Loading...
HomeMy WebLinkAboutColumbia River Walk Development - Storm Water Insfrastructure Improvements Agreement - River Walk Apartments((20-242)FILED FOR RECORD AT REQUEST OF: City of Pasco WHEN RECORDED RETURN TO: City of Pasco, Washington 525 North 3rd Pasco WA 99301 Tax Parcel No. 119740033 Legal Description: SHORT PLAT 2020-29 LOT 3 STORM WATER INFRASTRUCTURE IMPROVEMENTS AGREEMENT THIS STORM WATER INFRASTRUCTURE IMPROVEMENTS AGREEMENT entered into this br"' day of , 2022, by and between Columbia River Walk LLC, hereinafter referred to as "Developer", and the City of Pasco, Washington, a Municipal Corporation, hereinafter referred to as "City." WHEREAS, the Developer owns or controls approximately 11 acres of property in the north half of the northeast quarter Section 26, township 9 North, Range 29, East W.M. of the City of Pasco and is in the process of developing a portion of such property; and WHEREAS, the certain real property referred to above is situated within the City limits as designated by Franklin County; and WHEREAS, the Developer, requires additional stormwater retention capacity for their improvements to South 20"' Avenue; and WHEREAS, the Developer has been offered the option to reroute the stormwater to a location on the north side of this intersection that is mutually beneficial; and Developer has, as part of the improvements, a significant amount of Storm Water work (Exhibit B); and WHEREAS, the City desires, by this Storm Water Infrastructure Improvements Agreement, to participate in the cost of the storm water improvements within the intersection of `A' Street and South 20a' Avenue which provides benefit to all parties. Columbia River Walk Apartments Storm Water Infrastructure Improvements Agreement - 1 WHEREAS, the City has determined that the pro rata benefit to the City as a consequence of the additional storm water improvements is approximately $81,000, as this is the estimated fair market value of the materials and labor Developer will be contributing to this project which are in excess of Developer's project requirements. NOW, THEREFORE, and in consideration of the mutual terms and covenants contained herein, the parties agree as follows: 1. Developer Obligations. Developer shall: A. Provide the complete design of the proposed storm water infrastructure improvements by a Professional Engineer registered to practice engineering in the State of Washington. All work shall be in accordance with the current City of Pasco requirements, and standards and specifications, including any applicable or referenced State and Federal requirements and standards. The engineering design, construction plans and specifications shall be submitted to the City for review and/or approval at the final stages of design. B. From the design, as approved by the City, construct the storm water infrastructure improvements in accordance with applicable City, State, and Federal standards and specification requirements. C. Be responsible for all costs of the project, including, but not limited to, expenses relating to engineering, design, administration, legal, materials, labor, permits, reviews and/or approvals from all applicable jurisdictions, and any other project -related costs, except for the costs of the storm water improvements needed to collect, convey, and infiltrate the storm water generated from the intersection of `A' Street and South 201' Avenue, per Section 2E of this Agreement. D. Be responsible for providing the City with a cost estimate for all items included in the terms of this Storm Water Infrastructure Improvements Agreement. The City shall have sole discretion to determine the adequacy of any itemized invoice submitted. Lump sum items are not acceptable. E. Dedicate the storm water infrastructure improvements and all appurtenances thereto, to City at completion of the project, upon inspection and approval by the City. F. Execute all necessary documents, permits, agreements and checklists necessary for the permitting, construction, and conveyance of the storm water infrastructure improvements described above and for the performance of this Agreement. Columbia River Walk Apartments Storm Water Infrastructure Improvements Agreement - 2 G. Warrant the improvements to be free of all defects in materials and labor for one year after acceptance. This warranty shall supplement and be in addition to any and all other legal rights and remedies of the City with respect to with respect to the construction, design, and materials used in the construction of the improvements. 2. City Obligations. City shall: A. Process in its usual course, Developer's applications for plan review and permits associated with the storm water infrastructure improvements described in this Agreement, in a timely manner. B. Provide criteria to be met in order for the Developer to construct the project in compliance with City of Pasco's standards and specifications for storm water infrastructure improvements projects. C. Provide timely reviews of the engineering design, construction plans, and specifications at the time of final submittals. D. Provide inspection services during the course of construction consistent with the level of effort utilized on other capital and development projects within the City, or as may be required to ensure the required quality of the completed work. E. Be responsible for direct reimbursement of certain costs associated with the construction of storm water improvements to South 20th Avenue which are located in the intersection of `A' Street and South 20th Avenue which costs have been evaluated by the City Engineer or his designee for which reimbursements shall not exceed $81,180.00. While this Agreement constitutes a contractual obligation for reimbursement from the City to the Developer for the items stated, timing of the payments will be based upon funds available. Funds are distributed on a first come -first serve basis and payouts cannot exceed the annually budgeted amounts without specific approval. F. Upon satisfactory completion and inspection of the improvements described above, accept the dedication of the storm water infrastructure improvements, and by City Council Resolution accept ownership thereof, and maintenance and operation of the improvements thereafter as is normal procedure for acceptance in Right -of -Way infrastructure Improvements.. Columbia River Walk Apartments Storm Water Infrastructure Improvements Agreement - 3 4. Authority to Approve Agreement. The parties represent and warrant that all steps necessary for the approval of this Agreement have been completed by: A. Columbia River Walk LLC B. City of Pasco The officers signing below are authorized to do so and that the execution of this Storm Water Infrastructure Improvements Agreement is valid and binding for all purposes. 5. General Provisions. A. This Storm Water Infrastructure Improvements Agreement constitutes the entire agreement between the parties, and no prior oral or written agreement shall be valid, and any modifications of this Agreement must be in writing signed by all parties. B. This Storm Water Infrastructure Improvements Agreement shall be binding on the parties, and their heirs, successors and assigns. C. For the purpose of this Agreement, time is of the essence. 6. Dispute Resolution. In the event of a dispute between the parties regarding the interpretation, breach, or enforcement of this Agreement, the parties shall first meet in a good faith effort to resolve the dispute by themselves or with the assistance of a mediator. The remaining dispute shall be resolved by arbitration pursuant to RCW 7.04A, as amended, with all parties waiving the right of a jury trial upon de novo review, with the substantially prevailing party being awarded its reasonable attorney fees and costs against each other. 7. Mutual Cooperation and Further Agreements. The parties agree to cooperate in good faith, with regard to each and every aspect required for the completion of the construction of the storm water infrastructure improvements which are the object of this Agreement and the transfer of property, and to further sign all documents, deeds, and permits that are reasonably necessary to accomplish the purposes of this Agreement. Columbia River Walk Apartments Storm Water Infrastructure Improvements Agreement - 4 DATED this S r,4 day of Ail,, -,1' -- City of Pasco, Washington: By: Title: �f/iZ`�iPit® City Manager City of Pasco 525 N. 3rd Avenue Pasco, WA. 99301 STATE OF WASHINGTON ) : ss COUNTY OF FRANKLIN ) 2022. On this day personally appeared before me '��WA , of the City of Pasco, Washington, described in and who executed the w' inand regoing instrument, and acknowledged that he signed the same as his free and voluntary act and deed for the uses and purposes therein mentioned. �"1„111„I,,,,,,� Columbia River Walk Apartments Storm Water Infrastructure Improvements Agreement - 5 • • •OTA �- N Ry PUBLICS = %0F WAS N���°�• '�'F'oft1Otis sit%%It GIVEN under my hand and ficial seal this _tday of , 2022. V, W � Av�t� 9 " Notary Public in and for - the 1 State of Washington Residing at g � My Commission Expires: b-;, Developer: By: R-) po 6.6o Run Title: gf (cs v Address: 53 o g U CIO S -i &c D {osco ki,✓A -7930) STATE OF WASHINGTON ) : ss COUNTY OF FRANKLIN ) On this day personally appeared before me Derek Alexander, to me known to be the Developer, that executed the foregoing instrument and acknowledged the said instrument to be the free and voluntary act of and deed of said limited liability company, for the uses and purposes therein mentioned. ``�punmu�i�iVEN under my hand ancial seal this day of 1� 2022. �� p 41 NOTARY for the State of Washington �o g : = Residing at: • P%3 W + � �. alk Apartments Storm Water Infrastructure Improvements Agreement - 6 •...••:.�.�`. My Commission Expires: 12-1-22,, Izz_ ATTEST: Debby B h nV City of Pasco City Clerk APP D AS FORM: Kerr guson Law, PLLC of Pasco City Attorney Columbia River Walk Apartments Storm Water Infrastructure Improvements Agreement - 7 Exhibit A - Sheet 1 Page 1 / 1 CRW Costs - 111721 / A St Storm Improvements "A" Street Stormwater Improvements Quote PROJECT: Columbia River Walk Apartments DATE: Nov 17 2021 PROJECT DESCRIPTION: W A. St. and 20th Ave Stormwater Improvements CLIENT: Columbia River Walk Development CLIENT PROJ. NO, 21-318 ITEM NO. DESCRIPTION SCHEDULE OF VALUES QUANTITY I UNIT UNIT PRICEI TOTAL COST STORM DRAIN 1 Dig & Verify / Connect to Existing 1 EA $1,150 $1,150 2 Type 2 Precast Conc Catch Basin 1 EA $3,900 $3,900 3 12" ASTM D3034, SDR 35 PVC Drain Pipe 20 LF $150 $3,000. 4 Infiltration Trench 100 LF $300 $30,000, 5 Cut & Patch HMA Repair (4" depth) 200 Sy $65 $13,000; 6 Traffic Control 1 LS $8,700 $8,700 Subtotal $59,750 Sales Tax (8.6°.6) $5,139 CONSTRUCTION SUBTOTAL $sa,8as PROJECT TOTAL Page 1 / 1 CRW Costs - 111721 / A St Storm Improvements Exhibit A - Sheet 2 Non -Columbia River Walk 20th Ave Paving Costs PROJECT: Columbia River Walk Apartments DATE: Nov 17 2021 PROJECT DESCRIPTION: Frontage Paving for Property East of 20th Ave Centerline CLIENT: Columbia River Walk Development CLIENT PROD. NO. 20-242 ITEM NO. DESCRIPTION SCHEDULE OF VALUES QUANTITY UNIT UNIT PRICE TOTAL COST STORM DRAIN 1 Roadway Paving (2.5" depth) 59 TON $125 $7,338 2 Crushed Surfacing Top Course (2" depth) 45 TON $50 $2,230 3 Crushed Surfacing Base Course (6" depth) 134 TON $35 $4,683 4 Adjust existing drywell on the East of Center Line 1 EA $750 $750 Subtotal $15,001 Sales Tax (8.6%) $1,290 CONSTRUCTION SUBTOTAL $16,291 PROJECT TOTAL Page 1 / 1 CRW Costs - 111721 /North Coast Electric Frontage Exhibit B Page 1 / 1 CRW Costs • 111721 / 20th Ave Storm Improvements 20th Ave Street - Stormwater Improvement Costs PROJECT: Columbia River Walk Apartments DATE: Nov 17 2021 PROJECT DESCRIPTION: 20th Ave Stormwater Improvements CLIENT: Columbia River Walk Development CLIENT PROJ. NO. 20-242 ITEM NO. DESCRIPTION QUANTITY SCHEDULE OF VALUES UNIT UNIT PRICEI TOTAL COST STORM DRAIN 1 Type 1 Precast Conc Catch Basin 4 EA $1,400 $5,600 2 Type 2 Precast Conc Catch Basin 2 EA $3,400 $6,800 3 12" ASTM D3034, SDR 35 PVC Drain Pipe 182 LF $140 $25,480 4 Infiltration Trench 120 LF $300 $36,000 5 Roadway Paving (2.5" depth) 317 TON $125 $39,625 6 Crushed Surfacing Top Course (2" depth) 241 TON $50 $12,050 7 Crushed Surfacing Base Course (6" depth) 723 TON $35 $25,305 8 Adjust existing drywell on the East of Center Line 1 EA $750 $750 Subtotal $151,610 Sales Tax (8.6%) $13,038 CONSTRUCTION SUBTOTAL $164,648 PROJECT TOTAL Page 1 / 1 CRW Costs • 111721 / 20th Ave Storm Improvements STORMWATER NOTES: sDt EXISTING 10' SD CULVERT PIPE sD2 DIG AND VERIFY 10' SD PIPE BURY DEPTH AND DIAMETER AND INSTALL TYPE 2 CATCH BASIN PER COP DETAIL SD -2. soa PLUG AND ABANDON 10' SO PIPE OUTLET W/MIN. 2 PIPE DIAM. COMMERCIAL CONC. INSTALL 20LF 12 -IN DIAM PVC SO PIPE PER COP DETAIL SS -5, TYP. TRENCH SECTION sDs 12' x 12' PVC GASKETED SDR 35 TEE sos 12' PVC 90 -DEG GASKETED SDR 35 ELBOW sD7 (2) 50 -LF INFILTRATION TRENCH PER COP DETAIL SD -3 GENERAL NOTES: c, EXISTING 20' DI WATER MAIN, RETAIN AND PROTECT Gz EXISTING 36' CONC SEWER MAIN, RETAIN AND PROTECT Ga EXISTING 6' DI WATER MAIN, RETAIN AND PROTECT O PAVE ALL DISTURBED WORK AREA PER COP DETAIL ST -3, TRENCH SURFACING REPAIR, MATCH EXISTING GRADES G5 EXISTING HYDRANT O PROJECT STATIONING: EXISTING MON. 2+12.00 G7 BACKFILL PIPE CROSSING WITH CDF, MIN. 10 -FT WIDTH & LENGTH I � N - --- G2 S.O•� 50.0' I 2+00 2+12 G6 'n' •�' -- +i _ F- ---- r wi W A STREET ------ ----------------- / vi —�SD2 ('c' Ilk SCGZ) SD7 -j -1 _._ � - "'R/W----r.-_�ji-- '-k+.•j._-__ � 1 / e". \.,�,Ti II _ - r ` t l :r - _Up1, 345 345 --------- EXISTING GROUND AT CL -- ---------------------------------.----- ----------------------------- --- --- --------------'- -- ------- --.......------- -------------- ------------------------------- -- 19 LF 12" SDR351 'S-- - APPROXIMATE LOCATION- EXISTING 20" WATER MAIN ASTM D3034 @ 0.00% \ ....................------------- --- -------- -- ----- ._.........._..__..-- ._._...._..._._._ 340 340 EXISTING 6" FIRE 335 335 HYDRANT PIPE --- -- -- ------ ------------ - ...------ -------- -------------- ------ (2) 50 FL INFILTRATION TRENCH ...............------- ------------- ------------------- -------------- ---------- -------- ---------------------------------------------------- ------------------ --------------- -------------- --------------------- ---------------- ------------------ ----------------------------------------- --------------------- ---------------------- ------------- ._-------- ----------------- N zo 330 N 330 ------------------ o.------- -------------------------------- ----------------- c�---------- ----------- 3 -------------- --------------- EXISTING 36" SEWER z N w N v o of U � .................. W IR m ......_.. ..- __......... ....... _.......... ±M� +M� =±M STORMWATER Z------------------ ---------------- z f Z --------- ----------- _ .. = p ...... w�zy o��zz W�K, MN-~ N��-- IMPROVEMENT PLAN 325 325 — 08 mm dam o88 o� N O(� c� cz c� 0(� c+ 10 0 10 20 yj LL ((�� W� LL W LL 811 t+oo 1+50 2+00 2+12 SCALE BAR CALL BEFORE YOU DIG DRAWINGS PREPARED BY TRI -CITIES ENGINEERING, PLLC ARE INSTRUMENTS OF SERVICE FOR USE SOLELY WITH RESPECT TO THE REAL PROPERTY IDENTIFIED HEREIN. DRAWINGS SHALL NOT BE COPIED OR REPRODUCED WITHOUT EXPRESSED WRITTEN CONSENT OF TRI -CITIES ENGINEERING, PLLC. N C O O N .5 U m 2 N c •c o� rn c � 'rn ¢ ro 3 m O 'v ¢a� 0 H w 5� V) Im o �co �o vm 06 coO La Ll S o_ PROJ. NO.: 20-242 Z 6/29/21 W RR W STT REV. NO: - W a Q Z 0 0a.. N H Q Q W W d7 >N y I.J.. >< a> cc a 3 O W0tn W ¢oa a 04 C:) C0 O U) W ® �- Z Z o Q LL F— w o Z Q LU o � � N C O O N .5 U m 2 N c •c o� rn c � 'rn ¢ ro 3 m O 'v ¢a� 0 H w 5� V) Im o �co �o vm 06 coO La Ll S o_ PROJ. NO.: 20-242 DATE: 6/29/21 CHKD BY: RR DRAWN BY: STT REV. NO: - SHEET NUMBER C-1.0