WHEREAS, the City and RH2 Engineering entered into a Professional Services
Agreement on August 10, 2021 to provide Engineering services with respect to the Process Water
Reuse Facility (PWRF) Improvements project; and
WHEREAS as the Phase 1 project progressed, RH2 Engineering and City Staff identified
additional need for winter storage capacity; and
WHEREAS, Consultant and City have identified a total winter storage need of up to b70
million gallons which represents 470 million gallons of additional storage from the previous
estimate of 200 million gallons; and
WHEREAS, the City and RH2 Engineering desire to enter into an Amendment to the
Professional Services Agreement in order to carry out the intent of providing sufficient winter
storage capacity for the City's PWRF.
NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PASCO, WASHINGTON:
That this agreement is amended to allow RH2 Engineering to provide additional design
and right-of-way services a(scope& fee) as described within Exhibit A.
Be It Further Resolved that the City Manager of the City of Pasco,Washington,is hereby
authorized, empowered, and directed to sign and execute said Amendment on behalf of the City
of Pasco; and to make minor substantive changes as necessary to execute the Agreement.
Resolution-PWRF Phase 2 Amendment w/RH2- 1
PASSED by the City Council of the City of Pasco, Washington this 2na day of May, 2022.
Blanche Barajas
Mayor
ATTEST: APPROVED AS TO FORM:
���
��--� , -�
Debra Barham, CMC Kerr Fer aw, PLLC
City Clerk City Attorney
Resolution-PWRF Phase 2 Amendment w/RH2-2
AMENDMENT NUMBER 1 to
PROFESSIONAL SERVICES AGREEMENT
Process Water Reuse Facility Pretreatment Improvements—Phase 2: Winter Storage
Project No. 21298
AGREEMENT NO.21-039
WHEREAS,the City and RH2 Engineering, Inc., entered into a Professional Services
Agreement on 8/10/2021 to provide engineering services with respect to the Process Water
Reuse Facility(PWRF) Improvements project.
WHEREAS as the Phase 2 project progressed RH2 Engineering and City Staff have
identified an additional need for winter storage capacity; and
WHEREAS, Consultant and City have identified a total winter storage need of up to 670
million gallons which represents 470 million gallons of additional storage from the previous
estimate of 200 million gallons; and
WHEREAS, in order to carry out the intent of providing sufficient winter storage
capacity for the Cities PWRF the current Agreement needs to be modified to account for this
necessary additional capacity identified during Phase 2; and
NOW, THEREFORE, this agreement is amended to allow RH2 Engineering, Inc., to
provide additional professional engineering services as described in Exhibit A
1. Scoae of Work•
See Exhibit A.
2. Fee:
The compensation for the additional work is based on a Time &Materials Basis of
$267,625.00, increasing the overall total authorization amount to $690,167.00
3. Time of erformance:
The services shall be complete for the project on or before 12/31/2024.
DATED THIS DAY OF , 2022.
CITY OF PASCO: CONSULTANT
City of Pasco RH2 Engineering, Inc.
Dave Zabell—City Manager Paul Cross, PE—Principal
Amendment No. 1 to Professional Services Agreement Page 1
RH2 Engineering,Inc.
Process Water Reuse Facility Pretreatment Improvements—Phase 2:Winter Storage
EXHIBIT A
Scope of Work
Amendment No. 1
City of Pasco
Process Water Reuse Facility (PWRF� Improvements
Winter Storage
March 2022
Background
The City of Pasco (City) previously contracted with RH2 Engineering, Inc., (RH2) to design
approximately 200 million gallons (MG) of winter storage for the PWRF for winter process water. As
the project has progressed,the total winter storage needs have increased to as much as 670 MG and
have required the acquisition of an additional 240 acres of property from the US Bureau of
Reclamation (Reclamation).
These requested changes have been assimilated into RH2's design budget, but significantly larger
roles for subconsultants have been required as indicated in the following subtasks.
Task 2—Subsurface Investigation
Objective: Perform subsurface investigations and add additional dam safety expertise to the team
necessary to address the significant increase in winter storage and embankment design.
Approach:
2.6 Subcontract with Shannon & Wilson, Inc., to perform geotechnical review of additional
drilling and advise the design team on embankment design, side slopes, and geotechnical
protection.
2.7 Increase the number of geotechnical drilling cores necessary for the increased storage
volume.
Assumptions:
• Eight(8)additional borings are proposed for the site.
• No groundwater observations wells will be insralled.
• Dam failure analysis is not included in this Scope of Work.
RH2 Deliverables:
• Geotechnical Engineering Report in electronic PDF.
• Laboratory testing.
1
City of Pasco Exhibit A—Scope of Work
PWRF Improvements—Winter Storage Amendment No. 1
Task 3—Suppiemental Survey Information
Objective: Provide boundary and topographic surveys of the additional 240 acres of property to be
acquired from Reclamation.
Approach:
3.4 Provide boundary and topographic surveys of 240 acres of Reclamation property in the
vicinity of the PWRF facility.
Assumptions:
• The additiona!fee required for this work is being offset by other survey costs that have been
avoided as the contract has evolved in concert with the Phase 1 contract.
RH2 Deliverables:
� Property and topographic surveys in AutoCAD and electronic PDF.
Task 4— Permitting Assistance
Objective: Provide additional cultural review and environmental support assistance for the
Washington State Department of Ecology (Ecology) and Reclamation as required by the funding and
property acquisition requirements.
Approach:
4.5 Perform a cultural review and survey of up to 240 acres of additional Reclamation land and
prepare reports meeting Reclamation environmental requirements.
4.6 Assist the City with State Environmental Review Process (SERP) and National Fire Protection
Association (NEPA) reporting requirements meeting Reclamation and Ecology requirements
for the property acquisitions and funding.
Assumptions:
• No archaeological artifacts of significance or historic structures will be found on the sites.
• Biologica! assessments for burrowing owls and monarch butterfly species of interest will be
performed but no findings are anticipated.
• No additional mitigation efforts are included in this Scope of Work.
RH2 Deliverables:
• Draft purpose and need chapters for Reclamation use in the environmental assessment in
electronic PDF.
• Cross cutting documents for Ecology requirements in electronic PDF.
2
EXHIBIT B
Fee Estimate
AmendmeM No.l
City of Pasco
PWRF Improvements-Winter Storage
Mar-22
Total TotalLabor TotalSubconSukaM TotalExpense TotalCost
Description Hours
7ask 2 Subsurface Imrest ation S - S 186 185 $ • S 186 185
2.6 _ �Subcontract to perform additional geotechnical review - $ - $ 151,665 $ - S __ 151,685
2.7 �Increase drilling mres necessary for increased storage � _ �$ -' $ 34,500 5 = $ 34,500
Task3 Su IemenWlSurve Informadon - S $ �•�
3.4 _:Prowvde additional survey for Reclamation 240 acres(no wst char�e)_ _ _ - 5 - 5 -� 5 -. _ _ 5a.00
Task 4 Permittin Assistance 130 $ 22 430 56,390 S 2 620 $ 81440
4.5 Perform cultural review and survey of Reclamation acres I - I $ - $ 56,390 I $ $ 56,390
�' 4.6 Assistw�ndNEPAreportassistance � 130 I $ 22,430 $ -i $ 2,620 S_ _ 25,050
'' — — -
PROJECTTOTAL 130 $ 22,430 $ 242,575 $ 2,620 $ 267,625
RH2 ENGINEERING, INC.
2022 SCHEDULE OF RATES AND CHARGES
RATE LIST RATE UNIT
Professional I $150 $/hr
Professionalll $164 $/hr
Professional III $177 $/hr
ProfessionallV $195 $/hr
ProfessionalV $207 $/hr
ProfessionalVl $224 $/hr
Professional VII $236 $/hr
Professional VIII $246 $/hr
ProfessionallX $246 $/hr
Control Specialist I $136 $/hr
Control Specialist II $147 $/hr
Control Specialist III $161 $/hr
Control S ecialist IV $177 $/hr
Control Specialist V $187 $/hr
Control S ecialist VI $200 $/hr
Control S ecialist VII $213 $/hr
Control Specialist VIII $224 $/hr
Technician I $113 $/hr
Technician II $124 $/hr
Technician 111 $142 $/hr
Technician IV $152 $/hr
Technician V $167 $/hr
Technician VI $183 $/hr
Technician VII $198 $/hr
Technician VIII $207 $/hr
Administrative I $75 $/hr
Administrative II $88 $/hr
Administrative III $103 $/hr
Administrative IV $123 $/hr
Administrative V $145 $/hr
CAD/GIS S stem $27.50 $/hr
CAD Plots-Half Size $2.50 price per lot
CAD Plots-Full Size $10.00 price per plot
CAD Plots-Lar e $25.00 price per plot
Co ies(bw)8.5"X 11" $0.09 rice er co
Copies(bw 8.5"X 14" $0.14 rice per co y
Co ies bw 11"X 17" $0.20 price per cop
Co ies(color)8.5"X 11" $0.90 rice er co y
Copies(color 8.5"X 14" $1.20 price per copy
Co ies color 11"X 17" $2.00 price per co
Technology Charge 2.50% %of Direct Labor
price per mile
Mileage $0.5850 (or Current IRS Rate)
Subconsultants 15% Cost+
Outside Services at cost
Rates listed are adjusted annually.