S
k
.
7 |
|
|
�
§
� --- — -
�
§
k¥
k
«�
] •, @
�§,$
ƒ�
� 2
�
�
A/ v\
|§
�'
�
a§
!
§
| /
\DO \ /
. .
2,
§
§
K\
1p
2
\
\
t§
?
�
$
1A
/
------------
—
--
\
Z
\
7
,■
-
§§
%
@
c
§
co
§
|
§
�
%
\
¥*
ƒ
k A
-
\
2Cb
�
-;@
@
k �
a �!
— °
� k
-
---
k
%
`
|||
k
,
\DO r
}
#
�
; q
,
|
\
0
z
z
z
M
m
m
co
m
� O
4rn
O
z
I
H
.arc .e.�ena » moem wro VOLAyr rN.VVV
REVISIONS
Wo ZONE ZONE 3 RESERVOIR �' w
m�. 'ROGRESSIVE DESIGN BUILD s 1
FLOOR AND FOUNDATION PLAN �"�� ♦�
N
rn
M
012
IT!
m
13H
0
z
z
v
x1
4 z
m
0
z
-•- —04e $.4 — m I a<.� CITY OF PASCO
N
, q e�JIC wme M4Aa nar.awTxG.ovq
,o t, REVISIONS 0 POO ZONE 3 RESERVOIR w
PROGRESSIVE DESIGN BUILD
FOUNDATION SECTION AND DETAILS e�
T
-
ii
o
•
�
q `� H
u�}��S
13H
0
z
z
v
x1
4 z
m
0
z
-•- —04e $.4 — m I a<.� CITY OF PASCO
N
, q e�JIC wme M4Aa nar.awTxG.ovq
,o t, REVISIONS 0 POO ZONE 3 RESERVOIR w
PROGRESSIVE DESIGN BUILD
FOUNDATION SECTION AND DETAILS e�
T
A
--(P�
CITY OF PASCOWe
/
O, r�YLF wreoe aq4� Here LMOiEffi➢MD
REVISIONS 20NE3RESERVOIR m
» 'ROGRESSIVE DESIGN BUILD
»� RESERVOIR MECHANICAL PLAN AND b
DETAILS N
I 9
_ I M
Z
O
5
mm�1 y
O g�
z
� 9
N
$ IRA -
ypw
Z I
ED
•� w
x 32
V q O
m
m 1
o �� §
,32 a+
=m
O
z
CITY OF PASCO
�
REYIS ZONE 3 RESERVOIR
t PROGRESSIVE DESIGN BUILD
RESERVOIR INLET &OUTLET SECTION
8 w om uoarlu w +�.. --
a
o � �
70
M Y A
m
z � _
O
;V T Fpti LS'
K P
s � 4
�g
�e
1
3 6
A /
1T /
/
CITY OF PASCO
9.
m .�wtF waov� �94ma ,�e�ve LPDAEm1AM, _
<^' Ei
REVISIONS ��D ZONE 3 RESERVOIR m ,
g PROGRESSIVE DESIGN BUILD
RESERVOIR OVERFLOW AND
DRAIN PIPE SECTION N
� t901AY1' M
z I I
I I
c I I
z I I
� I
52 I I
;m
m
ftk= I —W '' ^ CITY OF PASCO
REVISIONS �'- ZONE 3 RESERVOIR ®p`
PROGRESSIVE DESIGN BUILD
CATHODIC PROTECTION PLAN AND
DETAILS N
g
E
EN
IN
z I I
I I
c I I
z I I
� I
52 I I
;m
m
ftk= I —W '' ^ CITY OF PASCO
REVISIONS �'- ZONE 3 RESERVOIR ®p`
PROGRESSIVE DESIGN BUILD
CATHODIC PROTECTION PLAN AND
DETAILS N