HomeMy WebLinkAboutDouble J Excavating - N Industrial Way Stormwater Retrofit & Overlay - Change Order No. 3 (20101)CITY OF PASCO PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO.3 Project No: 24101 Project Title: N Industrial Way Stormwater. Retrofit & Overlay Contractor: Double J Excavating Description of Change: Infiltration Trench Extension Detail as Appropriate: It was necessary to extend the length of the infiltration trench 15' to ensure that flows were adequately handled. This involves crossing an existing gas service line. Contract Bid Amount: $ 503,000.00 SALES TAX @ 8.7%: WA Total: $ 503,000.00 PREVIOUS CHANGE ORDER CURRENT CHANGE ORDER Subtotal $ 3,166.35 Subtotal $ 5,240.00 Sales tax @ 8.7% NIA Sales tax @ 8.7% N/A Total $ 3,166.35 Total $ 51240.00 Total Change Orders To Date $ 8,406.35 New Contract Amount $ 1511,406.35 IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER r—Y-E-6-1 NO Contract Time Prior to this Change Order ................_.............. . 41 Modification to Contract time by this Change Order .................... 1 revised Total Contract Time .................................................... 42 it is mutually agreed by both parties that this Change Order fully describes the change(s) that Is (are) being made and that the compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously executed Contract Documents shall apply to this Change Order. AGREED TO AND ACCEPTED: APPROVED: CONTRACTOR Da MOJECT MANAGER Dabs APPROVED: D' 5 -JZ •2Z C DData—-�� T. MANAGER ate b? DIRECTOR Dais -- F DOUBLE J Fxrmienmr. TO: City of Pasco Attn: Dan Pratt CHANGE PROPOSAL CP: #03 DATE: May 10, 2022 PROJECT NAME: N. Industrial Way Stormwater Retrofit & Overlay Project (No. 20-101) DESCRIPTION: Infiltration Trench Extension This Change Proposal addresses the request by the City of Pasco to extend the infiltration trench at 29+00. DESCRIPTION QTY U/OM RATE TOTAL 1— Mobilization 1 LS $ 1,000.00 $ 1,000.00 10— Underdrain Pipe Infiltration Trench System 12 In. Diam. 20 LF $ 211.00 $ 4,220.00 11— Shoring or Extra Excavation 20 LF $ 1.00 $ 20.00 TOTAL COST $ 5,240.00 ADDITIONAL WORKING DAYS REQUIRED: EXCLUSIONS: Engineering, Solid Rock Hammering/Removal, Utility Company Fees, Apprenticeship Requirements, Overtime Premiums, Sales Tax, and/or Permits. This Change Proposal, when accepted, becomes part of the Project Contact/Agreement. This Change Proposal is considered accepted when work is performed in relation this Change Proposal. Payment in full is due upon completion. Interest may accrue on all invoices that are past due at the rate of 1 %% per month (18% per annum) until paid in full. Respectfully submitted, Cameron Mensonides DOUBLE J EXCAVATING, INC. 2564 ROBERTSON DRIVE • RICHLAND, WA 99364 • (509) 627-2030 • (509) 352-6744 FAx WASHINGTON CONTRACTOR NUMBER: DOUBUE832LL OREGON CCB NUMBER: 231388 PAGE 1 OF 1