Loading...
HomeMy WebLinkAboutDouble J Excavating - N Industrial Way Stormwater Retrofit & Overlay -Monument Replacement - Change Order No. 2 (20101)CITY OF PASCO PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO.2 Project No: 20101 Project Title: N Industrial Way Stormwater Retrofit & Overlay Contractor: Double J Excavating Description of Change: Monument Replacement Detail as Appropriate: Replacement of an existing monument (STA 13+60) that was initially Installed improperly. L-.* qt,;$ -ro-ms Contract Bid Amount: $ 503.000.00 SALES TAX Q 8.7%: NIA Total: $ 503,000.00 PREVIOUS CHANGE ORDER CURRENT CHANGE ORDER Subtotal $ 1,277.65 Subtotal $ 11888.70 Sales tax @ 8.7% NIA Sales tax @ 8.7% NIA rotal $ 1,277.65 Total $ 1,888.70 Total Change Orders To Date $ 3,166.35 New Contract Amount $ 506,166.35 IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER YES NO Contract Time Prior to this Change Order ................................ 41 Modification to Contract time by this Change Order .................... 0 revisedTotal Contract Time .................................................... 41 It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously executed Contract Documents shall apply to this Change Order. AGREED TO AND ACCEPTED: APPROVED: 4gi` � 5 -2 -az coNTRAcrOR Dade PROJECT MANAGER Date DOUBLE J CHANGE VROVOSAI EXCAVATINGDATE: May 2, 2022 TO: City of Pasco Attn: Dan Pratt PROJECT NAME: N. Industrial Way Stormwater Retrofit & Overlay Project (No. 20-101) DESCRIPTION: Monument Replacement This Change Proposal addresses the replacement of an existing monument (STA 13+60) that was initially installed improperly. DESCRIPTION QTY U/OM RATE TOTAL EQUIPMENT 1. CAT 308 Excavator 2 HR $48.77 $ 97.54 2. Service Truck 2 HR $30.00 $ 60.00 EQUIPMENT SUBTOTAL $157.54 MARKUP (10%) $ 15.75 TOTAL EQUIPMENT $173.29 LABOR 1. Excavator Operator 2. Laborer MATERIALS 1. Parts SUBCONTRACTORS 1. Minister & Glaeser Surveying, Inc Administrative 1. Project Manager 2 HR $51.21 $102.42 4 HR $44.04 $176.16 LABOR SUBTOTAL $278.58 MARKUP (10%) $ 27.86 TOTAL LABOR $306.44 1 LS $54.78 $ 54.78 MATERIALS SUBTOTAL $ 54.78 MARKUP (10%) $ 5.48 TOTAL MATERIALS $ 60.26 1 LS $1,150.00 $1,150.00 SUBCONTRACTOR SUBTOTAL $1,150.00 MARKUP (10%) $ 115.00 TOTAL SUBCONTRACTORS $1,265.00 1 HR $59.10 $ 59.10 ADMINISTRATIVE SUBTOTAL $ 59.10 MARKUP (10%) $ 5.91 TOTAL ADMINISTRATIVE $ 65.01 2554 ROBERTSON DRIVE • RICHLAND, WA 99354 • (809) 627-2030 • (509) 352-6744 FAx WASHINGTON CONTRACTOR NUMBER: DOUBLJE832LL OREGON CCB NUMBER: 231388 PAGE 1 OF 2 Equipment $ 173.29 Labor $ 306.44 Materials $ 60.26 Subcontractors $ 1,265.00 Administrative $ 65.01 Total $ 1,870.00 Bond (1%) $ 18.70 TOTAL COST $ 1,888.70 ADDITIONAL WORKING DAYS REQUIRED: 0 EXCLUSIONS: Adjustment Covered in Bid Item 19, Engineering, Solid Rock Hammering/Removal, Utility Company Fees, Apprenticeship Requirements, Overtime Premiums, Sales Tax, and/or Permits. This Change Proposal, when accepted, becomes part of the Project Contact/Agreement. This Change Proposal is considered accepted when work is performed in relation this Change Proposal. Payment in full is due upon completion. Interest may accrue on all invoices that are past due at the rate of I A% per month (18% per annum) until paid in full. Respectfully submitted, Cameron Mensonides DOUBLE J EXCAVATING, INC. 2554 ROBERTSON DRIVE • RICHLAND, WA 99354 • (609) 627-2030 • (609) 352-6744 FAX WASHINGTON CONTRACTOR NUMBER: DOUBUE;8�321-1- OREGON CCB NUMBER: 231388 PAGE 2 OF 2